Final Drainage Report: Maverik Fuel Station Fort Collins
DCI Engineers
July 28, 2021
1
Final Drainage Report
for
Maverik Inc. Store
I-25 & North County Road 32 (Hwy 392)
Fort Collins, Colorado 80528
# PERMIT NO.
Prepared for:
Maverik, Inc.
185 South State Street Suite 800
Salt Lake City, Utah 84111
Prepared by:
DCI Engineers
1331 17th Street, Suite 605
Denver, Colorado
(720) 464-7728
DCI Job No. 19-122-0006
July 28, 2021
Final Drainage Report: Maverik Fuel Station Fort Collins
DCI Engineers
July 28, 2021
2
Engineer’s Certification:
I hereby affirm that this report and plan for the final drainage design for Maverick
Fuel Station Fort Collins was prepared by me, or under my direct supervision, for the
owners thereof, in accordance with the provision for City of Fort Collins Stormwater
Criteria Manual (2017), and approved variances and exceptions thereto. I understand
that they the City of Fort Collins does not and will not assume liability for drainage
facilities designed by others.
By: Harry Jones, P.E. Licensed
Professional Engineer State of
Colorado
No. 52959
Final Drainage Report: Maverik Fuel Station Fort Collins
DCI Engineers
July 28, 2021
3
Developer’s Certification:
Maverik, Inc. hereby certifies that the drainage facilities for the Maverick Fuel Station Fort
Collins shall be constructed according to the design presented in this report. I understand that
the City of Fort Collins does not and will not assume liability for the drainage facilities
designed and/or certified by my engineer and that the City of Fort Collins reviews drainage
plans pursuant to Colorado Revised Statutes; but cannot, on behalf of Maverik, Inc.
guarantee that final drainage design review will absolve Maverik, Inc. and/or their successors
and/or assigns of future liability for improper design. I further understand that approval of the
Final Drainage Report does not constitute approval of my engineer’s final drainage design.
Name
Authorized Signature
Cassie Younger
Final Drainage Report: Maverik Fuel Station Fort Collins
DCI Engineers
July 28, 2021
4
SECTION 1. GENERAL LOCATION AND EXISTING SITE INFORMATION
SITE LOCATION
The proposed Maverick Fuel Station is located in the City of Fort Collins, within Larimer County
in Colorado. The proposed 2.84-acre plot of land is comprised of one parcel #8615305702 with
East County Road 32/Highway 392 to the South, Interstate 25 to the east, and SW Frontage Road,
a federal right-of-way, to the North. Fossil Creek Reservoir is Northwest of the site. The proposal
includes 9 standard fuel dispensers and 6 hi-flow commercial diesel dispensers. A total of 28 off-
street parking spaces will be provided. Access is taken from SW Frontage Rd to the northwest.
The property is within the I-25/State Highway 392 Corridor Activity Center in the General
Commercial (CG) Zoning District and is subject to Planning and Zoning Board (Type 2) Review.
Final Drainage Report: Maverik Fuel Station Fort Collins
DCI Engineers
July 28, 2021
5
TOWNSHIP, RANGE SECTION AND ¼ SECTION
The Colorado State Land Board maintains records of the Cadastral Survey of the state
for purposes of establishing legal property boundaries in proposed land subdivisions.
The proposed property is located in a portion of the SW ¼ of Section 15, Township 6
North, Range 68 West, of the 6th Principal Meridian in the State of Colorado. A survey
was performed by Altura Land Consultants dated May 15, 2019, last revised June 3,
2019.
The legal description, as identified on the Title Survey from Altura Land Consultants,
is as follows:
Lot 2, Interstate Land Holdings Minor Land Subdivision File No. 12-S3124, City of
Fort Collins, County of Larimer, State of Colorado
The proposed development is located within the boundary of the City of Fort Collins,
within Larimer County in Colorado. The site is bordered by East County Road
32/Highway 392 to the South, Interstate Highway 25 to the East, and SW Frontage
Road, a federal right-of-way, to the West-Northwest. Proposed driveway connections
and improvements shall be subject to the review and approval of the Interstate Land
Holdings Minor Land Division.
The parcel is located in the General Commercial zoning district. Adjacent lots around
the subject property consist of vacant lots and commercial uses. The Fossil Creek
Reservoir is located northwest of the property.
DESCRIPTION OF PROPERTY
The proposed development consists of 2.841 acres of
undeveloped property. The site consists of one parcel
#8615305702.
An analysis by DCI Engineers using a modified rational
method indicates a weighted impervious percentage of
71.6% for the complete build out. Under the criteria of
Table 4.1-2 and 3 from Chapter 5 of the Fort Collins
Stormwater Criteria Manual, areas within the development
were separated into categories. Roofs were assigned an
impervious percentage of 95%, sidewalks and asphalt
pavements received a 95% percent categorization, and lawn
and landscaped areas were assigned a 2% weighted
impervious percentage. The resulting calculations can be
found in Appendix A
Final Drainage Report: Maverik Fuel Station Fort Collins
DCI Engineers
July 28, 2021
6
At full build out, the proposed site includes approximately 2.13 acres of proposed impervious
area, including rooftops, roadways, and paved sidewalk/courtyard areas. Approximately 6,662
cubic yards of soil will be removed and replaced or exported with the current proposed plan. The
development will increase the impervious area by the full 75% (from the existing undeveloped
land).
The site currently consists of undeveloped property covered with low-lying vegetation. The land
generally drains to the northwest with an approximate change in elevation of ten feet over a
horizontal distance of 350 feet towards the interstate ramp road.
Figure 1- Proposed project site facing north from Highway 392
Figure 2- Proposed project site facing west from Interstate 25
DCI consulted the Natural Resources Conservation Service’s (NRCS) Web Soil Survey for a description of
local soil types in the area. The natural soils encountered at the site predominantly consisted of wiley silt
loam and are classified as belonging to Hydrologic Soil Group C.
Final Drainage Report: Maverik Fuel Station Fort Collins
DCI Engineers
July 28, 2021
7
The site lies within the South Platte River Basin inside the Cache La Poudre River sub-basin.
Inside the Cache La Poudre River sub-basin, the site is adjacent to the Fossil Creek drainage sub-
basin.
