HomeMy WebLinkAboutSTETSON CREEK PUD, THIRD FILING - FINAL - 16-89J - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTFinal Drainage Report
for
Stetson Creek Third Piling P.U.D.
City of Fort Collins, Colorado
January 22, 1996
Prepared For:
Geneva Corporation
344 East Foothills Parkway, Suite 12
Fort Collins, Colorado 80525
Prepared By:
Northern Engineering Services, Inc.
420 South Howes, Suite 202
Fort Collins, Colorado 80521
(970)221-4158
Fax (970)221-4159
Project Number: 9601.00
First Final Submittal
Northern Engineering Services, Inc.
January 22, 1996
City of Fort Collins
Stormwater Utility
235 Mathews
Fort Collins, Colorado 80522
RE: Stetson Creek Third Filing P.U.D.
Fort Collins, Colorado
Project Number: 9601.00
Dear Staff:
Northern Engineering is pleased to submit this Final Drainage Report for
Stetson Creek Third Filing P.U.D. for your review.
This report was prepared in compliance with technical criteria set forth in the
City of Fort Collins Storm Drainage Design Criteria and Construction Standards
manual.
If you should have any questions or comments as you review this report, please
feel free to contact me at your convenience.
Sincerely,
NORTHERN EN,
Mary B. Wohnra(
ES, INC.
420 S. Howes, Suite 202 • Fort Collins, Colorado 80521 • (970) 221-4158 • Fax (970) 221-4159
No Text
Final Drainage Report
for
Stetson Creek Third Filing P.U.D.
I. INTRODUCTION
1.1 Objective
To provide a final drainage scheme for the proposed Stetson Creek Third
Filing planned unit development based on master drainageway planning and overall/
preliminary drainage concepts developed by others. Specific objectives as part of this
study are:
1. To adopt the drainage concepts contained in the
Overall/Preliminary Drainage and Erosion Control Study for
Stetson Creek P.U.D., (Reference 1),
2. To consider the drainage schemes of all adjacent developments
(References' 2 3),
3. To acknowledge SWV, modeling condo-: ted by RBD, Inc. for the
Stetson Creek and Timber Creek developments,
4. To consider any possible adverse effects downstream of the
development due to developed stormwater,
1.2 Mapping and Surveying
A field survey of the site was conducted by Landstar Surveying, Inc.
Loveland, Colorado in December, 1995. Based on this field survey information,
topographic mapping was computer generated by Landstar Surveying with a contour
interval of one (1) foot.
1.3 Site Reconnaissance
A site visit was conducted on Wednesday January 10, 1996 by the
project engineer. Based on the topographic mapping, existing drainage basins and
land use were confirmed as well as existing structures. The location and dimensions
of existing culverts and storm inlets were verified as well as their condition and flow
direction.
Stetson Creek Third Filing P.U.D. Page 2
Final Drainage Report
II. SITE LOCATION AND DESCRIPTION
2.1 Site Location
The project is located in the West Half of Section 5, Township 6 North,
Range 68 West of the 6th Principal Meridian in Fort Collins, Colorado. The project is
bounded by Timberline Road to the west and Harmony Road on the north. (See
Vicinity Map). Adjacent developments include Timber Creek P.U.D. to the north and
Stetson Creek P.U.D. First Filing to the west.
2.2 Site Description
Stetson Creek Third Filing P.U.D. is approximately 22.633 acres and has
historically been furrowed agricultural land. The site has been previously overlot
graded as part of both Timber Creek P.U.D. and Stetson Creek First Filing P.U.D.
construction and is currently covered with temporary vegetation. The McClellands
Basin Drainageway is located south of the site and flows from west to east.
2.3 Irrigation Ditches and Reservoirs
The Dixon Canyon irrigation lateral currently parallels the site (off -site) adjacent
the east propertyline flowing from to north to south. This lateral will not require
relocation or modification as part of the development of the Third Filing. Detention
Pond #373 , constructed as part of Timber Creek P.U.D., is located in the southeast
corner of the site and detains stormwater from portions of Stetson Creek First Filing
P.U.D., all of Timber Creek P.U.D. and the proposed Stetson Creek Third Filing
P.U.D.. This pond will not require modification as part of the development of the Third
Filing.
III. HISTORIC DRAINAGE BASIN
3.1 Moor Basin Description
The site is located in the McClellands Drainage Basin and is included in the
report entitled McClellands Basin Master Drainage Plan, by Greenhorne & O'Mara,
Inc., June 20, 1986 . SWMM modeling for this basin has been updated by RBD, Inc.
