FINAL DRAINAGE AND
EROSION CONTROL REPORT
FOR
TROUTMAN OFFICE PARK P.U.D.
FORT COLLINS, COLORADO
PREPARED FOR:
TROUTMAN OFFICE PARK ASSOC., LLC
FORT COLLINS, COLORADO 80525
JULY 19, 1996
PREPARED BY:
PARSONS & ASSOCIATES
CONSULTING ENGINEERS
432 LINK LANE PLAZA
FORT COLLINS, COLORADO 80524
(970) 221-2400
PROJECT NUMBER: 96.10 TOP
� PARSONS &
ASSOCIATES, INC.
CONSULTING ENGINEERS
July 19, 1996
Mr. Glen Schlueter
Fort Collins Stormwater Utility
235 Matthews
P.O. Box 580
Fort Collins, CO 80522
RE: Resubmittal of Final Drainage and Erosion Control for Parkway Townhomes,
P.U.D.
Dear Glen:
This drainage and erosion control report has been prepared to provide final
design information for the proposed 18,400 sq. ft. commercial office building at the
northwesterly corner of Troutman Parkway and JFK Parkway, Fort Collins, Colorado.
The parcel has been identified by plat as "Superblock Holding" and was reviewed and
approved thru preliminary P.U.D. with Marketplace P.U.D. in 1989.
Sincerely, `,,r1�,:'.
PARSONS & ASSOCIQwE; J
6
.
Gary A. Odehnal, P.E'�'`' ••
t"4AL - 0
Project Engineer ''%% '�'
�,
1•117;futt.::i•'
GAO/gbl
Enclosure
• 432 Link Lane Plaza . Ft. Collins, Colorado 80524 • 19701 221-2400
TABLE OF CONTENTS
I. INTRODUCTION
1
II. SITE DESCRIPTION
1,2
III. HISTORIC/MASTER DRAINAGE
2,3
IV. DRAINAGE CRITERIA
4
V. DRAINAGE UNDER DEVELOPED CONDITIONS 5,6
VI. EROSION CONTROL
7
EXHIBIT 1
VICINITY MAP
APPENDIX A
DEVELOPED DRAINAGE CALCULATIONS
APPENDIX B
DRAINAGE REPORTS OF RECORD
APPENDIX C
EROSION CONTROL -CALCULATIONS
BACK POCKET
EXHIBIT 2
FINAL DRAINAGE AND
EROSION CONTROL REPORT
FOR
TROUTMAN OFFICE PARK P.U.D.
This drainage and erosion control report has been prepared to provide final design
information for the proposed 18,400 sq. ft. commercial office building at the northwesterly
corner of Troutman Parkway and JFK Parkway, Fort Collins, Colorado. The parcel has been
identified by plat as "Superblock Holding" and was reviewed and approved thru preliminary
P.U.D. with the Marketplace P.U.D. in 1989.
This report was prepared in conformance with the City of Ft.Collins Stnrm DrainagP and
Construction Standards and with conformance to "Mail Creek and McClellands Major
Drainageway Plan: by Cornell Consulting Company, December, 1980.
Troutman Office Park P.U.D. is more specifically identified as a parcel of land situated in
the southwest quarter of Section 36, Township 7 North, Range 69 west of the 6th Principal
Meridian, City of Fort Collins, Larimer County, Colorado. The site is bounded on the north and
west by the fully developed Marketplace P.U.D. and on the south by Troutman Parkway and
east by JFK Parkway. Please refer to Figure 1 for a Vicinity Map of the area. The total
-1-
PROJECT SITE
VICINITY _IIAP
1" = 1400'
FIG URA' 1
proposed development contains approximately 0.82 acres. The site is currently vacant and
contains native grasses and a large cottonwood tree that will be saved as part of the
development. The existing site has relatively shallow slopes (approximately 2%) that drain to
an open 8" PVC pipe outfall at the southwesterly corner of the site.
Troutman Office Park is located in the McClelland Drainage Basin. As detailed in the
previous section, the approved Drainage Master Plan was prepared in 1980. This study
identifies the master basin as Area 10 or Reach 6D and describes the basin as fully developed
and connected by ponds and existing manmade conveyance elements.
