Loading...
HomeMy WebLinkAboutSTROMBERGER MASTER PLAN - 16-89 - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSITEM NO. 2 PLANNING AND ZONING BOARD MEETING OF April 26,, 1%9 STAFF REPORT 7 PROJECT: Stromberger PUD Master Plan - #16-89 APPLICANT: Everitt Companies Cityscape 3030 S. College, #200 Fort Collins, CO 80525 OWNER: Everitt Companies P. O. Box 2125 Denver, CO 80525 PROJECT PLANNER: Sherry Albertson -Clark PROJECT DESCRIPTION: A request for master plan approval for 151.1 acres of industrial and business service uses, located at the southeast corner of Harmony and Timberline Road, and is zoned I-P, Industrial Park Zoning District (pending). RECOMMENDATION: Approval. EXECUTIVE SUMMARY: The Stromberger PUD Master Plan, located at the southeast corner of Timberline and Harmony Road, is proposed as a mixed -use development, consisting of industrial and business service uses. Alternative uses proposed include community/regional retail, offices and residential uses. The proposed master plan is in conformance with the adopted plans and policies of the City and the Land Use Policies Plan supports these uses at this location. DEVELOPMENT 3C0 LaPorte Ave. • P O Box 580 • Fort Collins, Colorado 80522 • (3C3) 22'. 675J SEHVICES. PLANNING CEPARTMENT Stromberger PUD Master Plan - #16-89 P & Z Meeting - April 24, 1989 Page 2 COMMENTS 1. Background: The surrounding zoning and land uses are as follows: N: r-1-p, M-M; existing mobile home park S: T; vacant E: i-p; Charter Hospital (Wildwood Farm Master Plan) W: proposed T (pending), I-L (pending); vacant (proposed Harmony Number Six Annexation and Zoning) This site was annexed into the City in 1986 as the South Harmony Annexation and was zoned T-Transition. The applicant has requested I-P, Industrial Park Zoning for this site, with a PUD condition. 2. Land Use: The Stromberger PUD Master Plan is proposed as a mixed -use development, consisting of industrial and business service uses. Alternative uses proposed include community/regional retail, offices and residential uses. The land use mix represents the applicant's best estimate of development potential. As changes in the applicant's land use programming occur, revisions would be necessary to the Master Plan. The proposed master plan is supported by the following land use policies, as contained in the Land Use Policies Plan: 60 - Industrial uses should locate near transportation facilities that offer the required access to the industry but will not be allowed to create demands which exceed the capacity of the existing and future transportation network of the City. 61 - Industrial development should locate within the City or consistent with the phasing plan for the urban growth area, where the proper sizing of facilities such as water, sewer and transportation has occurred or is planned. 69 - Regional/community shopping centers should locate in areas which are easily accessible to existing or planned residential areas. 70 - Regional/community shopping centers should locate near transportation facilities that offer the required access to the center but will not be allowed to create demands which exceed the capacity of the existing and future transportation network of the City. 72 - Regional/community shopping centers should locate where they can be served by public transportation. Stromberger PUD Master Plan - #16-89 P & Z Meeting - April 24, 1989 Page 3 73 - Regional/community shopping centers shall locate in areas served by existing water and sewer facilities. The proposed master plan addresses these land use policies. 3. Neighborhood Comyatibility: A neighborhood meeting was held on March 8, 1989 (see attached summary). Questions raised related generally to the master plan process, storm drainage and potential improvements on Timberline Road. The applicant has submitted a master plan without a concurrent phase plan, so that the access points and land use mix could be reviewed at an early stage. Staff believes the proposed mix of land uses are compatible with the surrounding area. 4. Design: Industrial and business service uses are proposed on each of the four parcels of the master plan. Alternative uses are also proposed as follows: parcel A (community/regional retail) and parcels C and D (office park and/or residential). The applicant's intent is to create a park -like development, with open space areas to cover a significant portion (minimum 25%) of each of the parcels. An 80' landscaped buffer has been provided along Harmony Road. 5. Transportation: Harmony Road is a major arterial (6-lane) and Timberline Road south of Harmony is an arterial street. Access to this site from Harmony Road would be from an existing right-in/out along Harmony and at the location of the existing mobile home park access, which will be a signalized intersection. There are two Timberline Road access points indicated on the master plan. Access through the Wild Wood Farm PUD Master Plan to the east is also a potential and would require an amendment to the approved master plan. RECOMMENDATION The proposed master plan is in conformance with the City's adopted plans and policies and therefore, staff recommends approval of the Stromberger PUD Master Plan, # 16-89. JJ <R J :it ofteawma mi oil rip mm HARMONY RD. ■ ■ ■ ■ ■ ■ ■ Area of Notification 3. Sol IM son ornmammummommmumms won Lu z Project Location—i uJ ITEM STROMBERGER MASTER PLAN NUMBER 16-89 LAND USE BREAKDOWN FLOOR AREA F.A.R. PAR --EL AREA LAND USE OR MAXIMUM D.U. OR DENSITY A IH.0 ACA IND151RLLL/BUSINESS SERVICES T00,000 SO.". 4:1 B 15.0 AC3 INDUSTRIAL/BUSINESS SF/MC6 185,000 SO.l. .1 C 52.0 K3 INDUSTRIAL/BUSINESS SERVICE ST0,000 SOFT, A.1 0 20.1 AC3 INDUSTRVI/BUSINESS SEWKIM 220.M SO.R, - Torus 151.1 AC3 11SS .