DCI Engineers consulted the latest FEMA Flood Insurance Rate Maps to analyze the potential
floodplain delineations for the site. According to the FEMA Map 08069C1201F, the site is
located in Zone X, which corresponds to an area outside of the boundary of the 500- year design
storm floodplain. The DFIRM was last revised in April 2019.
SECTION 2. MASTER DRAINAGE BASIN DESCRIPTION
MAJOR DRAINAGE BASINS
The State of Colorado is comprised of seven major river basins that are governed by separate
divisions within the Colorado Department of Water Resources. The City and County of Denver
make up the largest metropolitan city within the South Platte River Basin. The River Basin
covers approximately 22,000 square miles in northeastern Colorado and accounts for nearly two-
thirds of the state’s gross municipal and industrial water demand. Estimates of the total demand
for the South Platte River Basin fall between 324,000 and 467,000 acre-feet of water per year.
Final Drainage Report: Maverik Fuel Station Fort Collins
DCI Engineers
July 28, 2021
8
The South Platte Basin supports a wide range of water needs including municipal, industrial,
agricultural as well as important water-dependent ecological and recreational attributes.
Coloradoans and tourists regularly enjoy the recreational opportunities provided by the many
environmental features of the basin.
Within the South Platte River Basin, the site lies inside the Cache La Poudre River sub-basin.
Inside the Cache La Poudre River sub-basin, the site is adjacent to the Fossil Creek drainage sub-
basin. A Problem Identification Map was developed by the City of Fort Collins to identify the
unique challenges associated within this basin. There were no problems located within the
vicinity of the project site. Flood control is shown for the land in the sub-basin near the project
site under the City of Fort Collins Selected Plan - Water Quality Improvements.
The Fossil Creek drainage basin extends along the south end of Fort Collins, from the foothills
across Interstate 25 past County Road 5. It encompasses 32 square miles in the city of Fort
Collins and Larimer County. Historically, the basin consisted of agricultural land, but the basin
has experienced significant development in the recent past. The original 1982 master plan
mapped a floodplain and restricted developed from the floodplain; hence, fewer structures are
damaged. An estimated 117 homes, 13 roads, and three railroads would be damaged during a
100-year storm with an estimated $10.6 million in damage.
Final Drainage Report: Maverik Fuel Station Fort Collins
DCI Engineers
July 28, 2021
9
The existing surface conditions were considered to be entirely pervious. In the fully developed
condition, we propose a weighted impervious percentage of approximately 71.6% (per the land
use calculations in Appendix A), well within the defined boundaries of the previous studies for
the watershed.
The basin drains to the Fossil Creek Reservoir outlet under Interstate-25.
As a part of this proposal, we intend to capture the onsite stormwater within underground piped
structures which shall be conveyed into water quality sand filters as part of the Low Impact
Design requirements and ultimately into an engineered detention pond along the western
boundary of the site. Stormwater detention shall consist of surface detention per the City of Fort
Collins Stormwater Criteria with discharge being limited to the 2-year historic release rate for the
Fossil Creek Basin (0.2 CFS/acre). Offsite flows shall continue their existing flow-path along
CDOT maintained vegetated swales along the exterior of the proposed Maverik property. After
mitigating for onsite flows and accounting for offsite stormwater flows in the existing swales
around the site, there is no anticipated impact to the drainageway.
MINOR DRAINAGE BASINS
The City of Fort Collins contains various irrigation channels designed to carry flows to different
regions within the city limits. At the time of the proposed development, there are no current
irrigation channels within the proposed limits of the study. Flows from the surrounding interstate
off-ramp improvements are carried via vegetated surface swales to an outlet in the northwest
corner of this site.
The off-site flow patterns and paths will not be impacted by the proposed development on the
property. The proposed Maverik site plan has been designed to allow the un-obstructed capture
and conveyance of the proposed off-site flows up to the 100-year recurrence interval and bypass
them safely to the existing roadside vegetated swale that was installed as part of the CDOT
interchange work. Flows along this swale are conveyed towards the north into an existing culvert
that travels underneath Frontage Road and into Fossil Creek. In addition, the detention basin has
been designed with emergency overflows capable of discharging the fully developed 100-year
un-detained flow from the 2.841-acre property.
The proposed site was split into six (6) separate sub-basins delineated by general flow patterns.
Roofs and canopies were treated as single basins capturing flows in an internal piped system and
discharging downstream via roof downspouts. Streets and patios were separated based on
anticipated slopes and drainage conditions. Flows for the entire development have been designed
to slow into LID sand filters prior to reaching the detention structure.
Final Drainage Report: Maverik Fuel Station Fort Collins
DCI Engineers
July 28, 2021
10
SPECIFIC BASIN DETAILS:
For the purposes of drainage analysis and discussion the Maverik Convenience Store site has
been analyzed using basins identifiers A though F as illustrated on the enclosed Drainage Map.
Basin A is 0.11-acre located center of the site. This developed area consists of a proposed
single-story building. Runoff produced within Basin A (1.1 cfs - 100-yr) is conveyed within a
series of roof drains to a storm sewer manhole locate north west of the building, also known as
Design Point 1. The total runoff flows to Sand Filter C where it is treated and released to the
detention pond.
Basin B is 0.38-acre located east and south east of the proposed building described in basin A
of the site. This developed area consists of proposed asphalt drive lanes, concrete curb and
gutters, concrete pavement, fuel canopy as well as new landscaping. Eighty percent of the runoff
produced within Basin B (3.8 cfs - 100-yr) is collected and conveyed through proposed curb and
gutter to a 5-ft wide curb inlet (Design Point 2) located near the south east corner of the building.
The flows are then conveyed through a 15-inch pvc pipe to the east along the south of the
building. Twenty percent of the runoff is produced from the east half of the commercial fuel
canopy located south of the building and is collected in a series of roof drains where it is diverted
to the same 15-inch pvc pipe from the 5-ft inlet described above. The total runoff in Basin B
flows to the same Sand Filter C describe in Basin A and is treated and released to the detention
pond. No impacts from runoff are anticipated to occur to the proposed structures in the 100-year
event.
Basin C is 0.29-acre located south and south west of the proposed building described in basin
A of the site. This developed area consists of proposed asphalt drive lanes, concrete curb and
gutters, concrete pavement at the trash enclosure, fuel canopy as well as new landscaping.
