HomeMy WebLinkAboutKECHTER FARM MIXED-USE TOWNHOMES - FDP210021 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY
This document, together with the concepts and recommendations presented herein, as an instrument of service, is intended only for the
specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization from
Kellar Engineering LLC shall be without liability to Kellar Engineering LLC.
Kechter Townhomes
SW Quadrant of Trilby Road and Ziegler Road, Fort Collins, CO
Traffic Impact Study
KE Job #2021-014
Prepared for:
Black Timber Land Company
417 Jefferson St
Fort Collins, CO 80524
Prepared by:
skellar@kellarengineering.com
www.kellarengineering.com
970.219.1602 phone
February 26, 2021
Sean K. Kellar, PE, PTOE
Kechter Farm Townhomes TIS -Page 1
TABLE OF CONTENTS
Page
1.0 Introduction 3
2.0 Existing Conditions and Roadway Network 3
2.1 Recent Traffic Volumes 3
3.0 Pedestrian Facilities 6
4.0 Proposed Development 6
4.1 Trip Generation 6
4.2 Trip Distribution 6
4.3 Traffic Assignment 7
4.4 Short Range Total Peak Hour Traffic 7
5.0 Traffic Operation Analysis 7
5.1 Analysis Methodology 7
5.2 Intersection Operational Analysis 8
5.3 Access and Intersection Recommendations 8
6.0 Findings 17
List of Figures: Page
Figure 1: Vicinity Map 4
Figure 2: Site Plan 5
Figure 3: Recent Peak Hour Traffic 10
Figure 4: 2025 Background Peak Hour Traffic 11
Figure 5: Trip Distribution 12
Figure 6: Site Generated Traffic 13
Figure 7: 2025 Short Range Total Peak Hour Traffic 14
Kechter Farm Townhomes TIS -Page 2
TABLE OF CONTENTS (continued)
List of Tables: Page
Table 1: Trip Generation 9
Table 2: Recent Peak Hour Operations 15
Table 3: 2025 Background Peak Hour LOS Operations 15
Table 4: 2025 Short Range Total Peak Hour LOS Operations 16
Appendices: Page
Appendix A: Recent Traffic Counts 19
Appendix B: TIS Scoping 22
Appendix C: ITE Code 220 26
Appendix D: Level of Service (LOS) Tables 31
Appendix E: Aerial Image 32
Appendix F: HCM Calculations (Synchro) 34
Kechter Farm Townhomes TIS -Page 3
1.0 Introduction
This Traffic Impact Study (TIS) is for the proposed Kechter Townhomes project located at the
southwest quadrant of Trilby Road and Ziegler Road in Fort Collins, CO. The purpose of this
TIS is to identify project traffic generation characteristics, to identify potential traffic related
impacts on the adjacent street system, and to develop mitigation measures required for
identified traffic impacts.
Kellar Engineering LLC (KE) has prepared the TIS to document the results of anticipated traffic
conditions in accordance with the Larimer County Urban Area Street Standards (LCUASS) and
to identify any projected impacts to the transportation system. The project is anticipated to
generate approximately 198 daily weekday trips, 13 AM total peak hour trips, and 16 PM total
peak hour trips. See Table 1: Trip Generation.
2.0 Existing Conditions and Roadway Network
The project site is located at the southwest quadrant of the Trilby Road/Ziegler Road
intersection. Trilby Road is classified as a 2-lane Collector adjacent to the project site on the
Fort Collins Master Street Plan. This portion of Trilby Road currently has a thru lane each
direction, bike lanes, detached sidewalks, and a posted speed of 25 mph adjacent to the project
site. Ziegler Road is classified as a 2-lane Collector north of the Trilby Road/Ziegler Road
intersection and unclassified south of the Trilby Road/Ziegler Road intersection on the Fort
Collins Master Street Plan. This portion of Trilby Road currently has a thru lane each direction,
bike lanes, detached sidewalks, and a posted speed of 30 mph adjacent to the project site. See
Figure 1: Vicinity Map.
2.1 Recent Traffic Volumes
Recent peak hour turning movement counts were conducted when school was in session. The
traffic counts were conducted by All Traffic Data Services Inc. on Thursday, February 4, 2021
during the peak hours of adjacent street traffic in 15-minute intervals from 7:00 AM to 9:00 AM,
2:30 PM to 3:30 PM, and 4:00 PM to 6:00 PM. These turning movement counts are shown in
Figure 3 with the count sheets provided in Appendix A.
