July 09, 2021
Cassie Younger
Maverik
185 State Street
Salt Lake City, UT 8411
RE: Maverik, FDP210003, Round Number 3
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of Maverik. If you have questions about any comments, you may
contact the individual commenter or direct your questions through your Development
Review Coordinator, Brandy Bethurem Harras via phone at 970-416-2744 or via email at
bbethuremharras@fcgov.com.
Comment Summary:
Department: Development Review Coordinator
Contact: Brandy Bethurem Harras, 970-416-2744, bbethuremharras@fcgov.com
Topic: General
Comment Number: 4
04/06/2021: FOR FINAL APPROVAL:
All "For Final Approval / For Approval" comments need to be addressed and
resolved prior to moving forward with the final documents and recording of this
project. I will provide a recording checklist and process information when we are closer to this step.
DCI Response: Noted
Comment Number: 1
04/06/2021: INFORMATION:
I will be your primary point of contact throughout the development review and
permitting process. If you have any questions, need additional meetings with the
project reviewers, or need assistance throughout the process, please let me
know and I can assist you and your team. Please include me in all email
correspondence with other reviewers and keep me informed of any phone
conversations. Thank you! DCI Response: Noted
Comment Number: 2 Comment Originated: 04/06/2021
04/06/2021: INFORMATION:
2
As part of your resubmittal you will respond to the comments provided in this
letter. This letter is provided to you in Microsoft Word format. Please use this
document to insert responses to each comment for your submittal, using a
different font color. When replying to the comment letter please be detailed in
your responses, as all comments should be thoroughly addressed. Provide
reference to specific project plans or explanations of why comments have not
been addressed, when applicable. DCI Response: Noted
Comment Number: 5 Comment Originated: 05/17/2021
05/17/2021: INFORMATION:
LUC 2.211 Lapse, Term of Vested Right: Within a maximum of three (3) years
following the approval of a final plan or other site specific development plan, the
applicant must undertake, install and complete all engineering improvements
(water, sewer, streets, curb, gutter, street lights, fire hydrants and storm
drainage) in accordance with city codes, rules and regulations. The period of
time shall constitute the "term of the vested property right." Failure to undertake
and complete such engineering improvements within the term of the vested
property right shall cause a forfeiture of the vested property right and shall
require resubmission of all materials and reapproval of the same to be
processed as required by this Code. All dedications as contained on the final
plat shall remain valid unless vacated in accordance with law. DCI Response: Noted
Department: Engineering Development Review
Contact: Spencer Smith, 970-221-6603, smsmith@fcgov.com
Topic: General
Comment Number: 1
07/06/2021: FOR DCP/BUILDING PERMIT
The City has had some coordination on being able to collect this fee. I should
be able to give you a final number prior to your DCP issuance. If you are ready
to move forward with construction prior to this being provided, we will have
some flexibility to allow you to begin construction prior to paying it, if absolutely
necessary, so this should not hold up your construction schedule. DCI Response: Noted
04/06/2021: FOR FINAL APPROVAL:
This comment is just a reminder that there is a repayment due to the City of Fort
Collins for previously constructed I-25/Hwy 392 interchange improvements. I
believe I provided an estimated cost of the repay in a previous comment or
email. Please contact me if you would like to have the exact amount provided. Maverik Response: This
fee will be coordinated with Spencer and paid at the requested time.
Comment Number: 2
07/06/2021: DEVELOPMENT AGREEMENT
I am continuing to work with City staff on finalizing the DA draft. Once our City
Attorney has reviewed the draft, it will be sent to the development team for review. DCI Response: Noted
05/24/2021: DEVELOPMENT AGREEMENT
Thank you for submitting the DA information form. A draft of the agreement will
be prepared by City staff and provided for review by the owner/developer.