Runoff produced within Basin C (2.9 cfs - 100-yr) is collected within the proposed curb and
gutter and conveyed to a 5-ft wide curb opening, Design Point 3.
Note: The commercial fuel canopy located in Basins B and C has perimeter trench drains along
the east, west and north sides that are connected to the storm sewer system. These trench drains
are a part of the “Fuel Spill Containment System” (FSCS) designed to capture fuel spills from
under the canopies near the fuel pumps. In case of a fuel spill, the fuel will be captured by the
trench drains and diverted to a spill control structure that is isolated by a shut-off valve to
prevent the contaminants from reaching the sand filter (see attached exhibit in Appendix D
showing the layout of the FSCS for the commercial and retail fuel canopies). A detailed
description of the FSCS and Standard Operating Procedure (SOP) is also included In Appendix
D of this report.
Final Drainage Report: Maverik Fuel Station Fort Collins
DCI Engineers
July 28, 2021
11
Basin D is 0.40-acre located along the south end of the site. This developed area consists of
proposed asphalt drive lanes and parking stalls, concrete curb and gutters, concrete pavement at
the RV dumping facility, new landscaping and sand filter “B”. Runoff produced within Basin D
(3.5 cfs - 100-yr) is collected within the proposed curb and gutter and conveyed to a 3-ft wide
curb opening, Design Point 4. The total runoff in Basin D flows to Sand Filter B and is treated
and released to the detention pond.
Basin E is 1.28-acres located north of the proposed building described in basin A of the site.
This developed area consists of proposed asphalt drive lanes and parking stalls, concrete curb
and gutters, concrete pavement, retail fuel canopy, new landscaping and sand filter “A”. Runoff
produced within Basin E (12.8 cfs - 100-yr) is collected within the proposed curb and gutter and
conveyed to a 5-ft wide curb opening, Design Point 5. The flows continue through a sidewalk
chase and into a concrete rundown to sand filter “A” located near the entry drive from the
Frontage Road.
Runoff produced from the retail fuel canopy is captured by roof drains and conveyed through a
10” storm pipe to a storm sewer manhole where it continues to flow to sand filter “C” outside
Basin A to Basin F and the detention pond.
Note: The retail fuel canopy located in Basins E has perimeter trench drains along the south and
north sides that are connected to the storm sewer system. These trench drains are a part of the
“Fuel Spill Containment System” (FSCS) for the retail fuel pumps and are designed to capture
fuel spills from under the canopies near the fuel pumps. In case of a fuel spill, the fuel will be
captured by the trench drains and diverted to a spill control structure that is isolated by a shut-off
valve to prevent the contaminants from reaching the sand filter (see attached exhibit in Appendix
D showing the layout of the FSCS for the commercial and retail fuel canopies). A detailed
description of the FSCS and Standard Operating Procedure (SOP) is also included In Appendix
D of this report.
Basin F is 0.37-acre is located west of the proposed building and along the west property line
of the site. This basin consists of proposed landscaping, concrete valley gutters, detention pond
and sand filter “C”. Runoff produced within Basin F (1.3 cfs - 100-yr) is collected in the
proposed valley gutter and conveyed to an outlet structure, Design Point 6.
The proposed development of this site consists of an overall imperviousness of 65.1 %.
SECTION 3. FLOODPLAIN INFORMATION
DCI Engineers consulted the latest FEMA Flood Insurance Rate Maps to analyze the potential
floodplain delineations for the site. According to the FEMA Map 08069C1201F, the site is
Final Drainage Report: Maverik Fuel Station Fort Collins
DCI Engineers
July 28, 2021
12
located in Zone X, which corresponds to an area outside of the boundary of the 500- year design
storm floodplain. The DFIRM was last revised in April 2019.
SECTION 4. PROJECT DESCRIPTION
The subject property consists of 2.841 acres. A commercial gas station with supplementing
paved parking is proposed for the subject property. The proposed 4,886 square foot convenience
store facility will front SW Frontage Road and proposes approximately 31,050 sf of landscaped
areas.
SECTION 5. PROPOSED DRAINAGE FACILITIES
A 29,002 cubic foot detention facility designed to comply with the City of Fort Collins Criteria
Manual is proposed on the western boundary of the site. Grading and surface runoff shall be
utilized to minimize structural BMP devices in the proposed conditions. Landscaped areas shall
be utilized to assist with water quality.
SECTION 6. DRAINAGE DESIGN CRITERIA
FOUR STEP PROCESS TO MINIMIZE ADVERSE IMPACTS OF URBANIZATION
The Mile High Flood District and the City of Fort Collins employ a four-step process to reduce
the negative effects of urbanization on our existing waterways. The four steps include
1. Employing Runoff Reduction Practices
2. Implement BMPs that incorporate the water quality volume with slow release
3. Stabilizing streams
4. Implementing site specific and other source control BMPs
In keeping with the requirements of the City of Fort Collins Storm Water Manual, the proposed
Maverik site has been designed with ample open space that aids in the water quality treatment on
the site. While large expanses of pavement are required for the standard operation of a fueling
station, the proposed site plan has incorporated surface detention and surface treatment through
sand filters in addition to decorative landscaping around the site.
Water quality for the site is managed through a system of sand filters that have been designed to
meet the criteria of the City of Fort Collins and the Mile High Flood District. Each sand filter
captures the proposed water quality control volume for its tributary basin and slowly releases the
volume to the downstream detention as it filters through the sand and into the underdrain system
below.
Final Drainage Report: Maverik Fuel Station Fort Collins
DCI Engineers
July 28, 2021
13
Due to the nature of the proposed development, site source controls will be implemented to
prevent the potential effects of urbanization to the Fossil Creek Watershed. In addition to
implementing Low Impact Design practices, Maverik proposes the use of fuel canopy perimeter
trench drains that are connected to fuel containment vault. These trench drains and vaults are a
part of the “Fuel Spill Containment System” (FSCS) designed to prevent against un-foreseen
release of oil and fuel-based contaminants into the downstream waterways. . In case of a fuel
spill, the fuel will be captured by the trench drains and diverted to a spill control structure that is
isolated by a shut-off valve to prevent the contaminants from reaching the sand filter (see
attached exhibit in Appendix D showing the layout of the FSCS for the commercial and retail
fuel canopies). A detailed description of the FSCS and Standard Operating Procedure (SOP) is
also included In Appendix D of this report.