The Basin upstream of Larimer No. 2 will drain to the canal per the "Final Drainage
Report for the Heart Special Improvement District" January, 1985 by EPI. This report allowed
for a 2 year Historic release to Larimer No.2 of 0.867 cfs/acre. The capacity of the Larimer
No. 2 was established in the "Fort Collins Retail Center P.U.D. Final Drainage Report" by RBD
Inc., September, 1985. This report details a total discharge of 240 cfs which is comprised of
155 cfs in irrigation flows and 85 cfs in stormwater flows. The Canal currently is concrete
lined along the western edge of the Pioneer Mobile Home Park and is conveyed under Harmony
Road in a 3'x 9' CBC.
The proposed site was included as part of "The Market Place P.U.D." Final Drainage
Report by Parsons & Associates January, 1990. The Market Place Study divided the
developed area into approximately 6 sub -basins that provided individual on -site detention and
routing of accumulated spills to a sub -surface conveyance system. The existing system spills
-2-
all combined flows to the Larimer No.2 per the design release rate of 0.87 cfs/acre. The text
and all calculations sections of the approved Market Place study are available in Appendix C of
this report.
The outparcel or "Superblock Holding", as identified in the Market Place Study, was
designed with an outfall to a shallow manhole at the southwesterly corner of the tract
(Manhole MH A-6). The outfall system has adequate excess capacity to spill controlled
releases from the proposed site, per allowance from calculations that are included in the
Market Place Study.
-3-
Run-off from each of the site sub -basins was determined by the Rational Method, a
widely accepted predictor of run-off from basins less than 200 acres. Flow capacities for
swales, gutters, and open channels were determined using the Mannings Equation. All run-off
coefficients and Mannings "n" were determined by tables and figures in "Fort CnIfins, Starm
Drainage Dpsiq Criteria Manual" -and conforms to "Urban DrainanP and Flood Control
ao al1. (UDFCM). Detention storage requirements were determined by the "FAA Method"
tables as outlined in the UDFCM.
Le
For the following discussion, please refer to the Drainage and Erosion Control Plan in the
back pocket of this report. As outlined above, the proposed lot is part of a larger, overall
drainage plan that was detailed by the Market Place P.U.D. drainage report. Portions of the
developed site will drain to existing detention ponds (A-5 and B-1) and release per design rates,
as detailed in the Market Place P.U.D. drainage report.
Basin B-1
This existing sub -basin was originally designed to drain to two area inlets in the parking
lot and landscaped area bordering the north side of the proposed development. This pond was
designed to detain 4144 cubic feet of storage with a release rate of 0.30cfs. The proposed
development added 3,880 sq. feet to this sub -basin (0.09 Ac) for a revised total area of 0.65
Acres. The design outfall rate of 0.30 cfs was used to calculate a revised storage volume of
3361 cubic feet, well below available storage of 4144 cubic feet, refer to Appendix A for
detention pond calculations.
-5-
storage at a release rate of 2.38 cfs. The proposed development will add 3135 square feet to the existing sub -
basin (0.07Ac) for a revised total area of 1.34 Acres. The design outfall rate of 2.38 cfs was used to calculate a
revised storage volume of 5617 cubic feet. This volume represents a shortfall of approximately 1300 cubic feet
which will be transferred to Sub -basin A-6, which has adequate storage available.
Basin A-6
Sub -basin A-6 is the remaining parcel that represents the proposed development area. All roof and
driveway flows will spill to a low point at the southeasterly corner of the parking lot. This point drains to a small
inlet box and orifice plate that represents a controlled release to a 15" RCP pipe and westerly to the existing 5'
Type "R' Inlet in the north flow -line of Troutman Parkway. The detention pond has a total storage volume of
6284 cubic feet, only 3530 cubic feet is required. The additional volume will be used to mitigate the storage
shortfall from Sub -basin A-5. Excess spills will flow east along the entrance drive to the pond surface. Please
refer to Appendix A for detailed summaries of Developed Basin Flows, detention pond calculations and
composite "C" calculations.
IRE
Wind Erosion:
This site is located in an area designated as having moderate wind erosion potential. The
anticipated construction will require disturbance of all natural features. Erosion control will be
carefully planned in areas of construction, structural measures will be used to mitigate wind
erosion during construction. Areas disturbed will require the installation of silt fencing and
gravel mulch or black base pavement will most likely work for on -site stabilization during
construction of building pads.
Water Erosion:
This site is located in an area of moderate to high potential for erosion due to storm run-
off. Therefore, emphasis will be placed on control of water erosion damage. Silt fencing,
straw bales and pavement/foundation paving and timing of construction will be carefully co-
crdinated to minimize exposed surfaces for more than two months. The finished site will be
largely covered by hard surface, providing adequate stabilization. The on -site slopes are very
flat, erosion from embankments should not be a major consideration.