— SOFT. 41:1 TIMBERLINE FARM 1 I (VACANT) uuL-----JL-----L------- 1 HARMONY ROAD MOBILE HOME PARK _` NOTE: 80'LANDSCAPE BUFFER TVP. ALONG HARMONY ROAD MEASURED FROM ULTMATE (PLANNED 2010) EDGE OF PAVEMENT FRANTZ PROPERTY (VACANT) 1 I LEGAL DESCRIPTION --mv. V O OO O 0 0 O Q � ���•• 8 �• I O RIGHT OUT ONLY O C :C O I PARCEL A A / PARCEL / C S% AC! � lSWJSERVICES 15.0 ACS IINDUSTRIAL/BU INDUSTRIAL/ IG BUSINESS SERVICES I I I I O 2 ol� o O C. I 1 1 I 20.1 AC! Iq: INDUSTRIAL/ 1 VICBUSINESS/ O/ 1 O O OI O PARCEL ^ sl 62.O [� w re w,c1 r..a .AooA A[.e[ATMM INDUSTRIAL/BUSINESS SERVICES J POSSIBLE LOCAL STREET CONNECTION DUSBABECK PROPERTY H. H. INVESTMENTS PROPERTY (VACANT)wr (VACANT) ^__-�I 1 CHARTER u N 1 HOSPITAL n r I 0 D — WILD WOOD FARM 11\51E11 RUYIF0 11DUST vAVBU31E55 ......._.._.I.—..— i NATIVE COUP STREET ALIGNMENT I RUFF PROPERTY (VACANT) *lp GENERAL NOTES KEY DEVELOPAEM AREA ® PRIMARY ROADWAY ® SECONDARY ACCESS ® AMENTY/SITE FEATURE ® EKIBTBD VEGETATK0N1 �p LANDSCAPE BUFFER OLE ORASNIGEIOPEN SPACE PEDESTRIAN WAY STROMBERGER PROPERTY MASTER PLAN PROJECT NO. W20 SCALE: 1-200' DATE OF PREPARATION: ]-6-B9 RA SIGNS: 4/5/gg t=FN .- .. IL Ynr � m SHEET NO. OF AUTOCAD RILE NAME:_ 902oN2 Cho � o 0 urban design, inc. STROMBERGER PROPERTY MASTER PLAN Statement of Planning Objectives March 6, 1989 The 151 acre Stromberger Property is located at Harmony Road and Timberline Road; a key intersection on an important entryway to Fort Collins. A number of considerations by public and private agencies have indicated the need to formulate a Master Plan for the property. These considerations include: - The need to, as a condition of rezoning, establish basic land use, access, traffic circulation, and site design guidelines. This will lay the foundation for more detailed Master Traffic Studies, Drainage Plans, and Utility Plans, which will be provided for City review with the plat and development plans for the first filing. - The City of Fort Collins planning department intends to begun work on a study of the Harmony entry corridor. The study will establish preliminary streetscape design guidelines and provide an overview of development opportunities and constraints. The proposed Master Plan in consistent with the existing design concepts associated with the Harmony Road Corridor. The Stromberger Property Master Plan is intended as a tool to assist in: - Avoiding creation of traffic problems that may result if the collector/arterial roadway pattern serving the area is not considered along with site specific development projects. - Allowing an on -site circulation system that can effectively direct most traffic toward Harmony and Timberline. - Provide a desirable mix of land uses in an attractive business park setting. - 1 - - Provide Fort Collins with a site that can compete for major regional employeers that may locate in northern Colorado. * The Stromberger Property, located midway between the Harmony Road/I-25 Interchange and College Avenue, represents: - A plan comprising a number of options for a user seeking a large [30 to 70 acre] site. - A chance to establish an alternative Master Planned business park with a zoning approach that will allow both the private and public sectors to become more responsive to economic development opportunities. - An opportunity to continue the high quality image, (both in visual and economic terms) that exists along the Harmony Corridor. An excellent location to deal with regional traffic with minimal impact on local streets, on a site that is within convenient driving distance for local employees and shoppers The land use pattern indicated on the Stromberger Property Master Plan is consistent with the adopted Land Use Policies Plan of the City of Fort Collins regarding the location of industrial or business service uses, retail (regional/community shopping centers), and residential uses of various densities. At this time, there is no definite phasing or development schedule for the site. It is estimated that development may begin in 1989 and continue beyond the year 2000. The land uses indicated could provide employment for an estimated 3,000 to 4,000 persons. - 2 - LAND USE BREAKDOWN-. 0 FLOOR AREA F.A.R. PARCEL AREA LAND USE OR MAXIMUM D.U. OR DENSITY A 72.4 ACC INDUSTRIAL/BUSINESS PARK 790,000 SQ.FT. 4:1 B 37.4 AC.t INDUSTRIAL/BUSINESS PARK 410,000 SQ.FT. 4:1 C 33.1 AC.f RESIDENTIAL 300 D.U. 9 D.U./AC. D 8.2 ACC BUSINESS SERVICES 90,000 SQ.FT. 4:1 TOTALS 151.1 AC.f 1,290,000 SQ.FT. 4:1 300 D.U. 9 D.U./AC. • f • 0 STROMBERGER PROPERTY Site, Landscape, and Architectural Design Guidelines [CITY AND CLIENT REVIEW DRAFT 04-05-891 902guid2.mss 4-5-89 General Intent These Guidelines are made to guide development, improvement and use of the non-residential development areas at the Stromberger Property, hereafter refered to as the Subject Property, so as to: - Encourage the development of aesthetic site development, architectural, and engineering design, including compatible landscaping, and, in general, provide a harmonious development that will promote the general welfare of the Owners and Occupants. These guidelines and the duly recorded Declaration of Covenants, Conditions, and Restrictions will be used as a basis for Grantor or Design Review Committee review of all proposed non-residential site, landscape, and architectural construction; whether proposed as a "use by right" or as a Planned Unit Development. Furthermore, all pertinent requirements of public agencies shall be followed in the development of a specific Building Site. Conflicts Zoning ordinances, building codes and regulations, and any other governmental restrictions and requirements shall be observed. Although based on local zoning, subdivision, and/or planned unit development regulations, these design criteria may be more