REGULATIONS
The proposed development is located within the boundaries of the City of Fort Collins and is
thus subject to the latest stormwater standards of the Fort Collins Stormwater Criteria Manual
revised in December 2018. In accordance with the latest guideline, this project was analyzed
with minimum and maximum release rate(s) for the developed condition 100-year recurrence
interval storm.
For developments smaller than 5 acres, the rational method is an accepted method for
determining pre and post developed hydrology. The project’s contributing area, totaling 2.841
acres, falls into the five-acre threshold where the Modified FAA procedure is required for basin
sizing.
The project was analyzed using a modified FAA Rational Method in accordance with Table 6-3.
The rational method is based on the direct relationship between rainfall and runoff and can be
expressed by the equation.
Q = CIA
In which:
Q = the peak rate of runoff (cubic feet per second [cfs])
C = the runoff coefficient that is the ratio between the runoff volume from an area and the
average rainfall depth over a given duration for that area
I = the average intensity of rainfall for a duration equal to the time of concentration
(inches/hour)
A = basin area (acres)
Final Drainage Report: Maverik Fuel Station Fort Collins
DCI Engineers
July 28, 2021
14
The runoff coefficients for each sub-watershed are available in the Appendix and based on Table
3.2-2.
DCI Engineers has prepared a Stormwater Site Plan for review by the City of Fort Collins. It is
understood that prior to the acceptance of the project, this Final Plan shall be submitted for
approval by the ruling jurisdiction. Included in the Plan Review is an existing conditions map, a
map of proposed development, this Final Drainage report, and an approved Soils report prepared
by a geotechnical professional. Prior to the start of construction, a site Storm Water Pollution
Prevention Plan (SWPPP) shall be prepared by DCI Engineers and submitted to the City of Fort
Collins and the Colorado Department of Environmental Health.
The Fort Collins Stormwater Criteria Manual calls for development and redevelopment projects
that discharge stormwater directly, or indirectly through a conveyance system, into a surface
waterbody to meet strict flow control criteria. Projects in which a total effective impervious
surface is 1,000 square feet or more are required match developed discharge durations to pre-
developed durations for the historic release rate of the individual drainage sub-basin. For the
Fossil Creek Basin, the historic release rate is equivalent to 0.2 cfs per acre.
DRAINAGE STUDIES, OUTFALL SYSTEMS PLANS, SITE CONSTRAINTS
The project site has been the subject of various drainage studies and reports over the last 20 years.
Maps of the Poudre River Floodplain were created for the first time in 1975. The city adopted
floodplain regulations beginning in 1979.
This particular site lies adjacent to the Fossil Creek drainage basin. The Master Plan for the Fort
Collins drainage basins is underway at the time this report was written.
A Problem Identification Map was developed by the city of Fort Collins to identify the unique
challenges associated within this basin. There were no problems shown to be near the project
site. Flood control is shown for the land in the sub-basin near the project site under the Selected
Plan - Water Quality Improvements. The nearest “problem area” is located approximately 12,000
feet to the west along the Fossil Creek river.
The proposed development associated with Maverick Fuel Station Fort Collins includes a
detention basin that has been sized to handle the stormwater runoff from the 2.841-acre
development. The offsite flows into the property will not flow-through the basin, but rather will
be carried through a separate swale that conveys flows around the property towards the Fossil
Creek Reservoir Outlet. The swales were constructed and maintained by CDOT as part of the
2011 I-25 and Highway 392 Interchange Project.
HYDROLOGY
The project’s contributing area, totaling 2.84-acres, contains multiple sub-basins that are under
Final Drainage Report: Maverik Fuel Station Fort Collins
DCI Engineers
July 28, 2021
15
the five-acre threshold for the use of the Rational Method:
The rational method is based on the direct relationship between rainfall and runoff and can be
expressed by the equation
Q = CIA
In which:
Q = the maximum rate of runoff (cubic feet per second [cfs])
C = the runoff coefficient that is the ratio between the runoff volume from an area and the
average rainfall depth over a given duration for that area
I = the average intensity of rainfall for a duration equal to the time of concentration
(inches/hour)
A = basin area (acres)
Final Drainage Report: Maverik Fuel Station Fort Collins
DCI Engineers
July 28, 2021
16
Table 3.2-2. Surface Type - Runoff Coefficients
Surface Type Runoff Coefficients
Hardscape or Hard Surface
Asphalt, Concrete 0.95
Rooftop 0.95
Recycled Asphalt 0.8
Gravel 0.5
Pavers 0.5
Landscape or Pervious Surface
Lawns, Sandy Soil, Flat Slope < 2% 0.1
Lawns, Sandy Soil, Avg Slope 2-7% 0.15
Lawns, Sandy Soil, Steep Slope >7% 0.2
Lawns, Clayey Soil, Flat Slope < 2% 0.2
Lawns, Clayey Soil, Avg Slope 2-7% 0.25
Lawns, Clayey Soil, Steep Slope >7% 0.35
Final Drainage Report: Maverik Fuel Station Fort Collins
DCI Engineers
July 28, 2021
17
IDF curves for Rational Method
Duration
(min)
Intensity 2-
year (in/hr)
Intensity 100-
year (in/hr)
5.00 2.85 9.95
10.00 2.21 7.72
15.00 1.87 6.52
20.00 1.61 5.60
25.00 1.43 4.98
30.00 1.30 4.52
35.00 1.17 4.08
40.00 1.07 3.74
45.00 0.99 3.46
50.00 0.92 3.23
55.00 0.87 3.03
60.00 0.82 2.86
65.00 0.78 2.71
70.00 0.73 2.59
75.00 0.70 2.48
80.00 0.66 2.38
85.00 0.64 2.29
90.00 0.61 2.21
95.00 0.58 2.13
100.00 0.56 2.06
105.00 0.54 2.00
110.00 0.52 1.94
115.00 0.51 1.88
120.00 0.49 1.84
Final Drainage Report: Maverik Fuel Station Fort Collins
DCI Engineers
July 28, 2021
18
The basis of storm drainage and hydrologic design for the City of Fort Collins is found in
Chapters 5 and 6 of the Fort Collins Stormwater Criteria Manual. An analysis of the Isopluvial
Maps show that all areas within the Fort Collins area can be described within a single rainfall
zone with minimal variation. The 1-hour duration rainfall depth for various recurrence intervals
has historically been used for the calculation of runoff using the Rational method.
