HomeMy WebLinkAboutMARKET PLACE PUD, LOT 3 - FINAL - 21-89E - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT/� PARSONS & 1� ASSOCIATES CONSULTING ENGINEERS July 6, 1992 Mr. Glen Schlueter Stormwater Utility City of Fort Collins 281 North College Avenue Fort Collins, Colorado 80524 RE: Drainage for Lot 3, Market Place P.U.D. Italian Oven Site Our Project Number: 92.16 GHA Dear Glen: I would like to review with you the site drainage for Lot 3 of the Market Place P.U.D. This lot is being developed as a restaurant site at the northwest corner of the Market Place Development. As you indicated at conceptual review, the drainage from this area was provided for as part of the Market Place P.U.D. Development, and a formal drainage report would not be needed. We have therefore designed the Lot 3 site improvements to comply with the requirements outlined in the Market Place Drainage Report as follows: 1. All runoff from Lot 3 is directed to the existing inlet and detention pond. • 432 Link Lane Plaza Ft. Collins, Colorado 80524 • [3031 221-2400 July 6, 1992 Drainage for Lot 3, Market Place P.U.D. Page 2 of 2 2. Our calculations, based on field survey, show that 11,391 cubic feet of volume exists in this pond. Approximately 10,950 cubic feet of volume was to be provided based on the Market Place Drainage Report. The orifice plate at inlet A-1 has a 2" x 2" opening and will control runoff from Basin A-1 at the approved rate of 0.25 cfs. Since all of the adjacent improvements are in place, only the building improvements, curb adjacent to the building and a small area of parking need to be constructed. Since no overlot grading will be required and since no water flows away form this site, we have not included any erosion control measures. I hope this answers any questions you may have concerning this project and please feel free to contact me should you have any questions. Sincerely n G ff Couch, P.E. roject Manager JWC/gbl cc: Anthony Ferrara, RMIR Enterprises Rick Hattman, Gefroh-Hattman