Engineering Consultants as part of the Stetson Creek First Filing P.U.D. and
incorporates both the Timber Creek and Stetson Creek developments. The Stetson
Creek Third Filing site is included in the modeling as part of Subcatchment 314 (See
Appendix, page 25). Modifications to the SWMM model will not be necessary in
connection with this submittal.
Stetson Creek Third Filing P.U.D.
Page 3
Final Drainage Report
3.2 Historic Drainage Patterns
The site has historically drained from northwest to southeast at a very gradual
slope of approximately 1%.
IV. DEVELOPED DRAINAGE BASIN
4.1 Developed Conditions
The proposed development of the site includes:
• new local and collector streets,
• new water services and sanitary sewer,
• and culvert crossings,
4.2 Design Criteria and References
Drainage criteria outlined in both the City of Fort Collins Storm Drainage Design
Criteria Manual (SDDCM) and Storm Drainage Criteria Manual by the Urban Drainage
and Flood Control District have been referenced for this Final Drainage Study.
4.3 Hydrologic Criteria
The Rational Method has been used to estimate peak stormwater runoff from
the developed site. The initial 2-year and major 100-year design storms have been
used in the evaluation of the proposed drainage system. Rainfall intensity data for the
Rational Method has been taken from Figure 3-1 of SDDCM.
Culvert 228 has been sized for a future 10-year storm, including off -site flows,
with no overtopping of Rock Creek Drive and for
sized 0-year storm with less fort he 100 y storm with aa 0.5'
of water over the crown. Culvert 706 has been
maximum depth of 0.50' over the crown in Stetson Creek Drive.
4.4 Hydraulic Criteria
The City of Fort Collins Storm Drainage Design Criteria has been referenced for
all hydraulic calculations. In addition, the following computer programs have been
utilized:
• The computer program "HY8" by the U.S. Department of
Transportation, Federal Highway Administration has been used to
size all culvert crossing,
• The computer program "UDINLET" has been used to analyze
sidewalk culvert capacities,
Stetson Creek Third Filing P.U.D. Page 4
Final Drainage Report
• The computer program "Flowmaster" has been used to analyze
the capacity of proposed swales,
4.5 Drainage Concept
Developed stormwater from Stetson Creek Third Filing will be conveyed
overland to Detention Pond #373 via curb and gutter and grasslined swales. Pond
#373 was designed and constructed as part of Timber Creek First Filing P.U.D. and
was intended to detain stormwater runoff from the Stetson Creek Third Filing site. An
existing swale (#167) was also constructed which leads from Timber Creek to Pond
#373 and will not be altered as part of the Third Filing improvements.
Off -site stormwater entering from the north (Timber Creek P.U.D.) and west
(Stetson Creek First Filing P.U.D.) from adjacent developments is also conveyed to
Pond #373 via existing streets, swales and storm sewer.
The existing storm sewer line in Stetson Creek Drive from Stetson Creek First
Filing will not be extended. Culvert 706 has been sized to include the 100-yr
discharge of 34.17 cfs from the existing storm sewer.
V. EROSION CONTROL
5.1 Erosion Control Plan
Permanent riprap will be provided at the outlet of all sidewalk culverts and at
the outlet of Culvert 706. Grass -lined swales shall be seeded immediately upon
completion with the permanent seed mix specified on the Grading Plan.
Temporary sediment control consisting of straw bale dikes will be used in
swales until permanent vegetation is established. Gravel filters will be required at all
curb inlets.
VI. CONCLUSIONS
6.1 Compliance with Standards
All drainage analyses have been performed according to the City of Fort Collins
Storm Drainage Design Criteria Manual (SDDCM) and the Urban Drainage and Flood
Control District's Drainage Criteria Manual.
Stetson Creek Third Filing P.U.D.
Final Drainage Report
Page 5
REFERENCES
1. Overall/Preliminary Drainage and Erosion Control Study for
Stetson Creek P.U.D., Fort Collins, Colorado, RBD, Inc.
Engineering Consultants, December, 1993.
2. Final Drainage and Erosion Control Study for Stetson Creek
P.U.D. First Filing, Fort Collins, Colorado, RBD, Inc.
Engineering Consultants, August 29, 1994.
3. Final Drainage and Erosion Control Study for Timber Creek
P.U.D. First Filing, Fort Collins, Colorado, RBD, Inc.
Engineering Consultants, April 7, 1994.
4. McClellands Basin Master Drainage Plan, Greenhorne &
O'Mara, Inc., June 20, 1986.
5. Storm Drainage Design Criteria and Construction
Standards, City of Fort Collins, Colorado, May, 1984.
6. Drainage Criteria Maunal, Urban Drainage and Flood
Control District, Wright -McLaughlin Engineers, Denver,
Colorado, March, 1969.