Loading...
HomeMy WebLinkAboutFORTY-THREE PRIME - FDP210019 - SUBMITTAL DOCUMENTS - ROUND 1 - EROSION CONTROL LETTER/REPORTProject Number:1328-010 Location:Fort Collins, CO Date:July 28, 2021 Total Acres:4.87 EROSION CONTROL MEASURE Units Estimated Quantity Unit Price Total Price L.F.260 $1.50 $390.00 Construction Fence w/Rock Sock L.F.- $4.50 $0.00 each 22 $75.00 $1,650.00 Wattle Dike Inlet Protection each - $100.00 $0.00 each - $75.00 $0.00 Wattle Dike Swale Protection each 9 $100.00 $900.00 each 1 $300.00 $300.00 each - $150.00 $0.00 each 1 $200.00 $200.00 each 1 $75.00 $75.00 L.F.95 $1.00 $95.00 per hour - $60.00 $0.00 Sub-Total:$3,610.00 1.5 x Sub-Total:$5,415.00 Amount of security:$5,415.00 Total Acres x $1325/acre:$6,452.75 Sub-Total:$6,452.75 1.5 x Sub-Total:$9,679.13 Cost to Re-seed:$9,679.13 Minimum escrow amount:$3,000.00 Erosion Control Escrow:$9,679.13 NOTE: 'Total Acres' represents total disturbed area. Forty-Three Prime Erosion Control Cost Estimate Silt Fencing Inlet Protection Wattle Dike Curb Side Check Dam Vehicle Tracking Control Pads Option 2 | Cost to Re-seed Disturbed acreage Option 3 | Miniumum Escrow Amount Final Escrow Amount Sediment Trap Concrete Washout Area Rock Sock Sawcutting Pollution Prevention Street Sweeping and Cleaning Option 1 | BMP Costs