HomeMy WebLinkAboutALPINE BANK - FDP210009 - SUBMITTAL DOCUMENTS - ROUND 3 - SITE, LANDSCAPE & ELEVATIONS PLANSFINAL SITE PLANS FOR
A PORTION OF LOTS 1, 2, 3, 4, 5 AND 6, BLOCK 1, I.C. BRADLEY'S
ADDITION TO THE CITY OF FORT COLLINS;
PART OF THE NORTHWEST QUARTER OF SECTION 24,
T. 7 N., R. 69 W. OF THE 6TH P.M., FORT COLLINS,
LARIMER COUNTY, COLORADO
JULY 2021
ALPINE BANK
-01/20/2021 2ND PDP SUB MAS
-02/17/2021 3RD PDP SUB MAS
-04/07/2021 1ST FDP SUB MAS
-05/19/2021 2ND FDP SUB MAS
-07/08/2021 3RD FDP SUB MAS
-
-
-
-
-
-
-
-
STAMP
H:\Alpine Bank\CO, Fort Collins - XXXXX - College & Prospect\CADD\3 CD\FDP\Final Site Plans\ALB001_FDP_C0.0-Cover.dwg - Matt Bundren - 7/8/2021Init.#Issue / DescriptionDate
THESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
6162 S. Willow Drive, Suite 320
Greenwood Village, CO 80111
303.770.8884
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:FINAL SITE PLANS FOR ALPINE BANK1608 SOUTH COLLEGE AVENUES. COLLEGE AVE. & PROSPECT ROADFORT COLLINS, COLORADO-12/02/2020 1ST PDP SUB MAS
ALB000001
MAS
JULY 2021
OF 13
COVER SHEET
1
C0.0
-01/20/2021 2ND PDP SUB MAS
-02/17/2021 3RD PDP SUB MAS
-04/07/2021 1ST FDP SUB MAS
-05/19/2021 2ND FDP SUB MAS
-07/08/2021 3RD FDP SUB MAS
-
-
-
-
-
-
-
-
STAMP
H:\Alpine Bank\CO, Fort Collins - XXXXX - College & Prospect\CADD\3 CD\FDP\Final Site Plans\ALB001_FDP_C0.1-Notes.dwg - Matt Bundren - 7/8/2021Init.#Issue / DescriptionDate
THESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
6162 S. Willow Drive, Suite 320
Greenwood Village, CO 80111
303.770.8884
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:FINAL SITE PLANS FOR ALPINE BANK1608 SOUTH COLLEGE AVENUES. COLLEGE AVE. & PROSPECT ROADFORT COLLINS, COLORADO-12/02/2020 1ST PDP SUB MAS
ALB000001
MAS
JULY 2021
OF 13
NOTES SHEET
2
C0.1
SCALE: 1"=20'
0 10 20
EM
SS
GMDYH
GM
ER
EVT
-01/20/2021 2ND PDP SUB MAS
-02/17/2021 3RD PDP SUB MAS
-04/07/2021 1ST FDP SUB MAS
-05/19/2021 2ND FDP SUB MAS
-07/08/2021 3RD FDP SUB MAS
-
-
-
-
-
-
-
-
STAMP
H:\Alpine Bank\CO, Fort Collins - XXXXX - College & Prospect\CADD\3 CD\FDP\Civil Consturction Plans\ALB001_C0.2-Demo.dwg - Matt Bundren - 7/8/2021Init.#Issue / DescriptionDate
THESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
6162 S. Willow Drive, Suite 320
Greenwood Village, CO 80111
303.770.8884
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:FINAL SITE PLANS FOR ALPINE BANK1608 SOUTH COLLEGE AVENUES. COLLEGE AVE. & PROSPECT ROADFORT COLLINS, COLORADO-12/02/2020 1ST PDP SUB MAS
ALB000001
MAS
JULY 2021
OF 13
EXISTING CONDITIONS
AND DEMO PLAN
3
C1.0
HISTORICAL
BUILDING
RELOCATED
PROPOSED
BANK EXIT ONLYTRASH
ENCLOSURE
SCALE: 1"=20'
0 10 20
EM
SS
GMDYH
GM
ER
EVT
FINAL SITE PLANS FOR
A PORTION OF LOTS 1, 2, 3, 4, 5 AND 6, BLOCK 1, I.C. BRADLEY'S
ADDITION TO THE CITY OF FORT COLLINS;
PART OF THE NORTHWEST QUARTER OF SECTION 24,
T. 7 N., R. 69 W. OF THE 6TH P.M., FORT COLLINS,
LARIMER COUNTY, COLORADO
JULY 2021
ALPINE BANK
-01/20/2021 2ND PDP SUB MAS
-02/17/2021 3RD PDP SUB MAS
-04/07/2021 1ST FDP SUB MAS
-05/19/2021 2ND FDP SUB MAS
-07/08/2021 3RD FDP SUB MAS
-
-
-
-
-
-
-
-
STAMP
H:\Alpine Bank\CO, Fort Collins - XXXXX - College & Prospect\CADD\3 CD\FDP\Final Site Plans\ALB001_FDP_Site Plan.dwg - Matt Bundren - 7/8/2021Init.#Issue / DescriptionDate
THESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
6162 S. Willow Drive, Suite 320
Greenwood Village, CO 80111
303.770.8884
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:FINAL SITE PLANS FOR ALPINE BANK1608 SOUTH COLLEGE AVENUES. COLLEGE AVE. & PROSPECT ROADFORT COLLINS, COLORADO-12/02/2020 1ST PDP SUB MAS
ALB000001
MAS
JULY 2021
OF 13
SITE PLAN
4
C2.0
GROUND LEVEL
98' -0"
SECOND FLOOR
113' -0"
LOW ROOF
111' -10"
ROOF
122' -0"
LEVEL 1
100' -0"
TOP OF BRICK
104' -0"
CS-1
AS-1
B-1M-1
WD-3
WD-1
AS-1
G-1
CS-1
B-1B-1
WD-1
BEYOND31' - 6"T.O. ROOF
129' -6"
WD-1
PC-1 ACM-1 WD-3 B-1
GROUND LEVEL
98' -0"
SECOND FLOOR
113' -0"
LOW ROOF
111' -10"
ROOF
122' -0"
LEVEL 1
100' -0"
TOP OF BRICK
104' -0"
AS-1
WD-1
WD-1
WD-3
G-1
CS-1AS-1
CS-1
WD-1
B-1
PC-1
B-1
B-1
BEYOND
WD-1
B-1
M-1G-1B-1 PC-1B-1 M-1M-1WS-1
T.O. ROOF
129' -6"
G-1 WD-3B-1
6162 S. Willow Drive, Suite 320
Greenwood Village, CO 80111
303.770.8884
Checked By:
Project No:
Drawn By:
COPYRIGHT
THESE PLANS ARE AN INSTRUMENT OF SERVICE
STAMPNOT FOR BIDDINGPRELIMINARY#Date Issue/Description
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR
REPRODUCED WITHOUT THE WRITTEN CONSENT
OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS
WILL BE ENFORCED AND PROSECUTED. NOT FOR CONSTRUCTION7/6/2021 11:59:03 AMBIM 360://ALB01 - Ft Collins/ALB_Ft Collins_R20.rvtARCHITECTURAL ELEVATIONS
A1.0
ALB000001
DMC
KKS. COLLEGE AVE. & EPROSPECT ROADFORT COLLINS, COLORADOALPINE BANKALPINE BANKLOTS 1, 2, 3, 4, 5 AND 6 OF THE I.C. BRADLEY'S ADDITION TO THE CITY OF FORT COLLINS,
SITUATED IN THE NW 1/4 OF SECTION 24, T. 7 N, R. 69 W., OF THE 6TH P.M.
CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO
JULY 2021
SCALE: 3/16" = 1'-0"2 SOUTH ELEVATION
SCALE: 3/16" = 1'-0"1 WEST ELEVATION
WS-1 WOOD SIDING CEDAR
WD-3 WOOD TIMBER WHITE
WD-1 WOOD TIMBER CEDAR
SF-1 STOREFRONT WINDOW SYSTEM DARK BRONZE
PT-1 PAINT COLOR TO MATCH BRICK
PC-1 PRECAST MATCH T-9817
M-1 METAL RAILING BLACK
G-2 1" INSULATED SPANDREL GLAZING DARK GREY
G-1 1" INSULATED VISION GLAZING CLEAR LOW 'E'
CS-1 CEDAR SHAKE SIDING CEDAR
BLK-1 BASALITE CONCRETE MASONRY UNIT COLOR TO MATCH BRICK
B-1 BRICK BURGUNDY
AS-1 ASPHALT SHINGLE ROOFING SLATE
ACM-1 ALUMINUM COMPOSITE PANEL DARK BRONZE
LABEL MATERIAL COLOR
EXTERIOR FINISH SCHEDULE
ALPINE BANK
FINAL SITE PLANS FOR
OF 29
12/2/2020 1ST PDP SUB
01/20/2021 2ND PDP SUB
02/17/2021 3RD PDP SUB
04/07/2021 1ST FDP SUB
05/19/2021 2ND FDP SUB
SCALE:3 SOUTHWEST PERSPECTIVE
SCALE:4 NORTHWEST PERSPECTIVE
07/08/2021 3RD FDP SUB
SECOND FLOOR
113' -0"
LOW ROOF
111' -10"
ROOF
122' -0"
LEVEL 1
100' -0"
TOP OF BRICK
104' -0"
AS-1
AS-1
AS-1
CS-1
WD-1
B-1
BEYOND
BEYOND
WD-1
CS-1
AS-1
WD-1
BEYOND
B-1
PC-1
PC-1
G-1 G-1 M-1B-1PC-1 M-1 WD-3G-1
WD-1
WD-3G-1
WD-1
GROUND LEVEL
98' -0"
SECOND FLOOR
113' -0"
LOW ROOF
111' -10"
ROOF
122' -0"
LEVEL 1
100' -0"
AS-1
AS-1
WD-1
WD-1
WD-1
B-1
WD-3G-1
B-1
PC-1
M-1
CS-1
WD-1
AS-1
WD-3 G-1
AS-1
WD-1
WD-3 G-1
B-131' - 6"T.O. ROOF
129' -6"
6162 S. Willow Drive, Suite 320
Greenwood Village, CO 80111
303.770.8884
Checked By:
Project No:
Drawn By:
COPYRIGHT
THESE PLANS ARE AN INSTRUMENT OF SERVICE
STAMPNOT FOR BIDDINGPRELIMINARY#Date Issue/Description
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR
REPRODUCED WITHOUT THE WRITTEN CONSENT
OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS
WILL BE ENFORCED AND PROSECUTED. NOT FOR CONSTRUCTION7/6/2021 11:59:10 AMBIM 360://ALB01 - Ft Collins/ALB_Ft Collins_R20.rvtARCHITECTURAL ELEVATIONS
A1.1
ALB000001
DMC
KKS. COLLEGE AVE. & EPROSPECT ROADFORT COLLINS, COLORADOALPINE BANKALPINE BANKLOTS 1, 2, 3, 4, 5 AND 6 OF THE I.C. BRADLEY'S ADDITION TO THE CITY OF FORT COLLINS,
SITUATED IN THE NW 1/4 OF SECTION 24, T. 7 N, R. 69 W., OF THE 6TH P.M.
CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO
JULY 2021
SCALE: 3/16" = 1'-0"2 NORTH ELEVATION
SCALE: 3/16" = 1'-0"1 EAST ELEVATION
WS-1 WOOD SIDING CEDAR
WD-3 WOOD TIMBER WHITE
WD-1 WOOD TIMBER CEDAR
SF-1 STOREFRONT WINDOW SYSTEM DARK BRONZE
PT-1 PAINT COLOR TO MATCH BRICK
PC-1 PRECAST MATCH T-9817
M-1 METAL RAILING BLACK
G-2 1" INSULATED SPANDREL GLAZING DARK GREY
G-1 1" INSULATED VISION GLAZING CLEAR LOW 'E'
CS-1 CEDAR SHAKE SIDING CEDAR
BLK-1 BASALITE CONCRETE MASONRY UNIT COLOR TO MATCH BRICK
B-1 BRICK BURGUNDY
AS-1 ASPHALT SHINGLE ROOFING SLATE
ACM-1 ALUMINUM COMPOSITE PANEL DARK BRONZE
LABEL MATERIAL COLOR
EXTERIOR FINISH SCHEDULE
ALPINE BANK
FINAL SITE PLANS FOR
OF 29
12/2/2020 1ST PDP SUB
01/20/2021 2ND PDP SUB
02/17/2021 3RD PDP SUB
04/07/2021 1ST FDP SUB
G-2
05/19/2021 2ND FDP SUB
07/08/2021 3RD FDP SUB
5
A1.2
4
A1.2
2
A1.210"7' - 8"7' - 8"10"17' - 0"EQ3' - 8"4' - 0"3' - 8"EQ9"
3
A1.2
10' - 0"2' - 8"1' - 0"
NOTE:
TRASH AND RECYCLING
ENCLOSURES IN COMPLIANCE WITH
LUC 3.2.5.TYP.70 3/4"TYP.
34"
2 YD SLANT NESTABLE FRONT
END LOAD TRASH CONTAINER
(2) 95 GALLON RECYCLING CARTS
2' - 8"2' - 8"28 1/2"42 1/2"8"
13' - 8"
2' - 0"
BLK-1
PC-1
8' - 4"
32" MIN.
DOOR-LESS PEDESTRIAN ENTRY
P-1
2' - 0"
PC-1
8' - 4"
2' - 0"
PC-1
8' - 4"
BLK-1
FACE OF CMU BLOCK BELOW
PRECAST CONCRETE CAP
RAKE JOINT & FILL W/BACKER ROD
& COLORED SEALANT AT ALL
MITERED PRE-CAST CORNERS 7' - 2"#3 DOWELS -EMBED INTO GROUTED
CELLS AND EPOXY INTO VOID AT CAP,
MIN. 2 PER EACH CAP SECTION, TYP.
BOLLARDS AT CORNERS OF ALL
PAVED SURFACES - REF: CIVIL10
A1.2
Sim
TYP.GATE ASSEMBLY
TYP.
4"6"SLOPE 2%
MAX.
12
A1.2
Sim
4'-0" MAX., TYP.
1' - 6" MIN.
EDGE OF CONC. CURB AROUND
PERIMETER - REF: SECTION,
COORD. EDGE WITH GATE POST 5"2' - 0"4'-0" O.C. MAX.EQ. SPACED @2' - 0"10
A1.2
Sim
TYP.9"
BOLLARDS AT BACK OF
ENCLOSURE - QUANTITY VARIES
PER WIDTH
CONCRETE SLAB - REF: STRUCT. &
CIVIL - SLOPE 2% MIN. TOWARDS
GATE TO DRAIN, COORD. WITH CIVIL
FINISHED GRADE OR
PAVEMENT - REF: CIVIL
CONCRETE FOUNDATION -
REF: STRUCT.4" MIN.VARIESSEALANT ON 1/2" EXPANSION
JOINT MATERIAL
A1.2
11
PRE-CAST CONCRETE CAP
8" CMU WALL - REF: STRUCT. -
REF: ELEVATIONS FOR FINISH &
COLOR
ALIGNVERTICAL REINFORCEMENT - REF
STRUCT.
PRE-CAST CONCRETE WALL CAP.
SLOPE TOP 2% TO DRAIN, BOTH SIDES.
CONTINUOUS DRIP EDGE, BOTH SIDES
EMBEDD #3 DOWELS INTO GROUTED
CELLS AND EPOXY INTO VOID AT CAP,
MIN. 2 PER EACH CAP SECTION
CONTINUOUS BUTYL FLASHING
BACKER ROD & SEALANT AT
JOINT -BOTH SIDES3 5/8"BOND BEAM -REF: STRUCT.
1"1"1 1/2"4"6"ROUND SMOOTH CONCRETE TOP
6" DIA. STD STL. PIPE FILLED WITH
CONCRETE - PRIME & PAINT WITH (2)
COATS OF COLOR TRAFFIC YELLOW,
UNLESS NOTED OTHERWISE
ADJOINING FINISH GRADE OR
PAVEMENT
24" DIA. CONCRETE FOOTING
REF: STRUCT.3' - 0"3' - 0"1"SLOPE TOP OF FOUNDATION TO
DRAIN
HINGE ELEVATION
L1 1/2 x 1 1/2 x 3/16
GATE: L3 x 2 x 3/16
1 1/2" STEEL ROOF DECK
1/2" DIA. BOLT, TYP. (4)
P6 PIPE
PL 1/4", HINGE PLATE
HINGE PLAN
CL
4"2"5"1 1/2"
1/4" THICK STEEL TOP
PLATE, TOP HINGE ONLY
2"2"1/2"12"
10" 2"4"1/2"1"2"1"1 1/2"5" 3 1/2" 2"
9/16" HOLE FOR 1/2"
BOLT, TYP.1"2"1"HINGE PLATE
8 1/2"
PL 1/4"
EDGE OF FRAME
1/8"
1/8"
PL 1/4", HINGE
1/8"1-6
3/16"
MATERIAL LEGEND:
PRECAST: MATCH T-9817
PAINT: COLOR TO MATCH BRICK
BASALITE CONCRETE MASONRY UNIT W/ BRICK VENEER TO MATCH BUILDING BRICK
PC-1
PT-1
BLK-1
PC-1
BLK-1
8' - 4"
2' - 0"
34"36 7/16"46 3/16"3 9 3 /4 "
70 3/4"
82 9/16"36 1/2"6162 S. Willow Drive, Suite 320
Greenwood Village, CO 80111
303.770.8884
Checked By:
Project No:
Drawn By:
COPYRIGHT
THESE PLANS ARE AN INSTRUMENT OF SERVICE
STAMPNOT FOR BIDDINGPRELIMINARY#Date Issue/Description
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR
REPRODUCED WITHOUT THE WRITTEN CONSENT
OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS
WILL BE ENFORCED AND PROSECUTED. NOT FOR CONSTRUCTION7/6/2021 11:59:20 AMBIM 360://ALB01 - Ft Collins/ALB_Ft Collins_R20.rvtARCHITECTURAL DETAILS
A1.2
ALB000001
DMC
KKS. COLLEGE AVE. & EPROSPECT ROADFORT COLLINS, COLORADOALPINE BANKALPINE BANKLOTS 1, 2, 3, 4, 5 AND 6 OF THE I.C. BRADLEY'S ADDITION TO THE CITY OF FORT COLLINS,
SITUATED IN THE NW 1/4 OF SECTION 24, T. 7 N, R. 69 W., OF THE 6TH P.M.
CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO
JULY 2021
SCALE: 1/4" = 1'-0"1 ENLARGED TRASH ENCLOSURE PLAN
SCALE: 1/4" = 1'-0"4 TRASH ENCLOSURE SIDE ELEVATION
SCALE: 1/4" = 1'-0"2 TRASH ENCLOSURE FRONT ELEVATION
SCALE: 1/4" = 1'-0"5 TRASH ENCLOSURE BACK ELEVATION
SCALE: 3/4" = 1'-0"8 ENLARGED PLAN DETAIL @ TRASH ENCLOSURE
SCALE: 3/4" = 1'-0"12 SECTION @ TRASH ENCLOSURE
SCALE: 3" = 1'-0"11 DETAIL @ PRE-CAST CONC. CAP
SCALE: 3/4" = 1'-0"10 DETAIL @ BOLLARD
SCALE: 1 1/2" = 1'-0"9 GATE HINGE
SCALE: 1/4" = 1'-0"3 TRASH ENCLOSURE SIDE ELEVATION
SCALE: 3/4" = 1'-0"7 TWO YARD SLANT ELEVATION
SCALE: 3/4" = 1'-0"6 TWO YARD SLANT NESTABLE ELEVATION
OF 29
12/2/2020 1ST PDP SUB
01/20/2021 2ND PDP SUB
02/17/2021 3RD PDP SUB
ALPINE BANK
FINAL SITE PLANS FOR
04/07/2021 1ST FDP SUB
05/19/2021 2ND FDP SUB
07/08/2021 3RD FDP SUB
HISTORICAL
BUILDING
RELOCATED
PROPOSED
BANK EXIT ONLYTRASH
ENCLOSURE
-01/20/2021 2ND PDP SUB MAS
-02/17/2021 3RD PDP SUB MAS
-04/07/2021 1ST FDP SUB MAS
-05/19/2021 2ND FDP SUB MAS
-07/08/2021 3RD FDP SUB MAS
-
-
-
-
-
-
-
-
STAMP
H:\Alpine Bank\CO, Fort Collins - XXXXX - College & Prospect\CADD\3 CD\ALB001x_P_14-Land.dwg - Matt Bundren - 7/8/2021Init.#Issue / DescriptionDate
THESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
6162 S. Willow Drive, Suite 320
Greenwood Village, CO 80111
303.770.8884
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:FINAL SITE PLANS FOR ALPINE BANK1608 SOUTH COLLEGE AVENUES. COLLEGE AVE. & PROSPECT ROADFORT COLLINS, COLORADO-12/02/2020 1ST PDP SUB MAS
ALB000001
MAS
JULY 2021
OF 13
L1.1
FINAL LANDSCAPE
PLAN
SCALE: 1"=20'
0 10 20
CAUTION
UTILITIES EXIST WITHIN CONSTRUCTION
LIMITS. CONTRACTOR IS RESPONSIBLE
FOR IDENTIFYING THEIR LOCATION
PRIOR TO CONSTRUCTION.
STREET TREE NOTES:
1.A PERMIT MUST BE OBTAINED FROM THE CITY FORESTER BEFORE ANY TREES OR SHRUBS AS NOTED ON THIS
PLAN ARE PLANTED, PRUNED OR REMOVED IN THE PUBLIC RIGHT-OF-WAY. THIS INCLUDES ZONES BETWEEN THE
SIDEWALK AND CURB, MEDIANS AND OTHER CITY PROPERTY. THIS PERMIT SHALL APPROVE THE LOCATION AND
SPECIES TO BE PLANTED. FAILURE TO OBTAIN THIS PERMIT IS A VIOLATION OF THE CITY OF FORT COLLINS CODE
SUBJECT TO CITATION (SECTION 27-31) AND MAY ALSO RESULT IN REPLACING OR RELOCATING TREES AND A HOLD
ON CERTIFICATE OF OCCUPANCY.
CITY OF FORT COLLINS STREET TREE NOTE
LANDSCAPE CALCULATIONS
PARKING LOT PERIMETER
PARKING LOT INTERIOR
TREE BIODIVERSITY
1 TREE / 25 LF ALONG ROW
1 TREE / 40 LF ALONG SIDE / REAR PROP
MIN. 30" HEIGHT SCREEN ALONG 70%
PERCENT OF THE LENGTH OF THE
STREET FRONTAGE OF THE PARKING LOT
AND ALSO SEVENTY (70) PERCENT OF THE
LENGTH OF ANY BOUNDARY OF THE
PARKING LOT THAT ABUTS ANY
NONRESIDENTIAL USE.
