HomeMy WebLinkAboutKECHTER FARM MIXED-USE TOWNHOMES - FDP210021 - SUBMITTAL DOCUMENTS - ROUND 1 - GEOTECHNICAL (SOILS) REPORTPRELIMINARY GEOTECHNICAL SUBSURFACE EXPLORATION REPORT
KECHTER FARM TOWNHOMES
LOT 1, BLOCK 15, KECHTER FARM P.L.D. FILING 1
FORT COLLINS, COLORADO
SOILOGIC # 21-1014
February 18, 2021
Soilogic, Inc.
3522 Draft Horse Court • Loveland, CO 80538 • (970) 535-6144
February 18, 2021
Kechter Townhomes, LLC
417 Jefferson Street
Fort Collins, Colorado 80524
Attn: Mr. Kyle Meyer
Re: Preliminary Geotechnical Subsurface Exploration Report
Kechter Farm Townhomes
Lot 1, Block 15, Kechter Farm PLD Filing 1
Fort Collins, Colorado
Soilogic Project # 21-1014
Mr. Meyer:
Soilogic, Inc. (Soilogic) personnel have completed the preliminary geotechnical subsurface
exploration you requested for the proposed multi-family residential development to be
constructed on Lot 1 of Block 15 in the Kechter Farm PLD Filing 1 residential subdivision
in Fort Collins, Colorado. The results of our subsurface exploration and pertinent
geotechnical engineering recommendations are included with this report.
In summary, approximately 3 to 6 inches of vegetation and topsoil was encountered at the
surface at boring locations underlain by reddish-brown to light brown/beige lean clay with
varying amounts of sand. The lean clay varied from soft to very stiff in terms of
consistency, exhibited high swell potential near-surface and no to low swell potential with
depth at in-situ moisture and density conditions and extended to depths of about 12½ to
13½ feet below ground surface, where it was underlain by gray/rust/olive
siltstone/claystone bedrock. The bedrock varied from weathered to firm in terms of relative
hardness and extended to the bottom of both borings at a depth of approximately 15 feet
below ground surface. Based on our experience with similar bedrock encountered in the
vicinity of the subject site, we anticipate the unweathered portion of the bedrock may
possess moderate or higher swell potential at in-situ moisture and density conditions.
Groundwater was measured at depths of approximately 15 and 13 feet below present site
grade in borings B-1 and B-2, respectively, when checked immediately after the
completion of drilling. When checked about 24 hours after completion of drilling,
Preliminary Geotechnical Subsurface Exploration Report
Kechter Farm Townhomes (Lot 1, Block 15, Kechter Farm PLD Filing 1)
Fort Collins, Colorado
Soilogic Project # 21-1014
2
groundwater was measured at depths of approximately 13 and 10 feet below grade in
borings B-1 and B-2, respectively.
Care will be needed across the development in order to maintain adequate separation
distances between footing foundations and the observed levels of groundwater. Typically,
we recommend foundation bearing elevations be established a minimum of three (3) feet
above the observed groundwater level.
Based on the subsurface conditions encountered in the completed site borings, results of
field and laboratory testing and type of construction proposed, we expect the proposed
lightly-loaded residential structures could be constructed with conventional footing
foundations and floor slabs bearing on natural site lean clay with no to low volume change
potential and/or a suitable zone of properly moisture conditioned and compacted
overexcavation/backfill (where required). Overexcavation/backfill procedures are also
recommended to develop low volume-change (LVC) floor slab, exterior flatwork and
pavement support if/where expansive soils are identified underlying these improvements.
Expansive lean clay soils were identified at the location of boring B-1 extending to depths
between approximately 3 and 4 feet below present site grade. Lean clay soils with higher
in-situ moisture content and resultant low swell potential were identified underlying the
expansive soils in that area. Full-depth basement construction and/or extending footing
foundations through any expansive near-surface lean clay to bear on higher moisture
content soils with low swell potential at greater depth could also be considered, however,
overexcavation/backfill procedures would still be required beneath at-grade floor slabs in
areas where expansive near-surface soils are identified.
In addition to the presence of near-surface lean clay soils exhibiting high swell potential,
comparatively soft, high moisture content clay soils exhibiting moderate compressibility
were encountered with depth in boring B-2 such that care will be needed to ensure footing
foundations are supported on soils with suitable strength. Overexcavation/ backfill
procedures or other approved stabilization measures, or alternative deep foundation
systems could be considered in areas of soft/compressible clay to reduce the potential for
excessive post-construction settlement of the proposed structures. If raising the site through
fill placement will be undertaken, areas of the site expected to receive fill depths greater
than about 4 to 5 feet should be developed as early as possible during the development
Preliminary Geotechnical Subsurface Exploration Report
Kechter Farm Townhomes (Lot 1, Block 15, Kechter Farm PLD Filing 1)
Fort Collins, Colorado
Soilogic Project # 21-1014
3
process and allowed to remain in place for several weeks in order to allow for consolidation
of the underlying soils prior to construction of any overlying improvements.