restrictive In land use, site development standards, landscape requirements, or in other matters. In the event of any conflict between this Declaration and any such governmental codes, the more restrictive standards shall apply 902guid2.mss 4-5-89 2 unless a variance is granted. Any approval of the Grantor or the Committee required in this Declaration does not in any way relieve Owners and Occupants from obtaining approvals required by any governmental body having jurisdiction. Master Plan A Master Plan has been developed to assist in the implementation of a unified project concept and allow compatible development of individual Building Sites. The Master Plan may incorporate the layout of major streets and land use patterns, zoning districts, landscape/streetscape criteria, and other guidelines for the Subject Property in addition to those included here. The Master Plan represents a best estimate of development potential at this time. As changes occur in the market place, as required public improvements are defined, and as development of the project continues, amendments to the Master Plan may be requested by the Grantor. Variances In order to meet special situations which may not be foreseen, it may be desirable from time to time for the Committee to a►low variances of certain requirements. Any variance granted is considered not to be precedent setting, but is made due to specific circumstances with the welfare of the overall development in mind. 902guid2.mss 4-5-89 3 0 • Site and Landscape Guidelines Objectives It is the intent of these guidelines to provide a framework for a compatible streetscape and site and landscape development of the highest quality for Builcing Sites within the Subject Property. Toward that goal, these design guidelines seek to: - Provide compatibility among the architectural features of each Building Site; - Integrate individual structures from Building Site to Building Site through harmonious site and landscape treatment; and - Create a pleasant and aesthetic environment for occupants and visitors. Some variation in on -site development and landscape architectural style is permitted and encouraged in order to increase visual interest, so long as the variations are in harmony with the Property as a whole. Intensity of Development - No site shall have building coverage exceeding thirty-three per cent (33%) of the total Building Site area, (Site area to building coverage ratio shall be at least 3:1). Parking areas or parking structures shall not cover more than fifty per cent (50%) of a Building Site. At least twenty per cent (20%) of a Building Site shall be landscaped in a manner acceptable to the Committee. - Typically floor areas of buildings shall be not more than thirty-three per cent (33%) of 9025uid2.mss 4-5-89 4 0 • the Building Site unless the building coverage is reduced as follows: * If the site area to floor area ratio is 2:1, the site area to building coverage ratio must be at least 5:1. * If the site area to floor area ratio is 1:1, the site area to building coverage ratio must be at least 6:1. - Total floor area of any building or group of buildings on a single lot at the Subject Property shall not exceed the total area of the Building Site [for a maximum site area to floor area ratio of 1:11 in any case. Building Envelopes/Setbacks Unless specifically approved in advance, all Buildings shall be setback the following distances: - Seventy-five (75) feet from any property line abutting Harmony Road. - Fifty (50) feet from any property line -- —y abutting Timberline Road. -'Z? t w+ -I - An average of forty (40) feet - and in no event closer than twenty (20) feet - from the boundary line of any other public street or 5 �� gpnvcp. Area � i right of way. - Fifty (50) feet from the intersection of any two streets. � o - An average of fifteen (15) feet (and in no Z g �F event closer than ten (10) feet) from the side boundary of any Building Site. - An average of twenty-five (25) feet (and in no event closer than fifteen (15) feet) from the rear boundary line of any Building Site- - Buildings should be oriented on the Building Site to minimumize the visual impact of parking areas located between the building entry and the street. 902guid2.mss 4-5-89 5 - Subject to the approval of the Grantor or the Committee, underground improvements such as storage tanks or vaults may be placed within the setback areas. Grading Building Sites shall be graded in such a way as to: - Be consistent with the Streetscape requirements of these Guidelines; - Handle storm water runoff in an attractive manner, consistent with the technical requirements of the Master Utility and Drainage Report; - Include slopes of not more that 3:1 (33%) and not less than 100:1 (1%). - Help to screen loading and service areas; and - Minimize drainage conflicts between Building Sites. Any retaining walls utilized should be of materials compatible with the building. Parking and Circulation Parking areas shall be designed according to the following guidelines: - In no case shall less than two parking spaces for every three employees/shift be provided. For specific users, the Grantor or the Committee may require additional off-street parking or loading areas. - Parking Islands located at the ends of parking aisles, must be landscaped as required in the landscape section of these guidelines. 