6% OF PARKING LOT SHALL BE LANDSCAPE
NO LANDSCAPE OVER 24" WITHIN 15' OF
CURB CUT
1 CANOPY SHADE TREE PER 150 SF OF
INTERNAL LANDSCAPE AREA/ 1 CANOPY
TREE PER ISLAND
MAX. 33% OF ONE TREE SPECIES
(TOTAL QUANTITY / SPECIES QUANTITY)
200 LF = 8 TREES
154 LF = 4 TREES
70% = 370 LF
6% OF 6,160 SF = 370 SF
N/A
10 TREES
STREET TREE REQUIREMENT -
SOUTH COLLEGE AVE
1 SHADE TREE PER 40 LF 372 LF = 9 TREES
REQUIREMENT CALCULATION REQUIRED PROVIDED
12 TREES
70% SCREENING
370 SF OF LANDSCAPE
AREA
NO LANDSCAPE OVER 24" IS
LOCATED WITHIN 15' OF
CURB CUT
10 TREES
5 TREES
*TREE REQUIREMENT NOT
MET DUE TO CONFLICTS
WITH EXISTING UTILITIES
TREE MITIGATION 8 ON-SITE TREES WILL BE IMPACTED BY
CONSTRUCTION, SEE MITIGATION PLAN
18 TREES 15 TREES PROVIDED (M)*
*CASH-IN-LIEU WILL BE
PROVIDED FOR THE
REMAINING 3 TREES
MAX 6 OF ONE TREE
SPECIES
NO ONE SPECIES
EXCEEDS A QUANTITY
OF 6 - SEE PLANTING
LEGEND
EFB
SRA
8
-01/20/2021 2ND PDP SUB MAS
-02/17/2021 3RD PDP SUB MAS
-04/07/2021 1ST FDP SUB MAS
-05/19/2021 2ND FDP SUB MAS
-07/08/2021 3RD FDP SUB MAS
-
-
-
-
-
-
-
-
STAMP
H:\Alpine Bank\CO, Fort Collins - XXXXX - College & Prospect\CADD\3 CD\ALB001x_P_14-Land.dwg - Matt Bundren - 7/8/2021Init.#Issue / DescriptionDate
THESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
6162 S. Willow Drive, Suite 320
Greenwood Village, CO 80111
303.770.8884
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:FINAL SITE PLANS FOR ALPINE BANK1608 SOUTH COLLEGE AVENUES. COLLEGE AVE. & PROSPECT ROADFORT COLLINS, COLORADO-12/02/2020 1ST PDP SUB MAS
ALB000001
MAS
JULY 2021
OF 13
LANDSCAPE NOTES
AND DETAILS
CAUTION
UTILITIES EXIST WITHIN CONSTRUCTION
LIMITS. CONTRACTOR IS RESPONSIBLE
FOR IDENTIFYING THEIR LOCATION
PRIOR TO CONSTRUCTION.
STREET TREE NOTES:
1.A PERMIT MUST BE OBTAINED FROM THE CITY FORESTER BEFORE ANY TREES OR SHRUBS AS NOTED ON THIS PLAN ARE PLANTED, PRUNED OR REMOVED IN
THE PUBLIC RIGHT-OF-WAY. THIS INCLUDES ZONES BETWEEN THE SIDEWALK AND CURB, MEDIANS AND OTHER CITY PROPERTY. THIS PERMIT SHALL APPROVE
THE LOCATION AND SPECIES TO BE PLANTED. FAILURE TO OBTAIN THIS PERMIT IS A VIOLATION OF THE CITY OF FORT COLLINS CODE SUBJECT TO CITATION
(SECTION 27-31) AND MAY ALSO RESULT IN REPLACING OR RELOCATING TREES AND A HOLD ON CERTIFICATE OF OCCUPANCY.
2.CONTACT THE CITY FORESTER TO INSPECT ALL STREET TREE PLANTINGS AT THE COMPLETION OF EACH PHASE OF THE DEVELOPMENT. ALL MUST BE
INSTALLED AS SHOWN ON THE LANDSCAPE PLAN. APPROVAL OF STREET TREE PLANTING IS REQUIRED BEFORE FINAL APPROVAL OF EACH PHASE.
3.STREET LANDSCAPING, INCLUDING STREET TREES, SHALL BE SELECTED IN ACCORDANCE WITH ALL CITY CODES AND POLICIES. ALL TREE PRUNING AND
REMOVAL WORKS SHALL BE PERFORMED BY A CITY OF FORT COLLINS LICENSED ARBORS WHERE REQUIRED BY CODE.STREET TREES SHALL BE SUPPLIED AND
PLANTED BY THE DEVELOPER USING A QUALIFIED LANDSCAPE CONTRACTOR.
4.THE DEVELOPER SHALL REPLACE DEAD OR DYING STREET TREES AFTER PLANTING UNTIL FINAL MAINTENANCE INSPECTION AND ACCEPTANCE BY THE CITY OF
FORT COLLINS FORESTRY DIVISION. ALL STREET TREES IN THE PROJECT MUST BE ESTABLISHED, WITH AN APPROVED SPECIES AND OF ACCEPTABLE
CONDITION PRIOR TO ACCEPTANCE.
5.SUBJECT TO APPROVAL BY THE CITY FORESTER -- STREET TREE LOCATIONS MAY BE ADJUSTED TO ACCOMMODATE DRIVEWAY LOCATIONS, UTILITY
SEPARATIONS BETWEEN TREES, STREET SIGNS AND STREET LIGHTS. STREET TREES TO BE CENTERED IN THE MIDDLE OF THE LOT TO THE EXTENT FEASIBLE.
QUANTITIES SHOWN ON PLAN MUST BE INSTALLED UNLESS A REDUCTION IS APPROVED BY THE CITY TO MEET SEPARATION STANDARDS.
6.THE DESIGN AND INSTALLATION OF ALL PARKWAY/TREE LAWN AND MEDIAN AREAS IN THE RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH THE CITY
STANDARDS. UNLESS OTHERWISE AGREED TO BY THE CITY WITH THE FINAL PLANS, ALL ONGOING MAINTENANCE OF SUCH AREAS IS THE RESPONSIBILITY OF
THE OWNER/DEVELOPER. ANNUAL/PERENNIAL PLANTINGS IN THE PLANTER POTS ALONG PROSPECT RD. SHALL BE KEPT WELL MAINTAINED AND THRIVING IN A
MANNER THAT IS CONSISTENT WITH THE CITY OWNED AND MAINTAINED PLANTING OF THE INTERSECTION. THE OWNER/DEVELOPER SHALL MAINTAIN THESE
LANDSCAPE FEATURES IN PERPETUITY IN ORDER TO KEEP THE INTERSECTION FEATURES PRESENTABLE.
7.ALL EXISTING TREES WITHIN THE LIMITS OF THE DEVELOPMENT AND WITHIN ANY NATURAL AREA BUFFER ZONES SHALL REMAIN AND BE PROTECTED UNLESS
NOTED ON THESE PLANS FOR REMOVAL.
8.WITHIN THE DRIP LINE OF ANY PROTECTED EXISTING TREE, THERE SHALL BE NO CUT OR FILL OVER A FOUR-INCH DEPTH UNLESS A QUALIFIED ARBORIST OR
FORESTER HAS EVALUATED AND APPROVED THE DISTURBANCE.
TREE PROTECTION NOTES:
1.ALL PROTECTED EXISTING TREES SHALL BE PRUNED TO THE CITY OF FORT COLLINS FORESTRY STANDARDS. TREE PRUNING AND REMOVAL SHALL BE
PERFORMED BY A BUSINESS THAT HOLDS A CURRENT CITY OF FORT COLLINS ARBORIST LICENSE WHERE REQUIRED BY CODE.
2.PRIOR TO AND DURING CONSTRUCTION, BARRIERS SHALL BE ERECTED AROUND ALL PROTECTED EXISTING TREES WITH SUCH BARRIERS TO BE OF ORANGE
FENCING A MINIMUM OF FOUR (4) FEET IN HEIGHT, SECURED WITH METAL T- POSTS, NO CLOSER THAN SIX (6) FEET FROM THE TRUNK OR ONE-HALF (½) OF THE
DRIP LINE, WHICHEVER IS GREATER. THERE SHALL BE NO STORAGE OR MOVEMENT OF EQUIPMENT, MATERIAL, DEBRIS OR FILL WITHIN THE FENCED TREE
PROTECTION ZONE.
3.DURING THE CONSTRUCTION STAGE OF DEVELOPMENT, THE APPLICANT SHALL PREVENT THE CLEANING OF EQUIPMENT OR MATERIAL OR THE STORAGE AND
DISPOSAL OF WASTE MATERIAL SUCH AS PAINTS, OILS, SOLVENTS, ASPHALT, CONCRETE, MOTOR OIL OR ANY OTHER MATERIAL HARMFUL TO THE LIFE OF A
TREE WITHIN THE DRIP LINE OF ANY PROTECTED TREE OR GROUP OF TREES.
4.NO DAMAGING ATTACHMENT, WIRES, SIGNS OR PERMITS MAY BE FASTENED TO ANY PROTECTED TREE.
5.LARGE PROPERTY AREAS CONTAINING PROTECTED TREES AND SEPARATED FROM CONSTRUCTION OR LAND CLEARING AREAS, ROAD RIGHTS-OF-WAY AND
UTILITY EASEMENTS MAY BE "RIBBONED OFF," RATHER THAN ERECTING PROTECTIVE FENCING AROUND EACH TREE AS REQUIRED IN SUBSECTION (G)(3)THIS
MAY BE ACCOMPLISHED BY PLACING METAL T-POST STAKES A MAXIMUM OF FIFTY (50) FEET APART AND TYING RIBBON OR ROPE FROM STAKE- TO-STAKE
ALONG THE OUTSIDE PERIMETERS OF SUCH AREAS BEING CLEARED.
6.THE INSTALLATION OF UTILITIES, IRRIGATION LINES OR ANY UNDERGROUND FIXTURE REQUIRING EXCAVATION DEEPER THAN SIX (6) INCHES SHALL BE
ACCOMPLISHED BY BORING UNDER THE ROOT SYSTEM OF PROTECTED EXISTING TREES AT A MINIMUM DEPTH OF TWENTY-FOUR (24) INCHES. THE AUGER
DISTANCE IS ESTABLISHED FROM THE FACE OF THE TREE (OUTER BARK) AND IS SCALED FROM TREE DIAMETER AT BREAST HEIGHT AS DESCRIBED IN THE
CHART BELOW:
7.TREE REMOVAL SHOWN SHALL BE COMPLETED OUTSIDE OF THE SONGBIRD NESTING SEASON (FEB 1 - JULY 31) OR CONDUCT A SURVEY OF TREES ENSURING
NO ACTIVE NESTS IN THE AREA.
GENERAL LANDSCAPE NOTES:
1.PLANT QUALITY: ALL PLANT MATERIAL SHALL BE A-GRADE OR NO. 1 GRADE - FREE OF ANY DEFECTS, OF NORMAL HEALTH, HEIGHT, LEAF DENSITY AND SPREAD
APPROPRIATE TO THE SPECIES AS DEFINED BY THE AMERICAN ASSOCIATION OF NURSERYMEN (AAN) STANDARDS. ALL TREES SHALL BE BALL AND BURLAP OR
EQUIVALENT.