Kechter Farm Townhomes TIS -Page 4
Figure 1: Vicinity Map
Kechter Farm Townhomes TIS -Page 5
Figure 2: Site Plan
Kechter Farm Townhomes TIS -Page 6
3.0 Pedestrian Facilities
Detached sidewalks and bike lanes exist adjacent to the project site. These detached
sidewalks and bike lanes provide adequate pedestrian and bicycle facilities.
4.0 Proposed Development
The proposed project consists of 27 townhome dwelling units. Primary access to the
site is proposed from one full-movement access point to Ziegler Road and a right-
in/right-out (RIRO) access point to Trilby Road. See Table 1: Trip Generation and
Figure 2: Site Plan.
4.1 Trip Generation
Site generated traffic estimates are determined through a process known as trip
generation. Rates and equations are applied to the proposed land use to estimate traffic
generated by the development during a specific time interval. The acknowledged source
for trip generation rates is the Trip Generation Report published by the Institute of
Transportation Engineers (ITE). ITE has established trip generation rates in nationwide
studies of similar land uses. For this study, KE used the ITE 10th Edition Trip Generation
Report average trip rates. Since traffic on the adjacent streets and intersections is
highest during the weekday peak hours, this study analyzed the weekday peak hour
traffic. The proposed project is anticipated to generate approximately 198 daily weekday
trips, 13 AM total peak hour trips, and 16 PM total peak hour trips. See Table 1: Trip
Generation.
4.2 Trip Distribution
Distribution of site traffic on the street system was based on the area street system
characteristics, existing traffic patterns and volumes, anticipated surrounding
development areas, and the proposed access system for the project. The directional
distribution of traffic is a means to quantify the percentage of site generated traffic that
approaches the site from a given direction and departs the site back to the original
source. Figure 5 illustrates the trip distribution used for the project’s analysis.
Kechter Farm Townhomes TIS -Page 7
4.3 Traffic Assignment
Traffic assignment was obtained by applying the trip distributions to the estimated trip
generation of the development. Figure 6 shows the site generated peak hour traffic
assignment.
4.4 Short Range Total Peak Hour Traffic
Site generated peak hour traffic volumes were added to the background traffic volumes
to represent the estimated traffic conditions for the short range 2025 horizon. The
background (2025) and short range (2025) total traffic volumes are shown in Figure 4
and Figure 7 respectively. The traffic analysis in this study includes the traffic generated
from the proposed development plus a 2% increase in background traffic per year.
5.0 Traffic Operation Analysis
KE’s analysis of traffic operations in the site vicinity was conducted to determine the
capacity at the identified intersection. The acknowledged source for determining overall
capacity is the Highway Capacity Manual.
5.1 Analysis Methodology
Capacity analysis results are listed in terms of level of service (LOS). LOS is a
qualitative term describing operating conditions a driver will experience while traveling
on a particular street or highway during a specific time interval. LOS ranges from an A
(very little delay) to an F (long delays). A description of the level of service (LOS) for
signalized and unsignalized intersections from the Highway Capacity Manual are
provided in Appendix D.
Kechter Farm Townhomes TIS -Page 8
5.2 Intersection Operational Analysis
Operational analysis was performed for the short range 2025 horizon. The calculations
for this analysis are provided in Appendix F. Using the short range total traffic volumes,
the project is projected to operate acceptably with all studied intersections and access
points meeting LCUASS LOS criteria. See Table 4: 2025 Short Range Total Peak Hour
Operation.
5.3 Access and Intersection Recommendations
The site access locations and proposed turning movements at the study intersections
were reviewed. Due to the existing school’s peak hour traffic, it is recommended that the
proposed site access to Trilby Road (Access #1) be right-in/right-out only. The proposed
site access to Ziegler Road (Access #2) will function safely and appropriately as a full-
movement access. Dedicated right-turn deceleration lanes are not warranted at the site
access points per the LCUASS. Additionally, a northbound left-turn deceleration lane at
the site access to Ziegler Road (Access #2) is not warranted per the LCUASS criteria.
Additionally, the proposed project’s traffic will not trigger the requirement for a
roundabout at the Ziegler Road and Trilby Road/Lady Moon Drive intersection. The
Levels of Service (LOS) of this intersection will meet the City’s LOS requirements with
the development of the project and background traffic in the 2025 Short Range Total
future. The existing intersection controls and geometry at the Ziegler Road and Trilby
Road/Lady Moon Drive intersection are appropriate to meet LCUASS requirements and
accommodate the project’s traffic.