902guid2.mss 4-5-89 6 - Parking lots are to be broken into sections of not more than 250 parking spaces. Sections are to be separated by well landscaped circulation drives or landscape buffers at least twelve (12) feet wide. - Visitor parking, handicapped parking, and drop-off areas as needed shall be appropriately located near building entrances. - Bicycle parking shall be provided near building entries, but shall not encroach into pedestrian walkways. Bike racks should be screened or otherwise incorporated into the site landscape/hardscape design. - All driveways and areas for parking, maneuvering, loading or unloading shall be paved with asphalt, concrete or similar materials. - Parking areas may project not more than five (5) feet into required minimum side and rear setbacks. - Parking structures are encouraged so long as such structures are well integrated into the site and landscape design, and do not become barriers to direct pedestrian access to the building. Entryway Treatment The major entryways into the Subject Property may be used for the Installation of significant identity features, comprising signage, walls and/or other hardscape elements, berming and landscaping. Care will be taken that plantings at street intersections are set back far enough from the right-of-way that the view of traffic on the intersecting Streets is not impeded. Entrances into Building Sites should, to the extent possible: - Provide a direct vista of the building entry 902guld2.mss 4-5-89 7 0 • or other architectural focal point; - Include the Building Site's ground sign and intensified landscape treatment at the street/drive intersection, compatible with the required Streetscape treatment. Building entry areas should strive to: - Provide a pleasant transition between site landscaping, parking, pedestrian circulation, and the building exterior and interior; - Create a sense of human scale; - Provide landscaping, including planting beds, pedestrian amenities such as benches, fountains, or works of art - if practical -, or other special identity features. Walkways and Hardscapes Pedestrian circulation shall be facilitated through the provision of convenient walkways providing direct access between building entries, parking areas, and public streets. - If possible, pedestrian crossings of major vehicular circulation lanes in parking areas should be clearly defined through a change of materials, color, and/or special textured surface treatment. - Plazas, patios, courtyards, retaining walls and other hardscape surfaces should be compatible with the materials of the Building; or concrete accented with brick pavers. - The use of fountains, sculpture, and other special focal points is encouraged in the design of hardscape areas. - Handicapped access criteria should be used in the design of all pedestrian walkways. 902guid2.mss 4-5-89 8 i Storage, Loading/Service Areas - Storage, loading, and service areas shall be located on the side or rear of the Building, and screened from public view. - Garbage and refuse containers shall be contained within Buildings, or shall be concealed by means of shrubbery and opaque screening walls - a minimum of five 151 feet in height - of material similar to and compatible with that of the Building. - Fuel and other storage tanks shall be installed underground wherever practical or inconspicuously located and screened from public view. - No materials, supplies or equipment shall be stored in any area on a Building Site except inside a closed Building, or behind a visual barrier of wood or masonry - similar to and compatible with those materials used on the building. Chain link type fences with wood slats inserts are not an acceptable screening device. - Screening barriers shall be of sufficient height to conceal the materials, supplies or equipment from the view of the public and the views of the occupants of adjacent Building Sites. Fences and Screening - No fence shall exceed eight feet 18'1 in height, without prior approval of the Committee. - Any fence visable from a street shall be constructed of materials similar to or compatible with those materials used in the Building. Decorative or protective wrought iron fences shall be allowed when incorporated properly within a site plan. Chain link 902guid2.mss 4-5-89 9 0 • fences are not acceptable when visible from a Street. Site Lighting - Between the front of the building and the street, low bollard lighting or landscape lighting will be encouraged. Bollards may be constructed of wood, concrete, or appropriately finished metal materials. Any materials utilized shall be finished to be compatible with the building. - Ground mounted flood lighting fixtures shall be weather-proof and vandal resistant, mounted not more than 18" above grade, and shall be screened by low planting materials or architectural elements. - Pole mounted flood and parking lot lights are Permitted. However, they may not spill light onto areas beyond the Building Site. p - All lighting utilized on an individual Building Site shall be of the same family of fixtures and be compatible and harmonious throughout the property. Landscaping - The density of Landscaping to be attained on individual building sites need not be done so dense as to completely cover or mask the Building Site but shall not be so sparse as to seem to be applied to the Building Site artificially rather than serving to integrate the various elements of the site. - An interesting variety of plant materials, seasonal color [flower blooming times, fall color, and winter twig color] should be considered in the formulation of the landscape plan. 902guld2.mss 4-5-89 10 r� u - Landscape materials shall be of long lived varieties, and shall be permanent in nature. Short lived materials, such as annual flowers, may be used to accent or supplement the basic permanent landscape plan. - Plantings shall be grouped by combining plants of similar water requirements. - Thorny plants shall not be placed next to pedestrian areas. - Planting areas with special themes such as xeriscape techniques, native plantings, and ornamental grasses, will be encouraged, especially in Common/Greenbelt