04/06/2021: DEVELOPMENT AGREEMENT:
A development agreement (DA) will be required for this project. Please
complete and submit a development agreement information form (included in
the comments/redlines for this submittal). I will need this in order to prepare the
draft agreement. I will try and get a draft DA ready for review by our City
3
Attorney by the time we issue comments on your next submittal. Once our
attorney has reviewed the agreement, the draft will be provided to you for
review. The DA will need to be completed prior to final approval. For more
information on development agreements, please visit the City Development
Review Engineering website: https://www.fcgov.com/engineering/devrev.php
DCI Response: Noted
Comment Number: 3
07/06/2021: DEVELOPMENT CONSTRUCTION PERMIT
I understand that construction may be planned to begin later this year. Please
continue to keep me in the loop regarding your construction schedule and when
you will be looking to have the DCP meeting, which is required prior to DCP
issuance. I have sent the cost estimate and utility plans to our Chief
Engineering Inspector for review. I will follow up once I have received either
approval or comments from him. DCI Response: Noted
05/24/2021: DEVELOPMENT CONSTRUCTION PERMIT
Thank you for submitting the cost estimate and DCP application form. Once
staff feels that the site layout/design will not significantly change, the estimate
will be sent to the Chief Engineering Inspector for review. DCI Response: Noted
04/06/2021: DEVELOPMENT CONSTRUCTION PERMIT:
A development construction permit (DCP) will be required prior to commencing
construction of any public improvements. Once the plans are close to approval,
we will need an engineer's opinion of cost submitted by the consulting engineer
(licensed in CO). This cost estimate will be reviewed by Engineering and
Engineering Inspections staff. Once approved, it will serve as the basis for
Engineering inspection fees as well as public improvement surety that will be
required prior to DCP issuance. For more information on the DCP process,
requirements and cost estimate template, visit the City Development Review
Engineering website: https://www.fcgov.com/engineering/devrev.php
DCI Response: Noted
Comment Number: 5
05/24/2021: FOR FINAL APPROVAL
Thank you for submitting the easement documents for review. Please continue
to work with me to get the easements approved and then recorded. Please
note that the developer will need to pay the appropriate recording fees to
Larimer County in order to record all documents. Once the easement
documents are finalized, the City will provide you with the final amount of the
recording fees. DCI Response: Noted
04/06/2021: FOR FINAL APPROVAL:
There are going to be quite a few easement dedications and vacations for this
site. They will need to be processed by separate instrument, which will require
legal descriptions and exhibits for each, as well as deeds of dedication or
vacation resolutions. We will want to see the survey documents as soon as
possible once the site, utilities, etc. are pretty well set and not going to change.
You will need to submit a completed TDRF application and fees for the
easements ($250/dedication and $400/vacation). There is more information as
well as template deeds of dedication on our website: City Development Review
Engineering website: https://www.fcgov.com/engineering/devrev.php. Please
note that this comment only applies to easements to be dedicated to the City of
4
Fort Collins or City easements being vacated. Easements dedicated to or
being vacated that are owned by another municipality would be handled per that
entity's standards and coordinated with them. We would just need the
documentation (reception #) for those dedications/vacations to be shown on the plans.
DCI Response: Noted
Department: Traffic Operation
Contact: Steve Gilchrist, 970-224-6175, sgilchrist@fcgov.com
Topic: General
Comment Number: 2
05/24/2021: FOR FINAL APPROVAL:
Signing and Striping redlines have been provided for the changes requested in
the previous comment. DCI Response: All redlines that have been provided on 5/24/2021 have been
addressed and submitted at the 3rd submittal. No additional redlines have been provided with these
“Round 3” Comments.
Department: Stormwater Engineering
Contact: Basil Hamdan, 970-222-1801, bhamdan@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 04/01/2021
05/20/2021: FOR FINAL APPROVAL:
Please address all redlined comments provided on the plans. DCI Response: All redlines that have been
provided on 5/20/2021 have been addressed and submitted at the 3rd submittal. No additional
redlines have been provided with these “Round 3” Comments.
04/01/2021: INFORMATION ONLY:
The City Manager’s development review fee schedule under City Code 7.5-2
was updated to include fees for Erosion Control and Stormwater Inspections.
As of January 1st, 2021, these fees will be collected on all projects for such
inspections.
The Erosion Control fees are based on; the number of lots, the total site
disturbance and the estimated number of years the project will be active; the
Stormwater Inspection Fees are based on the number of LID/WQ Features that
are designed for on this project. Based on the proposed site construction
associated with this project we are assuming 1 lot, 2.89 acres of disturbance, 1
year from demo through build out of construction and an additional 3 years till full
vegetative stabilization due to seeding. Which results in an Erosion Control Fee
estimate of $ 1,172.09
Based on 1 extended detention and 2 sand filters/underground treatments, the
estimate of the Stormwater LID/WQ Inspection fee to is $ 1,080
Please note that as the plans and any subsequent review modifications of the
above-mentioned values change the fees may need to be modified. I have
provided a copy of the spreadsheet used to arrive at these estimates for your
review. Maverik Response: The fees will be coordinated with Brandy and paid at the requested time.
DCI Response: All redlines that have been provided on 5/20/2021 have been addressed and
submitted at the 3rd submittal. No additional redlines have been provided with these “Round 3”
5
Comments.
FOR FINAL APPROVAL:
Please address all redlined comments provided on the Final Erosion and
Sediment Control Plan. DCI Response: Noted
Contact: Dan Mogen, 970-305-5989, dmogen@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 04/05/2021
07/07/2021: FOR FINAL APPROVAL - UPDATED:
I appreciate the continued coordination and discussion around updates.
Please see updated redlines and contact me for discussion.