Kechter Farm Townhomes TIS -Page 9
Table 1: Trip Generation (ITE Trip Generation, 10th Edition)
ITE Code Land Use Average Daily Trips AM Peak Hour Trips PM Peak Hour Trips
Size Rate Total Rate % In In % Out Out Total Rate % In In % Out Out Total
220 Townhomes 27 DU 7.32 198 0.46 23% 3 77% 10 13 0.56 63% 10 37% 6 16
Total 198 3 10 13 10 6 16
DU = Dwelling Units
Kechter Farm Townhomes TIS -Page 10
Figure 3: Recent Peak Hour Traffic
Kechter Farm Townhomes TIS -Page 11
Figure 4: 2025 Background Traffic
Kechter Farm Townhomes TIS -Page 12
Figure 5: Trip Distribution
Kechter Farm Townhomes TIS -Page 13
Figure 6: Site Generated Traffic
Kechter Farm Townhomes TIS -Page 14
Figure 7: 2025 Short Range Total Traffic
Kechter Farm Townhomes TIS -Page 15
Table 2: Recent Peak Hour Operations
Level of Service (LOS) LOS
Compliance Intersection Movement AM School PM PM
LOS LOS LOS
Ziegler Rd. & Trilby
Rd./Lady Moon Dr.
EB Left A B B Y
EB Thru/Right A B B Y
EB Approach A B B Y
WB Left/Thru/Right B B B Y
WB Approach B B B Y
NB Left A A A Y
NB Thru/Right A A A Y
NB Approach A A A Y
SB Left A A A Y
SB Thru A A A Y
SB Right A A A Y
SB Approach A A A Y
Table 3: 2025 Background Peak Hour Operations
Level of Service (LOS) LOS
Compliance Intersection Movement AM School PM PM
LOS LOS LOS
Ziegler Rd. & Trilby
Rd./Lady Moon Dr.
EB Left A B B Y
EB Thru/Right B B B Y
EB Approach A B B Y
WB Left/Thru/Right B B B Y
WB Approach B B B Y
NB Left A A A Y
NB Thru/Right A A A Y
NB Approach A A A Y
SB Left A A A Y
SB Thru A A A Y
SB Right A A A Y
SB Approach A A A Y
Kechter Farm Townhomes TIS -Page 16
Table 4: 2025 Short Range Total Peak Hour Operations
Level of Service (LOS) LOS
Compliance Intersection Movement AM School PM PM
LOS LOS LOS
Ziegler Rd. & Trilby
Rd./Lady Moon Dr.
EB Left B B B Y
EB Thru/Right B B B Y
EB Approach B B B Y
WB Left/Thru/Right B B B Y
WB Approach B B B Y
NB Left A A A Y
NB Thru/Right A A A Y
NB Approach A A A Y
SB Left A A A Y
SB Thru A A A Y
SB Right A A A Y
SB Approach A A A Y
Level of Service (LOS) LOS
Compliance Intersection Movement AM School PM PM
LOS LOS LOS
Trilby Rd.& Access #1
(Right-in/Right-out) EB Thru/Right A A A Y
EB Approach A A A Y
WB Thru A A A Y
WB Approach A A A Y
NB Right A A A Y
NB Approach A A A Y
Level of Service (LOS) LOS
Compliance Intersection Movement AM School PM PM
LOS LOS LOS
Ziegler Rd & Access #2
EB Left/Right A A A Y
EB Approach A A A Y
NB Left/Thru A A A Y
NB Approach A A A Y
SB Thru/Right A A A Y
SB Approach A A A Y
Kechter Farm Townhomes TIS -Page 17
6.0 Findings
Based upon the analysis in this study, the proposed Kechter Townhomes project located at the
southwest quadrant of Trilby Road and Ziegler Road in Fort Collins, CO demonstrates
compliance with the standards in the Larimer County Urban Area Street Standards (LCUASS)
for traffic at the time of development.
The findings of the TIS are summarized below:
• The proposed project is anticipated to generate approximately 198 daily weekday trips,
13 AM total peak hour trips, and 16 PM total peak hour trips.
• The project complies with the Levels of Service (LOS) requirements for traffic, the City of
Fort Collins Transportation Plan, and the Larimer County Urban Area Street Standards
(LCUASS).
• The study intersections will operate acceptably and comply with the intersection levels of
service (LOS) requirements in the LCUASS with the development of the project and
background traffic in the 2025 Short Range Total future.
• The proposed access points will operate safely and demonstrate compliance with the
City’s LOS requirements.
• The proposed project’s traffic will not trigger the requirement for a roundabout at the
Ziegler Road and Trilby Road/Lady Moon Drive intersection. The LOS of this intersection
will meet the City’s LOS requirements with the development of the project and
background traffic in the 2025 Short Range Total future.
• The existing street improvements are sufficient to accommodate the proposed project’s
traffic. See Section 5.2 and Section 5.3.
