Response to Conceptual Review Letter
Issues raised at the April 20, 1998, Conceptual Review meeting, have been addressed as
follows:
1. Light and Power.
A Utility Coordination Meeting was held with representatives from the City Light and
Power and WateNWastewater Departments, The Writer Corporation, and designers on
May 22, 1998. The concern over locations of the services was addressed. Utility plans
reflect the agreement reached at this meeting.
2. Poudre Fire Authority.
Fire hydrants and the water supply system have been located and designed to meet the
requirements of the Fire Authority.
Alleyways are 20 feet wide.
A Hazardous Material Impact Analysis will be submitted with construction documents.
3. Engineering:
A Traffic Impact Analysis is included in this submittal.
Additional right-of-way for Timberline has been accommodated.
4. Zoning:
The Landscape Plan has been revised to illustrate the requested and required elements.
Trash collection services have not yet been established. Plans are to contract with one
company for curbside service to avoid the necessity for dumpsters.
Bicycles are expected to be parked inside the private garages.
5. Water/Wastewater.
A copy of the Homeowner's Association documents will be provided upon its completion
if it becomes necessary.
The irrigation systems and landscaping have been designed to meet the City's water
conservation standards.
6. Stormwater Utility:
Drainage and erosion control reports and plans are included with this submittal.
7. Current Planning:
A neighborhood meeting will be scheduled as needed.
8. Comment #10:
A request for Partial Abandonment of the Stetson Creek ODP was submitted on May 30,
1998, and is expected on the June 181h Planning Commission agenda.
9. All impact and application fees will be paid upon request.
Commufay Planning and Environmental Wices
Current Planning
City of Fort Collins
May 8, 1998
Eldon Ward
Cityscape Urban Design, Inc.
3555 Stanford Road, Suite 105
Fort Collins, CO. 80525
Dear Eldon,
For your information, attached is a copy of the Staff s comments concerning the request
for the Stetson Creek PUD, Fifth Filing, which was presented before the Conceptual
Review Team on April 20, 1998.
This is a request for 102 residential townhomes on 12.96 acres located at the northeast
corner of Timberline Road and Stetson Creek Drive. The property is in the LMN - Low
Density Mixed Use Neighborhood Zoning District.
The comments are offered informally by Staff to assist you in preparing the detailed
components of the project application. Modifications and additions to these comments
may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in the
review process, please feel free to call me at 221-6750.
Sin erely,
eve Olt,
Project Planner
cc: Stormwater Utility
Streets
File
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (1)70) 221-6750 o FAX (970) 416-2020
i
MEETING DATE:
ITEM:
APPLICANT:
LAND USE DATA:
April 20, 1998
Stetson Creek PUD, Fifth Filing
Eldon Ward
Cityscape Urban Design, Inc.
3555 Stanford Road, Suite 105
Fort Collins, CO. 80525
Request for 102 residential townhomes on 12.96 acres located at the northeast corner
of Timberline Road and Stetson Creek Drive. The property is in the LMN - Low Density
Mixed Use Neighborhood Zoning District.
COMMENTS:
Bruce Vogel of the Light & Power Department offered the following comments:
a. The locations for electric services in this development could be a real
challenge. A utility coordination meeting needs to be scheduled right away
to discuss the issues here.
b. The normal electric development charges will apply to this project.
Please contact Bruce, at 221-6700, if you have questions about these
comments.
2. Ron Gonzales of the Poudre Fire Authority offered the following comments:
a. Fire hydrants must be spaced at 800' in this development and a hydrant
must be within 400' of each building. They must provide fire flows of 1,000
gallon per minute at a residual pressure of 20 pounds per square inch.
b. The alleyways must be a minimum of 20' wide and must always remain
unobstructed.
C. A Hazardous Materials Impact Analysis is needed for the swimming pool
facility.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750
CURRENT PLANNING DEPARTMENT
0
Cl
Please contact Ron, at 221-6570, if you have questions about these comments.