If/where moderately to highly expansive siltstone/claystone bedrock is identified at the
time of site-specific subsurface explorations, maintaining a six (6) foot offset between
siltstone/claystone bedrock and footing foundations and slabs-on-grade or use of drilled
pier foundations and structurally-supported floors may be warranted.
Based on the results of completed laboratory testing, the site lean clay appears suitable for
use as fill and overexcavation/backfill to develop the site. Depending on the in-place
moisture content of the pavement subgrade soils at the time of construction, stabilization
of the lean clay subgrade soils may become necessary prior to surfacing in order to develop
a suitable paving platform. If public street improvements will be constructed as part of this
project, a final pavement exploration will be required for these roadways after the sanitary
sewer and water utilizes have been installed and the streets graded to approximate finish
subgrade elevation in accordance with Larimer County Urban Area Street Standards
(LCUASS). Preliminary pavement section design estimates are included with this report.
Other preliminary opinions and recommendations concerning design criteria and
construction details for the proposed site improvements are also included.
Preliminary Geotechnical Subsurface Exploration Report
Kechter Farm Townhomes (Lot 1, Block 15, Kechter Farm PLD Filing 1)
Fort Collins, Colorado
Soilogic Project # 21-1014
4
02/18/2021
We appreciate the opportunity to be of service to you on this project. If you have any
questions concerning the enclosed information or if we can be of further service to you in
any way, please do not hesitate to contact us.
Very Truly Yours,
Soilogic, Inc. Reviewed by:
Alec Kaljian, P.E. Darrel DiCarlo, P.E.
Project Engineer Senior Project Engineer
02/18/2021
PRELIMINARY GEOTECHNICAL SUBSURFACE EXPLORATION REPORT
KECHTER FARM TOWNHOMES
LOT 1, BLOCK 15, KECHTER FARM P.L.D. FILING 1
FORT COLLINS, COLORADO
SOILOGIC # 21-1014
February 18, 2021
INTRODUCTION
This report contains the results of the preliminary geotechnical subsurface exploration
completed for the proposed Kechter Farm Townhomes residential development to be
constructed on Lot 1 of Block 15 of Kechter Farm PLD Filing 1 in Fort Collins, Colorado.
The purpose of our exploration was to describe the subsurface conditions encountered in
the completed site borings and develop preliminary recommendations concerning design
and construction of the multi-family residence foundations and support of floor slabs,
exterior flatwork and site pavements. Recommendations concerning the installation of site
utilities are also included. The conclusions and recommendations outlined in this report are
based on results of the completed field and laboratory testing and our experience with
subsurface conditions in this area.
PROPOSED CONSTRUCTION
We understand the property will be developed as multi-family residential. We anticipate
the residences will be lightly-loaded two or three-story wood-frame structures constructed
over full basement or crawl space areas. Foundations loads for the structures are expected
to be light, with continuous wall loads on the order of 3.5 kips per lineal foot and individual
column loads less than 75 kips. Infrastructure improvements for the development will
include utility installation and private site drive and parking area pavement construction.
Some minor public street construction may also be completed. We expect the site
pavements will be utilized by low volumes of automobiles and light trucks with occasional
trash, delivery and emergency truck traffic. Small grade changes are anticipated to develop
finish site grades.
SITE DESCRIPTION
The development parcel includes approximately 2.82 acres which is identified as Lot 1 of
Block 15 in the Kechter Farm PLD Filing 1 residential development in Fort Collins,
Colorado. At the time of our site exploration, the site was moderately vegetated in grass
Preliminary Geotechnical Subsurface Exploration Report
Kechter Farm Townhomes (Lot 1, Block 15, Kechter Farm PLD Filing 1)
Fort Collins, Colorado
Soilogic Project # 21-1014
2
vegetation, contained scattered small-diameter deciduous and coniferous trees and
consisted of gently rolling terrain. The maximum difference in ground surface elevation
across the site was estimated to be less than approximately 10 feet. Evidence of prior
building construction was not observed on the development parcel by Soilogic Inc.
(Soilogic) personnel at the time of our site exploration.
SITE EXPLORATION
Field Exploration
To develop preliminary subsurface information across the development parcel, two (2) soil
borings were extended to a depth of approximately 15 feet below present site grade. The
boring locations were established in the field by Soilogic personnel based on a provided
site plan and by pacing and estimating angles from identifiable site references. A diagram
indicating the approximate boring locations is included with this report. The boring
locations outlined on the attached diagram should be considered accurate only to the degree
implied by the methods used to make the field measurements. Graphic logs of each of the
auger borings are also included.
The test holes were advanced using 4-inch diameter continuous-flight auger, powered by a
truck-mounted CME-45 drill rig. Samples of the subsurface materials were obtained at
regular intervals using California barrel sampling procedures in general accordance with
ASTM specification D-1586. As part of the D-1586 sampling procedure, the standard
sampling barrel is driven into the substrata using a 140-pound hammer falling a distance
of 30 inches. The number of blows required to advance the sampler a distance of 12 inches
is recorded and helpful in estimating the consistency, relative density or hardness of the
soils/bedrock encountered. In the California barrel sampling procedure, lesser disturbed
samples are obtained in removable brass liners. Samples of the subsurface materials
obtained in the field were sealed and returned to the laboratory for further evaluation,
classification and testing.