• Due to the existing school’s peak hour traffic, it is recommended that the proposed site
access to Trilby Road be right-in/right-out (RIRO) only. See Section 5.3.
Kechter Farm Townhomes TIS -Page 18
APPENDICES:
Kechter Farm Townhomes TIS -Page 19
Appendix A: Recent Traffic Counts
Kechter Farm Townhomes TIS -Page 20
Kechter Farm Townhomes TIS -Page 21
Kechter Farm Townhomes TIS -Page 22
Appendix B: TIS Scoping
Kechter Farm Townhomes TIS -Page 23
Kechter Farm Townhomes TIS -Page 24
Kechter Farm Townhomes TIS -Page 25
Kechter Farm Townhomes TIS -Page 26
Appendix C: ITE Code 220
Kechter Farm Townhomes TIS -Page 27
Kechter Farm Townhomes TIS -Page 28
Kechter Farm Townhomes TIS -Page 29
Kechter Farm Townhomes TIS -Page 30
Kechter Farm Townhomes TIS -Page 31
Appendix D: Level of Service (LOS) Table
Level of Service Definitions
Level of Service Signalized Intersection Unsignalized Intersection
(LOS) Average Total Delay Average Total Delay
(sec/veh) (sec/veh)
A ≤ 10 ≤ 10
B > 10 and ≤ 20 > 10 and ≤ 15
C > 20 and ≤ 35 > 15 and ≤ 25
D > 35 and ≤ 55 > 25 and ≤ 35
E > 55 and ≤ 80 > 35 and ≤ 50
F > 80 > 50
LCUASS Table 4-3
Kechter Farm Townhomes TIS -Page 32
Appendix E: Aerial Image
Kechter Farm Townhomes TIS -Page 33
Kechter Farm Townhomes TIS -Page 34
Appendix F: HCM Calculations (Synchro)
Recent AM Peak Hour Kellar Engineering
3: Ziegler Rd & Trilby Rd/Lady Moon Dr 02/24/2021
HCM 2010 TWSC Synchro Report
Sean Kellar, PE, PTOE
Intersection
Int Delay, s/veh 3.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 43 21 1 0 12 1 2 63 2 3 41 54
Future Vol, veh/h 43 21 1 0 12 1 2 63 2 3 41 54
Conflicting Peds, #/hr 0 00000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 95 -----60--120-276
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 22222222222
Mvmt Flow 51 25 1 0 14 1 2 74 2 4 48 64
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 143 136 48 180 199 75 112 0 0 76 0 0
Stage 1 56 56 - 79 79 -------
Stage 2 87 80 - 101 120 -------
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 -------
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 -------
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 826 755 1021 782 697 986 1478 - - 1523 - -
Stage 1 956 848 - 930 829 -------
Stage 2 921 828 - 905 796 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 809 752 1021 759 694 986 1478 - - 1523 - -
Mov Cap-2 Maneuver 809 752 - 759 694 -------
Stage 1 955 845 - 929 828 -------
Stage 2 903 827 - 875 794 -------
Approach EB WB NB SB
HCM Control Delay, s 9.8 10.2 0.2 0.2
HCM LOS A B
Minor Lane/Major Mvmt NBL NBT NBREBLn1EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1478 - - 809 761 710 1523 - -
HCM Lane V/C Ratio 0.002 - - 0.063 0.034 0.022 0.002 - -
HCM Control Delay (s) 7.4 - - 9.7 9.9 10.2 7.4 - -
HCM Lane LOS A - -AABA - -
HCM 95th %tile Q(veh) 0 - - 0.2 0.1 0.1 0 - -
Recent PM Peak Hour Kellar Engineering
3: Ziegler Rd & Trilby Rd/Lady Moon Dr 02/24/2021
HCM 2010 TWSC Synchro Report
Sean Kellar, PE, PTOE
Intersection
Int Delay, s/veh 4.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 78 34 3 5 25 6 6 55 4 13 64 94
Future Vol, veh/h 78 34 3 5 25 6 6 55 4 13 64 94
Conflicting Peds, #/hr 0 00000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 95 -----60--120-276
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 22222222222
Mvmt Flow 92 40 4 6 29 7 7 65 5 15 75 111
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 205 189 75 265 298 68 186 0 0 70 0 0
Stage 1 105 105 - 82 82 -------
Stage 2 100 84 - 183 216 -------
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 -------
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 -------
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 753 706 986 688 614 995 1388 - - 1531 - -
Stage 1 901 808 - 926 827 -------
Stage 2 906 825 - 819 724 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 712 695 986 648 605 995 1388 - - 1531 - -
Mov Cap-2 Maneuver 712 695 - 648 605 -------
Stage 1 896 800 - 921 823 -------
Stage 2 863 821 - 768 717 -------
Approach EB WB NB SB
HCM Control Delay, s 10.7 10.9 0.7 0.6
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBREBLn1EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1388 - - 712 712 654 1531 - -
HCM Lane V/C Ratio 0.005 - - 0.129 0.061 0.065 0.01 - -