2.IRRIGATION: ALL LANDSCAPE AREAS WITHIN THE SITE INCLUDING TURF, SHRUB BEDS AND TREE AREAS SHALL BE IRRIGATED WITH AN AUTOMATIC IRRIGATION
SYSTEM. THE IRRIGATION PLAN MUST BE REVIEWED AND APPROVED BY THE CITY OF FORT COLLINS WATER UTILITIES DEPARTMENT PRIOR TO THE ISSUANCE
OF A BUILDING PERMIT. ALL TURF AREAS SHALL BE IRRIGATED WITH AN AUTOMATIC POP-UP IRRIGATION SYSTEM. ALL SHRUB BEDS AND TREES, INCLUDING IN
NATIVE SEED AREAS, SHALL BE IRRIGATED WITH AN AUTOMATIC DRIP (TRICKLE) IRRIGATION SYSTEM, OR WITH AN ACCEPTABLE ALTERNATIVE APPROVED BY
THE CITY WITH THE IRRIGATION PLANS. THE IRRIGATION SYSTEM SHALL BE ADJUSTED TO MEET THE WATER REQUIREMENTS OF THE INDIVIDUAL PLANT
MATERIAL. IRRIGATION SYSTEMS TO BE TURNED OVER TO THE CITY PARKS DEPARTMENT FOR MAINTENANCE MUST BE APPROVED BY THE PARKS MANAGER
AND MEET PARKS IRRIGATION STANDARDS. DESIGN REVIEW SHALL OCCUR DURING UTILITIES DEPARTMENT IRRIGATION REVIEW PRIOR TO THE ISSUANCE OF A
BUILDING PERMIT AND CONSTRUCTION OBSERVATION AND INSPECTION BY PARKS SHALL BE INCORPORATED INTO THE CONSTRUCTION PROCESS.
3.TOPSOIL: TO THE MAXIMUM EXTENT FEASIBLE, TOPSOIL THAT IS REMOVED DURING CONSTRUCTION ACTIVITY SHALL BE CONSERVED FOR LATER USE ON
AREAS REQUIRING REVEGETATION AND LANDSCAPING.
4.SOIL AMENDMENTS: SOIL AMENDMENTS SHALL BE PROVIDED AND DOCUMENTED IN ACCORDANCE WITH CITY CODE SECTION 12-132. THE SOIL IN ALL
LANDSCAPE AREAS, INCLUDING PARKWAYS AND MEDIANS, SHALL BE THOUGHLY LOOSENED TO A DEPTH OF NOT LESS THAN EIGHT(8) INCHES AND SOIL
AMENDMENT SHALL BE THOROUGHLY INCORPORATED INTO THE SOIL OF ALL LANDSCAPE AREAS TO A DEPTH OF AT LEAST SIX(6) INCHES BY TILLING, DISCING
OR OTHER SUITABLE METHOD, AT A RATE OF AT LEAST THREE (3) CUBIC YARDS OF SOIL AMENDMENT PER ONE THOUSAND (1,000) SQUARE FEET OF
LANDSCAPE AREA. PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY, A WRITTEN CERTIFICATION MUST BE SUBMITTED TO THE CITY THAT ALL
PLANTED AREAS, OR AREAS TO BE PLANTED, HAVE BEEN THOROUGHLY LOOSENED AND THE SOIL AMENDED, CONSISTENT WITH THE REQUIREMENTS SET
FORTH IN SECTION 12-132.
5.INSTALLATION AND GUARANTEE: ALL LANDSCAPING SHALL BE INSTALLED ACCORDING TO SOUND HORTICULTURAL PRACTICES IN A MANNER DESIGNED TO
ENCOURAGE QUICK ESTABLISHMENT AND HEALTHY GROWTH. ALL LANDSCAPING FOR EACH PHASE MUST BE EITHER INSTALLED OR THE INSTALLATION MUST
BE SECURED WITH AN IRREVOCABLE LETTER OF CREDIT, PERFORMANCE BOND, OR ESCROW ACCOUNT FOR 125% OF THE VALUATION OF THE MATERIALS AND
LABOR PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY FOR ANY BUILDING IN SUCH PHASE.
6.MAINTENANCE: TREES AND VEGETATION, IRRIGATION SYSTEMS, FENCES, WALLS AND OTHER LANDSCAPE ELEMENTS WITH THESE FINAL PLANS SHALL BE
CONSIDERED AS ELEMENTS OF THE PROJECT IN THE SAME MANNER AS PARKING, BUILDING MATERIALS AND OTHER SITE DETAILS. THE APPLICANT,
LANDOWNER OR SUCCESSORS IN INTEREST SHALL BE JOINTLY AND SEVERALLY RESPONSIBLE FOR THE REGULAR MAINTENANCE OF ALL LANDSCAPING
ELEMENTS IN GOOD CONDITION. ALL LANDSCAPING SHALL BE MAINTAINED FREE FROM DISEASE, PESTS, WEEDS AND LITTER, AND ALL LANDSCAPE
STRUCTURES SUCH AS FENCES AND WALLS SHALL BE REPAIRED AND REPLACED PERIODICALLY TO MAINTAIN A STRUCTURALLY SOUND CONDITION.
7.REPLACEMENT: ANY LANDSCAPE ELEMENT THAT DIES, OR IS OTHERWISE REMOVED, SHALL BE PROMPTLY REPLACED IN ACCORDANCE WITH THE
REQUIREMENTS OF THESE PLANS.
8.THE FOLLOWING SEPARATIONS SHALL BE PROVIDED BETWEEN TREES/SHRUBS AND UTILITIES:
40 FEET BETWEEN CANOPY TREES AND STREET LIGHTS
15 FEET BETWEEN ORNAMENTAL TREES AND STREETLIGHTS
10 FEET BETWEEN TREES AND PUBLIC WATER, SANITARY AND STORM SEWER MAIN LINES
6 FEET BETWEEN TREES AND PUBLIC WATER, SANITARY AND STORM SEWER SERVICE LINES.
4 FEET BETWEEN SHRUBS AND PUBLIC WATER AND SANITARY AND STORM SEWER LINES
4 FEET BETWEEN TREES AND GAS LINES
9.ALL STREET TREES SHALL BE PLACED A MINIMUM EIGHT (8) FEET AWAY FROM THE EDGES OF DRIVEWAYS AND ALLEYS PER LUC 3.2.1(D)(2)(a).
10. PLACEMENT OF ALL LANDSCAPING SHALL BE IN ACCORDANCE WITH THE SIGHT DISTANCE CRITERIA AS SPECIFIED BY THE CITY OF FORT COLLINS. NO
STRUCTURES OR LANDSCAPE ELEMENTS GREATER THAN 24" SHALL BE ALLOWED WITHIN THE SIGHT DISTANCE TRIANGLE OR EASEMENTS WITH THE
EXCEPTION OF DECIDUOUS TREES PROVIDED THAT THE LOWEST BRANCH IS AT LEAST 6' FROM GRADE. ANY FENCES WITHIN THE SIGHT DISTANCE TRIANGLE
OR EASEMENT MUST BE NOT MORE THAN 42" IN HEIGHT AND OF AN OPEN DESIGN.
11. THE FINAL LANDSCAPE PLAN SHALL BE COORDINATED WITH ALL OTHER FINAL PLAN ELEMENTS SO THAT THE PROPOSED GRADING, STORM DRAINAGE, AND
OTHER DEVELOPMENT IMPROVEMENTS DO NOT CONFLICT WITH NOR PRECLUDE INSTALLATION AND MAINTENANCE OF LANDSCAPE ELEMENTS ON THIS PLAN.
12. MINOR CHANGES IN SPECIES AND PLANT LOCATIONS MAY BE MADE DURING CONSTRUCTION -- AS REQUIRED BY SITE CONDITIONS OR PLANT AVAILABILITY.
OVERALL QUANTITY, QUALITY, AND DESIGN CONCEPT MUST BE CONSISTENT WITH THE APPROVED PLANS. IN THE EVENT OF CONFLICT WITH THE QUANTITIES
INCLUDED IN THE PLANT LIST, SPECIES AND QUANTITIES ILLUSTRATED SHALL BE PROVIDED. ALL CHANGES OF PLANT SPECIES AND LOCATION MUST HAVE
WRITTEN APPROVAL BY THE CITY PRIOR TO INSTALLATION.
13. ALL PLANTING BEDS SHALL BE MULCHED TO A MINIMUM DEPTH OF THREE INCHES.
CITY OF FORT COLLINS STANDARD NOTES
1.THE LANDSCAPE CONTRACTOR IS REQUIRED TO CONTACT THE COUNTY PUBLIC WORKS DEPARTMENT, AND ANY
OTHER PUBLIC OR PRIVATE AGENCY NECESSARY FOR UTILITY LOCATION PRIOR TO ANY CONSTRUCTION.
2.THIS DRAWING IS A PART OF A COMPLETE SET OF BID DOCUMENTS, SPECIFICATIONS, ADDITIONAL DRAWINGS, AND
EXHIBITS. UNDER NO CIRCUMSTANCES SHOULD THESE PLANS BE USED FOR CONSTRUCTION PURPOSES WITHOUT
EXAMINING ACTUAL LOCATIONS OF UTILITIES ON SITE, AND REVIEWING ALL RELATED DOCUMENTS.
3.THE LOCATION OF THE ALL UNDERGROUND UTILITIES ARE LOCATED ON THE ENGINEERING DRAWINGS FOR THIS
PROJECT. THE MOST CURRENT REVISION IS HERE IN MADE PART OF THIS DOCUMENT. UNDERGROUND UTILITIES
EXIST THROUGHOUT THIS SITE AND MUST BE LOCATED PRIOR TO ANY CONSTRUCTION ACTIVITY. WHERE
UNDERGROUND UTILITIES EXIST, FIELD ADJUSTMENT MAY BE NECESSARY AND MUST BE APPROVED BY A
REPRESENTATIVE OF THE OWNER. NEITHER THE OWNER NOR THE LANDSCAPE ARCHITECT ASSUMES ANY
RESPONSIBILITY WHATSOEVER, IN RESPECT TO THE CONTRACTORS ACCURACY IN LOCATING THE INDICATED PLANT
MATERIAL, AND UNDER NO CIRCUMSTANCES SHOULD THESE PLANS BE USED WITHOUT REFERENCING THE ABOVE
MENTIONED DOCUMENTS.
UTILITY NOTES
MIN. 2 X ROOTBALL
DIAMETERTHAN ROOTBALLMIN. 6" DEEPER1
3
4
5
6
FINISH GRADE. SEE PLANTING
PLAN FOR GROUND COVER
TREATMENT
PLANT ROOT BALL. SET TOP
ROOTBALL 2" ABOVE ADJECENT
GRADE. IN BERMED AREAS SET
ROOTBALL 2" ABOVE LOWER
ADJECENT GRADE - INSTALL
WATER RING (2 - 3" HT.)
BACKFILL MIX (PER PLANTING
SPECIFICATIONS). AMEND AND
FERTILIZE ONLY AS
RECOMMENDED IN SOIL
FERTILITY ANALYSIS. JET
BACKFILL WITH WATER TO
ELIMINATE VOIDS.
UNDISTURBED NATIVE SOIL.
COMPACTED BACKFILL MIX (75%).
