Attached are five sets of prints of the Timber Creek First Filing, PUD Site and
Landscape Plans, reflecting revisions made in response to Staff Comments. Additional
information regarding responses to specific comments follows:
2. The Timber Creek intersection with Timberline Road is designed with the same
geometrics that were used in the approved intersection at Stetson Creek and
Timberline Road.
12. The proposed location for the U.S. West equipment cabinet installation has been noted
on the plans.
14. As we discussed with the preliminary PUD, special emphasis has been focused on
enhancing the pedestrian environment along the Tiber Creek - Stetson Creek loop, and
the connection to the adjacent school park. This upgraded walkway system was
proposed for preliminary approval with the understanding that the applicant would not
be asked to provide both a special pedestrian streetscape, and walkways through the
greenbelt areas.
In addition to the connection to the future neighborhood park, we have added a
walkway from the end of Spruce Ridge (now Pole Pine Lane) to Tract B. The other
walkways requested conflict with drainage plans as well as the Preliminary PUD.
Color renderings, 8'/2 x 11 reductions, and ten sets of prints will be provided by
February 22nd as requested.
Thank you for your efforts in the review of this plan.