HCM Control Delay (s) 7.6 - - 10.8 10.4 10.9 7.4 - -
HCM Lane LOS A - -BBBA - -
HCM 95th %tile Q(veh) 0 - - 0.4 0.2 0.2 0 - -
Recent School PM Peak Hour Kellar Engineering
3: Ziegler Rd & Trilby Rd/Lady Moon Dr 02/24/2021
HCM 2010 TWSC Synchro Report
Sean Kellar, PE, PTOE
Intersection
Int Delay, s/veh 4.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 112 45 6 2 32 17 9 91 2 6 70 158
Future Vol, veh/h 112 45 6 2 32 17 9 91 2 6 70 158
Conflicting Peds, #/hr 0 00000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 95 -----60--120-276
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 22222222222
Mvmt Flow 132 53 7 2 38 20 11 107 2 7 82 186
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 255 227 82 349 412 108 268 0 0 109 0 0
Stage 1 96 96 - 130 130 -------
Stage 2 159 131 - 219 282 -------
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 -------
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 -------
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 698 672 978 606 530 946 1296 - - 1481 - -
Stage 1 911 815 - 874 789 -------
Stage 2 843 788 - 783 678 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 639 663 978 559 523 946 1296 - - 1481 - -
Mov Cap-2 Maneuver 639 663 - 559 523 -------
Stage 1 904 811 - 867 783 -------
Stage 2 779 782 - 723 675 -------
Approach EB WB NB SB
HCM Control Delay, s 11.7 11.5 0.7 0.2
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBREBLn1EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1296 - - 639 689 616 1481 - -
HCM Lane V/C Ratio 0.008 - - 0.206 0.087 0.097 0.005 - -
HCM Control Delay (s) 7.8 - - 12.1 10.7 11.5 7.4 - -
HCM Lane LOS A - -BBBA - -
HCM 95th %tile Q(veh) 0 - - 0.8 0.3 0.3 0 - -
2025 Background AM Peak Hour Kellar Engineering
3: Ziegler Rd & Trilby Rd/Lady Moon Dr 02/24/2021
HCM 2010 TWSC Synchro Report
Sean Kellar, PE, PTOE
Intersection
Int Delay, s/veh 3.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 47 23 1 0 13 1 2 68 2 3 44 58
Future Vol, veh/h 47 23 1 0 13 1 2 68 2 3 44 58
Conflicting Peds, #/hr 0 00000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 95 -----60--120-276
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 22222222222
Mvmt Flow 55 27 1 0 15 1 2 80 2 4 52 68
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 153 146 52 193 213 81 120 0 0 82 0 0
Stage 1 60 60 - 85 85 -------
Stage 2 93 86 - 108 128 -------
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 -------
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 -------
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 814 745 1016 767 684 979 1468 - - 1515 - -
Stage 1 951 845 - 923 824 -------
Stage 2 914 824 - 897 790 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 797 742 1016 742 681 979 1468 - - 1515 - -
Mov Cap-2 Maneuver 797 742 - 742 681 -------
Stage 1 950 842 - 922 823 -------
Stage 2 895 823 - 865 788 -------
Approach EB WB NB SB
HCM Control Delay, s 9.9 10.3 0.2 0.2
HCM LOS A B
Minor Lane/Major Mvmt NBL NBT NBREBLn1EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1468 - - 797 750 696 1515 - -
HCM Lane V/C Ratio 0.002 - - 0.069 0.038 0.024 0.002 - -
HCM Control Delay (s) 7.5 - - 9.9 10 10.3 7.4 - -
HCM Lane LOS A - -ABBA - -
HCM 95th %tile Q(veh) 0 - - 0.2 0.1 0.1 0 - -
2025 Backround PM Peak Hour Kellar Engineering
3: Ziegler Rd & Trilby Rd/Lady Moon Dr 02/24/2021
HCM 2010 TWSC Synchro Report
Sean Kellar, PE, PTOE
Intersection
Int Delay, s/veh 4.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 84 37 3 5 27 6 6 60 4 14 69 102
Future Vol, veh/h 84 37 3 5 27 6 6 60 4 14 69 102
Conflicting Peds, #/hr 0 00000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 95 -----60--120-276
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 22222222222
Mvmt Flow 99 44 4 6 32 7 7 71 5 16 81 120
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 220 203 81 285 321 74 201 0 0 76 0 0
Stage 1 113 113 - 88 88 -------
Stage 2 107 90 - 197 233 -------
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 -------
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 -------
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 736 693 979 667 596 988 1371 - - 1523 - -
Stage 1 892 802 - 920 822 -------
Stage 2 898 820 - 805 712 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 693 682 979 625 586 988 1371 - - 1523 - -