1
2
3
4
5
6
SHRUB AND PERENNIAL DETAIL
SCALE: NOT TO SCALE1
2 SHREDDED BARK MULCH, 3" MIN.
DEPTH, ROUGHLY THE EXTENTS
OF ROOTBALL
5
6
7
4
8
9
11
10
12
PREVAILING
WINDS
NOTES:
1.SCARIFY SIDES OF PLANTING PIT PRIOR TO SETTING
TREE.
2.REMOVE EXCESS SOIL APPLIED ON TOP OF THE
ROOTBALL THAT COVERS THE ROOT FLARE. THE
PLANTING HOLE DEPTH SHALL BE SUCH THAT THE
ROOTBALL RESTS ON UNDISTURBED SOIL, AND THE
ROOT FLARE IS 3"-5" ABOVE FINISH GRADE.
3.CUT OFF BOTTOM 1/3 OF WIRE BASKET BEFORE PLACING
TREE IN HOLE, CUT OFF AND REMOVE REMAINDER OF
BASKET AFTER TREE IS SET IN HOLE, REMOVE ALL
NYLON TIES, TWINE, ROPE, AND OTHER PACKING
MATERIAL. REMOVE ALL BURLAP FROM AROUND
ROOTBALL.
4.TREE WRAP IS NOT TO BE USED ON ANY NEW
PLANTINGS, EXCEPT IN LATE FALL PLANTING
SITUATIONS, AND ONLY THEN AFTER CONSULTATION
WITH THE LANDSCAPE ARCHITECT. WHEN WRAPPING
TREE, WRAP FROM TRUNK FLARE TO LOWEST MAJOR
BRANCH.
5.REMOVE ALL NURSERY STAKES AFTER PLANTING.
6.FOR TREES OVER 3" CALIPER, USE THREE STAKES OR
DEADMEN (AS APPROPRIATE), SPACED EVENLY AROUND
TREE.
7.DO NOT ALLOW AIR POCKETS TO FORM WHEN
BACKFILLING.
1
2
3
TREE CANOPY.
NYLON TREE STRAPS AT ENDS OF WIRES -
SECURE TO STAKE OR DEADMEN WITH NAILS.
12 GAUGE GALVANIZED WIRE. SECURE TO
TRUNK JUST ABOVE LOWEST MAJOR
BRANCHES.
PRESSURE-TREATED WOOD STAKE, 2" DIA.
EXTEND STAKES 12" MIN. INTO UNDISTURBED
SOIL.
24" X 3/4" P.V.C. MARKERS OVER WIRES.
PRESSURE-TREATED WOOD DEADMEN, TWO
PER TREE (MIN.). BURY OUTSIDE OF
PLANTING PIT AND 18" MIN. INTO
UNDISTURBED SOIL.
WOOD MULCH TREE RING 3' DIA MIN. TYPE
AND DEPTH PER PLANS. DO NOT PLACE
MULCH WITHIN 3" OF TRUNK.
FINISH GRADE. SEE PLANTING PLAN FOR
GROUND COVER TREATMENT
BACKFILL. AMEND AND FERTILIZE ONLY AS
RECOMMENDED IN SOIL FERTILITY ANALYSIS.
ROOT BALL-SEE NOTE 3, THIS DETAIL
UNDISTURBED NATIVE SOIL
TRUNK FLARE.
PREVAILING
WINDS
STAKING EXAMPLES (PLAN VIEW)
1
5 6
TREE PLANTING DETAIL
SCALE: NOT TO SCALE4
EVERGREEN
TREE
DECIDUOUS
TREE
1
2
5
7
8
9
10
11
12
3
4
6
3X ROOTBALL DIA.
13
13 SOFT VELCRO, OR OTHER FABRIC WRAP
14
14 CENTRAL LEADER, SEE PLANTING NOTES
EFB
3
SCALE: NOT TO SCALE
CONCRETE PAVING
COMPACTED SUB-GRADE
ROCK MULCH
PRO-5 WEED BARRIER,
SEE STANDARD
PLANTING NOTES
4" MIN.
UNDISTURBED
NATIVE SOIL
NOTES:
1.MULCH TO BE MIN 4" THICK. SEE STANDARD PLANTING
NOTES.
2.NO PLASTIC WEED BARRIERS SHALL BE SPECIFIED.
3.INSTALL ROCK MULCH 1"-2" BELOW CONCRETE FINISH
GRADE.
PLANTING NOTES
GENERAL
1.ALL WORK SHALL CONFORM TO ALL APPLICABLE STATE AND LOCAL CODES, STANDARDS, AND SPECIFICATIONS.
2.LANDSCAPE DESIGN IS DIAGRAMMATIC IN NATURE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR HIS OWN TAKEOFFS AND
QUANTITY CALCULATIONS. IN THE EVENT OF A DISCREPANCY BETWEEN THE PLAN AND THE LANDSCAPE LEGEND, THE PLANT
QUANTITY AS SHOWN ON THE PLAN SHALL TAKE PRECEDENCE AND NOTIFY THE LANDSCAPE ARCHITECT OF THESE DISCREPANCIES.
MINOR ADJUSTMENTS TO THE LANDSCAPE MATERIAL AND LOCATIONS MAY BE PROPOSED FOR CITY CONSIDERATION AT THE
CONSTRUCTION DOCUMENT STAGE TO RESPOND TO MARKET AND FIELD CONDITIONS. HOWEVER, THERE SHALL BE NO REDUCTION
IN THE NUMBER AND SIZE OF MATERIALS.
3.CONTRACTOR SHALL MAKE HIMSELF AWARE OF THE LOCATIONS OF EXISTING AND PROPOSED UTILITIES, AND SHALL BE
RESPONSIBLE FOR ANY DAMAGE TO THE UTILITIES AND/OR ANY INJURY TO ANY PERSON. THIS DRAWING IS PART OF A COMPLETE
SET OF CONTRACT DOCUMENTS. UNDER NO CIRCUMSTANCES SHOULD THIS PLAN BE USED FOR CONSTRUCTION PURPOSES
WITHOUT EXAMINING ACTUAL LOCATIONS OF UTILITIES ON SITE AND REVIEW ALL RELATED PLANS AND DOCUMENTS.
4.ALL UTILITY EASEMENTS SHALL REMAIN UNOBSTRUCTED AND FULLY ACCESSIBLE ALONG THEIR ENTIRE LENGTH FOR MAINTENANCE
EQUIPMENT.
5.THE CONTRACTOR SHALL TAKE EXTREME CARE NOT TO DAMAGE ANY EXISTING PLANTS INDICATED AS "TO REMAIN". ANY SUCH
PLANTS DAMAGED BY THE CONTRACTOR SHALL BE REPLACED WITH THE SAME SPECIES, SIZE, AND QUANTITY AT THE
CONTRACTOR'S OWN EXPENSE, AND AS ACCEPTABLE TO THE OWNER. REFER TO THE TREE PROTECTION NOTES ON THE PLANS (AS
APPLICABLE).
6.LANDSCAPE CONTRACTOR SHALL EXAMINE THE SITE CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED AND NOTIFY THE
GENERAL CONTRACTOR IN WRITING OF UNSATISFACTORY CONDITIONS. IF SITE CONDITIONS OR PLANT AVAILABILITY REQUIRE
CHANGES TO THE PLAN, THEN AN APPROVAL WILL BE OBTAINED FROM THE CITY. DO NOT PROCEED UNTIL CONDITIONS HAVE BEEN
CORRECTED.
7.ALL CONSTRUCTION DEBRIS AND MATERIAL SHALL BE REMOVED AND CLEANED OUT PRIOR TO INSTALLATION OF TOPSOIL, TREES,
SHRUBS, AND TURF.
8.FOR ALL INFORMATION ON SURFACE MATERIAL OF WALKS, DRIVES, AND PARKING LOTS, SEE THE SITE PLAN. SEE PHOTOMETRIC
PLAN FOR FREE STANDING LIGHTING INFORMATION.
9.THE LANDSCAPE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT ONE WEEK PRIOR TO BEGINNING CONSTRUCTION.
10.WINTER WATERING SHALL BE AT THE EXPENSE OF THE CONTRACTOR UNTIL SUCH TIME AS FINAL ACCEPTANCE IS RECEIVED.
11.ALL LANDSCAPE CONSTRUCTION PRACTICES, WORKMANSHIP, AND ETHICS SHALL, BE IN ACCORDANCE WITH INDUSTRY STANDARDS
SET FORTH IN THE CONTRACTORS HANDBOOK PUBLISHED BY THE COLORADO LANDSCAPE CONTRACTORS ASSOCIATION.
12.LANDSCAPE AND IRRIGATION WORK SHALL BE COMPLETED PRIOR TO THE ISSUANCE OF THE FINAL CERTIFICATE OF OCCUPANCY.
FINISH GRADING AND SOIL PREPARATION
13.CONTRACTOR SHALL CONSTRUCT AND MAINTAIN FINISH GRADES AS RECOMMENDED BY THE GEOTECHNICAL REPORT. ALL
LANDSCAPE AREAS SHALL HAVE POSITIVE DRAINAGE AWAY FROM STRUCTURES AT THE MINIMUM SLOPE SPECIFIED IN THE REPORT,
AND AREAS OF POTENTIAL PONDING SHALL BE REGRADED TO BLEND IN WITH THE SURROUNDING GRADES AND ELIMINATE PONDING
POTENTIAL. SHOULD ANY CONFLICTS AND/OR DISCREPANCIES ARISE BETWEEN THE GEOTECHNICAL REPORT, THE GRADING PLANS,
THESE NOTES, AND ACTUAL CONDITIONS, THE CONTRACTOR SHALL IMMEDIATELY BRING SUCH ITEMS TO THE ATTENTION OF THE
LANDSCAPE ARCHITECT AND OWNER.
14.AFTER FINISH GRADES HAVE BEEN ESTABLISHED, IT IS RECOMMENDED THAT THE CONTRACTOR SHALL HAVE SOIL SAMPLES TESTED
BY AN ESTABLISHED SOIL TESTING LABORATORY FOR THE FOLLOWING: GENERAL SOIL FERTILITY, PH, ORGANIC MATTER CONTENT,
SALT (CEC), LIME, SODIUM ADSORPTION RATIO (SAR) AND BORON CONTENT. EACH SAMPLE SUBMITTED SHALL CONTAIN NO LESS
THAN ONE QUART OF SOIL. CONTRACTOR SHALL ALSO SUBMIT THE PROJECT'S PLANT LIST TO THE LABORATORY ALONG WITH THE
SOIL SAMPLES. THE SOIL REPORT PRODUCED BY THE LABORATORY SHALL CONTAIN RECOMMENDATIONS FOR THE FOLLOWING (AS
APPROPRIATE): GENERAL SOIL PREPARATION AND BACKFILL MIXES, PRE-PLANT FERTILIZER APPLICATIONS, AND ANY OTHER SOIL
RELATED ISSUES. THE REPORT SHALL ALSO PROVIDE A FERTILIZER PROGRAM FOR THE ESTABLISHMENT PERIOD AND FOR
LONG-TERM MAINTENANCE.
15.THE CONTRACTOR SHALL RECOMMEND INSTALLATION OF SOIL AMENDMENTS AND FERTILIZERS PER THE SOILS REPORT FOR THE
THE OWNER/OWNER'S REPRESENTATIVE CONSIDERATION.