Areas, subject to review by the Committee. - Plant material shall be uniform in shape, in good healthy condition - in accordance with AAN specifications for Number One Grade - and well adapted to the Fort Collins area climate zone. - Nothing with invasive roots shall be used. - Artificial plant materials are prohibited. - Each Building Site shall have a minimum of twenty per cent (20%) of its total area in landscaping. - Any unpaved areas lying within adjacent Street rights -of -way shall be landscaped and maintained to the finished curb line of the Street by the Owner or Occupant. - At least thirty (30) trees per acre shall be provided in large open space areas, unless precluded by the intended use of the affected open space. - Landscaped islands, a minimum be 17' in length and 9' in width, and including at least one shade tree, shall be required in large parking lots. At least one (11 such island shall be installed for each forty [401 vehicular parking spaces provided on the Building Site. Subject to the approval of the Committee, individual required landscaped islands may be aggregated into fewer larger islands to soften the effect of large paved parking areas. 902guid2.mss 4-5-89 I RR - Parking lots are to be broken into sections of not more than 250 parking spaces. Sections are to be separated by well landscaped circulation drives, or landscape buffers at least twelve (12) feet wide which may include walkways up to six (6) feet wide. - Where parking Is located between the Building and the Street, the parking area should be screened by landscaping and/or berms. - Planting beds and other acceptable landscape treatment shall be provided around the perimeter of buildings. - Disturbed areas proposed for future expansion shall be seeded with an appropriate turf grass blend, irrigated, and maintained in a mowed and neat condition. - All landscaped areas, including parking lot islands, shall be irrigated by a fully automatic underground irrigation system providing at least one hundred percent [100%] irrigation coverage. Streetscapes - A high quality streetscape treatment is a key element at the Subject Property. The effect desired is one of a street defined by berms and deciduous canopy trees with main entrances, major intersections, and entries to Building Sites accented by planting beds, identity signage, and walkways. - Deciduous canopy or overstory trees should be placed along the Street frontage parallel to the public right-of-way. These canopy trees are to be informally spaced; at an average of thirty-five (35) feet on center along Harmony Road and Timberline road; and at an average of forty (40) feet on center along all other streets. - Widths of the following required streetscape areas are to be measured from the ultimate 902giid2.mss 4-5-89 12 • n edge of pavement or flow -line of adjacent streets. * Along Harmony Road, a landscaped area at least 75 feet wide with bluegrass sod and informally grouped canopy street trees shall be provided. Beyond the street trees, berms at least 36 inches high, spaced in concert with the street trees shall be provided. Berming and canopy trees should be designed to work with existing healthy trees within the required 75 foot streetscape area. * Along Timberline Road, a landscaped area at least 50 feet wide, shall be treated in a manner similar to that described above for Harmony Road. Minimum height of berms along Timberline shall be 30 inches. * Along internal collector streets a landscaped area at least 25 feet wide shall be provided. - Smaller ornamental trees and evergreen trees may be intermixed with these taller canopy trees but should generally be located further away from the Street so as not to detract from the street defining effect of the deciduous canopy trees. - All areas fronting on a Street and not utilized for parking, driveways, or walkways shall be landscaped in a similar manner. Where possible, berms should be designed to extend at least thirty 1301 inches above the high point of the finished pavement in the parking area being screened. - Landscaping adjacent to Streets and the front sixty feet 16011 of all side yard landscaping shall be predominately a lawn established by sodding with bluegrass or other high quality sod blend. 902guid2.mss 4-5-89 13 Recommended Plant List/Minimum Sizes Plant Size - All plant material shall meet the minimum size and height requirements indicated in the Recommended Plant List. Trees included in this list have been selected for their adaptability to the Front Range region and for their relatively low water use requirements. The use of hardy, long-lived hardwood and evergreen trees is encouraged, although "in -planting" with faster growing, shorter lived species will be allowed. COMMON NAME BOTANICAL NAME Ash, Marshall's Seedless Fraxlnus pennslyvanla "Marshall's Seedless" Ash, Autumn purple Fraxlnus americana 'Autumn Purple' Ash, Green Fraxlnus pennslyvanla Ash, Summit Fraxlnus pennslyvanla 'Summltt' Hackberry Celtls occldentalis Honeylocust Gledltsla trlacanthos Inermis varieties Linden, Littleleaf Tllia cordata Maple, Norway Acer piatanoldes varieties Oak, Bur Ouercus macrocarpa Oak, English Ouercus robur Oak, Swamp White puercus bicolor Pine, Austrian Plnus nigra Pine, Pinyon Plnus edulls Pine, Ponderosa Plnus ponderosa Pine, Scotch Pinus sylvestrls Spruce, Colorado Blue/ Picea pungens 'Glauca' or Green Crabapple, Beverly Malus variety Crabapple, Hopa Malus variety Crabapple, Royalty Malus variety Crabapple, Dolgo Malus variety Crabapple, Llset Malus variety Crabapple, Radiant Malus variety Hawthorn, Cockspur Crataegus crusgaill Hawthorn, Downy Crataegus mollis Hawthorn, Washington Crataegus phaenopyrum Plum, Newport Prunus amerlcana 'Newport' Pear, Bradford Prunus calleryana 'Bradford' MINIMUM SIZE REMARKS 2" capper 2" capper 2" capper 2" caliper 2" caliper 2" caliper Protected locations 2" caliper 2" caliper 1 1/2" caliper 2" caliper 2" caliper 5 - 6' height 5 - 6' height 5 - 6' height Insecticide application 5 - 6' height recommended B' height 3/4" caliper Susceptible to disease, 3/4" caliper use as limited planting. 