Loading...
HomeMy WebLinkAboutSTROMBERGER MASTER PLAN - 16-89 - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEWDevelo*nt Services Planning Department i Citv or Fort C;iins February 15, 1989 Eldon Ward c/o Cityscape Urban Design 3030 South College Ave. Fort Collins, CO 80525 Dear Mr. Ward, For your information, attached is a copy of the Staff's comments concerning Harmony and Timberline Master Plan, which was presented before the Concep- tual Review Team on February 13, 1989. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. Sincerely, Sherry Albe t on -Clark Senior City `Planner j Attachment SAC/bh xc: Tom Peterson, Director of Planning Mike Herzig, Development Coordinator Project Planner File 300 LaPorte Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750 1 CONCEPTUAl REVIEW STA7F COMMENTS MEETING DATE: February 13, 1989 PROJECT: SE Corner Harmony and Timberline Master Plan APPLICANT: Eldon Ward, c/o Cityscape, 3030 S. College, Suite #200, Fort Collins, CO 80525. Frank Vaught, c/o Vaught -Frye Architects, 2900 S. College Ave., Fort Collins, CO 80525 LAND USE DATA: Request for master plan and rezoning to I-L, Limited Industrial, for 150-acre mixed -use master plan, located south of Harmony and east of Timberline. COMMENTS: 1. Light and Power has a major duct bank along Harmony with vaults. Can serve from along Harmony. May be extending power along west side of Timberline. 2. Sewer exists along alignment of Kcenland extended. Repay exists for one parcel. A 16" water line exists along the north side of Harmony. Will need easements along the south side of Harmony. 3. There is a dual -release rate required for detention ponds in this area. McClelland Channel will parallel alignment of Keenland extended. Any road or other crossing of this channel will be at developer's cost. 4. A neighborhood park (8-]0 acres) will be desired if parts of this site develop in residential. 5. The Timberline alignment is shifted 10' east of the centerline of the sec- tion. The Master Street Plan shows Timberline transitioning to an arterial (from a major arterial) south of Harmony Road. 6. The plan appears to be in conformance with the Harmony Road Access Plan. 7. Staff recommends that the intersection with the collector on -site be designed closer to a t-intersection. 8. Staff suggests working with other properties to include them in any master plan for the area. 9. Staff recommends the I-P, Planned Industrial Zoning District, since the property is located at two arterial streets.