16.AT A MINIMUM, ALL TOPSOIL SHALL BE AMENDED WITH NITROGEN STABILIZED ORGANIC AMENDMENT COMPOST AT A RATE OF 5.0
CUBIC YARDS AND AMMONIUM PHOSPHATE 16-20-0 AT A RATE OF 15 POUNDS PER THOUSAND SQUARE FEET OF LANDSCAPE AREA.
COMPOST SHALL BE MECHANICALLY INTEGRATED INTO THE TOP 6" OF SOIL BY MEANS OF ROTOTILLING AFTER CROSS-RIPPING.
GROUND COVER & PERENNIAL BED AREAS SHALL BE AMENDED AT A RATE OF 8 CUBIC FEET PER THOUSAND SQUARE FEET OF
NITROGEN STABILIZED ORGANIC AMENDMENT AND 10 LBS. OF 12-12-12 FERTILIZER PER CU. YD., ROTOTILLED TO A DEPTH OF 8". NO
MANURE OR ANIMAL-BASED PRODUCTS SHALL BE USED FOR ORGANIC AMENDMENTS.
PLANTING
17.ALL DECIDUOUS TREES SHALL HAVE FULL, WELL-SHAPED HEADS/ALL EVERGREENS SHALL BE UNSHEARED AND FULL TO THE
GROUND; UNLESS OTHERWISE SPECIFIED. TREES WITH CENTRAL LEADERS WILL NOT BE ACCEPTED IF LEADER IS DAMAGED OR
REMOVED. PRUNE ALL DAMAGED TWIGS AFTER PLANTING.
18.ALL PLANTS WITHIN A SPECIES SHALL HAVE SIMILAR SIZE, AND SHALL BE OF A FORM TYPICAL FOR THE SPECIES. ANY PLANT
DEEMED UNACCEPTABLE BY THE LANDSCAPE ARCHITECT SHALL BE IMMEDIATELY REMOVED FROM THE SITE AND SHALL BE
REPLACED WITH AN ACCEPTABLE PLANT OF LIKE TYPE AND SIZE AT THE CONTRACTOR'S OWN EXPENSE. ANY PLANTS APPEARING
TO BE UNHEALTHY, EVEN IF DETERMINED TO STILL BE ALIVE, SHALL NOT BE ACCEPTED. THE LANDSCAPE ARCHITECT SHALL BE THE
SOLE JUDGE AS TO THE ACCEPTABILITY OF PLANT MATERIAL.
19.ALL TREES SHALL BE GUYED AND WOOD STAKED AS PER DETAILS. NO 'T-STAKES' SHALL BE USED FOR TREES.
20.ALL PLANT MATERIALS SHALL BE TRUE TO TYPE, SIZE, SPECIES, QUALITY, AND FREE OF INJURY, BROKEN ROOT BALLS, PESTS, AND
DISEASES, AS WELL AS CONFORM TO THE MINIMUM REQUIREMENTS DESCRIBED IN THE "AMERICAN STANDARD FOR NURSERY
STOCK". FOLLOW GREENCO TREE PLANTING RECOMMENDATIONS FOR MINIMUM QUALITY REQUIREMENTS FOR TREES.
21.ALL TREE AND SHRUB BED LOCATIONS ARE TO BE STAKED OUT ON SITE FOR APPROVAL BY THE LANDSCAPE ARCHITECT PRIOR TO
INSTALLATION.
22.ALL TREES PLANTED ADJACENT TO PUBLIC AND/OR PEDESTRIAN WALKWAYS SHALL BE PRUNED CLEAR OF ALL BRANCHES BETWEEN
GROUND AND A HEIGHT OF EIGHT (8) FEET FOR THAT PORTION OF THE PLAN LOCATED OVER THE SIDEWALK AND/OR ROAD.
23.ALL PLANT MATERIAL SHALL NOT BE PLANTED PRIOR TO INSTALLATION OF TOPSOIL.
24.ALL PLANT BEDS SHALL BE CONTAINED WITH STEEL EDGER. STEEL EDGER IS NOT REQUIRED ALONG CURBS, WALKS OR BUILDING
FOUNDATIONS. ALL EDGING SHALL OVERLAP AT JOINTS A MINIMUM OF 6-INCHES, AND SHALL BE FASTENED WITH A MINIMUM OF 4
PINS PER EACH 10 FOOT SECTION. THE TOP OF ALL EDGING MATERIAL SHALL BE A ROLLED TOP AND 1/2 INCH ABOVE THE FINISHED
GRADE OF ADJACENT LAWN OR MULCH AREAS. COLOR: GREEN.
25.THE DEVELOPER, HIS SUCCESSOR, OR ASSIGNEE SHALL BE RESPONSIBLE FOR ESTABLISHING AND CONTINUING A REGULAR
PROGRAM OF MAINTENANCE FOR ALL LANDSCAPED AREAS. SEE LANDSCAPE GUARANTEE AND MAINTENANCE NOTE.
26.A 3-FOOT CLEAR SPACE SHALL BE MAINTAINED AROUND THE CIRCUMFERENCE OF ALL FIRE HYDRANTS.
27.LANDSCAPE CONTRACTOR TO SUBMIT SAMPLES OF MISCELLANEOUS LANDSCAPING MATERIALS TO THE LANDSCAPE ARCHITECTS
AND OWNER'S REPRESENTATIVE FOR APPROVAL PRIOR TO INSTALLATION, IE.; MULCH, EDGER, LANDSCAPE FABRIC, ETC.
MULCHING
28.AFTER ALL PLANTING IS COMPLETE, THE CONTRACTOR SHALL INSTALL A MINIMUM 4" THICK LAYER OF MULCH AS SPECIFIED IN THE
PLANTING LEGEND. INSTALL A 4" THICK RING OF DOUBLE SHREDDED CEDAR BARK MULCH AROUND ALL PLANT MATERIAL IN ROCK
MULCH BEDS WHERE LANDSCAPING IS SHOWN ON THE PLANS. WOOD MULCH RING SIZE SHALL BE THE CONTAINER SIZE OF THE
SHRUBS, PERENNIALS, AND ORNAMENTAL GRASSES. TREE RING SIZE SHALL BE GREEN INDUSTRIES OF COLORADO INDUSTRY
STANDARD WIDTH.
29.ALL MULCH SHALL BE HARVESTED IN A SUSTAINABLE MANNER FROM A LOCAL SOURCE.
30.INSTALL DEWITT PRO-5 WEED BARRIER FABRIC UNDER ALL ROCK MULCH SHRUB BEDS SPECIFIED ON THE PLANS ONLY. NO
LANDSCAPE FABRIC SHALL BE USED IN WOOD MULCH AREAS. NO PLASTIC WEED BARRIERS SHALL BE SPECIFIED.
31.ABSOLUTELY NO EXPOSED GROUND SHALL BE LEFT SHOWING ANYWHERE ON THE PROJECT AFTER MULCH HAS BEEN INSTALLED.
32.ALL PLANTING AREAS WITH LESS THAN A 4:1 GRADIENT SHALL RECEIVE A LAYER OF MULCH, TYPE AND DEPTH PER PLANS. SUBMIT 1
CUBIC FOOT SAMPLE OF MULCH (ONE SAMPLE PER TYPE) TO LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION. THE
MULCH SHALL BE SPREAD EVENLY THROUGHOUT ALL PLANTING AREAS EXCEPT SLOPES 4:1 OR STEEPER, OR AS OTHERWISE
DENOTED ON THE PLAN. ABSOLUTELY NO EXPOSED GROUND SHALL REMAIN IN AREAS TO RECEIVE MULCH AFTER MULCH HAS BEEN
INSTALLED.
33.ALL PLANTING AREAS ON SLOPES OVER 4:1 SHALL RECEIVE COCONUT FIBER EROSION CONTROL NETTING FROM ROLLS. NETTING
SHALL BE #CT-125, AS MANUFACTURED BY NORTH AMERICAN GREEN (OR EQUAL). INSTALL AND STAKE PER MANUFACTURER'S
SPECIFICATIONS. SEE ALSO THE CIVIL ENGINEER'S EROSION CONTROL PLAN.
ROCK MULCH ALONG CONCRETE PAVING
2
SCALE: NOT TO SCALE
CONCRETE PAVING
COMPACTED SUB-GRADE
TURF. FINISH GRADE.
UNDISTURBED NATIVE SOIL
NOTES:
1.SEE STANDARD PLANTING NOTES FOR TURF
REQUIREMENTS.
2.INSTALL TURF 1"-2" BELOW CONCRETE FINISH GRADE.
TURF ALONG CONCRETE PAVING
1" MAX.
1" MAX.
6" MIN.
6" MIN. AMENDED TOPSOIL
6" MIN. AMENDED TOPSOIL
9
L1.2
SRA
4" MIN. TYP.
6" MIN.
NOTE: THE DESIGN AND INSTALLATION OF ALL PARKWAY/TREE LAWN
AND MEDIAN AREAS IN THE RIGHT-OF-WAY SHALL BE IN ACCORDANCE
WITH THE CITY STANDARDS. UNLESS OTHERWISE AGREED TO BY THE
CITY WITH THE FINAL PLANS, ALL ONGOING MAINTENANCE OF SUCH
AREAS IS THE RESPONSIBILITY OF THE OWNER/DEVELOPER.
ANNUAL/PERENNIAL PLANTINGS IN THE PLANTER POTS ALONG
PROSPECT RD. SHALL BE KEPT WELL MAINTAINED AND THRIVING IN A
MANNER THAT IS CONSISTENT WITH THE CITY OWNED AND MAINTAINED
PLANTINGS OF THE INTERSECTION. THE OWNER/DEVELOPER SHALL
MAINTAIN THESE LANDSCAPE FEATURES IN PERPETUITY IN ORDER TO
KEEP THE INTERSECTION FEATURES PRESENTABLE.
HISTORICAL
BUILDING
RELOCATED
PROPOSED
BANK EXIT ONLYTRASH
ENCLOSURE
4
56 3
27
8
9
10 11 1
EXISTING TREES TO REMAIN -
CONTRACTOR TO PROTECT IN PLACE
HISTORICAL
BUILDING
RELOCATED
PROPOSED
BANK EXIT ONLYTRASH
ENCLOSURE
-01/20/2021 2ND PDP SUB MAS
-02/17/2021 3RD PDP SUB MAS
-04/07/2021 1ST FDP SUB MAS
-05/19/2021 2ND FDP SUB MAS
-07/08/2021 3RD FDP SUB MAS
-
-
-
-
-
-
-
-
STAMP
H:\Alpine Bank\CO, Fort Collins - XXXXX - College & Prospect\CADD\3 CD\ALB001x_P_14-Land.dwg - Matt Bundren - 7/8/2021Init.#Issue / DescriptionDate
THESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
6162 S. Willow Drive, Suite 320
Greenwood Village, CO 80111
303.770.8884
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:FINAL SITE PLANS FOR ALPINE BANK1608 SOUTH COLLEGE AVENUES. COLLEGE AVE. & PROSPECT ROADFORT COLLINS, COLORADO-12/02/2020 1ST PDP SUB MAS
ALB000001
MAS
JULY 2021
OF 13
TREE PRESERVATION
AND HYDROZONE
PLAN
SCALE: 1"=30'
0 15 30
CAUTION
UTILITIES EXIST WITHIN CONSTRUCTION
LIMITS. CONTRACTOR IS RESPONSIBLE
FOR IDENTIFYING THEIR LOCATION
PRIOR TO CONSTRUCTION.