3/4" caliper Do not plant fruiting varieties 1 3/4" caliper near walks or streets. 1 3/4" caliper " 1 3/4" caliper " 1 3/4" caliper Thornless variety available 1 3/4" caliper 11" 1 3/4" caliper " 1 3/4" caliper 1 3/4" caliper 902guld2.mss 4-5-89 14 S1gnage Objectives It is the intent of these guidelines to provide a compatible system of signage at the Subject Property. Allowed signage will communicate: - Project Identification - Identification for the primary users] of each Building Site - Traffic control and directional information - Construction related information (on a temporary basis] Entrv/Identity Structures The project identity signs at the major entryways Into the Subject Property may combine signage with decorative walls and ground lighting and/or internal illumination; and should be complemented with bermed planting beds. Sign Design Restrictions The information on a sign is restricted by the amount of information absorbed by a driver in a moving vehicle. Therefore clear, simple signage designs are a basic assumption. - Free standing ground signs [one per street frontage per building] to be placed at or near the main entry drives to a Building Site shall 902guid2.mss 4-5-89 15 i be allowed as a building's main identity signage. No large roof signs are permitted. - Information that may be included on the identity sign may include the company or Building Site name and logo and the address of the building. - For a Building with multiple tenants, each tenant may be identified with: * A consistent system of wall mounted plaques; or * A wall sign of individually applied letters, not exceeding twelve inches (1211) in height, and not exceeding a total of ten (10) square feet in area. * Identification plaques, or applied letters shall be of the same color and type face (except logo's) at all locations on the building. - Signs may be illuminated but shall not be moving, flashing, blinking or fluctuating. Ground lit or internally lit Signs are preferred; no illumination is also acceptable If approved by the Committee. Variations Any sign design solutions that vary from the standards set forth by this guide are discouraged. Proposed variations must be submitted for review and approval by the Committee. PROJECT NAME TENANT NAME TENANT NAME TENANT NAME' 902guid2.mss 4-5-89 16 i • Architectural Guidelines Architectural Design Objectives The objective of this guideline Is to encourage consistency and quality in architectural design at the Subject Property, to maintain consistency, yet permit interest and variety and the use of new materials as they may develop. Building Height No improvements shall exceed thirty-five (35) feet in height at a twenty (20) foot front building setback line, except an improvement may exceed such height provided such improvement does not at any point project above a line sloping upward at a forty-five (45) degree angle at the required height and setback line. No building or appurtenance, including but not limited to, penthouses, elevators or elevator equipment, stairways, fire or parapet walls, skylights, wireless, radio or television masts or flagpoles shall exceed a height of fifty (50) feet above the finished building grade without the prior written approval of the Architectural Committee. Construction Methods/Materials - A relatively wide variety of architectural Design and materials shall be permitted. However, it is intended that a basic harmony of architecture shall prevail so that no cl.L//`i A.T' GP FJ.r PRE ?�//F:Jio �o WEKsi 902guid2.mss 4-5-89 17 building shall detract from the attractiveness of the overall environment. - The number of materials used for the exterior of all buildings shall be kept to a minimum to acheive unity and simplicity. Generally, no more than two (2) basic building materials, in addition to glass, should be used on exterior walls with one of the following materials having the dominant role: * Brick Masonry units shall be of a consistent size, type, texture, color and placement. * Stone units shall have a natural weathered face or shall be polished fluted or broken face. * Concrete Masonry shall be those generally described as customized architectural concrete masonry units. All concrete masonry units shall be integrally coated or coated with an approved coating. There shall be no exposed concrete block on the exterior of any building. * Concrete may be poured in place, tilt -up Q O C3 0 or pre -cast and shall be finished in D stone, textured or coated in a manner to be approved by the committee.pu� * Stucco/Plaster may be used as a dominant exterior surface or in combination with one of the above materials. S"(LYLo * Metal Siding shall be used only in combination with one of the above materials and upon specific approval of the committee. Roofing It is anticipated that the majority of the structures in the Subject Property will be low profile with flat roofs; however, sloped roofs may be proposed on smaller structures and as canopies in certain locations. Materials that will be 902guld2.mss 4-5-89 18 u • considered for these applications include: I. Wood shakes or shingles 2. Natural clay tiles 3. Slate 4. Concrete tiles 5. Fibbed metal or corten steel Architectural Screening All utility lines including electrical shall be underground. Padmounted transformers, switchgear and similar equipment which must be installed above ground line shall be screened with suitable landscaping