3. Mike Coley of the Engineering Department offered the following comments:
a. A Transportation Impact Analysis is required with your Project
Development Plan (PDP) submittal. Please contact Eric Bracke, at 221-
6062, to schedule a "scoping" meeting to discuss the information needed
in the analysis.
b. The proposed alleyways will be OK, if they can meet the access and utility
requirements.
C. Street oversizing fees of $901 per dwelling unit will apply to this
development. The fees will be collected at the time of issuance of building
permits. New fees were recently approved by City Council, and they are
now based on vehicle trip generations by the development.
d. The standard utility plan requirements must be submitted to the City for
review and approval.
e. Additional right-of-way may be needed for Timberline Road.
f. A utility coordination meeting is needed and should be scheduled as soon
as possible if this development is to move ahead.
Mike is no longer with the City, so please contact Dave Stringer, at 221-6750, if
you have questions about these comments.
4. Jenny Nuckols of the Zoning Department offered the following comments:
a. This property is in the LMN - Low Density Mixed Use Neighborhood
Zoning District and the proposed townhomes would be subject to a Type I,
administrative review and approval.
b. The Landscape Plan must show "typical" foundation planting schemes.
C. More trees are needed along timberline Road than are shown on the
concept plan.
d. What is the plan for trash collection service for this development? An
attempt to minimize the number of trash collection companies should be
made.
e. Bicycle parking must be placed in safe and convenient locations.
Please contact Jenny, at 221-6760, if you have questions about these
•
comments.
5. Roger Buffington of the Water/Wastewater Department offered the following
comments:
a. Existing 8" water and existing 8" sanitary sewer mains in Stetson Creek
Drive have been stubbed to the north at the proposed drive locations and
at one point between the drives.
b. The water and sanitary sewer main stubs between the proposed drives
must be abandoned at the mains.
C. If only one water and one sanitary sewer service are proposed for each
building (with multiple dwelling units), then a copy of the Homeowner's
Association documents must be submitted to the City for review of the
water and sanitary sewer payment responsibilities.
d. A utility coordination meeting will be required for this project.
e. The City's water conservation standards for landscaping and irrigation
systems will apply to this site. Information on these standards can be
obtained at the Water Department and the Current Planning Department.
Plant investment fees and water rights will apply to this development and
they will be due at time of issuance of building permits.
Please contact Roger, at 221-6681, if you have questions about these
comments.
6. Matt Fater of the Stormwater Utility offered the following comments:
a. The site is located within the McClellands/Mail Creek Basin, where the
new development fee is $3,717 per acre and that is subject to the runoff
coefficient reduction. The site is also located within inventory grid #12R.
b. The standard drainage and erosion control reports and plans are required
and they must be prepared by a professional engineer registered in the
State of Colorado.
C. Water quality needs to be considered and addressed in some way.
Extended stormwater detention is a recommended method and detention
is required in addition to the site requirements.
d. The overall Stetson Creek ODP and First filing drainage report should be
referred to. There is an existing SWMM Model for this area. On -site
detention with a 0.5 cfs/acre release rate, is required, but the Stetson
Creek ODP drainage report should be referred to.
Please contact Matt, at 221-6589, if you have questions about these comments.
7. Janet Meisel of the Parks Planning Department stated that this development
would be subject to both the [per dwelling unit] neighborhood parkland and
community parkland fees and they are determined by the square footage of each
dwelling unit.
8. A neighborhood meeting should be held for this development proposal prior to
formal submittal of the request (Section 2.2.2 of the LUC). Please contact Steve
Olt of the Current Planning Department to assist you in scheduling this
meeting. He can be reached at 221-6341.
9. This development request will be subject to the Development Review Fee
Schedule that is available in the Current Planning Department office. The fees
are due at the time of submittal of the required documents for the Overall
Development Plan, Project Development Plan, and Final Compliance phases of
development review by City staff and affected outside reviewing agencies.
10. This development proposal is not in conformance with the approved ODP in that
the easterly 5 acres is approved for single family residential, not townhomes. The
ODP cannot be amended at this time; therefore, this portion may have to be
abandoned.