Loading...
HomeMy WebLinkAboutGUARDIAN SELF STORAGE - FDP210018 - DOCUMENT MARKUPS - ROUND 1 - UTILITY PLANS (2)Fort Collins Water Utilities Comments Matt Simpson 2/15/2021 Show the delineation of all existing wetlands onsite. JR RESPONSE: ADDRESSED Please check if this is this the actual direction of fall ("1-pt slope")? For final,please add spot elevations and/or contours in this intersection JR RESPONSE: ADDRESSED JR RESPONSE: ADDRESSED Please change the line type of the underdrain to make it easy to discern. For Final,please try to make this alignment work for the storm pipe. We can work with a 10-inch or 12-inch diameter pipe. For alternate materials, such as PVC, you will need to get Engineering department approval, but Stormwater would support. The vertical separation of 1.3-ft should be discussed with SFCSD. Please coordinate with the Landscape Plan design. Please jog electric out and around to avoid conflict with underdrain and inlet. JR RESPONSE: ADDRESSED JR RESPONSE: ADDRESSED JR RESPONSE: ADDRESSED. FCLWD will need to sign off on the 1.3' separa- tion but we will submit with this configuration. Good Show the delineation of existing onsite wetlands on the drainage plan. JR RESPONSE: ADDRESSED For final: Confirm the existing and proposed pipe sizes Please see if this configuration would work. better hydraulically, requires custom inlet box structure. JR RESPONSE: CONFIGURATION CHANGED TO WORK BETTER HYDRAULICALLY JR RESPONSE: 29X45 CONFIRMED. ADDRESSED