For the purpose of small urban watersheds less than 20 acres in size, a rainfall intensity duration
frequency curve can be used in association with the Rational Method, to determine rainfall
intensity distribution over the period of the 1 hour duration equation 5.1 from the SDDTC
describes the intensity with the following equation:
Final Drainage Report: Maverik Fuel Station Fort Collins
DCI Engineers
July 28, 2021
19
DETENTION STORAGE CALCULATION
New development and significant redevelopment in the City of Fort Collins is governed by the
Fort Collins Stormwater Criteria Manual. Per the Fort Collins Stormwater Criteria Manual, the
Modified FAA Procedure was utilized to size the detention volume. The peak control volume for
the 100 year was determined, while maintaining release rates at the historic 2 year release for the
Fossil Creek Basin.
The City of Fort Collins utilizes the criteria described in the Storm Drainage Design and
Technical Criteria as well as the District Manual to determine infiltration potential as it relates to
soil types. In general, hydrologic soils group are classified into four categories based on ability to
infiltrate stormwater. Hydrologic Group A has the highest capacity for infiltration, Hydrologic
Group B is considered moderate, while Groups C and D are considered poor drainage and
generally unsuitable for infiltration. An investigation of soils groups through the National
Resource Conservation Service (NRCS) for our site indicates that the majority of soils within the
project area can be classified as Hydrologic Group C based on the results of an NRCS Web Soil
Survey analysis.
Storm drainage runoff shall be determined by the Rational Method because the site is less than 5
acres. Table 2.0-1 below summarizes the acceptable methods along with an established criterion
for the use of each method.
The drainage system shall account for runoff from both minor and major storm events as
required in Section 1.4 of the FCSWCM. The design capacity for the development for the major
and minor storm events does not include the effects of onsite detention on the peak flows. In all
cases, the onsite system has been designed to minimize life hazards and health, damage to
structures, and interruption to traffic and services associated with the 100-year storm event.
The City of Fort Collins maintains a policy requirement for onsite detention of flood flows for all
development and redevelopment projects as defined in the Fort Collins Stormwater Criteria
Manual (FCSCM). Onsite detention is required or all projects proposing 1,000 sf of impervious
coverage or more. Storage for the onsite detention of runoff shall be governed by the policies set
forth in Chapter 6 of the Criteria Manual. The City of Fort Collins requires the Modified FAA
Procedure for water quality detention design for sites less than 5 acres. The Modified FAA
Procedure determines volumetric storage for peak flows. The FCSCM requires a peak release
rate for the 100-year storm for the post developed condition to be no greater than the 2-year
historic release rate of 0.2 cfs per acre. The project will utilize a modified version of the City of
Fort Collins Water Quality Outlet Structure standard detail D-46. Because water quality is being
Final Drainage Report: Maverik Fuel Station Fort Collins
DCI Engineers
July 28, 2021
20
provided upstream of the detention pond via Sand Filters, the outlet structure has been modified
to provide the 100-year orifice plate in the location where the Water Quality Orifice would
typically be installed. The 100-year orifice plate has been sized to meter the release rate from the
pond during the 100-year storm event to comply with the allowable release rate of 0.57 cfs. The
top of the outlet structure is set at the 100-year water surface elevation. During storm events that
exceed the 100-year recurrence interval (4881.90), water will overtop the outlet structure which
is also equal to the 100 yr WSE and discharge through the 12-inch outlet pipe. The outlet
structure outlet pipe can convey 2.66 cfs. Any flows exceeding the outlet pipe’s capacity will
overtop the emergency spillway at an elevation of 4882.00. In order to detain the difference
between the post-developed 100-year flow rate and the historic 2-year flows, the detention pond
must hold a required 28,346 cf of runoff with a metered outflow to Fossil Creek. The provided
pond volume is 29,002 cf. The detention pond calculations can be found in Appendix A.
HYDRAULICS
In accordance with the City of Fort Collins standards, drainage for the proposed Maverik Fuel
Station has been designed to adequately capture and convey the runoff form the site for both the
major and minor storm event. Pipes, swales, and catch basins have been designed to handle the
2-year developed flow rate as well as the 100-year major storm event based on a rational method
analysis of each sub-drainage basin. We have assumed a frost depth of 30” from finished surface.
HYDRAULIC GRADE LINE CALCULATION METHOD
Private storm drainage for the property has been designed using the hydraulic grade line
calculation and the methods outlined below. For the purposes of design, Manning’s equation was
used to calculate the available pipe capacity at full flow for a stretch of pipe. Manning’s
Equation is shown below:
Q = (1.49/n) AR 2/3 S ½
Where Q = available flow rate (cfs)
n = Manning’s roughness factor
A = cross sectional flow area (sf)
R = hydraulic radius = D/4 (ft)
S = friction slope (ft/ft)
In order to analyze the hydraulic capacity of the onsite storm drain system, head losses were
calculated through the pipe network to determine the Energy Grade Line. Head losses through
pipe networks are defined by the following equation
H = KoCDCdCQCPCB (V2/2g)
Where K = initial loss coefficient
Final Drainage Report: Maverik Fuel Station Fort Collins
DCI Engineers
July 28, 2021
21
V = velocity in the outflow pipe
g = gravitational acceleration (32.2 ft/sec2)
C = correction factors for pipe size, bends, etc.
WATER QUALITY ENHANCEMENT
Per the current requirements of the Fort Collins Stormwater Manual, all new or redevelopment
projects are required to implement Low Impact Development design as part of the initial site
concept. The land Use Code allows for adherence to the L.I.D. requirements by one of the
following options:
1. 50% of the newly added or modified impervious areas must be treated by LID
techniques and 25% of new paved areas must be pervious
2. 75% of all newly added or modified impervious areas must be treated by LID
techniques.
Due to the soil conditions on this site, the use of pervious pavements is not recommended. As a
result, Maverik proposed compliance with the Low Impact Development requirement using
Option 2. The site proposes the use of L.I.D. sand filters to treat 100% of new impervious areas
on the site.