Preliminary Geotechnical Subsurface Exploration Report
Kechter Farm Townhomes (Lot 1, Block 15, Kechter Farm PLD Filing 1)
Fort Collins, Colorado
Soilogic Project # 21-1014
3
Laboratory Testing
The samples collected were tested in the laboratory to measure natural moisture content
and visually or manually classified in accordance with the Unified Soil Classification
System (USCS). The USCS group symbols are indicated on the attached boring logs. An
outline of the USCS classification system is included with this report. Classification of
bedrock was completed through visual and tactual observation of disturbed samples. Other
bedrock types could be revealed through petrographic analysis.
As part of the laboratory testing, a calibrated hand penetrometer (CHP) was used to
estimate the unconfined compressive strength of essentially-cohesive specimens. The CHP
also provides a more reliable estimate of soil consistency than tactual observation alone.
Dry density, Atterberg limits, -200 wash and swell/consolidation tests were completed on
selected samples to help establish specific soil characteristics. Atterberg limits tests are
used to determine soil plasticity. The percent passing the #200 size sieve (-200 wash) test
is used to determine the percentage of fine-grained materials (clay and silt) in a sample.
Swell/consolidation tests are performed to evaluate soil volume change potential with
variation in moisture content. Results of the completed laboratory tests are outlined on the
attached boring logs and swell/consolidation test summaries.
SUBSURFACE CONDITIONS
The subsurface materials encountered in the completed site borings can be summarized as
follows. Approximately 3 to 6 inches of vegetation and topsoil was encountered at the
surface at boring locations underlain by reddish-brown to light brown/beige lean clay with
varying amounts of sand. The lean clay varied from soft to very stiff in terms of
consistency, exhibited high swell potential near-surface and no to low swell potential with
depth at in-situ moisture and density conditions and extended to depths of about 12½ to
13½ feet below ground surface, where it was underlain by gray/rust/olive
siltstone/claystone bedrock. The bedrock varied from weathered to firm in terms of relative
hardness and extended to the bottom of both borings at a depth of approximately 15 feet
below ground surface. Based on our experience with similar bedrock encountered in the
vicinity of the subject site, we anticipate the unweathered portion of the bedrock may
possess moderate or higher swell potential at in-situ moisture and density conditions.
Preliminary Geotechnical Subsurface Exploration Report
Kechter Farm Townhomes (Lot 1, Block 15, Kechter Farm PLD Filing 1)
Fort Collins, Colorado
Soilogic Project # 21-1014
4
The stratigraphy indicated on the included boring logs represents the approximate location
of changes in soil and/or bedrock types. Actual changes may be more gradual than those
indicated.
Groundwater was measured at depths of approximately 15 and 13 feet below present site
grade in borings B-1 and B-2, respectively, when checked immediately after the
completion of drilling. When checked about 24 hours after completion of drilling,
groundwater was measured at depths of approximately 13 and 10 feet below grade in
borings B-1 and B-2, respectively. Groundwater level information is indicated in the upper
right-hand corner of the attached boring logs.
Groundwater levels will vary seasonally and over time based on weather conditions, site
development, irrigation practices and other hydrologic conditions. Perched and/or trapped
groundwater conditions may also be encountered at times throughout the year. Perched
water is commonly encountered in soils overlying less permeable soil layers and/or
bedrock. Trapped water is typically encountered within more permeable zones of layered
soil and bedrock systems. The location and amount of perched/trapped water can also vary
over time.
ANALYSIS AND RECOMMENDATIONS
General
Groundwater was measured in both borings at depths between approximately 10 and 13
feet below present site grade, which could impact full-depth basement construction
depending on finish site grades. Care will be needed across the development in order to
maintain adequate separation distances between footing foundations and the observed
levels of groundwater. Typically, we recommend foundation bearing elevations be
established a minimum of three (3) feet above the observed groundwater level.
Relatively dry near-surface lean clay soils exhibiting high swell potential and extending to
depths on the order of approximately 3 to 4 feet were encountered at the location of boring
B-1. Where highly expansive near-surface lean clay soils are identified at the time of
overlot grading and/or foundation excavation, these materials should be completely
Preliminary Geotechnical Subsurface Exploration Report
Kechter Farm Townhomes (Lot 1, Block 15, Kechter Farm PLD Filing 1)
Fort Collins, Colorado
Soilogic Project # 21-1014
5
removed to low swelling soil level beneath the building footprints. Since movement of site
and roadway pavements and exterior flatwork is generally less consequential than
structural and floor slab movement, it is our opinion the depth of overexcavation in these
areas could be reduced to a depth of two (2) feet below finish pavement and exterior
flatwork subgrade level.
