Loading...
HomeMy WebLinkAboutSTETSON CREEK PUD, SECOND FILING - FINAL - 16-89H - CORRESPONDENCE - MEETING COMMUNICATION• i ene�� H•O•M•E•S 344 E. Foothills Pkwy. ( i Suite 12 .0� Fort Collins, CO 80525 970/225-9810 February 27, 1996 Mr. Ted Shepard City of Fort Collins P.O. Box 580 Fort Collins, CO 80522-0580 RE: Stetson Creek 2nd Filing Staff Review Comments Dear Ted, A meeting was held last spring prior to submitting the second filing to the City with the adjacent homeowners in the Blehm and Scheller subdivisions regarding the location and ownership of the tail water ditch and fence that divides Stetson Creek from the properties to the South. As I recall all but one homeowner was present at the meeting. I presented the following arrangement: Geneva will construct a concrete drainage pan at the approximate location of the current ditch. Geneva will install a 6 ft privacy fence on the rear property lines of the lots in filing two. Property owners in the Blehm and Scheller subdivisions will be responsible for their own perimeter fences as they currently are. The concrete pan and space between the two fences will be maintained by the Stetson Creek Homeowners Association. It appeared as if everyone liked the plan and no objections were voiced. After some discussion the plan was approved by everyone present. Please let me know if you need further details. a Gary Hover 'Vice President GH/dr