Staff has completed its review of Taco Bell at Market Place P.U.D.,
Preliminary and Final, and offers the following comments:
1. The traffic impact analysis indicates unacceptable levels of
service at the Troutman access point into both Market Place
and Pavilion shopping centers. The study suggests that the
signal at College/Troutman include separate left turn phases
for east and westbound traffic. This would create more gaps
in Troutman for cars exiting these shopping centers. The
traffic study also indicates that it may be appropriate to
implement double left turns for east and westbound Troutman at
College. These are serious traffic issues that need to be
resolved with both the Transportation and Engineering
Departments. It is suggested that we schedule a meeting to
discuss potential modifications to the operation of the
College/Troutman intersection.
2. The utility plans should show parking lot striping, parking
dimensions, drive aisle dimensions, and arrows indicating
traffic circulation. Also, please distinguish existing
improvements from new construction.
3. The development of this pad site may necessitate the repair or
modification of the "pork -chop" island. It appears that
trucks turning into the center may have damaged the curb and
gutter. Taco Bell should work with the shopping center to
repair damaged curb and gutter or modify the pork -chop to
enlarge the turning radius.
4. Light and Power cautions that any modification or alteration
to the existing electric system will need to be done by a work
request on behalf of the developer. The developer will then
be billed for labor, equipment, and materials by Light and
Power, if such modifications are needed.
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
5. U.S. West cautions that relocation of any existing telephone
facilities required by development of this pad must be paid
for by the developer. (Is there any chance of moving the
green -metal telephone box off the College Avenue frontage?
This location is not very aesthetic.)
6. Please locate the nearest fire hydrant and indicate on the
utility plans. If there is not a fire hydrant within 400 feet
of the store, then an additional hydrant must be installed.
7. The following comments are corrections that need to be made to
the landscape plan:
A. There are three existing trees on College Avenue, between
sidewalk and curb, that are not shown on the landscape
plan. One of these is a large, mature deciduous tree
located in the parkway strip on southern edge of the pad
site property line. Just north of this tree are two
street trees planted with the construction of Phar-Mor.
One of these trees is just south of the oval electrical
vault, and one is just north of the sidewalk chase.
These trees should be indicated as "existing" and not to
be removed.
B. The existing row of Seagreen Juniper, just east of the
sidewalk along College Avenue, is not listed in the plant
material schedule under "existing landscaping." Please
add these to the table and verify the quantities.
C. On the north side of the pad site, the landscape plan
indicates three Seagreen Junipers between two Radiant
Crabs. These are actually Forsythias. The one Forsythia
that is indicated is actually a Seagreen Juniper.
8. The following comments are additions that should be made to
the landscape plan:
A. There are two landscape islands that flank the parking
bay that faces the southern elevation and main entry.
Each of these islands contain four Seagreen Junipers.
Each island should also contain one deciduous shade tree.
B. On the east side of the pad site, between the drive-thru
lane and the Market Place access drive, there are two
sets of two Spring Snow Crabs. There is a gap of 48 feet
between these two sets. This gap should be filled in
with one, two-inch caliper deciduous tree or two, 1 1/2
inch caliper ornamental trees.
C. On the west elevation, between the drive-thru exit lane
and the sidewalk to the west entry, there is a sodded
area that measures 8.5' x 401. Again, this area should
feature one, two inch caliper deciduous tree or two, 1
1/2 inch ornamental trees.
D. On the east side of the building, there is an open space
area between the rear of the store and the looping drive-
thru lane. This area needs to be filled in with trees to
mitigate the hard surface of the drive-thru lane or the
glare of the stacked cars. Since the store is basically
surrounded by hard surface, this open area should feature
three, two-inch caliper, deciduous trees. This will also
mitigate the trash enclosure, menu board, transformer gas
meter.
E. Staff is concerned about cars exiting the drive-thru lane
and facing west - into College Avenue traffic. The
headlight glare of these exiting vehicles must be
screened by additional shrub material located on the
outside curve of the drive-thru lane. Beginning at the
north end of the row of Seagreen Junipers along College
Avenue, a continuous row of evergreen shrubs should wrap
around the curve to the east. This gap should be filled
in with five -gallon evergreen shrubs, designed to form a
solid hedge at maturity.
F. Similarly, as cars enter the drive-thru lane, headlight
glare will face north, into the shared access drive
between Best Buy and Market Place. The area between the
two evergreen trees should be filled in with five -gallon
shrubs. There are presently two Forsythias in this area
but these are inadequate to do the job of screening
headlights.
G. There are other gaps on the perimeter of the drive-thru
lane that should be filled in with a mix of evergreen and
deciduous shrubs. On the east side of the pad site,
directly opposite the menu board, there are gaps around
the two Ponderosa Pine that should be filled in.
Similarly, on the north side of the drive-thru lane, in
the area of the two Radiant Crabs, there are some gaps
that should be filled in. The purpose of filling in
these gaps is to mitigate the impact of a fast food
restaurant surrounded by on three sides by a drive-thru
lane.
9. The Preliminary P.U.D. for Market Place indicated that both
Burger King and this pad site would have equivalent signage so
no one user would gain an advantage. The drawings that you
have submitted indicate that this will be the case. There is
a slight discrepancy between the drawings on sheet L-1 and the
Planning Objectives in terms of the size of the free-standing
monument sign.
10. The Burger King does not have wall signage on the east side of
the building. Consequently, Taco Bell should delete its wall
signage on its east elevation.
11. Were you aware that the Taco Bell at Prospect and College was
allowed an etched glass sign in the picture window facing
College? Were you also aware that Burger King has an etched
glass --sign facing College Avenue hidden behind the play
equipment? Staff suggests that Taco Bell consider an etched
glass sign facing College Avenue to complement the etched
glass sign in Burger King. In the event that the playground
equipment is ever removed, the two etched glass signs would
present a rather dramatic image for both users and the entire
center.
12. It is not necessary to include signage schematics on the
P.U.D., as long as the signage proposed is in conformance with
the Preliminary P.U.D. for the shopping center. Similarly, it
is not necessary to include the wall signage specification (114
each @ 17 S.F.) on the architectural sheet.
13. Consequently, notes number seven and eight should be deleted
from the document. However, the sentence referring to onsite
directional signage should remain.
14. Note number five should also indicate that the masonry
enclosure for the trash dumpsters is to match the building's
exterior.
15. The site plan should include the title in the lower right
corner. The title should reference that this submittal is an
amended preliminary and final P.U.D.
16. The vicinity map should be more legible and include street
names.
This concludes Staff comments at this time. Please note the
following deadlines for the March 28, 1994:
Plan revisions are due March 9, 1994.
P.M.T.'s, 10 prints, renderings are due March 21, 1994.
Please note that detailed comments pertaining to the drainage,
grading and utility plans are being made under separate cover. As
always, please call if there are any questions.
Sincer
lye
7sw,
Ted Shepard
Senior Planner
xc: Joe Frank, Chief Planner
Kerrie Ashbeck, Civil Engineer