and screening walls as described above, consistent with safety and other regulations of the utility companies. All mechanical equipment on building exteriors, roofs, or parking areas must be screened from view of all front and side streets and adjoining side properties. Building Expansion All Controls refer to the total (ultimate) development of any site. All site plans, when possible, shall identify initial and ultimate improvements, including buildings, paved areas, grading and landscaping. fig o�®c ys�'OB 902guid2.mss 4-5-89 19 r--] 0" M u� O O 0 a O O v 0 z a J W > O J D z W Q z Q z Q CO M v M W C1 W Oct M 8 0 CV O� �o m C3 M M z E w w z c� z w J U z 0 Q CC 0 0- cn z a cc • U LL W Q F_ Memorandum To: Bob Za.k:e1y, Everitt Enterprises, Inc. Eldon Ward, Cityscape Eric Bra.cke, Fort Collins Transport. Planner Fort Collins Planninq Staff From: Platt Del ich Date: April 5, 1 98'i Subject: Preliminary traffic study of Stromberger Property Master Plan This memorandum presents a preliminary traffic study of the Stromberger Property Master Plan addressing specific concerns. The following specific concerns_ are presented: — Trip generation - Trip distribution - Access locations - Need for signals. - Signal progression - Road geometric=_. This study relates to the conceptual plan prepared by Cityscape Urban Design, Inc. dated March 6, 1189. No specific development proposal is part of this. submis- sion. The master plan is presented in a conceptual sense. When specific development proposals are put forth on all or part of the land, a detailed traffic study should be performed. Streets This proposed development is located in the southwest quadrant of the Harmony Road and Timberline Poa.d intersection in Fort Collins, Colorado. Harmony Road and Timberline Road are classified as major arterials. In this area., Harmony Road is a four lane highway with a. center median. Currently signals exist at College, Lem.a.y, and Timberline. Harmony Road is. also S.H. 68 and is considered to be an access controlled highway. Speed 1 imi t_. are generally 55 mph with a re- duction to 45 mph approaching signalized intersections. Timberline Road has a. paved two lane rural cross. section north of Harmony Road and a. gravel surface south of Harmony Road. South of Harmony Road, Timberline Road 1 i • i F. k:nal.,:ln as Cc-un t;✓ Roa.d I I . The pc i=.ted _.peed l i m i t on the pa:!ed portion of Timberline Road is 40 mph. S't r om b e r- g e r- Property M-as.ter P1-a.n The Strcmterger Frclper ty i = pr_pcs.ed to to an i ndu= tr l al busi net=•er''•:' I Cep• de':!e l oF'rrleri t hi �.Cht►Rl,.t l'- o+ the plan is shown in Figure 1. The l e t ter s on the s.chema.t i s refer to p arse 1 s I:-,Ih i ch ,.re shot,in i n Ta.b1 e 1, Tr i p Gener-a.t i can . Intended access• to the si to i =_. a.l so shovjn i n Fi Qur-e 1 . Tt,,lo a.cces._.es are proposed to H.a.rmon:, Road, The - easter-nm st is intended to be a +u l l turn ,.c,--r— k,.jh i ch I;,Ii l l eventu-a1 1 :Y I;,I.a.rra.nt i gna.l i za.t i on . The I;:Ie ternmost a.cCes•_. to Ha.r-morly` Ro.a.d i= prc,pc,sed to h•a.ve l i m i t e d turn=.. Tl:,ao ,.cce=ses. ,.re pr-c,pos.ed to Tirnberl i n e Road <I=R 11 :? . These a.ccesses. I,ii 1 1 be ev-aI u-it ted a.s f u 1 1 t_urn C:i rcul,.t i c n ,.cce•_•-. i = i ntended to the proper- t i e-S to the east a.nd south. The on -=i to rcDa.d=.vstem _.hcl::ln i n Fi gure 1 ma;Y be changed to accommcda.te a.ct_ua.l user= The i n terna.l s-'Y'Sterrl Shca.an tea ill pros! i de good c i rcul �.t i on. Changes to the s. in wi 1 1 be e'.:'.3.1 uated a.t the time firm development propo=..a.1s. are put forth. Trip Generation Tr i p genera.t i on i s important i n con=.i der i ng the i rrlp.a.c t of a. d e v e l opmen t s u c h ,._. t_h i =. upon the e- i s t i ng ,arid proposed street sy—teal. H compilation of tr• i p gener,.t i on information !,?a.s• prepay-ed b the Institute cif Transportation Engi deers in 157, CS, updated in 1 ^E'7, ,and I;,I.a._• uzed to project trips that v)ould be generated by the prcDpo=.ed 1i.=.es. a.t. th i s s i to . Table 1 shot-,-1 . the expected tar i p generation on a. daily and peak: hour ba._ i ._ . The assumed use cateQor:r for. the ma.=.ter• plan tlas i ndustr i a.l park from the Trip Generation 11anua.l A terna.t i ve use s a.re s.hol,:ln c,n e.a.ch pa.rce 1 H1 tern.a.t i ve uses shou 1 d be e':!a.l u.a.ted at the t ime a. fu1 1 tr,.ff i c study i s prepared. The-aria.l ;*'s I s a.= =•timed no tra.n=- i t , r I de char i ng, or. i nter-naI tr I ps. Hs such , the generat I c n values used in s.ub=equent analyses ar-e core=er-va.t. i ve1 y high. Trip Dia.tr-ibutic,n Di rect i on.a.l di =.tr. i but i cin of the generated tr i p`. trom,'t.o the Stromberger Proper ty I,.?a-. de term i n e d ass- umi ng the future street _terrl in the a.rea and future land use=. in the c i t;Y. The di str- i but i on used in th i s pre i m i na.r';,,' tra.ff i c aria] ysi s I'!a- il': ea=north, 10"/ sou th . and 40/. uaest . The Nor th Fran t Range Corr i dor 1 1 I 1 1 1 1 1 1 1 1 1 w U w > < oC 0 w o w ►--- a: Z o W <z o /{ iA V\ U Q) o m � o J W > Q ~ cc m (A w < V z (J) z W U) U ::) (n a mw U NJU o Q> o�W CCU) � D 0 z ------- - TIMBERLINE z 0 w w 0 a I 1 1 I I I I 1 1' I 1 I 1 I I 1 I I _ 1 SITE PLAN FIGURE 1 • Land Use Parcel A - 64 Acres Parcel B - 15 Acre=. Parcel C - 52 Acres Parcel D - 20.1 Acres Total Table 1 Trip Generation Daily Trips 4020 940 3270 1260 9490 A.M. Peak Trips Trips in out 499 157 117 37 405 127 157 49 1178 370 P.M. Peak: Trips Trips in out 170 529 40 124 138 430 53 156 401 1249 Study was used to develop the long range future tr i p distribution. Traffic Assignment U=. i ng the above trip generation and tr i p distribution, an a.vera.ge daily traffic a. ss ignment performed. A daily, rather than peak hour a.