Mov Cap-2 Maneuver 693 682 - 625 586 -------
Stage 1 888 793 - 915 818 -------
Stage 2 853 816 - 750 704 -------
Approach EB WB NB SB
HCM Control Delay, s 10.9 11.1 0.7 0.6
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBREBLn1EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1371 - - 693 698 632 1523 - -
HCM Lane V/C Ratio 0.005 - - 0.143 0.067 0.071 0.011 - -
HCM Control Delay (s) 7.6 - - 11.1 10.5 11.1 7.4 - -
HCM Lane LOS A - -BBBA - -
HCM 95th %tile Q(veh) 0 - - 0.5 0.2 0.2 0 - -
2025 Background School PM Peak Hour Kellar Engineering
3: Ziegler Rd & Trilby Rd/Lady Moon Dr 02/24/2021
HCM 2010 TWSC Synchro Report
Sean Kellar, PE, PTOE
Intersection
Int Delay, s/veh 4.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 121 49 6 2 35 18 10 99 2 6 76 171
Future Vol, veh/h 121 49 6 2 35 18 10 99 2 6 76 171
Conflicting Peds, #/hr 0 00000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 95 -----60--120-276
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 22222222222
Mvmt Flow 142 58 7 2 41 21 12 116 2 7 89 201
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 275 245 89 377 445 117 290 0 0 118 0 0
Stage 1 103 103 - 141 141 -------
Stage 2 172 142 - 236 304 -------
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 -------
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 -------
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 677 657 969 580 508 935 1272 - - 1470 - -
Stage 1 903 810 - 862 780 -------
Stage 2 830 779 - 767 663 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 613 648 969 531 501 935 1272 - - 1470 - -
Mov Cap-2 Maneuver 613 648 - 531 501 -------
Stage 1 895 806 - 854 773 -------
Stage 2 761 772 - 704 660 -------
Approach EB WB NB SB
HCM Control Delay, s 12.1 11.8 0.7 0.2
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBREBLn1EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1272 - - 613 672 592 1470 - -
HCM Lane V/C Ratio 0.009 - - 0.232 0.096 0.109 0.005 - -
HCM Control Delay (s) 7.9 - - 12.6 10.9 11.8 7.5 - -
HCM Lane LOS A - -BBBA - -
HCM 95th %tile Q(veh) 0 - - 0.9 0.3 0.4 0 - -
2025 Short Range Total AM Peak Hour Kellar Engineering
3: Ziegler Rd & Trilby Rd/Lady Moon Dr 02/22/2021
HCM 2010 TWSC Synchro Report
Sean Kellar, PE, PTOE
Intersection
Int Delay, s/veh 3.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 50 25 1 1 13 1 6 69 2 3 45 58
Future Vol, veh/h 50 25 1 1 13 1 6 69 2 3 45 58
Conflicting Peds, #/hr 0 00000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 95 -----60--120-276
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 22222222222
Mvmt Flow 59 29 1 1 15 1 7 81 2 4 53 68
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 165 158 53 206 225 82 121 0 0 83 0 0
Stage 1 61 61 - 96 96 -------
Stage 2 104 97 - 110 129 -------
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 -------
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 -------
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 800 734 1014 752 674 978 1467 - - 1514 - -
Stage 1 950 844 - 911 815 -------
Stage 2 902 815 - 895 789 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 781 728 1014 724 669 978 1467 - - 1514 - -
Mov Cap-2 Maneuver 781 728 - 724 669 -------
Stage 1 945 841 - 906 811 -------
Stage 2 880 811 - 860 787 -------
Approach EB WB NB SB
HCM Control Delay, s 10 10.4 0.6 0.2
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBREBLn1EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1467 - - 781 736 687 1514 - -
HCM Lane V/C Ratio 0.005 - - 0.075 0.042 0.026 0.002 - -
HCM Control Delay (s) 7.5 - - 10 10.1 10.4 7.4 - -
HCM Lane LOS A - -BBBA - -
HCM 95th %tile Q(veh) 0 - - 0.2 0.1 0.1 0 - -
2025 Short Range Total AM Peak Hour Kellar Engineering
6: Access #1 & Trilby Rd 02/22/2021
HCM 2010 TWSC Synchro Report
Sean Kellar, PE, PTOE
Intersection
Int Delay, s/veh 0.3
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 71 1 0 77 0 5
Future Vol, veh/h 71 1 0 77 0 5
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length -----0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 84 1 0 91 0 6
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 85
Stage 1 ------
Stage 2 ------
Critical Hdwy -----6.22
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy -----3.318