Comparatively soft, high moisture content lean clay soils which exhibit moderate
compressibility were also encountered in boring B-2 at a depth of about four (4) feet below
grade. The clay soils would be expected to be easily disturbed by grading and construction
activities. Care should be taken to avoid disturbing the site soils prior to placement of any fill
or overlying improvements. Soils which are disturbed by the construction activities or allowed
to dry out or become wet and softened should be removed and replaced or reworked in place
prior to construction of any overlying improvements. Some overexcavation/backfill or other
approved stabilization procedures may be required to develop suitable strength foundation
bearing if more extensive zones of soft lean clay are identified at intended foundation
bearing elevation at the time of construction.
The comparatively soft, high moisture content clay soils encountered in the completed site
borings would be subject to consolidation under additionally imposed fill loads. Areas of the
site expected to receive fill depths greater than 4 to 5 feet should be developed as early as
possible in the construction process. We recommend the fill materials in these areas be placed
and allowed to remain in place for several weeks prior to the installation of site utilities and
construction of any overlying improvements in order to allow for consolidation of underlying
soils.
At this time, we understand the proposed site structures will be constructed over crawl
spaces or full basements. Extending garage and other upper-level footing foundations to
bear on lean clay with low swell potential at slightly greater depths than typical may be
required if/where expansive near-surface lean clay materials are encountered. Completing
overexcavation/backfill procedures beneath garage and any at-grade floor slabs would also
be required in these areas.
Based on the subsurface conditions encountered in the completed site borings, results of
field and laboratory testing and type of construction proposed, we expect the proposed
Preliminary Geotechnical Subsurface Exploration Report
Kechter Farm Townhomes (Lot 1, Block 15, Kechter Farm PLD Filing 1)
Fort Collins, Colorado
Soilogic Project # 21-1014
6
lightly-loaded structures could be constructed with conventional spread footing
foundations and floor slabs bearing on natural site lean clay with no to low volume change
potential and/or on a zone of properly placed and compacted overexcavation/ backfill
(where required).
Individual site explorations should be completed for each of the proposed residences after
overlot grading and infrastructure development of the site have been completed to help
better define subsurface conditions at the specific residence locations. If expansive bedrock
is identified at time of final exploration, maintaining a six (6) foot offset or use of crawl
space construction could be considered to allow use of footing foundation and slab-on-
grade construction.
If City of Fort Collins streets will be constructed as part of this project, a final pavement
exploration will be required for these roadways after utilities have been installed and streets
graded to approximate finish subgrade elevation in accordance with Larimer County Urban
Area Street Standards (LCUASS). Depending on the in-place moisture content of the
subgrade soils at the time of construction, stabilization of the pavement subgrade soils may
become necessary after grading and/or overexcavation/backfill have been performed and
prior to surfacing in order to develop a suitable paving platform.
Site Development
All existing vegetation and topsoil, including all tree root systems and dry and desiccated
soils associated with tree root systems should be removed from the building, exterior
flatwork, pavement and any proposed fill areas. Removal of soil identified as expansive in
the area of boring B-2 extending to a depth ranging from approximately 3 to 4 feet below
ground surface could also be completed at this time. After stripping and completing all cuts
and any overexcavation procedures as outlined above and prior to placement of any new
fill, overexcavation/backfill, floor slab/flatwork concrete or site pavements, we
recommend the exposed subgrade soils be scarified to a depth of 9 inches, adjusted in
moisture content and compacted to at least 95% of the materials standard Proctor maximum
dry density. The moisture content of the scarified soils should be adjusted to be within the
range of -1% to +3% of standard Proctor optimum moisture content at the time of
compaction for the site lean clay. Slopes steeper than 4:1 (H:V) expected to receive fill
Preliminary Geotechnical Subsurface Exploration Report
Kechter Farm Townhomes (Lot 1, Block 15, Kechter Farm PLD Filing 1)
Fort Collins, Colorado
Soilogic Project # 21-1014
7
should be continuously and horizontally benched level during fill placement in order to
reduce the potential for development of a shear plane between the natural site soils and
overlying fill.
Soils used as general site fill and overexcavation/backfill should consist of approved LVC
materials free from organic matter, debris and other objectionable materials. Based on
results of the completed laboratory testing, it is our opinion the site lean clay could be used
as fill and overexcavation/backfill to develop the site provided the proper moisture content
is developed in those materials at the time of placement and compaction. We recommend
the site lean clay and/or similar soils be placed in loose lifts not to exceed 9 inches thick,
adjusted in moisture content and compacted as recommended for the scarified materials
above.
Care should be taken to maintain the proper moisture content in the prepared subgrade soils
prior to foundation and floor slab/flatwork concrete placement and/or paving. The prepared
structural mat should not be left exposed for extended periods of time. In the event that the
reconditioned soils are allowed to dry out or if rain, snowmelt or water from any source is
allowed to infiltrate the bearing/subgrade soils, reworking of those materials or
removal/replacement procedures may be required.