•asignment, k:,ja. performed si n c e th i =. ma.s.ter pl .a.n i =. not spec i f i c a.nd i ._ i n tended on l r• to =.hovj order of m?gn i tude tra.ff i c . Deta.iled anal ys.i=. of individua.1 intersections should be performed in later tra.ff i s studi es• when more spec i f i c development proposals are put forth. The traffic a.ss i g n m e n t i s. shot:an i n F i pure "I. Ba.ckgrround tra.ff i s t,i-as obta.i n e d from the Plorth Front Range Gorr i dor 'study an other traffic studies performed in this general area.. 0nl "` a. l or,l� range ('2010) tra.ff i c pro.Iect l on vja.'= conducted i n th i s prel i m i na.r; tra.ff i c stud;:. r*hort a.nd 1onri ra.nc�e projections. =•houId be=-hol,;,n in s.ubs.equent tra.ff i c _tudi es. t--jhen spec i f i c d e v e 1 opments. a.re proposed. S. i g r, a 1 I.,.I .a. r r a. n_ s As a. mat ter of pol i cy, t.ra.ff i c =. i gn.a.l =_ a.re not ir,=.ta.11ed atan-,1c_a.tion ur,1e �:ja.rrant=. a.re met a.ccordi ng to the "rla.nual on Uniform Tra.ff i c Control Deviro=," Hov)ever, it 1= possible to determine whether traffic sign.a.I= a.re 1 ike1y to be met based upon estimated ADT an util i z i n g the chart shot,-jr, in Table 2'. Using the ma.jior- an m i nor =.tree t ?oI urr,e s shot,:,n i n F i gu r e 2, i t i s 1 i Vel y that si gna.l s t.ii 1 1 be t,:ia.r ra.n t e d at the Har-mony; Pla. i n Access i n t e r s e c t i on . Th i= i s. i n con- formance t,:ith the recently adopted Harmony Road Acces.=. P1 an . I t i s expected that eventual 1 y si gna.l s vji 1 1 be t!:,a.rran ted a.t_ other i n tersec t i on s 7--.1 or,g Harmony Road to the east as noted i n the Harmony' Road Acces=_ P1 an . i gna.l Progressi on gnaI progressior, w.a. not analyzed .along Harmony' Rod s P.B. t of th i a.na.l ys i s . The Harmon-,, R. Ac=e=._. aa. Plan ha.s a number of general signal progression schemes. tthen firm development proposals. are put forth, detailed progression ek:)al uat i ons should be performed. Future Access The fol 1 ot,.ji na comment-. are made concern i ng access and Qeometrics. v)ith reaa.rd=_. to the '';t_romberger Propert.' F-1aster Plan. • Q N SITE & BACKGROUND TRAFFIC FIGURE 2 TAE3LE: ;' VOLUME R�QU?FrMENTS • FOR . SIGNAL WARRANTS VEHICLES PER HOUR ON NUMPER OF LANES. VEHICLES PER HOUR ON HIGHER VOLUME MINOR FOR MOVING TRAFFIC MAJOR STREET (TOTAL EQUIVALENT STREET APPROACH (ONE EQUIVALENT ON EACH APPROACH OF BOTH APPROACHES). A.D.T.* DIRECTION ONLY) A.D.T.* MAJOR ST. MINOR ST. 100a 80% 700% 100IV801my 700% 100% 80p 70% 1000V 800 70p 500 400 350 8,300 6,640 5,810 150 120 105 4,600 3,680 3,220 • ►- 2 or more 1 600 480 420 10,000 8,000 7,000 150 120 105 4,600 3,680 3,220 2 or more 2 or more 600 480 420 10,000 8,000 7,000 200 160 140 6,000 4,800 4,200 a 1 2 or more 500 400 350 8,300 6,640 5,810 200 160 140 6,000 4,800 4,200 1 1 750 600 525 12,500 10,000 8,750 75 60 53 2,300 1,840 1,610 _ 2 or more 1 900 720 630 15,000 12,000 10,500 75 60 53 2,300 .1,840 1,610 c 2 or more 2 or more 900 720 630 15,000 12,000 10,500 100 80 70 3,100 -2,480 2,170 < y 1 2 or more . 750 600 .525 12,500 10,000 8,750 100 80 70 3,100 2,480 2,170 *Box, P. "Warrants for Traffic Control Signals", Traffic Encineerinq, November 1967. is "COTES: 1. Minor street ADT of 3600 (one -lane) and 4800 (two-lane) have been accepted in some instances as meeting Warrant I requirements. 2. For one-way minor street, reduce minor street ADT requirement by 33-1/3a. • 0 — Access from Harmony Road can be made at ti;lo locations, one being st the intended signal i zed intersection (h'la. i n Access" The ether is to the we =.t in the area of Parcel A and i t v:j i 1 l h-:Rve stop s i qn control v: i th 1 imi ted turns. The location shown on the master plan is. reasonable from a.signal progression point of v i e - Prirna.ry acce — i a.l=�o intended from Tirnberl ine Road (CR 1 1) . The l oca.t i nn =.hov:in -should fu l l turn access. This should be further evaluated in future tra.ff i c s t u d i e - Fi pure 3 =_ho(::1s the 1 ong range 1 a.ne requ i rements on the area. road=_. acid street Theeome tr i cs are based upon the tra.ff i c voI ume shot,jn i n Fi gure 2. Th i = prel i m i nary tra.ff i c stud one a.ddre=.=.es the t_ra.ff i c impacts i n a. general i zed manner and i = can 1 a.ppropr i a.te for the ma.st.er pl an submi tted. I t i =_ recommended that a. more deta.i 1 ed traff i c studybe considered a.s the va.riou=. element=. of thi cS project a.dv.a.nce through the p l ann i ng prose ss_., Conclusions The fni 1 ov:,i ng concl usi on=_ are dra.t.,n from th i =_ prelimitraffic anal >'si= of the cStrorriberger Propert, P'1aster P1 a.n : - I t i _. e::;pec ted that th i =. proposed deve 1 oprnen t , at full build -nut as described, v011 generate a.pprox i mate l y 500 veh i c l e tr i p end on an average t.,,i e e k d -a y. �ignaIs t,) I 1 ikely be v.1arra.nt.ed wi th ful l de -.:)el opment of the =tromberger Proper.t> Ha=ter PI ari -at the Harmony RoadiTla.i n Access i rater. sec t i on . - The asses es _.hco.-)n in the m.zaster plan are at reasonable locations. a.nd are in conformance v.ji th the H.a.rrnony Road Access P1 a.n . - The on-si to road x-stern wi 1 1 _.er,je the 1 and uses a.nd pro:) i de a.cce _._. to a.dj a.cen t proper t i e=.. Adjustments to the c i rcu l at i on s =.tem can be made (-,,hen spec i f i c 1 and use proposal = are put forth. - The geome tr i c requ i rernen is a.l ong Harms �nx Road are in ba.s i c accord-ance With the Fort Cal 1 i n=. Master Street Plan. 4 N W Z LANE REQUIREMENTS FIGURE 3 0 - Additional traffic studies• Should be conducted when specific development proposals ar•e put forth. Ideally, a traffic impact study should be conducted which considers this property as well as other nearby development proposals. C f