Pot Cap-1 Maneuver - - 0 - 0 974
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -----974
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach EB WB NB
HCM Control Delay, s 0 0 8.7
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h) 974 - - -
HCM Lane V/C Ratio 0.006 - - -
HCM Control Delay (s) 8.7 - - -
HCM Lane LOS A - - -
HCM 95th %tile Q(veh) 0 - - -
2025 Short Range Total AM Peak Hour Kellar Engineering
8: Ziegler Rd & Access #2 02/22/2021
HCM 2010 TWSC Synchro Report
Sean Kellar, PE, PTOE
Intersection
Int Delay, s/veh 0.5
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 1 1 77 45 2
Future Vol, veh/h 5 1 1 77 45 2
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 -----
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 6 1 1 91 53 2
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 147 54 55 0 - 0
Stage 1 54 -----
Stage 2 93 -----
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 845 1013 1550 - - -
Stage 1 969 -----
Stage 2 931 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 844 1013 1550 - - -
Mov Cap-2 Maneuver 844 -----
Stage 1 968 -----
Stage 2 931 -----
Approach EB NB SB
HCM Control Delay, s 9.2 0.1 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR
Capacity (veh/h) 1550 - 868 - -
HCM Lane V/C Ratio 0.001 - 0.008 - -
HCM Control Delay (s) 7.3 0 9.2 - -
HCM Lane LOS A A A - -
HCM 95th %tile Q(veh) 0 - 0 - -
2025 Short Range Total PM Peak Hour Kellar Engineering
3: Ziegler Rd & Trilby Rd/Lady Moon Dr 02/22/2021
HCM 2010 TWSC Synchro Report
Sean Kellar, PE, PTOE
Intersection
Int Delay, s/veh 4.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 86 38 3 7 27 6 8 61 4 14 73 102
Future Vol, veh/h 86 38 3 7 27 6 8 61 4 14 73 102
Conflicting Peds, #/hr 0 00000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 95 -----60--120-276
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 22222222222
Mvmt Flow 101 45 4 8 32 7 9 72 5 16 86 120
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 230 213 86 296 331 75 206 0 0 77 0 0
Stage 1 118 118 - 93 93 -------
Stage 2 112 95 - 203 238 -------
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 -------
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 -------
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 725 684 973 656 588 986 1365 - - 1522 - -
Stage 1 887 798 - 914 818 -------
Stage 2 893 816 - 799 708 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 681 672 973 613 577 986 1365 - - 1522 - -
Mov Cap-2 Maneuver 681 672 - 613 577 -------
Stage 1 881 789 - 908 812 -------
Stage 2 846 810 - 743 700 -------
Approach EB WB NB SB
HCM Control Delay, s 11 11.3 0.8 0.5
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBREBLn1EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1365 - - 681 688 622 1522 - -
HCM Lane V/C Ratio 0.007 - - 0.149 0.07 0.076 0.011 - -
HCM Control Delay (s) 7.7 - - 11.2 10.6 11.3 7.4 - -
HCM Lane LOS A - -BBBA - -
HCM 95th %tile Q(veh) 0 - - 0.5 0.2 0.2 0 - -
2025 Short Range Total PM Peak Hour Kellar Engineering
6: Access #1 & Trilby Rd 02/22/2021
HCM 2010 TWSC Synchro Report
Sean Kellar, PE, PTOE
Intersection
Int Delay, s/veh 0.1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 124 4 0 137 0 3
Future Vol, veh/h 124 4 0 137 0 3
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length -----0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 146 5 0 161 0 4
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 149
Stage 1 ------
Stage 2 ------
Critical Hdwy -----6.22
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy -----3.318
Pot Cap-1 Maneuver - - 0 - 0 898
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -----898
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach EB WB NB
HCM Control Delay, s 0 0 9
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h) 898 - - -
HCM Lane V/C Ratio 0.004 - - -
HCM Control Delay (s) 9 - - -
HCM Lane LOS A - - -
HCM 95th %tile Q(veh) 0 - - -
2025 Short Range Total PM Peak Hour Kellar Engineering
8: Ziegler Rd & Access #2 02/22/2021
HCM 2010 TWSC Synchro Report
Sean Kellar, PE, PTOE
Intersection
Int Delay, s/veh 0.3
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 3 1 1 73 77 6
Future Vol, veh/h 3 1 1 73 77 6
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 -----
