HomeMy WebLinkAboutSTETSON CREEK PUD, SECOND FILING - FINAL - 16-89H - CORRESPONDENCE - MEETING COMMUNICATION• i
ene��
H•O•M•E•S
344 E. Foothills Pkwy. ( i
Suite 12 .0�
Fort Collins, CO 80525
970/225-9810
February 27, 1996
Mr. Ted Shepard
City of Fort Collins
P.O. Box 580
Fort Collins, CO 80522-0580
RE: Stetson Creek 2nd Filing
Staff Review Comments
Dear Ted,
A meeting was held last spring prior to submitting the second filing to the City with the adjacent
homeowners in the Blehm and Scheller subdivisions regarding the location and ownership of the
tail water ditch and fence that divides Stetson Creek from the properties to the South. As I
recall all but one homeowner was present at the meeting. I presented the following
arrangement:
Geneva will construct a concrete drainage pan at the approximate location of the current ditch.
Geneva will install a 6 ft privacy fence on the rear property lines of the lots in filing two.
Property owners in the Blehm and Scheller subdivisions will be responsible for their own
perimeter fences as they currently are. The concrete pan and space between the two fences will
be maintained by the Stetson Creek Homeowners Association.
It appeared as if everyone liked the plan and no objections were voiced. After some discussion
the plan was approved by everyone present.
Please let me know if you need further details.
a
Gary Hover
'Vice President
GH/dr