May 13, 1993
Planning and Environmenta&rvices
Eldon Ward
Cityscape Design
3555 Stanford Road, Suite 105
Fort Collins, Co 80525
Dear Eldon:
For your information, attached is a copy of the Staff's comments concerning South
Timberline Properties ODP and PUD, presented before the Conceptual Review Team
on May 10, 1993.
The comments are offered informally by Staff to assist you in' preparing the
detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6750.
Sincerely,
Kirsten Whetstone
Project Planner
KW/gjt
Attachments
cc: Tom Peterson, Planning Director
Kerrie Ashbeck, Civil Engineer
Transportation Department
Stormwater Department
Project Planner
File
281 North College Avenue • P.O. Box 580 • Fort Collins. CO 80522-0780 • (303) 221-67-0
•
u
MEETING DATE: May 10, 1993
ITEM: South Timberline Properties ODP and PUD
APPLICANT: Eldon Ward
Cityscape Design
3555 Stanford Road, Suite 105
Fort Collins, CO 80525
LAND USE DATA: This is a proposal for an ODP for approximately 130
acres of undeveloped property, located on the east side of
Timberline Road, approximately one half mile south of Harmony Road.
The property is zoned ep, employment park.
COMMENTS:
1. Light and Power has an existing overhead line running along
Timberline Road from Harmony Road to serve the existing house.
Light and Power will provide the site with underground power.
Normal residential development charges would apply.
2. There is an existing sewer main along the south and east
property lines. Water is located in the intersection of
Harmony and Timberline Road, and will have to be extended at
your cost, to the site.
3. A Master Utility Plan for the entire area would be helpful.
4. The ep, employment park, Zoning District requires residential
uses to be reviewed as a Planned Unit Development (PUD).
Project location signs must be located on platted property.
5. There is a proposed 10 acre park site located near the future
Jr. High School. Parks and Recreation would like to see some
street access to the park. Good pedestrian access should be
provided throughout the ODP to provide connections to the
school, park, and future employment areas.
6. Parkland fees of $625.00 per dwelling unit are payable at the
time of building permit issuance.
7. The property is located in the McClellands-Mail Creek Drainage
Basin. Stormwater development fees are $3717.00 per acre
subject to the coefficient of run-off.
8. The drainage crossing of Timberline will need to be improved.
Downstream improvements are still needed in this area. The
City has programmed some of these improvements for 1994.
9. An overall drainage report and plan would be required for an
area this large.
10. A standard stormwater submittal includes drainage and grading
plans, drainage report, and an erosion control plan.
11. Addressing of the loop street should be discussed with Jim
Hoff in Engineering.
12. Sight distance can be a problem on loop streets and may
require dedication of sight distance easements on some lots.
13. The project will have obligations for improving Timberline
Road and may have off -site obligations from Harmony to the
site. A development agreement will be required. A standard
engineering submittal will be required.
14. An overall traffic study would be desirable. There was a
traffic study done for the Jr. High School which may be
useful. One of the issues will be whether the connecting
streets should be collector or local streets. Pedestrian and
bicycle connections will also be important.
15. A minimum of 65% of the lots must meet requirements of the
solar orientation ordinance.
16. A Planned Unit Development must meet the minimum density
requirement of 3.0 dwelling units per acre.
17. Planning concerns include buffer treatment along the north
property line, arterial streetscape and landscaping, fencing,
pedestrian connections, and treatment of the open space areas.
18. Poudre Valley Hospital has purchased the property to the
north. You should contact them to discuss this proposal and
see what is planned for their property.