HomeMy WebLinkAboutBROOKSIDE VILLAGE AT ROCK CREEK PUD - PRELIMINARY - 16-89E - CORRESPONDENCE - RESPONSE TO APPLICANTand Environmental3ervices
Planning Department
City of Fort Collins
November 16, 1993
Mr. Gary Hoover
Geneva Homes
c/o Cityscape
3555 Stanford
Fort Collins,
Urban Design
Road, Suite 105
CO 80525
RE: Brookside Village at Rock Creek, Preliminary P.U.D.
Dear Eldon:
On Monday, November 15, 1993, at the regular meeting of the City of
Fort Collins Planning and Zoning Board, the Board voted 5 - 0 to
approve Brookside Village at Rock Creek, Preliminary P.U.D. subject
to the following conditions:
1. By the time of consideration of the Final P.U.D., the City
Council shall have passed, on second reading, the request to
rezone the property from T, Transition, to R-L-P, Low Density
Planned Residential.
2. At the time of consideration of Final P.U.D., the design of
the southerly perimeter fence that divides Brookside Village
P.U.D. from the rural properties within the Blehm and Scheller
Subdivisions shall be such that it provides an effective
livestock enclosure, using appropriate materials suitable to
control livestock.
3. At the time of consideration of Final P.U.D., the discharge of
irrigation flows from the Scheller and Blehm Subdivisions
shall be accommodated in a manner that is in accordance with
Colorado law and respects the private property rights of all
affected parties. In addition, due to the possibility of a
high water table in the general area and the pre-existing
condition of irrigated pastures, the developer shall include
a note on the plat advising the general public of such
conditions.
If you have any questions regarding the action of the City of Fort
Collins Planning and Zoning Board, please feel free to call the
Planning Department at 221-6750.
Sincerely:
Ted Shepard
Senior Planner
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750