Sand Filters were designed in accordance with Chapter 7 of the FCSM as well as the Low Impact
Development Implementation Manual (July 2017). Best Management Practices were designed to
capture and treat the Water Quality Capture Volume as specified in the equation below
WQCV = a (0.913 – 1.19I2 + 0.78I )
WQCV = Water Quality Control Volume (in watershed inches)
A = Coefficient corresponding to WQCV drain time [Table 5.4.-1]
I = Imperviousness (%/100)
From FCSCM Table 5.4-1: Drain Time Coefficients for WQCV Calculations
The required BMP Storage Volume, V is computed using Equation 7-2:
V = (WQCV / 12 ) x A x 1.2
V = required volume, acre-ft
Final Drainage Report: Maverik Fuel Station Fort Collins
DCI Engineers
July 28, 2021
22
A = tributary catchment area upstream, acres
WQCV = Water Quality Capture Volume, watershed inches
1.2 = to account for the additional 20% of required storage for sedimentation accumulation
DCI proposes the use of engineered sand filters to capture and remove pollutants from the
asphalt and concrete roadways prior to conveyance into the detention pond. The sand filter
consists of a surcharge zone underlain by a sand bed with a perforated pipe underdrain system. A
forebay consisting of 1% of the WQCV shall be implemented at each sand filter.
Final Drainage Report: Maverik Fuel Station Fort Collins
DCI Engineers
July 28, 2021
23
Three sand filters are proposed on the site. Sand Filter A, which is designed to treat flows
coming from the passenger vehicle fueling court treats 1.29 acres of tributary area for a total
volume of 1,916 cubic feet. Sand Filter B corresponds to a tributary area of 0.49 acres which
captures flows from a large portion of the commercial fueling court on the south side of the
building. Lastly, flows from the building roofs, canopies, and the northern portion of the
commercial fueling court are conveyed into a curb inlet to a designed sand filter located just west
of the proposed structure. Sand Filter C has been designed to capture the water quality flows
from 0.8 acres of tributary area for a total volume of 1,394 cubic feet.
Immediately underneath the fueling canopies, Maverik proposes the use of an underground
storage chamber system designed to capture potential spills or leaks of fuel or oil-contaminated
water prior to entering the storm drain system. The sill containment chambers will capture
potential contaminants and treat them through an oil/water separator prior to discharge into the
downstream detention system. An LID Site Plan has been included in the appendices.
EROSION CONTROL
Maverik, Inc. is dedicated to the preservation of the natural environment throughout the life cycle
of the project. The project shall maintain compliance with all requirements of the City of Fort
Collins Erosion Control Criteria, including the provisions of Chapters 3 and 4 of the Stormwater
Manual. An Erosion and Sediment Control Plan (along with associated details) is included with
the final construction drawings. Staging and/or phasing of the BMPs depicted, and additional or
different BMPs from those included may be necessary during construction, or as required by the
authorities having jurisdiction.
It shall be the responsibility of the Contractor to ensure erosion control measures are properly
maintained and followed. The Erosion and Sediment Control Plan is intended to be a active
Final Drainage Report: Maverik Fuel Station Fort Collins
DCI Engineers
July 28, 2021
24
document, continually acclimating to site conditions and needs. The Contractor is also responsible
for updating BMPs as dictated throughout construction.
The Erosion and Sediment Control Plan will demonstrate the use of both temporary measures and
permanent erosion control protection during and upon completion of construction activities.
BMP’s from the MHFD and the City of Fort Collins Erosion Control Reference Manual for
Construction Sites will be utilized. Expected measures include silt fencing along the disturbed
perimeter, gutter protection in the adjacent roadway, and inlet protection at proposed storm inlets
and culverts. Vehicle tracking control pad, spill containment and clean-up procedures, designated
concrete washout areas, and job site restrooms shall also be provided by the Contractor.
SECTION 7: CONCLUSIONS
The Final Drainage Report for Maverik Fort Collins has been designed to comply with the
requirements of the City of Fort Collins Stormwater Criteria Manual. The drainage has been
analyzed using the Rational Method for the minor and major storm events. Through the use of an
engineered detention pond, the site shall detain the difference between the 100-year developed
flow rate and the 2-year historic flow rate for the Fossil Creek Basin. In addition, 100% of the
site impervious area shall be treated for water quality utilizing Low Impact Development in
accordance with the LID Implementation Manual.
SECTION 8: APPENDICES
Please refer to the attached Appendices for additional information/ reference documents.
SECTION A: HYDROLOGIC COMPUTATIONS and HYDRAULIC SIZING
SECTION B: WATER QUALITY /LID COMPUTATIONS
SECTION C: REFERENCE INFORMATION
SECTION D: SPILL CONTAINMENT SYSTEM STANDARD OPERATING PROCEDURE
SDSSSSWWWWWWW
W
W
WWW
W
W
W
W
W
W
SSSSSSSS
SS
SS
SS
SS
2.03 7.06
H-1
2.84
5
PRE-DEVELOPED
DRAINAGE
CONDITIONS
1
A
1.41
A
0.14 0.40
1
PROJECT NUMBER
ISSUE DATE:
REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description
NOTE:
Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements.
Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-07-27Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF
1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com
CIVIL / STRUCTURAL
07/2021©
This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use.
JULY 28, 2021
19-122-0006
3
VANSTOP
STOP
SDSSSSSSWWWWWWW
W
W
WWW
W
W
W
W
W
W
SSSSSSSS
SS
SS
SS
SS
SS
W
5
2
3
4
6
1
0.790.98
E
1.28
0.770.97
B
0.38
0.951.00
A
0.11
0.700.88
D
0.40
0.92 1.00
C
0.30
0.25 0.31
F
0.35
1
0.400.14
A
1.41
A
POST-DEVELOPED
DRAINAGE
CONDITIONS
2
PROJECT NUMBER
ISSUE DATE:
REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description
NOTE:
Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements.
Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-07-27Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF
1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com
CIVIL / STRUCTURAL
07/2021©
This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use.
