HomeMy WebLinkAboutGUARDIAN SELF STORAGE - FDP210018 - DOCUMENT MARKUPS - ROUND 1 - UTILITY PLANS (2)Fort Collins Water Utilities Comments
Matt Simpson
2/15/2021
Show the delineation of all existing
wetlands onsite.
JR RESPONSE: ADDRESSED
Please check if this is this the actual
direction of fall ("1-pt slope")?
For final,please add spot
elevations and/or contours
in this intersection
JR RESPONSE: ADDRESSED
JR RESPONSE: ADDRESSED
Please change the line
type of the underdrain to
make it easy to discern.
For Final,please try to make this alignment work for the storm pipe.
We can work with a 10-inch or 12-inch diameter pipe.
For alternate materials, such as PVC, you will need to get Engineering
department approval, but Stormwater would support.
The vertical separation of 1.3-ft should be discussed with SFCSD.
Please coordinate with the Landscape Plan design.
Please jog electric out and
around to avoid conflict with
underdrain and inlet.
JR RESPONSE: ADDRESSED
JR RESPONSE: ADDRESSED
JR RESPONSE: ADDRESSED. FCLWD will need to sign off on the 1.3' separa-
tion but we will submit with this configuration.
Good
Show the delineation of existing
onsite wetlands on the drainage
plan.
JR RESPONSE: ADDRESSED
For final:
Confirm the existing and proposed
pipe sizes
Please see if this
configuration would work.
better hydraulically,
requires custom inlet box
structure.
JR RESPONSE: CONFIGURATION
CHANGED TO WORK BETTER
HYDRAULICALLY
JR RESPONSE: 29X45
CONFIRMED. ADDRESSED