HomeMy WebLinkAboutSTETSON CREEK PUD, FIRST FILING - FINAL - 16-89F - SUBMITTAL DOCUMENTS - ROUND 1 - LDGS ACTIVITY FORMS 7-4'T SO nJ G � K , d of s T
Activity A: ALL DEVELOPMENT CRITERIA
ALL CRITERIA
APPLICABLE CRITERIA ONLY
Is ;he Cx9en n win the aft
apoicabie? be satisfied?
CRITERION
Yes No If no, please explain
9
Al.
COMMUNITY -WIDE CRITERIA
2
1.1
Solar Orientation
1.2
Ccmprehensive Plan
1.3
Wildlife Habitat
1.4
Mineral Deposit
1.5
Ecologically Sensitive Areas
reserved
1.6
Lands of Agricultural Importance
reserved
1.7
Enercy Conservation
1.8
Air Quality
�/
1.9
Water Qualitv
✓
A 2.
NEIGHBORHOOD COMPATIBILITY CRITERIA
2.1
Vehicular. Pedestrian, Bike TransQortation
2.2
Building Placement and Orientation
2.3
Natural Features
2.4
Vehicular Circulation and Parking
2.5
Emergency Access
2.6
Pedestrian Circulation
2.7
Architecture
V_H
2.8
Building Height and Views
2.9
Shading
2.10
Solar Access
2.11
Historic Resources
2.12
Setbacks I
IV/
2.13
Landscape
2.14
Signs
2.15
Site Lighting
2.16
Noise and Vibration
2.17
Glare or Heat
2.18
Hazardous Materials
A 3.
ENGINEERING CRITERIA
3.1
Utility Capacity
3.2
Design Standards
3.3
Water Hazards
3.4
Geologic Hazards
54