Footing Foundations
Based on the materials encountered in the completed site borings and results of laboratory
testing, we expect the site structures could be constructed with conventional spread footing
foundations bearing on natural, undisturbed site lean clay with no to low swell potential
and/or properly-placed and compacted overexcavation/backfill. Extending garage and
other upper-level footing foundations to bear on lean clay with low swell potential at
slightly greater depths than typical should be expected in some areas. For design of footing
foundations bearing on low-swelling lean clay and/or properly placed and compacted
overexcavation/backfill, maximum net allowable soil bearing pressures in the range of
1,000 to 2,000 psf with minimum dead load pressures on the order of 500 psf appear
suitable.
Preliminary Geotechnical Subsurface Exploration Report
Kechter Farm Townhomes (Lot 1, Block 15, Kechter Farm PLD Filing 1)
Fort Collins, Colorado
Soilogic Project # 21-1014
8
Individual site explorations should be completed for each of the proposed site structures
after overlot grading is complete to help better define subsurface conditions at the specific
building locations.
Floor Slabs
Based on the type of construction proposed and results of the completed field and
laboratory testing, we expect lightly-loaded at-grade residence garage floor slabs could be
supported on reconditioned natural site soils with no to low swell potential and/or properly
placed and compacted fill or overexcavation/backfill (where required). We expect
basement floor slabs (if constructed) could bear directly on natural, undisturbed, moist lean
clay with no to low swell potential and/or overexcavation/backfill.
Care should be taken to avoid disturbing floor slab subgrades prior to concrete placement.
Subgrade soils expected to receive floor slab concrete should be evaluated closely prior to
surfacing. If areas of disturbed, wet and softened, or dry subgrade soils develop during
construction, those materials should be removed and replaced or reworked in place prior
to placement of the overlying improvements.
Crawl Space and Basement Construction
We recommend perimeter drain systems be installed around all below-grade areas
(including crawl spaces) to help reduce the potential for development of hydrostatic
pressures behind below-grade walls and surface water infiltration into the crawl space
and/or basement areas. Perimeter drain systems should consist of a 4-inch diameter,
perforated drain pipe surrounded by a minimum of six (6) inches of free-draining gravel.
A filter fabric should be considered around the free-draining gravel or perforated pipe to
reduce the potential for an influx of fine-grained soils into the systems. The drain pipes
should be placed at approximate foundation bearing level at the high point of the systems,
run around the interior or exterior perimeters of crawl space areas and exterior perimeters
of basement areas with a minimum slope of ⅛-inch per foot to facilitate efficient water
removal and be designed to discharge to sump pit and pump systems and or project
underdrain system (if available).
Preliminary Geotechnical Subsurface Exploration Report
Kechter Farm Townhomes (Lot 1, Block 15, Kechter Farm PLD Filing 1)
Fort Collins, Colorado
Soilogic Project # 21-1014
9
Backfill placed adjacent to the below grade walls should consist of LVC potential and
relatively impervious soils which are free from organic matter, debris and other
objectionable materials. The site lean clay could be used as backfill in these areas. The site
lean clay soils should be placed in loose lifts not to exceed 9 inches thick, adjusted in
moisture content and compacted as previously outlined in the “Site Development” section
of this report.
Excessive lateral stress can be imposed on below-grade walls when using heavier
mechanical compaction equipment. We recommend compaction of unbalanced basement
wall backfill be completed using light mechanical or hand compaction equipment.
Utility Installation
Bedding around utility pipelines should be placed in accordance with recommendations
from the pipeline designer. Backfill soils placed above pipelines should consist of approved
materials which are free from organic matter, debris and other objectionable materials. The
on-site lean clay could be used as pipeline backfill. Lean clay pipeline backfill should be
placed in maximum 9-inch loose lifts, adjusted in moisture content and compacted as
previously outlined in the ‘Site Development’ section of this report.
Care will be needed to ensure utilities are not placed on or above disturbed or sloughed
materials. Utility excavations will likely expose the overburden lean clay. Care will also
be needed to develop stable side slopes in pipeline trenches. As such, we expect temporary
shoring, bracing, or cutting of shallow slopes may be necessary in deeper excavations.
Excavations should be sloped or shored in the interest of safety following local and federal
regulations, including current OSHA excavation and trench safety standards. As a safety
measure, it is recommended that vehicles and soil stockpiles be kept to a minimum lateral
distance from the crest of the slope equal to no less than the slope height.
Groundwater was encountered as shallow as approximately 10 feet below present site grade
in boring B-2, completed in the southeast corner of the project site. Utility excavations
extended below groundwater will require dewatering to facilitate proper construction.
Preliminary Geotechnical Subsurface Exploration Report
Kechter Farm Townhomes (Lot 1, Block 15, Kechter Farm PLD Filing 1)
Fort Collins, Colorado
Soilogic Project # 21-1014
10
Private Drive and Parking Area Pavements
We expect overexcavation/backfill procedures will be required to develop LVC potential
site pavement subgrades in the area of boring B-1 completed on the northwest side of the
project site and other areas where expansive lean clay soils are identified underlying
pavements to any appreciable degree. Site pavements could be supported directly on
reconditioned natural site soils with no to low swell potential and/or properly placed and
compacted overexcavation/backfill soils developed as outlined above (where required). If
subgrade instability is observed prior to paving, stabilization of the pavement subgrade
soils would be required. Chemical treatment of the pavement subgrade soils could be
considered if widespread areas of instability are observed immediately prior to surfacing.