STREET TREE NOTES:
1.A PERMIT MUST BE OBTAINED FROM THE CITY FORESTER BEFORE ANY TREES OR SHRUBS AS NOTED ON THIS
PLAN ARE PLANTED, PRUNED OR REMOVED IN THE PUBLIC RIGHT-OF-WAY. THIS INCLUDES ZONES BETWEEN THE
SIDEWALK AND CURB, MEDIANS AND OTHER CITY PROPERTY. THIS PERMIT SHALL APPROVE THE LOCATION AND
SPECIES TO BE PLANTED. FAILURE TO OBTAIN THIS PERMIT IS A VIOLATION OF THE CITY OF FORT COLLINS CODE
SUBJECT TO CITATION (SECTION 27-31) AND MAY ALSO RESULT IN REPLACING OR RELOCATING TREES AND A HOLD
ON CERTIFICATE OF OCCUPANCY.
CITY OF FORT COLLINS STREET TREE NOTE
HYDROZONE CHART
HIGH HYDROZONE
MODERATE HYDROZONE
LOW HYDROZONE
VERY LOW HYDROZONE
18 GALLONS / SQUARE FEET / SEASON
10 GALLONS / SQUARE FEET / SEASON
3 GALLONS / SQUARE FEET / SEASON
0 GALLONS / SQUARE FEET / SEASON
0 SQUARE FEET
2,726 SQUARE FEET
7,903 SQUARE FEET
0 SQUARE FEET
NOTE: ALL PLANTING BEDS NOT LABELED "MODERATE HYDROZONE" ARE CONSIDERED LOW HYDROZONE.
SHREDDED HARDWOOD MULCH, SEE NOTES.
OUTLINE OF TREE CROWN (EDGE OF DRIPLINE)
CORRESPONDS WITH ROOT SPREAD.
TRUNK PROTECTION BOARDS MIN. 2" THICK. BENEATH
BOARDS ARE 3-4 LAYERS OF BURLAP AROUND TRUNK.
TIE BOARDS SECURELY AT TOP, BOTTOM AND CENTER
WITH HEAVY DUTY CORD, WIRE, OR CABLE CHOKERS.
CONCRETE BLANKET MAY BE USED AS AN ALTERNATIVE.
CONSTRUCTION FENCING (MIN. 4' HEIGHT, CHAIN LINK)
TREE PROTECTION DETAIL
SCALE: NOT TO SCALE1
NO TREES SHALL BE REMOVED DURING THE SONGBIRD NESTING
SEASON (FEBRUARY 1 TO JULY 31) WITHOUT FIRST HAVING A
PROFESSIONAL ECOLOGIST OR WILDLIFE BIOLOGIST COMPLETE A
NESTING SURVEY TO IDENTIFY ANY ACTIVE NESTS EXISTING ON THE
PROJECT SITE. THE SURVEY SHALL BE SENT TO THE CITY
ENVIRONMENTAL PLANNER. IF ACTIVE NESTS ARE FOUND, THE CITY
WILL COORDINATE WITH RELEVANT STATE AND FEDERAL
REPRESENTATIVES TO DETERMINE WHETHER ADDITIONAL
RESTRICTIONS ON TREE REMOVAL AND CONSTRUCTION APPLY
TREE REMOVAL:
TREE PRESERVATION PLAN
SCALE: 1" = 30'1
1.ALL EXISTING TREES WITHIN THE LIMITS OF THE DEVELOPMENT AND WITHIN ANY NATURAL AREA BUFFER ZONES SHALL REMAIN AND
BE PROTECTED UNLESS NOTED ON THESE PLANS FOR REMOVAL.
2.WITHIN THE DRIP LINE OF ANY PROTECTED EXISTING TREE, THERE SHALL BE NO CUT OR FILL OVER A FOUR-INCH DEPTH UNLESS A
QUALIFIED ARBORIST OR FORESTER HAS EVALUATED AND APPROVED THE DISTURBANCE.
3.ALL PROTECTED EXISTING TREES SHALL BE PRUNED TO THE CITY OF FORT COLLINS FORESTRY STANDARDS. TREE PRUNING AND
REMOVAL SHALL BE PERFORMED BY A BUSINESS THAT HOLDS A CURRENT CITY OF FORT COLLINS ARBORIST LICENSE WHERE
REQUIRED BY CODE.
4.PRIOR TO AND DURING CONSTRUCTION, BARRIERS SHALL BE ERECTED AROUND ALL PROTECTED EXISTING TREES WITH SUCH
BARRIERS TO BE OF ORANGE FENCING A MINIMUM OF FOUR (4) FEET IN HEIGHT, SECURED WITH METAL T-POSTS, NO CLOSER THAN
SIX (6) FEET FROM THE TRUNK OR ONE-HALF (½) OF THE DRIP LINE, WHICHEVER IS GREATER. THERE SHALL BE NO STORAGE OR
MOVEMENT OF EQUIPMENT, MATERIAL, DEBRIS OR FILL WITHIN THE FENCED TREE PROTECTION ZONE.
5.DURING THE CONSTRUCTION STAGE OF DEVELOPMENT, THE APPLICANT SHALL PREVENT THE CLEANING OF EQUIPMENT OR
MATERIAL OR THE STORAGE AND DISPOSAL OF WASTE MATERIAL SUCH AS PAINTS, OILS, SOLVENTS, ASPHALT, CONCRETE, MOTOR
OIL OR ANY OTHER MATERIAL HARMFUL TO THE LIFE OF A TREE WITHIN THE DRIP LINE OF ANY PROTECTED TREE OR GROUP OF
TREES.
6.NO DAMAGING ATTACHMENT, WIRES, SIGNS OR PERMITS MAY BE FASTENED TO ANY PROTECTED TREE.
7.LARGE PROPERTY AREAS CONTAINING PROTECTED TREES AND SEPARATED FROM CONSTRUCTION OR LAND CLEARING AREAS,
ROAD RIGHTS-OF-WAY AND UTILITY EASEMENTS MAY BE "RIBBONED OFF," RATHER THAN ERECTING PROTECTIVE FENCING AROUND
EACH TREE AS REQUIRED IN SUBSECTION (G)(3) ABOVE. THIS MAY BE ACCOMPLISHED BY PLACING METAL T-POST STAKES A
MAXIMUM OF FIFTY (50) FEET APART AND TYING RIBBON OR ROPE FROM STAKE-TO-STAKE ALONG THE OUTSIDE PERIMETERS OF
SUCH AREAS BEING CLEARED.
8.THE INSTALLATION OF UTILITIES, IRRIGATION LINES OR ANY UNDERGROUND FIXTURE REQUIRING EXCAVATION DEEPER THAN SIX (6)
INCHES SHALL BE ACCOMPLISHED BY BORING UNDER THE ROOT SYSTEM OF PROTECTED EXISTING TREES AT A MINIMUM DEPTH OF
TWENTY-FOUR (24) INCHES. THE AUGER DISTANCE IS ESTABLISHED FROM THE FACE OF THE TREE (OUTER BARK) AND IS SCALED
FROM TREE DIAMETER AT BREAST HEIGHT AS DESCRIBED IN THE CHART BELOW:
9.ALL TREE REMOVAL SHOWN SHALL BE COMPLETED OUTSIDE OF THE SONGBIRD NESTING SEASON (FEB 1 - JULY 31) OR CONDUCT A
SURVEY OF TREES ENSURING NO ACTIVE NESTS IN THE AREA.
CITY OF FORT COLLINS TREE PROTECTION NOTES:
TREE DIAMETER AT BREAST AUGER DISTANCE FROM FACE
HEIGHT (INCHES)OF TREE (FEET)
0-2 1
3-4 2
5-9 5
10-14 10
15-19 12
OVER 19 15
SCALE: 1"=30'
0 15 30
EXISTING TREE KEY
EXISTING TREE TO BE RELOCATED
EXISTING TREE TO BE REMOVED
NOTE: SEE LANDSCAPE NOTES
FOR TREE PROTECTION
REQUIREMENTS
1.USE CITY OF FORT COLLINS TREE PROTECTION NOTES. TREE PROTECTION NOTES BELOW SHALL BE USED FOR FURTHER
INTEGRATION.
2."PROTECTED ZONE" FOR EXISTING TREES: BEFORE BEGINNING ANY DEMOTION OR CONSTRUCTION OPERATIONS, THE
CONTRACTOR SHALL INSTALL TEMPORARY CHAIN LINK FENCING AROUND ALL EXISTING TREES WITHIN THE CONSTRUCTION ZONE
THAT ARE TO BE SAVED. THE FENCE SHALL BE INSTALLED NO CLOSER TO THE TREE THAN THE EDGE OF THE TREE'S PROTECTED
ZONE, GENERALLY DEFINED AS THE AREA BEGINNING FIVE FEET OUTSIDE OF THE TREE'S DRIP LINE AND EXTENDING TOWARDS
THE TREE. IN THE EVENT THAT CONSTRUCTION IS REQUIRED WITHIN THE TREE PROTECTION ZONE A PRE-CON MEETING IS
REQUIRED WITH THE CONTRACTOR, FORESTRY DEPARTMENT, LANDSCAPE ARCHITECT AND CIVIL ENGINEER TO DISCUSS
CONSTRUCTION METHODS ON A CASE BY CASE BASIS. THE FENCING SHALL BE OF A MATERIAL AND HEIGHT ACCEPTABLE TO THE
LANDSCAPE ARCHITECT AND FORT COLLINS FORESTRY DEPARTMENT. ALL CONTRACTORS AND THEIR CREWS SHALL NOT BE
ALLOWED INSIDE THIS "PROTECTED ZONE" NOR SHALL THEY BE ALLOWED TO STORE OR DUMP FOREIGN MATERIALS WITHIN THIS
AREA. NO WORK OF ANY KIND, INCLUDING TRENCHING, SHALL BE ALLOWED WITHIN THE PROTECTED ZONE EXCEPT AS DESCRIBED
BELOW. THE FENCING SHALL REMAIN AROUND EACH TREE TO BE SAVED UNTIL THE COMPLETION OF CONSTRUCTION OPERATIONS.
3.TEMPORARY MULCH: TO ALLEVIATE SOIL COMPACTION IN ANTICIPATED AREAS OF HIGH CONSTRUCTION TRAFFIC, AND ONLY
WHERE FENCING CANNOT BE SET FIVE FEET OUTSIDE OF THE DRIPLINE, THE CONTRACTOR SHALL INSTALL A LAYER OF MULCH,
9"-12" THICK, OVER ALL EXPOSED EARTH FROM THE TREE TRUNK TO 5' OUTSIDE OF THE DRIPLINE. THIS LAYER SHALL BE
MAINTAINED AT ALL TIMES DURING CONSTRUCTION. WHEN PLANTING OPERATIONS ARE COMPLETED, THE MULCH SHALL BE
REDISTRIBUTED THROUGHOUT ALL PLANTING AREAS IN A 3" THICK "PERMANENT" MULCH LAYER.
4.NECESSARY WORK: WHEN IT BECOMES NECESSARY TO ENTER THE "PROTECTED ZONE", SUCH AS FOR FINE GRADING, IRRIGATION
INSTALLATION, AND PLANTING OPERATIONS, THE CONTRACTOR SHALL STRICTLY ADHERE TO THE FOLLOWING RULES:
A.EVERY EFFORT SHALL BE MADE TO PRESERVE THE EXISTING GRADE AROUND PROTECTED TREES IN AS WIDE AN AREA AS
POSSIBLE.
