Loading...
HomeMy WebLinkAboutMAVERIK - FDP210003 - DOCUMENT MARKUPS - ROUND 4 - UTILITY PLANS (3)VANSTOP STOP COVER SHEET 1 FINAL UTILITY PLANS FOR MAVERIK INC. STORE LOT 2, INTERSTATE LAND HOLDINGS MINOR LAND SUBDIVISION FILE NO. 12-S3124 A PORTION OF THE SW 1 4 OF SECTION 15, T6N, R68W, OF THE 6TH P.M. CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF C OLORADO MARCH, 2021 VICINITY MAP All changes, addendums, additions, deletions and modifications to these drawings must be approved, in writing, by the Fort Collins-Loveland Water District and the South Fort Collins Sanitation District. District Engineer Date FORT COLLINS - LOVELAND WATER DISTRICT SOUTH FORT COLLINS SANITATION DISTRICT PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 GENERAL NOTES 2 ’ “” – – ’ ’ ’ ’ “” – “” “”“” PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 GENERAL NOTES 3 ’ “” ’ ’ ’ “” PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 VANS TOP STOP SDSITE PLAN 4 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 SDSSSSSSWWWWWWW W W WWW W W W W W W SSSSSSSS SS SS SS SS SS SS W W W EXISTING SITE SURVEY 5 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 SDSSSSSSSSWWWWWWW W W WWW W W W W W W SSSSSSSS SS SS SS SS SS SS SS W W W W W DEMOLITION PLAN 6 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 VANS TOP STOP SDWWWWWWW W W WWW W W W W W W W W W W HORIZONTAL CONTROL PLAN 7 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 VANS TOP STOP SDSITE EASEMENT PLAN 8 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 VANS TOP STOP SD SSSSSSWWWWWWW W W WWW W W W W W W SSSSSSSS SS SS SS SS SS W B B BBOVERALL GRADING PLAN 9 N.T.S. PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 VANSDB B DETAILED GRADING PLAN 10 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 N.T.S. VANSTOP STOP SDSSSSSSSSSSSSSSWWWWWWWWWW W W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W WWBBDETAILED GRADING PLAN 11 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 N.T.S. POND GRADING DETAIL 12 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 VANSTOP STOP SDSSSSSS SS SS SS HARDSCAPE PLAN 13 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 VANS TOP STOP SDSSSSSSSSWWWWWWW W W WWW W W W W W W SSSSSSSS SS SS SS SS SS SS SS W W W W OVERALL UTILITY PLAN 14 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 VANSTOP STOP SDSSSSWWWWWWW W W WW W W W W W W SSSSSS SS SS SS SS STORM SEWER DRAINAGE PLAN 15 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 VANSTORM DRAIN PROFILE H-SCALE: 1"=20' V-SCALE: 1"=4' 16 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 H-SCALE: 1"=20' V-SCALE: 1"=4' VANSTOP STOP SDSSSSSSWWWWWWW W W WWW W W W W W W SSSSSSSS SS SS SS SS SS W 5 2 3 4 6 1 0.790.98 E 1.28 0.770.97 B 0.38 0.951.00 A 0.11 0.700.88 D 0.40 0.92 1.00 C 0.30 0.25 0.31 F 0.35 DRAINAGE PLAN 17 1 0.400.14 A 1.41 A PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 4870 4875 4880 4885 4890 4895 4900 4905 4910 4870 4875 4880 4885 4890 4895 4900 4905 4910 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 VANST O P ST O P SD SSSSSSSSSSWW WWWWW W W W W W WWW W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W BBB B FRONTAGE ROAD PLAN AND PROFILEATTACHED WALK PLAN VIEW 4'X6' TREE GRATE DETAIL (TYP.) SCALE: 1"-10' 18 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006RD ATTACHED WLK EXH.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 FRONTAGE RD FL 12+00 START STA: 0+00.00, END STA: 1+50.00 4870 4875 4880 4885 4890 4895 4900 4870 4875 4880 4885 4890 4895 4900 0+00 0+50 1+00 1+50 FRONTAGE RD FL 13+00 START STA: 0+00.00, END STA: 1+50.00 4870 4875 4880 4885 4890 4895 4900 4870 4875 4880 4885 4890 4895 4900 0+00 0+50 1+00 1+50 FRONTAGE RD FL 14+00 START STA: 0+00.00, END STA: 1+50.00 4870 4875 4880 4885 4890 4895 4900 4870 4875 4880 4885 4890 4895 4900 0+00 0+50 1+00 1+50 FRONTAGE RD FL 15+00 START STA: 0+00.00, END STA: 1+50.00 4860 4865 4870 4875 4880 4885 4890 4860 4865 4870 4875 4880 4885 4890 0+00 0+50 1+00 1+50 FRONTAGE RD FL 16+00 START STA: 0+00.00, END STA: 1+50.00 4860 4865 4870 4875 4880 4885 4890 4860 4865 4870 4875 4880 4885 4890 0+00 0+50 1+00 1+50 FRONTAGE RD FL 16+42.22 START STA: 0+00.00, END STA: 1+50.00 4860 4865 4870 4875 4880 4885 4890 4860 4865 4870 4875 4880 4885 4890 0+00 0+50 1+00 1+50 FRONTAGE RD FL 10+94.76 START STA: 0+00.00, END STA: 1+50.00 4875 4880 4885 4890 4895 4900 4905 4875 4880 4885 4890 4895 4900 4905 0+00 0+50 1+00 1+50 FRONTAGE ROAD CROSS SECTIONS 19 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006RD ATTACHED WLK EXH.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 N.T.S. VANST OP ST O P SD FRONTAGE SIGNING AND STRIPING PLAN 20 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006RD ATTACHED WLK EXH.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 ’ “” SD INITIAL EROSION CONTROL PLAN 21 13 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 VANS TOP STOP SD INTERIM EROSION CONTROL PLAN 22 13 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 VANS TOP STOP SD FINAL EROSION CONTROL PLAN 23 13 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 EROSION CONTROL DETAILS 24 13 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 EROSION CONTROL PLAN 25 13 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 VANS TOP STOP SDSSSSWWWWWWW W W WWW W W W W W W SSSSSSSS SS SS SS SS FIRE ACCESS PLAN 26 13 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 TRASH ENCLOSURE DETAILS 27 13 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 FI R E L A N E - N O P A R KIN G FIRE NO PARKING LANE DETAILS 28 13 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 DETAILS 29 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 DETAILS 30 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 DETAILS 31 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 DETAILS 32 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 DETAILS 33 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 C SAND FILTER "A" FOREBAY PLAN SECTION C SECTION B BBA SECTION A AASAND FILTER "B" FOREBAY PLAN SAND FILTER "C" FOREBAY PLAN SAND FILTER FOREBAY DETAILS 34 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 CONCRETE SPILL CONTAINMENT VAULT (MODIFIED FORT COLLINS DETAIL D-42 WITH DIMENSIONS) DETAILS 35 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 DETAILS 36 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37 DETAILS 37 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-06-22Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 06/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. JUNE 21, 2021 19-122-0006 37