Loading...
HomeMy WebLinkAbout3516 S MASON MEDICAL AND RETAIL MARIJUANA STORE - BDR200011 - SUBMITTAL DOCUMENTS - ROUND 3 - SUPPORTING DOCUMENTATION (2)3516 S Mason St ITEM QUANTITY UNIT UNIT COST TOTAL COST COMMENTS REMOVALS Remove surface paving materials and dispose off site 45 CY $40.00 $1,800 Quantity is approximate, based on 8" estimated depth plus 15% compaction and rounding. Actual quantity will be as required to remove all undesirable materials. SUBTOTAL $1,800 DECOMPACTION Rip existing soil to 12" depth 1,455 SF $0.65 $946 According to the Site Restoration Plan SUBTOTAL $946 SOIL TESTING Sample existing soil; submit soil samples to testing lab 1 LS $250.00 $250 SUBTOTAL $250 EXISTING SOIL REMEDIATION AND AMENDMENT Perform soil remediation and amendment 1,455 SF $0.15 $218 According to soil test results and Site Restoration Plan SUBTOTAL $218 SITE PREPARATION Perform weed control 1 LS $450.00 $450 According to the Site Restoration Plan Import and spread topsoil 45 CY $55.00 $2,475 Quantity is approximate, based on 8" estimated depth plus 15% compaction and rounding. Actual quantity will be as required to meet final grades following removal of undesirable materials. Apply soil amendment; incorporate by tilling 1,455 SF $0.15 $218 According to the Site Restoration Plan and City Code Fine grading 1,455 SF $0.65 $946 SUBTOTAL $4,089 PLANT MATERIAL & INSTALLATION Deciduous Shrubs 9 EA $60.00 $540 NHBZ area shrubs only SUBTOTAL $540 IRRIGATION New irrigation system 1,455 SF $1.30 $1,892 NHBZ area irrigation only SUBTOTAL $1,892 SEEDING Native Seeding 1,455 SF $0.45 $655 See Native Seed Mix on Sheet L4.0 Mulching 1,455 SF $0.35 $509 Certified weed-free mulch, crimped, according to the Site Restoration Plan SUBTOTAL $1,164 CONSTRUCTION SUBTOTAL $10,899 POST CONSTRUCTION MONITORING, INSPECTION, AND WEED CONTROL First season monthly monitoring March through September 7 MONTHS $95.00 $665 According to the Site Restoration Plan First season monthly weed control March through September 7 MONTHS $85.00 $595 According to the Site Restoration Plan Year 1 weed control 1 LUMP SUM $450.00 $450 According to the Site Restoration Plan Year 1 annual inspection and monitoring report 1 LUMP SUM $950.00 $950 According to the Site Restoration Plan Year 2 weed control 1 LUMP SUM $450.00 $450 According to the Site Restoration Plan Year 2 annual inspection and monitoring report 1 LUMP SUM $950.00 $950 According to the Site Restoration Plan Year 3 weed control 1 LUMP SUM $250.00 $250 According to the Site Restoration Plan Year 3 annual inspection and monitoring report 1 LUMP SUM $950.00 $950 According to the Site Restoration Plan SUBTOTAL $5,260 GRAND TOTAL ESTIMATE (CONSTRUCTION + POST CONSTRUCTION)$16,159 1. Refer to the Site Restoration Plan, the Landscape Plans, and the Landscape Cost Estimate for additional information. NOTES NHBZ Cost Estimate 7/15/2021