After overexcavation/backfill procedures, we expect the pavement subgrades will consist
of reconditioned lean clay with low swell potential. Structure pavement design is based, in
part, on subgrade support as established by the Hveem R-value test. The site lean clay
would be subject to low remolded strength. An R-value of 5 was estimated for the site lean
clay and used to develop the preliminary pavement section design estimates outlined
below. For preliminary estimates, a composite pavement section consisting of 4 to 5 inches
of hot bituminous pavement overlying 6 to 8 inches of aggregate base course and Portland
cement concrete section in the range of 5 to 6 inches could be used. Depending on City of
Fort Collins roadway classification, thicker pavements sections may be required for city
streets (if any).
Drainage
Positive drainage is imperative for satisfactory long-term performance of the proposed site
structures and associated site improvements. We recommend positive drainage be
developed away from all site structures and pavement areas to reduce the potential for
wetting of the subgrade and bearing materials. Water which is allowed to pond adjacent to
site improvements can result in unsatisfactory performance of those improvements over
time. Water which is allowed to pond adjacent to site pavements can result in a loss of
subgrade support and premature failure of the overlying pavement sections.
Preliminary Geotechnical Subsurface Exploration Report
Kechter Farm Townhomes (Lot 1, Block 15, Kechter Farm PLD Filing 1)
Fort Collins, Colorado
Soilogic Project # 21-1014
11
LIMITATIONS
This report was prepared based upon the data obtained from the completed site exploration,
laboratory testing, engineering analysis and any other information discussed. The
completed borings provide an indication of subsurface conditions at the boring locations
only. Variations in subsurface conditions can occur in relatively short distances away from
the borings. This report does not reflect any variations which may occur across the site or
away from the borings. If variations in the subsurface conditions anticipated become
evident, the geotechnical engineer should be notified immediately so that further evaluation
and supplemental recommendations can be provided.
The scope of services for this project does not include either specifically or by implication
any biological or environmental assessment of the site or identification or prevention of
pollutants or hazardous materials or conditions. Other studies should be completed if
concerns over the potential of such contamination or pollution exist.
The geotechnical engineer should be retained to review the plans and specifications so that
comments can be made regarding the interpretation and implementation of our
geotechnical recommendations in the design and specifications. The geotechnical engineer
should also be retained to provide testing and observation services during construction to
help determine that the design requirements are fulfilled.
This report has been prepared for the exclusive use of our client for specific application to
the project discussed and has been prepared in accordance with the generally accepted
standard of care for the profession. No warranties express or implied, are made. The
conclusions and recommendations contained in this report should not be considered valid
in the event that any changes in the nature, design or location of the project as outlined in
this report are planned, unless those changes are reviewed and the conclusions of this report
modified and verified in writing by the geotechnical engineer.
LOG OF BORING B-1
1/1 CME 45
4" CFA
Automatic
JL / BM
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N"MC DD qu % Swell @ Pressure # 200 Sieve
(ft)(%)(pcf)(psf)500 psf (psf)LL PI (%)
3-6" VEGETATION & TOPSOIL -
1
-
2
-
3 CS 31 12.8 116.2 8000 6.0%8600 ---
-
4
-
5 CS 9 26.4 94.8 4000 --39 15 85.6%
CL LEAN CLAY with varying -
amounts of SAND 6
reddish-brown to light brown, beige -
medium stiff to very stiff 7
-
8
-
9
-
10 CS 17 17.7 110.6 9000+2.0%3800 ---
-
11
-
12
-
13
SILTSTONE/CLAYSTONE -
gray, rust, olive 14
weathered -
15 CS 18 24.1 100.8 9000+-----
BOTTOM OF BORING @ 15.0'-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
LOT 1, BLOCK 15, KECHTER FARM P.L.D. FILING 1 PRELIMINARY EXPLORATION
FORT COLLINS, COLORADO
Project # 21-1014
February 2021
Sheet Drilling Rig:Water Depth Information