JULY 28, 2021
19-122-0006
3
Elevation Area (sqft) Volume Between Contours (cf) Total Volume (cf)
Bottom 4878.00 2553 -
4330.41
4879.00 6397 4,330
7248.13
4880.00 8134 11,579
8671.82
4881.00 9221 20,250
8751.23
100-yr WSE 4881.90 10235 29,002
11964.76
Spillway 4882.00 10350 40,966
10935.68
Top 4883.00 11532 40,966
Total Volume (cf) 40,966
AVAILABLE SITE DETENTION POND VOLUME
Required Volume = 28,346 CF
Pond Characteristics
A=Area of bottom contour, (sf)
B=Area of top contour, (sf)
100-yr W.S. EL. = 4881.90 (Volume = 29,002 CF)
V = D/3(A+B+(A*B)^1/2
WHERE:
V=Volume between contours, (cf)
D=Depth between contours, (ft)
Pipe Naming for Hydraulic Sizing
VANSTOP
STOP
SDSSSSWWWWWWW
W
W
WW
W
W
W
W
W
W
SSSSSS
SS
SS
SS
SS
W
LID SITE
PLAN
3
PROJECT NUMBER
ISSUE DATE:
REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description
NOTE:
Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements.
Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-07-27Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF
1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com
CIVIL / STRUCTURAL
07/2021©
This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use.
JULY 28, 2021
19-122-0006
3
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia =84.9 %
(100% if all paved and roofed areas upstream of sand filter)
B) Tributary Area's Imperviousness Ratio (i = Ia/100)i = 0.849
C) Water Quality Capture Volume (WQCV) Based on 12-hour Drain Time WQCV = 0.29 watershed inches
WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including sand filter area)Area = 49,419 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =1,191 cu ft
VWQCV = WQCV / 12 * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 = in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region, VWQCV OTHER =cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth DWQCV =1.0 ft
B) Sand Filter Side Slopes (Horizontal distance per unit vertical, Z = 4.00 ft / ft
4:1 or flatter preferred). Use "0" if sand filter has vertical walls.
C) Minimum Filter Area (Flat Surface Area)AMin =524 sq ft
D) Actual Filter Area AActual =1687 sq ft
E) Volume Provided VT =2491 cu ft
3. Filter Material
4. Underdrain System
A) Are underdrains provided?1
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y =ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 =cu ft
iii) Orifice Diameter, 3/8" Minimum DO = in
19122-0006 Maverick
Fort Collins, Colorado - Sand Filter "A"
Design Procedure Form: Sand Filter (SF)
Shawn Krieger
DCI Engineers
July 27, 2021
UD-BMP (Version 3.07, March 2018)
Choose One
Choose One
18" CDOT Class B or C Filter Material
Other (Explain):
YES
NO
UD-BMP_v3.07_SF-A.xlsm, SF 7/27/2021, 2:50 PM
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
6. Inlet / Outlet Works
A) Describe the type of energy dissipation at inlet points and means of
conveying flows in excess of the WQCV through the outlet
Notes:
Design Procedure Form: Sand Filter (SF)
Shawn Krieger
DCI Engineers
July 27, 2021
19122-0006 Maverick
Fort Collins, Colorado - Sand Filter "A"
Choose One
YES NO
UD-BMP_v3.07_SF-A.xlsm, SF 7/27/2021, 2:50 PM
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia =60.7 %
(100% if all paved and roofed areas upstream of sand filter)
B) Tributary Area's Imperviousness Ratio (i = Ia/100)i = 0.607
C) Water Quality Capture Volume (WQCV) Based on 12-hour Drain Time WQCV = 0.19 watershed inches
WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including sand filter area)Area = 17,520 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =279 cu ft
VWQCV = WQCV / 12 * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 = in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region, VWQCV OTHER =cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth DWQCV =1.0 ft
B) Sand Filter Side Slopes (Horizontal distance per unit vertical, Z = 4.00 ft / ft
4:1 or flatter preferred). Use "0" if sand filter has vertical walls.
C) Minimum Filter Area (Flat Surface Area)AMin =133 sq ft
D) Actual Filter Area AActual =968 sq ft
E) Volume Provided VT =1593 cu ft
3. Filter Material
4. Underdrain System
A) Are underdrains provided?1
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y =ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 =cu ft
iii) Orifice Diameter, 3/8" Minimum DO = in
19122-0006 Maverick
Fort Collins, Colorado - Sand Filter "B"
Design Procedure Form: Sand Filter (SF)
Shawn Krieger
DCI Engineers
July 27, 2021
UD-BMP (Version 3.07, March 2018)
Choose One
Choose One
18" CDOT Class B or C Filter Material
Other (Explain):
YES
NO
UD-BMP_v3.07_SF-B.xlsm, SF 7/27/2021, 2:49 PM
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
6. Inlet / Outlet Works
A) Describe the type of energy dissipation at inlet points and means of
conveying flows in excess of the WQCV through the outlet
Notes:
Design Procedure Form: Sand Filter (SF)
Shawn Krieger
DCI Engineers
July 27, 2021
19122-0006 Maverick
Fort Collins, Colorado - Sand Filter "B"
Choose One
YES NO
UD-BMP_v3.07_SF-B.xlsm, SF 7/27/2021, 2:49 PM
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia =89.1 %
(100% if all paved and roofed areas upstream of sand filter)
B) Tributary Area's Imperviousness Ratio (i = Ia/100)i = 0.891
C) Water Quality Capture Volume (WQCV) Based on 12-hour Drain Time WQCV = 0.32 watershed inches
WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including sand filter area)Area = 40,510 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =1,064 cu ft
VWQCV = WQCV / 12 * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 = in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region, VWQCV OTHER =cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth DWQCV =1.5 ft
B) Sand Filter Side Slopes (Horizontal distance per unit vertical, Z = 4.00 ft / ft
4:1 or flatter preferred). Use "0" if sand filter has vertical walls.