05/24/2021: Thank you for reaching out, meeting, and coordinating on these
latest updates and addressing many of my concerns. While many have been
addressed, there are still some questions remaining regarding the outlet
structure, spillway, hydraulic sizing, and other details. Please see updated
redlines for reference, and I encourage another meeting to review redlines and
potential revisions. DCI Response: All redlines have either been address or explained through our
direct video call. These redlines have been meticulously worked through by your direction to
assure proper response.
04/05/2021: There are numerous redlines from preliminary review that have not
been addressed including details on the spill containment system, the sand
filters and forebays. Please review current redlines, and provide written
responses on the PDFs. DCI Response: All redlines have either been address or explained through
our direct video call. These redlines have been meticulously worked through by your direction to
assure proper response.
I encourage you to reach out with any questions or to review potential revisions,
and I’d be happy to set up a meeting or conference call to do so in place of
written responses.
Comment Number: 3 Comment Originated: 04/05/2021
07/07/2021: FOR RECORDING - UPDATED:
Drainage easement is required to be recorded along with project approval.
05/24/2021: Thank you for clarifying easement boundaries and providing
easement dedication documents. Comment to remain active to ensure
easement is dedicated prior to final project approval. DCI Response: Noted
04/05/2021: Please clarify proposed drainage easements areas to include all
sand filters, detention pond, and outfall. Please provide easement dedication
or plat for review. DCI Response: The drainage easement has been submitted by separate document
and is currently under review.
Comment Number: 5 Comment Originated: 04/05/2021
07/07/2021: DEVELOPMENT AGREEMENT - UPDATED:
Please see redlines regarding final details needed for SOPs.
05/24/2021: Thank you for providing initial SOPs; clarification is needed on
some of the details prior to final approval and inclusion in the DA. Please see
redlines for additional information. DCI Response: All SOP redlines have been address, the format
6
issue has been corrected in the report. Additional information has been added to clarify the
procedure for isolating fuel spills.
04/05/2021: Please provide spill containment details in Standard Operating
Procedures (SOPs) for inclusion in the DA. Please see redlines for additional
details needed on the spill containment systems. DCI Response: with your direction, the details have
been revised and all additional redlines have been addressed.
Department: Environmental Planning
Contact: Scott Benton, (970)416-4290, sbenton@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 03/30/2021
03/30/2021: FOR DCP AND DEVELOPMENT AGREEMENT (Repeat
comment):
Since a humane form of fumigation is to be used (PERC) the lower
payment-in-lieu fee of $3,797.08 is available. The payment-in-lieu is due prior
to issuance of the DCP, and the fee and payment mechanism is required to be
recorded in the Development Agreement. Maverik Response: This fee will be coordinated with
Brandy and paid prior to issuance of the DCP.
Comment Number: 4 Comment Originated: 06/30/2021
06/30/2021: No further comments for FDP phase. Looking forward to
addressing prairie dogs as per the plan for DCP issuance. Maverik Response: Noted
Department: Internal Services
Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated: 04/02/2021
04/02/2021: BUILDING PERMIT:
Construction shall comply with adopted codes as amended. Current adopted
codes are:
2018 International Building Code (IBC) with local amendments
2018 International Existing Building Code (IEBC) with local amendments
2018 International Energy Conservation Code (IECC) with local amendments
2018 International Mechanical Code (IMC) with local amendments
2018 International Fuel Gas Code (IFGC) with local amendments
2018 International Swimming Pool and Spa Code (ISPSC) with local
amendments
2018 International Plumbing Code (IPC) as amended by the State of Colorado
2020 National Electrical Code (NEC) as amended by the State of Colorado
Copies of current City of Fort Collins code amendments can be found at
fcgov.com/building.
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2017.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Loads: Risk Category II (most structures):
7
· 140mph (Ultimate) exposure B or
· Front Range Gust Map published by The Structural Engineer's Association of
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code: 2018 IECC commercial chapter.
INFORMATIONAL ITEMS:
· Commercial occupancies must provide 10ft setback from property line and 20
feet between other buildings or provide fire rated walls and openings per
chapter 6 and 7 of the IBC.
· City of Fort Collins amendments to the 2018 IBC require a full NFPA-13
sprinkler system per IBC chapter 9 or when building exceeds 5000 sq.ft. (or
meet fire containment requirements).
· Prescriptive energy compliance with increased insulation values is required for
buildings using electric heat.
· A City licensed commercial general contractor is required to construct any new
commercial structure.
Building Permit Pre-Submittal Meeting:
Please schedule a pre-submittal meeting with Building Services for this project.
Pre-Submittal meetings assist the designer/builder by assuring, early on in the
design, that the new projects are on track to complying with all of the adopted
City codes and Standards listed below. The proposed project should be in the
early to mid-design stage for this meeting to be effective. Applicants of new
projects should email rhovland@fcgov.com to schedule a pre-submittal
meeting. Applicants should be prepared to present site plans, floor plans, and
elevations and be able to discuss code issues of occupancy, square footage,
type of construction, and energy compliance method being proposed.