Start Date 2/2/2021 Auger Type:During Drilling 15'
Finish Date 2/2/2021 Hammer Type:After Drilling 15'USCSSamplerAtterberg Limits
Surface Elev.-Field Personnel:24 Hours After Drilling 13'
LOG OF BORING B-2
1/1 CME 45
4" CFA
Automatic
JL / BM
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N"MC DD qu % Swell @ Pressure # 200 Sieve
(ft)(%)(pcf)(psf)500 psf (psf)LL PI (%)
3-6" VEGETATION & TOPSOIL -
1
-
2
-
3 CS 15 15.7 116.9 9000+0.3%1000 ---
-
4
-
5 CS 4 13.2 100.7 2000 None <500 ---
-
CL LEAN CLAY with varying 6
amounts of SAND -
reddish-brown to light brown, beige 7
soft to stiff -
8
-
9
-
10 CS 14 18.6 111.9 9000+-----
-
11
-
12
-
13
-
SILTSTONE/CLAYSTONE 14
gray, rust, olive -
firm 15 CS 28 19.1 109.4 9000+-----
BOTTOM OF BORING @ 15.0'-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
Sheet Drilling Rig:Water Depth Information
LOT 1, BLOCK 15, KECHTER FARM P.L.D. FILING 1 PRELIMINARY EXPLORATION
FORT COLLINS, COLORADO
Project # 21-1014
February 2021
USCSSamplerAtterberg Limits
Start Date 2/2/2021 Auger Type:During Drilling 13'
Finish Date 2/2/2021 Hammer Type:After Drilling 13'
Surface Elev.-Field Personnel:24 Hours After Drilling 10'
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf)116.2
LOT 1, BLOCK 15, KECHTER FARM P.L.D. FILING 1 PRELIMINARY
KECHTER FARM. FT COLLINS. COLORADO
Project # 21-1014
February 2021
SWELL/CONSOLIDATION TEST SUMMARY
Sample ID: B-1 @ 2
Initial Moisture 12.8%
Sample Description: Reddish-Brown/Beige Lean Clay with Sand (CL)
500
Final Moisture 18.4%
% Swell @ 500 psf 6.0%
Swell Pressure (psf)8,600
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf)110.6
SWELL/CONSOLIDATION TEST SUMMARY
LOT 1, BLOCK 15, KECHTER FARM P.L.D. FILING 1 PRELIMINARY
KECHTER FARM. FT COLLINS. COLORADO
Project # 21-1014
February 2021
Initial Moisture 17.7%
Sample ID: B-1 @ 9
Sample Description: Reddish-Brown Sandy Lean Clay (CL)
500
Final Moisture 19.4%
% Swell @ 500 psf 2.0%
Swell Pressure (psf)3,800
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf)116.9
SWELL/CONSOLIDATION TEST SUMMARY
LOT 1, BLOCK 15, KECHTER FARM P.L.D. FILING 1 PRELIMINARY
KECHTER FARM. FT COLLINS. COLORADO
Project # 21-1014
February 2021
Initial Moisture 15.7%
Sample ID: B-2 @ 2
Sample Description: Brown Lean Clay with Sand (CL)
500
Final Moisture 17.3%
% Swell @ 500 psf 0.3%
Swell Pressure (psf)1,000
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf)100.7
SWELL/CONSOLIDATION TEST SUMMARY
LOT 1, BLOCK 15, KECHTER FARM P.L.D. FILING 1 PRELIMINARY
FORT COLLINS, COLORADO
Project # 21-1014
February 2021
Initial Moisture 13.2%
Sample ID: B-2 @ 4
Sample Description: Brown Lean Clay with Sand (CL)
500
Final Moisture 25.2%
% Swell @ 500 psf None
Swell Pressure (psf)<500
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
UNIFIED SOIL CLASSIFICATION SYSTEM
Criteria for Assigning Group Symbols and Group Names Using Laboratory TestsA Soil Classification
Group
Symbol
Group NameB
Cu ! 4 and 1 " Cc " 3E GW Well graded gravelF Clean Gravels
Less than 5% finesC Cu < 4 and/or 1 > Cc > 3E GP Poorly graded gravelF
Fines classify as ML or MH GM Silty gravelF,G, H
Coarse Grained Soils
More than 50% retained
on No. 200 sieve
Gravels
More than 50% of coarse
fraction retained on
No. 4 sieve Gravels with Fines More
than 12% finesC Fines classify as CL or CH GC Clayey gravelF,G,H
Cu ! 6 and 1 " Cc " 3E SW Well graded sandI Clean Sands
Less than 5% finesD Cu < 6 and/or 1 > Cc > 3E SP Poorly graded sandI
Fines classify as ML or MH SM Silty sandG,H,I
Sands
50% or more of coarse
fraction passes
No. 4 sieve Sands with Fines
More than 12% finesD Fines classify as CL or CH SC Clayey sandG,H,I
PI > 7 and plots on or above “A” lineJ CL Lean clayK,L,M Silts and Clays
Liquid limit less than 50
Inorganic
PI < 4 or plots below “A” lineJ ML SiltK,L,M
Liquid limit - oven
dried
Organic clayK,L,M,N
Fine-Grained Soils
50% or more passes the
No. 200 sieve
Organic
Liquid limit - not
dried
< 0.75 OL
Organic siltK,L,M,O
Inorganic PI plots on or above “A” line CH Fat clayK,L,M
Silts and Clays
Liquid limit 50 or more PI plots below “A” line MH Elastic siltK,L,M
Liquid limit - oven dried Organic clayK,L,M,P Organic
Liquid limit - not dried
< 0.75 OH
Organic siltK,L,M,Q
Highly organic soils Primarily organic matter, dark in color, and organic odor PT Peat
A Based on the material passing the 3-in. (75-mm) sieve
B If field sample contained cobbles or boulders, or both, add “with cobbles
or boulders, or both” to group name.