B.TRENCHING WITHIN THE PROTECTED ZONE OF EXISTING TREES SHALL BE PERFORMED BY HAND, AND WITH EXTREME CARE
NOT TO SEVER ROOTS 2" IN DIAMETER AND LARGER. WHERE ROOTS 2" IN DIAMETER AND LARGER ARE ENCOUNTERED, THE
CONTRACTOR SHALL TUNNEL UNDER SAID ROOTS. EXPOSED ROOTS THAT HAVE BEEN TUNNELED UNDER SHALL BE
WRAPPED IN WET BURLAP AND KEPT MOIST WHILE THE TRENCH IS OPEN.
C.WHERE ROOTS 2" IN DIAMETER OR LARGER MUST BE CUT DUE TO EXTENSIVE GRADE CHANGES, THOSE ROOTS MUST BE
EXPOSED BY HAND DIGGING AND CUT CLEANLY. RAGGED CUTS GENERALLY DO NOT HEAL PROPERLY, AND MAY LEAVE THE
TREE OPEN TO PESTS AND PATHOGENS.
D.WHERE TRENCHING NEAR TREES HAS ALREADY OCCURRED FROM PREVIOUS CONSTRUCTION OPERATIONS, THE
CONTRACTOR SHALL MAKE EVERY EFFORT TO CONFINE HIS TRENCHING OPERATIONS TO THE PREVIOUSLY-CREATED
TRENCHES, WHILE ADHERING TO THE CONDITIONS SET FORTH IN 3B.
4.POTENTIAL CONFLICTS: THE CONTRACTOR SHALL NOTIFY THE OWNER AND ARBORIST SHOULD ANY POTENTIAL CONFLICTS ARISE
BETWEEN THESE SPECIFICATIONS AND/OR LARGE ROOTS ENCOUNTERED IN THE FIELD, AND CONSTRUCTION OPERATIONS. THE
CONTRACTOR SHALL NOT TAKE ANY ACTION IN SUCH CONFLICTS WITHOUT THE CITY FORESTER'S WRITTEN APPROVAL. THE CITY
FORESTER SHALL HAVE FINAL AUTHORITY OVER ALL METHODS NECESSARY TO HELP ENSURE THE PROTECTION AND SURVIVAL OF
EXISTING TREES.
5.PRUNING: PRUNING IS TO BE COORDINATED WITH THE CITY OF FORT COLLINS FORESTRY DEPARTMENT. PRUNING MUST BE
COMPLETED BY A CITY OF FORT COLLINS LICENSED ARBORIST. THE CITY WILL LIKELY HANDLE ALL ROW PRUNING BUT THE
CONTRACTOR MAY COORDINATE TO HAVE A LICENSED ARBORIST COMPLETE THIS WORK. PRUNE ONLY THE TREES THAT ARE
INDICATED ON THE PLANS AS REQUIRING PRUNING. PRUNE TREES ACCORDING TO INTERNATIONAL SOCIETY OF ARBORICULTURE /
ANSI A300 STANDARDS:
A.REMOVE ALL DEAD WOOD.
B.PRUNE LIVE WOOD FOR HEALTH OR STRUCTURAL REASONS ONLY, INCLUDING THE NEED TO ELIMINATE DISEASED OR
DAMAGED GROWTH, ELIMINATE STRUCTURALLY UNSOUND GROWTH, REDUCE THE POTENTIAL FOR WIND TOPPLING OR WIND
DAMAGE, OR TO MAINTAIN GROWTH WITHIN LIMITED SPACE. DO NOT REMOVE MORE THAN 25% OF ANY TREE'S LIVE FOLIAGE
IN ANY ONE GROWING SEASON. PRUNE ONLY TO INTERNATIONAL SOCIETY OF ARBORICULTURE/ANSI A300 STANDARDS, AND
ONLY UNDER THE DIRECT SUPERVISION OF A CERTIFIED ARBORIST.
C.FINAL CUTS SHALL BE MADE JUST OUTSIDE THE SHOULDER RING AREA. EXTREMELY FLUSHED CUTS WHICH PRODUCE LARGE
WOUNDS SHALL NOT BE MADE.
D.ALL TRIMMING CUTS SHALL BE PERFORMED IN SUCH A MANNER AS TO PROMOTE THE NATURAL GROWTH AND SHAPE OF
EACH TREE SPECIES.
E.IMPROPER PRUNING METHODS INCLUDING, BUT NOT LIMITED TO, "TOPPING", "TIPPING", "HEADING BACK", "DEHORNING", AND
"LIONTAILING" WILL NOT BE ALLOWED. THE CONTRACTOR SHALL PAY FOR ALL WORK NECESSARY TO CORRECT SUCH
PRUNING WHEN PERFORMED BY HIS CREWS OR SUBCONTRACTORS.
F.SHOULD THE CONTRACTOR REQUIRE MORE INFORMATION, THE CONTRACTOR SHALL CONTACT THE ISA AT (217) 355-9411 FOR
A COPY OF THE ANSI A300 PRUNING STANDARDS. CONTRACTOR SHALL ADHERE TO THE METHODS AND PRACTICES SET
FORTH IN THIS DOCUMENT.
6.LANDSCAPE AND IRRIGATION (NATIVE TREES ONLY): ANY FUTURE LANDSCAPE AND IRRIGATION SHOULD ADHERE TO THE
FOLLOWING GUIDELINES:
A.DRIP IRRIGATION SHALL BE PROVIDED TO ALL EXISTING TREES.
B.IRRIGATION OR PLANTING THAT OCCURS CLOSER THAN 8'-10' FROM THE TRUNK SHALL BE CAREFULLY HAND DUG AND
PLACED STRATEGICALLY TO AVOID IMPACTING ROOTS 2" OR LARGER IN DIAMETER.
C.WHERE IRRIGATION DOES OCCUR WITHIN THE PROTECTED ZONE, DRIP IRRIGATION SHOULD BE USED WHEREVER POSSIBLE.
ADDITIONALLY, ONLY PLANTS WITH LOW WATER NEEDS SHOULD BE PLANTED WITHIN THE PROTECTED ZONE, SPACED FAR
APART WHERE CLOSE TO THE TREE. PLANTS MAY BE SPACED CLOSER TOGETHER NEAR THE EDGE OF THE PROTECTED
ZONE.
TREE PROTECTION NOTES:
HYDROZONE PLAN
SCALE: 1" = 30'2
MODERATE HYDROZONE
(10 GALLONS / SF / SEASON)
LOW HYDROZONE:
(3 GALLONS / SF / SEASON)
HIGH HYDROZONE:
(18 GALLONS / SF / SEASON)
VERY LOW HYDROZONE:
(0 GALLONS / SF / SEASON)
HYDROZONE LEGEND
EFB
10
L1.3
SRA
-01/20/2021 2ND PDP SUB MAS
-02/17/2021 3RD PDP SUB MAS
-04/07/2021 1ST FDP SUB MAS
-05/19/2021 2ND FDP SUB MAS
-07/08/2021 3RD FDP SUB MAS
-
-
-
-
-
-
-
-
STAMP
H:\Alpine Bank\CO, Fort Collins - XXXXX - College & Prospect\CADD\3 CD\ALB001x_P_14-Land.dwg - Matt Bundren - 7/8/2021Init.#Issue / DescriptionDate
THESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
6162 S. Willow Drive, Suite 320
Greenwood Village, CO 80111
303.770.8884
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:FINAL SITE PLANS FOR ALPINE BANK1608 SOUTH COLLEGE AVENUES. COLLEGE AVE. & PROSPECT ROADFORT COLLINS, COLORADO-12/02/2020 1ST PDP SUB MAS
ALB000001
MAS
JULY 2021
OF 13
L1.4
PATIO FURNISHINGS
EFB
CRAFTSMAN STYLE - RAISED PLANTERS & SEAT WALLS
SCALE: NTS1 CRAFTSMAN STYLE - TRASH RECEPTACLE
SCALE: NTS2
CRAFTSMAN STYLE - BENCH
SCALE: NTS4
CRAFTSMAN STYLE - TABLE AND CHAIRS
SCALE: NTS3
CRAFTSMAN STYLE - RAILINGS
SCALE: NTS3
11
SRA
FINAL SITE PLANS FOR
A PORTION OF LOTS 1, 2, 3, 4, 5 AND 6, BLOCK 1, I.C. BRADLEY'S
ADDITION TO THE CITY OF FORT COLLINS;
PART OF THE NORTHWEST QUARTER OF SECTION 24,
T. 7 N., R. 69 W. OF THE 6TH P.M., FORT COLLINS,
LARIMER COUNTY, COLORADO
JULY 2021
ALPINE BANK
-01/20/2021 2ND PDP SUB MAS
-02/17/2021 3RD PDP SUB MAS
-04/07/2021 1ST FDP SUB MAS
-05/19/2021 2ND FDP SUB MAS
-07/08/2021 3RD FDP SUB MAS
-
-
-
-
-
-
-
-
STAMP
H:\Alpine Bank\CO, Fort Collins - XXXXX - College & Prospect\CADD\3 CD\FDP\Final Site Plans\ALB001_FDP_PH1.0-Photometric.dwg - Matt Bundren - 7/8/2021Init.#Issue / DescriptionDate
THESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
6162 S. Willow Drive, Suite 320
Greenwood Village, CO 80111
303.770.8884
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:FINAL SITE PLANS FOR ALPINE BANK1608 SOUTH COLLEGE AVENUES. COLLEGE AVE. & PROSPECT ROADFORT COLLINS, COLORADO-12/02/2020 1ST PDP SUB MAS
ALB000001
MAS
JULY 2021
OF 13
SCALE: 1"=20'
0 10 20
20' OFF PROPERTY LINE (TYP.)
20' OFF PROPERTY LINE (TYP.)
20' OFF PROPERTY LINE (TYP.)
20' OFF PROPERTY LINE (TYP.)
PHOTOMETRIC PLAN
12
PH1.0
FINAL SITE PLANS FOR
A PORTION OF LOTS 1, 2, 3, 4, 5 AND 6, BLOCK 1, I.C. BRADLEY'S
ADDITION TO THE CITY OF FORT COLLINS;
PART OF THE NORTHWEST QUARTER OF SECTION 24,
T. 7 N., R. 69 W. OF THE 6TH P.M., FORT COLLINS,
LARIMER COUNTY, COLORADO
JULY 2021
ALPINE BANK
-01/20/2021 2ND PDP SUB MAS
-02/17/2021 3RD PDP SUB MAS
-04/07/2021 1ST FDP SUB MAS
-05/19/2021 2ND FDP SUB MAS
-07/08/2021 3RD FDP SUB MAS
-
-
-
-
-
-
-
-
STAMP
H:\Alpine Bank\CO, Fort Collins - XXXXX - College & Prospect\CADD\3 CD\FDP\Final Site Plans\ALB001_FDP_PH1.1-Photometric Details.dwg - Matt Bundren - 7/8/2021Init.#Issue / DescriptionDate
THESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
6162 S. Willow Drive, Suite 320
Greenwood Village, CO 80111
303.770.8884
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:FINAL SITE PLANS FOR ALPINE BANK1608 SOUTH COLLEGE AVENUES. COLLEGE AVE. & PROSPECT ROADFORT COLLINS, COLORADO-12/02/2020 1ST PDP SUB MAS
ALB000001
MAS
JULY 2021
OF 13
S, S1 & D
WP2 C
WP1
UPLIGHT RATING OF 0, FIXTURE IS FULL
CUT-OFF, DOWN DIRECTIONAL, SHIELDED
PHOTOMETRIC DETAILS
13
PH1.1