Comment Number: 2 Comment Originated: 04/02/2021
04/02/2021: BUILDING PERMIT:
A passing building air tightness test (blower door) is required before CO can be
issued.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Construction Drawings
Comment Number: 4 Comment Originated: 04/05/2021
07/06/2021: FOR FINAL APPROVAL-UNRESOLVED:
Please provide the following information for the Benchmark Statement in the
EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
8
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS
DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION
SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF
FORT COLLINS DATUM) = NAVD88 DATUM - X.XX’.
05/26/2021: FOR FINAL APPROVAL:
Please provide the following information for the Benchmark Statement in the
EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS
DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION
SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF
FORT COLLINS DATUM) = NAVD88 DATUM - X.XX’.
04/05/2021: FOR FINAL APPROVAL:
Benchmark Y401 is a about 5 miles from the project site. Please add another
benchmark that is close to the project site and in the City's Vertical Control
Network. Please contact our office if you need any help with benchmark
information. DCI Response: Benchmark on plans have been revised to meet the City’s format and
have included the conversion statement.
Comment Number: 6 Comment Originated: 05/26/2021
07/06/2021: FOR FINAL APPROVAL-UNRESOLVED:
Some of the sheet titles in the sheet index do not match the sheet titles on the
noted sheets. See redlines. DCI Response: Revised the sheet index to match sheet titles.
05/26/2021: FOR FINAL APPROVAL:
Some of the sheet titles in the sheet index do not match the sheet titles on the
noted sheets. See redlines. DCI Response: Revised the sheet index to match sheet titles.
Comment Number: 7 Comment Originated: 05/26/2021
07/06/2021: FOR FINAL APPROVAL-UNRESOLVED:
All Benchmark Statements must match on all sheets.
05/26/2021: FOR FINAL APPROVAL:
9
All Benchmark Statements must match on all sheets. DCI Response: all benchmarks match on all
sheets.
Comment Number: 8 Comment Originated: 05/26/2021
07/06/2021: FOR FINAL APPROVAL-UNRESOLVED:
There are line over text issues. See redlines.
05/26/2021: FOR FINAL APPROVAL:
There are line over text issues. See redlines. DCI Response: all text has been moved or masked to
avoid text over linework and text on text.
Comment Number: 9 Comment Originated: 05/26/2021
07/06/2021: FOR FINAL APPROVAL-UNRESOLVED:
There are text over text issues. See redlines.
05/26/2021: FOR FINAL APPROVAL:
There are text over text issues. See redlines. DCI Response: all text has been moved or masked to
avoid text over linework and text on text.
Topic: Site Plan
Comment Number: 2 Comment Originated: 04/05/2021
07/06/2021: FOR FINAL APPROVAL-UNRESOLVED:
There are line over text issues. The 4/06/21 redlines have been included. DCI Response: all text has
been moved or masked to avoid text over linework and text on text.
05/24/2021: FOR FINAL APPROVAL-UNRESOLVED:
There are line over text issues. See the 4/06/21 redlines. DCI Response: all text has been moved or
masked to avoid text over linework and text on text.
04/05/2021: FOR FINAL APPROVAL:
There are line over text issues. See redlines. DCI Response: all text has been moved or masked to
avoid text over linework and text on text.
Comment Number: 5 Comment Originated: 05/26/2021
07/06/2021: FOR FINAL APPROVAL-UNRESOLVED:
Please provide the following information for the Benchmark Statement in the
EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS
DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION
SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF
FORT COLLINS DATUM) = NAVD88 DATUM - X.XX’.
10
05/26/2021: FOR FINAL APPROVAL:
Please provide the following information for the Benchmark Statement in the
EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS
DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION
SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF
FORT COLLINS DATUM) = NAVD88 DATUM - X.XX’.
DCI Response: Benchmark on plans have been revised to meet the City’s format and have included
the conversion statement.
Department: Outside Agencies
Contact: Nate Ensley, PE FCLWD/SFSD, (970) 226-3104 Ext 113,
NEnsley@FCLWD.com, ,
Topic: General
Comment Number: 1 Comment Originated: 05/25/2021
05/25/2021: FOR FINAL APPROVAL:
Please see our attached comments. DCI Response: no additional comments have been provided with
“Round 3” Comments.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/26/2021
03/26/2021: BUILDING PERMIT:
Irrigation plans are required no later than at the time of building permit. The
irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of
the Land Use Code. Direct questions concerning irrigation requirements to Eric
Olson, at 221-6704 or eolson@fcgov.com DCI Response: Noted