C Gravels with 5 to 12% fines require dual symbols: GW-GM well graded
gravel with silt, GW-GC well graded gravel with clay, GP-GM poorly
graded gravel with silt, GP-GC poorly graded gravel with clay.
D Sands with 5 to 12% fines require dual symbols: SW-SM well graded
sand with silt, SW-SC well graded sand with clay, SP-SM poorly graded
sand with silt, SP-SC poorly graded sand with clay
E Cu = D60/D10 Cc =
F If soil contains ! 15% sand, add “with sand” to group name.
G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM.
HIf fines are organic, add “with organic fines” to group name.
I If soil contains ! 15% gravel, add “with gravel” to group name.
J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay.
K If soil contains 15 to 29% plus No. 200, add “with sand” or “with
gravel,” whichever is predominant.
L If soil contains ! 30% plus No. 200 predominantly sand, add
“sandy” to group name.
M If soil contains ! 30% plus No. 200, predominantly gravel, add
“gravelly” to group name.
N PI ! 4 and plots on or above “A” line.
O PI < 4 or plots below “A” line.
P PI plots on or above “A” line.
Q PI plots below “A” line.
GENERAL NOTES
DRILLING & SAMPLING SYMBOLS:
SS: Split Spoon - 1⅜" I.D., 2" O.D., unless otherwise noted HS: Hollow Stem Auger
ST: Thin-Walled Tube – 2.5" O.D., unless otherwise noted PA: Power Auger
RS: Ring Sampler - 2.42" I.D., 3" O.D., unless otherwise noted HA: Hand Auger
CS: California Barrel - 1.92" I.D., 2.5" O.D., unless otherwise noted RB: Rock Bit
BS: Bulk Sample or Auger Sample WB: Wash Boring or Mud Rotary
The number of blows required to advance a standard 2-inch O.D. split-spoon sampler (SS) the last 12 inches of the total 18-inch
penetration with a 140-pound hammer falling 30 inches is considered the “Standard Penetration” or “N-value”. For 2.5” O.D.
California Barrel samplers (CB) the penetration value is reported as the number of blows required to advance the sampler 12
inches using a 140-pound hammer falling 30 inches, reported as “blows per inch,” and is not considered equivalent to the
“Standard Penetration” or “N-value”.
WATER LEVEL MEASUREMENT SYMBOLS:
WL: Water Level WS: While Sampling
WCI: Wet Cave in WD: While Drilling
DCI: Dry Cave in BCR: Before Casing Removal
AB: After Boring ACR: After Casing Removal
Water levels indicated on the boring logs are the levels measured in the borings at the times indicated. Groundwater levels at other
times and other locations across the site could vary. In pervious soils, the indicated levels may reflect the location of groundwater.
In low permeability soils, the accurate determination of groundwater levels may not be possible with only short-term observations.
DESCRIPTIVE SOIL CLASSIFICATION: Soil classification is based on the Unified Classification System. Coarse Grained Soils
have more than 50% of their dry weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand.
Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they
are plastic, and silts if they are slightly plastic or non-plastic. Major constituents may be added as modifiers and minor constituents
may be added according to the relative proportions based on grain size. In addition to gradation, coarse-grained soils are defined
on the basis of their in-place relative density and fine-grained soils on the basis of their consistency.
FINE-GRAINED SOILS COARSE-GRAINED SOILS BEDROCK
(CB)
Blows/Ft.
(SS)
Blows/Ft.
Consistency
(CB)
Blows/Ft.
(SS)
Blows/Ft.
Relative
Density
(CB)
Blows/Ft.
(SS)
Blows/Ft.
Consistency
< 3 0-2 Very Soft 0-5 < 3 Very Loose < 24 < 20 Weathered
3-5 3-4 Soft 6-14 4-9 Loose 24-35 20-29 Firm
6-10 5-8 Medium Stiff 15-46 10-29 Medium Dense 36-60 30-49 Medium Hard
11-18 9-15 Stiff 47-79 30-50 Dense 61-96 50-79 Hard
19-36 16-30 Very Stiff > 79 > 50 Very Dense > 96 > 79 Very Hard
> 36 > 30 Hard
RELATIVE PROPORTIONS OF SAND AND
GRAVEL
GRAIN SIZE TERMINOLOGY
Descriptive Terms of
Other Constituents
Percent of
Dry Weight
Major Component
of Sample
Particle Size
Trace < 15 Boulders Over 12 in. (300mm)
With 15 – 29 Cobbles 12 in. to 3 in. (300mm to 75 mm)
Modifier > 30 Gravel 3 in. to #4 sieve (75mm to 4.75 mm)
Sand
Silt or Clay
#4 to #200 sieve (4.75mm to 0.075mm)
Passing #200 Sieve (0.075mm)
RELATIVE PROPORTIONS OF FINES PLASTICITY DESCRIPTION
Descriptive Terms of
Other Constituents
Percent of
Dry Weight
Term Plasticity Index
Trace
With
Modifiers
< 5
5 – 12
> 12
Non-plastic
Low
Medium
High
0
1-10
11-30
30+