C) Minimum Filter Area (Flat Surface Area)AMin =451 sq ft
D) Actual Filter Area AActual =651 sq ft
E) Volume Provided VT =1626 cu ft
3. Filter Material
4. Underdrain System
A) Are underdrains provided?1
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y =ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 =cu ft
iii) Orifice Diameter, 3/8" Minimum DO = in
19122-0006 Maverick
Fort Collins, Colorado - Sand Filter "C"
Design Procedure Form: Sand Filter (SF)
Shawn Krieger
DCI Engineers
July 27, 2021
UD-BMP (Version 3.07, March 2018)
Choose One
Choose One
18" CDOT Class B or C Filter Material
Other (Explain):
YES
NO
UD-BMP_v3.07_SF-C.xlsm, SF 7/27/2021, 2:51 PM
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
6. Inlet / Outlet Works
A) Describe the type of energy dissipation at inlet points and means of
conveying flows in excess of the WQCV through the outlet
Notes:
Design Procedure Form: Sand Filter (SF)
Shawn Krieger
DCI Engineers
July 27, 2021
19122-0006 Maverick
Fort Collins, Colorado - Sand Filter "C"
Choose One
YES NO
UD-BMP_v3.07_SF-C.xlsm, SF 7/27/2021, 2:51 PM
Final Drainage Report: Maverik Fuel Station Fort Collins
DCI Engineers
July 28, 2021
1
Fuel Spill Containment System and
Standard Operating Procedure (SOP)
for
Maverik Inc. Store
I-25 & North County Road 32 (Hwy 392)
Fort Collins, Colorado 80528
Background
A Fuel Spill Containment System (FSCS) consists of trench drains with grates installed at the
surface surrounding fuel canopies. The trench drains collect any fuel spillage that may occur at
the fuel pumps. The trench drains connect to a Fuel Spill Containment Vault designed to contain a
minimum of 150 gallons of spilled fuel. The Vault is also designed to allow any normal drainage
to flow through to the outfall of the system. Fuel spills are isolated by closing a gate valve located
2 feet downstream from the vault (see attached exhibit for location of gate valves). The fuel is
then promptly removed through an access hatch / manhole installed in the top of the Vault. The
Vault is connected to the upstream trench drains and downstream outfall with 6” PVC pipe.
The entire system is gravity fed and is constructed to ensure positive drainage throughout the
system to the outfall.
Normal Function of Fuel Spill Containment System
Whether there is a fuel spill or not, the trench drains will capture any upstream runoff that
normally occurs. The valve 2 feet downstream of the Fuel Spill Containment Vault should be left
open under normal conditions to allow runoff to pass through to the downstream stormwater
system. This runoff will flow through the system whether there is a fuel spill contained in the
Vault or not and will be released at the outfall.
Final Drainage Report: Maverik Fuel Station Fort Collins
DCI Engineers
July 28, 2021
2
Standard Operating Procedure (SOP) - Actions to be Taken After a Fuel Spill Incident
In the event of a fuel spill, the following shall be the basic course of action:
Shut down equipment
Evacuate the area
Block access to the area
Close valve just downstream of Fuel Spill Containment Vault
Contact designated emergency personnel
Determine the source of the spill
Stop the spill at the source
Apply absorbent to soak up spilled fuel
Use neutralizing agents to reduce the chance of fuel ignition
Sweep up absorbent and neutralizing agents and dispose of properly
Safely remove and properly dispose of spilled fuel detained within the Fuel Spill
Containment Vault to prevent discharge to either storm or sanitary sewer
Use absorbent pads to soak up any remaining fuel and chemicals
Dispose of used absorbent pads in designated barrels
Completely clean containment system and collect the wash water and dispose properly
Check the outfall for spill that may have escaped the Fuel Spill Containment Vault and
clean up area if necessary
Once the fuel spill is cleaned up completely open the valve just downstream of Fuel Spill
Containment Vault to allow runoff to flow through normally
The action procedure presented above is meant to be a guideline for what to do to clean up a fuel
spill that has been contained within a FSCS. It is the responsibility of the owner/operator to have
a detailed hazardous material spill procedure and all materials and equipment on hand to
implement it. Other procedures and actions may be required by local, state, and federal
regulations such as reporting and investigating the incident. All required procedures should be
followed in an incident where fuel is spilled.
Final Drainage Report: Maverik Fuel Station Fort Collins
DCI Engineers
July 28, 2021
3
Fuel Spill Containment System
Required Action Maintenance Objective Frequency of Action
Trench Drain
Inspection
Inspect the trench drain through the
grates and from each end. Look for
obstructions, vegetation, debris,
litter, sediment, etc. inside the
trench drain. Vegetation or algae
growing in the trench drain
indicate the presence of standing
water. Water backing up out of the
trench drain entrance indicates a
blockage. During a rainstorm, a
blockage will be indicated by
slow water flow or by water
backing up at the trench drain
entrance.
Routine - Including just before
annual storm seasons (that is,
April and May), end of storm
season after leaves have fallen,
and following significant rainfall
events.
Trench Drain Sediment
Debris and Litter removal
Clear as much of the trench drain
as possible from each end with a
long- handled tool such as a hoe.
Raise the grates to clean
inaccessible portions of the trench
drain. Scrape with hoe or similar
tool to ensure that water flows
freely along the concrete flow-line
of the trench drain
Routine - Including just before
annual storm seasons (that is,
April and May), end of storm
season after leaves have fallen,
and following significant rainfall
events.
Fuel Spill Containment
Vault inspection
lnspect vault to ensure that the
vault continues to function as
initially intended. Examine the outlet
for clogging, excessive
sedimentation levels, oily sheen,
and damage to any structural
element.
Routine - Annual inspection of
hydraulic and structural
facilities. Also check for obvious
problems during routine
maintenance visits, especially
for plugging of outlets.
Fuel Spill Containment
Vault Sediment Oily
Sheen, Debris, and Litter
removal
Vacuum and remove accumulated
sediment and liquids from the
bottom of the vault through the
access hatch on the top of the
vault. Ensure outlet is clear of
debris.
Routine - Annually including just
before annual storm seasons
(that is, April and May), end of
storm season after leaves
have fallen, and following
significant rainfall events and
when oily sheen is seen during
any routing inspection.
VAN2600 Michelson Drive, SUITE 930Irvine, Ca 92612PHONE: (949) 892-4950WEBSITE: www.dci-engineers.com
CIVIL / STRUCTURAL
COMMERCIAL FUEL CANOPY
RESIDENTIAL FUEL CANOPY
FUEL SPILL CONTAINMENT VAULT
WITH ACCESS MANHOLE
FUEL SPILL ISOLATION VALVE IN
VALVE BOX. USE HANDWHEEL
TO OPEN AND CLOSE VALVE
PERIMETER
TRENCH DRAINS
PERIMETER
TRENCH DRAINS
FUEL SPILL
CONTAINMENT VAULT
WITH ACCESS MANHOLE
FUEL SPILL ISOLATION VALVE IN
VALVE BOX. USE HANDWHEEL
TO OPEN AND CLOSE VALVE