HomeMy WebLinkAboutMAVERIK - FDP210003 - SUBMITTAL DOCUMENTS - ROUND 4 - SUPPORTING DOCUMENTATION (2)PROJECT NAME:
DATE:
LF 0 $7.97 $0.00 $2.25 $0.00
LF 0 $5.14 $0.00 $2.25 $0.00
EACH 0 $6,500.00 $0.00 $170.00 $0.00
Sewer Cleanout EACH 0 $132.07 $0.00 $170.00 $0.00
EACH 1 $5,000.00 $5,000.00 $230.00 $230.00
Sanitary Sewer Inspection Fees $230.00
LF 168 $36.67 $6,160.56 $2.45 $411.60
LF 168 $16.40 $2,755.20 $2.45 $411.60
EACH 2 $539.58 $1,079.16 $255.00 $510.00
EACH 0 $0.00 $0.00 $150.00 $0.00
EACH 0 $0.00 $0.00 $105.00 $0.00
EACH 0 $0.00 $0.00 $105.00 $0.00
EACH 2 $0.00 $0.00 $85.00 $170.00
EACH 0 $0.00 $0.00 $130.00 $0.00
EACH 1 $2,340.79 $2,340.79 $130.00 $130.00
EACH 0 $0.00 $0.00 $130.00 $0.00
EACH 1 $2,340.79 $2,340.79 $400.00 $400.00
EACH 0 $0.00 $0.00 $400.00 $0.00
EACH 1 $4,616.68 $4,616.68 $255.00 $255.00
LF 434 $7.19 $3,120.46 $2.45 $1,063.30
EACH 3 $69.11 $207.33 $85.00 $255.00
Water Inspection Fees $3,606.50
LF 113 $34.57 $3,906.41 $1.50 $169.50
LF 0 $0.00 $0.00 $2.95 $0.00
LF 45 $207.82 $9,351.90 $2.95 $132.75
EACH 0 $0.00 $0.00 $230.00 $0.00
EACH 2 $1,606.10 $3,212.20 $230.00 $460.00
EACH 1 $6,500.00 $6,500.00 $170.00 $170.00
Public Storm Inspection Fees $932.25
LS 1 $15,000.00 $15,000.00
SY 1,500 $19.23 $28,845.00 $2.55 $3,825.00
SY 0 $0.00 $0.00 $2.55 $0.00
LF 670 $17.66 $11,832.20 $2.55 $1,708.50
LF 1,040 $36.99 $38,469.60 $2.55 $2,652.00
EACH 1 $0.00 $0.00 $100.00 $100.00
SY 0 $0.00 $0.00 $0.65 $0.00
SY 180 $50.00 $9,000.00 $1.40 $252.00
SY 0 $0.00 $0.00 $2.55 $0.00
SY 0 $0.00 $0.00 $1.40 $0.00
LF 625 $258.01 $0.00 $2.95 $1,843.75
LF 113 $48.30 $5,457.90 $2.30 $259.90
LF 0 $0.00 $0.00 $2.30 $0.00
LF 168 $48.30 $8,114.40 $2.30 $386.40
Street System Inspection Fees $11,027.55
LS 1 $45.00 $45.00
EACH 3 $600.00 $1,800.00 $30.00 $90.00
LF 0 $0.00 $0.00 $0.40 $0.00
SF 4,190 $20,740.50
Pavement Age 5 Excavation Permit Fees $20,875.50
TOTAL INSPECTION FEES $36,671.80
$165,782.79
Water Meter Pit (1 1/2")
Water Meter Pit (3" )
INFRASTRUCTURE
CONSTRUCTION COST
PER UNIT
(COST ESTMATE APPROVED BY THE
CITY)
TOTAL ESTIMATED
INFRASTRUCTURE COST
4" PVC Sewer Main
1" Copper Irrigation Main
1" Water Valves
INSPECTION FEE PER
UNIT
(SET BY THE CITY)
TOTAL INSPECTION FEE
Monday, April 26, 2021
Maverik Convenience Store and Fuel Station
UNIT OF
MEASURE
ESTIMATED
QUANTITY
(PROVIDED BY PROJECT
ENGINEER)
TOTAL PUBLIC INFRASTRUCTURE COST
Boring
Concrete Pavement
Application
Potholing
Pavement Impact Fees
Curb & Gutter
Drive Approach
Trench - Storm
Trench - Sewer
Trench - Water
Excavation Permit
Retaining Wall (Concrete, Masonry, Stone)
Asphalt Pavement
Sidewalk**
Pedestrian Ramps
Apron
Gutter Cross Pan
Fire Access Grass Crete
Water Connection/Disconnect
Grading
4" Fire Line Fitting (Bend/Tee/Cross)*
Public Storm Sewer System
12" Storm Reinforced Concrete Pipe
Storm Concrete Headwall/Wing Walls
Box Culvert
Storm Chase
Storm Inlet All Types
Storm Manhole
Street System & Trenching
Water Fire Hydrant
2" Water Valves
Water Meter Pit (3/4" )
* PRIVATE IMPROVEMENTS REQUIRING CITY INSPECTIONS WILL NEED TO BE INCLUDED. HOWEVER PRIVATE IMPROVEMENTS WILL NOT BE INCLUDED IN THE TOTAL
INFRASTRUCTURE COST FOR BONDING
** INCREASE SIDEWALK LENGTH FOR ANY SIDEWALKS WIDER THAN 4.5' IN WIDTH. STANDARD SIDEWALK INSPECTION FEE WIDTH IS 4.5'
DESCRIPTION
(ALL PUBLIC & APPLICABLE PRIVATE* IMPROVEMENTS)
Sanitary Sewer System
6" PVC Sewer Main
Sewer Manhole
4" PVC Water Main (Fire Line)*
Water Meter Pit (2" )
Water Meter Pit (1")
Water Fitting (Bend/Tee/Cross)
Sewer Main Connection/Disconnect
Water System
2" Copper Water Main
Water Service Line Stub
For Review
04/26/2021 5:22:17 PM