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 4 1 1 86 91 7
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 183 95 98 0 - 0
Stage 1 95 -----
Stage 2 88 -----
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 806 962 1495 - - -
Stage 1 929 -----
Stage 2 935 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 805 962 1495 - - -
Mov Cap-2 Maneuver 805 -----
Stage 1 928 -----
Stage 2 935 -----
Approach EB NB SB
HCM Control Delay, s 9.3 0.1 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR
Capacity (veh/h) 1495 - 839 - -
HCM Lane V/C Ratio 0.001 - 0.006 - -
HCM Control Delay (s) 7.4 0 9.3 - -
HCM Lane LOS A A A - -
HCM 95th %tile Q(veh) 0 - 0 - -
2025 Short Range Total School PM Peak Hour Kellar Engineering
3: Ziegler Rd & Trilby Rd/Lady Moon Dr 02/22/2021
HCM 2010 TWSC Synchro Report
Sean Kellar, PE, PTOE
Intersection
Int Delay, s/veh 5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 122 49 6 3 35 18 11 99 2 6 77 171
Future Vol, veh/h 122 49 6 3 35 18 11 99 2 6 77 171
Conflicting Peds, #/hr 0 00000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 95 -----60--120-276
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 22222222222
Mvmt Flow 144 58 7 4 41 21 13 116 2 7 91 201
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 279 249 91 381 449 117 292 0 0 118 0 0
Stage 1 105 105 - 143 143 -------
Stage 2 174 144 - 238 306 -------
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 -------
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 -------
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 673 654 967 577 505 935 1270 - - 1470 - -
Stage 1 901 808 - 860 779 -------
Stage 2 828 778 - 765 662 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 609 644 967 527 497 935 1270 - - 1470 - -
Mov Cap-2 Maneuver 609 644 - 527 497 -------
Stage 1 892 804 - 851 771 -------
Stage 2 758 770 - 702 659 -------
Approach EB WB NB SB
HCM Control Delay, s 12.2 11.9 0.8 0.2
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBREBLn1EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1270 - - 609 668 587 1470 - -
HCM Lane V/C Ratio 0.01 - - 0.236 0.097 0.112 0.005 - -
HCM Control Delay (s) 7.9 - - 12.7 11 11.9 7.5 - -
HCM Lane LOS A - -BBBA - -
HCM 95th %tile Q(veh) 0 - - 0.9 0.3 0.4 0 - -
2025 Short Range Total School PM Peak Hour Kellar Engineering
6: Access #1 & Trilby Rd 02/22/2021
HCM 2010 TWSC Synchro Report
Sean Kellar, PE, PTOE
Intersection
Int Delay, s/veh 0
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 171 1 0 217 0 1
Future Vol, veh/h 171 1 0 217 0 1
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length -----0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 201 1 0 255 0 1
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 202
Stage 1 ------
Stage 2 ------
Critical Hdwy -----6.22
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy -----3.318
Pot Cap-1 Maneuver - - 0 - 0 839
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -----839
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach EB WB NB
HCM Control Delay, s 0 0 9.3
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h) 839 - - -
HCM Lane V/C Ratio 0.001 - - -
HCM Control Delay (s) 9.3 - - -
HCM Lane LOS A - - -
HCM 95th %tile Q(veh) 0 - - -
2025 Short Range Total School PM Peak Hour Kellar Engineering
8: Ziegler Rd & Access #2 02/22/2021
HCM 2010 TWSC Synchro Report
Sean Kellar, PE, PTOE
Intersection
Int Delay, s/veh 0.1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 1 1 112 84 2
Future Vol, veh/h 1 1 1 112 84 2
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 -----
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 1 1 1 132 99 2
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 234 100 101 0 - 0
Stage 1 100 -----
Stage 2 134 -----
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 754 956 1491 - - -
Stage 1 924 -----
Stage 2 892 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 753 956 1491 - - -
Mov Cap-2 Maneuver 753 -----
Stage 1 923 -----
Stage 2 892 -----
Approach EB NB SB
HCM Control Delay, s 9.3 0.1 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR
Capacity (veh/h) 1491 - 842 - -
HCM Lane V/C Ratio 0.001 - 0.003 - -
HCM Control Delay (s) 7.4 0 9.3 - -
HCM Lane LOS A A A - -
HCM 95th %tile Q(veh) 0 - 0 - -