July 13, 2021
John Lorenzen
831 W OLIVE ST
Fort Collins, CO 805212554
RE: Response to comments Lorenzen Subdivision, BDR210003, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of Lorenzen Subdivision. If you have questions about any
comments, you may contact the individual commenter or direct your questions through your
Development Review Coordinator, Brandy Bethurem Harras via phone at 970‑416‑2744 or
via email at bbethuremharras@fcgov.com.
Comment Summary:
Department: Development Review Coordinator
Contact: Brandy Bethurem Harras, 970‑416‑2744, bbethuremharras@fcgov.com
Topic: General
Comment Number: 1
05/04/2021: INFORMATION:
I will be your primary point of contact throughout the development review and
permitting process. If you have any questions, need additional meetings with the
project reviewers, or need assistance throughout the process, please let me
know and I can assist you and your team. Please include me in all email
correspondence with other reviewers and keep me informed of any phone
conversations. Thank you!
Comment Number: 2
05/04/2021: INFORMATION:
As part of your resubmittal you will respond to the comments provided in this
letter. This letter is provided to you in Microsoft Word format. Please use this
document to insert responses to each comment for your submittal, using a
different font color. When replying to the comment letter please be detailed in
your responses, as all comments should be thoroughly addressed. Provide
reference to specific project plans or explanations of why comments have not
been addressed, when applicable, avoiding responses like noted or acknowledged.
Comment Number: 3
05/04/2021: INFORMATION:
Resubmittals are accepted any day of the week, with Wednesday at noon being
the cut‑off for routing the same week. When you are ready to resubmit your
plans, please notify me advanced notice as possible.
Comment Number: 4
05/04/2021: INFORMATION:
Temporary Service Changes ‑ City of Fort Collins Development Review
In order to continue providing thorough reviews and giving every project the
attention it deserves, the City of Fort Collins is implementing temporary
changes in how we serve our development customers. As you may be aware,
we are experiencing staff shortages in a number of key departments, which has
begun to impact the timeliness of our reviews. We recognize that development
and construction play a critical role in our community’s vibrancy and economic
recovery, and we have been exploring options for mitigating impacts to our
customers. As a result, we will be making some temporary service changes.
Beginning Monday April 12 one additional week of review time will be added to
all 1st and 2nd round submittals (increase from 3 weeks to 4 weeks).
Comment Number: 5
05/04/2021: INFORMATION:
LUC 2.211 Lapse, Rounds of Review: Applicants, within one hundred eighty
(180) days of receipt of written comments and notice to respond from the City
on any submittal (or subsequent revision to a submittal) of an application for
approval of a development plan, shall file such additional or revised submittal
documents as are necessary to address such comments from the City. If the
additional submittal information or revised submittal is not filed within said
period of time, the development application shall automatically lapse and become null and void.
Comment Number: 6
05/04/2021: FOR FINAL APPROVAL:
All "For Final Approval / For Approval" comments need to be addressed and
resolved prior to moving forward with the final documents and recording of this
project. I will provide a recording checklist and process information when we are closer to this step.
Comment Number: 7
05/04/2021: FOR FINAL APPROVAL:
The Director shall issue a written decision to approve, approve with conditions,
or deny the development application based on compliance with the standards
referenced in Step 8 of the Common Development Review Procedures (Section 2.2.8).
The written decision shall be mailed to the applicant, to any person who
provided comments during the comment period and to the abutting property
owners, and shall also be posted on the City's website at www.fcgov.com.
Comment Number: 8
05/04/2021: FOR FINAL APPROVAL:
If the project is approved by the Director, there is a two‑week appeal period from the date of the decision.
The project is not able to be recorded until it is confirmed there are no appeals.
Department: Technical Services
Contact: Jeff County, 970‑221‑6588, jcounty@fcgov.com
Topic: Plat
Comment Number: 1
07/02/2021: FOR FINAL APPROVAL ‑ UNRESOLVED:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on redlined sheets and/or in response letter.
Specifically needing addressed:
The lienholder was removed from the Plat.
Does this connote that there is no longer a lienholder on the property?
Both properties were purchased with cash. There is no lienholder on either property. In my discussion
with John Von Nieda he said to delete the lienholder section if there is no lienholder. Reference
his email dated 5/28/21, Brandy Bethurem Harras and others were copied. This was discussed with Chris
DePaulis at King Surveyors in conjunction with the updated title work and the lienholder section was
removed.
Please provide the effective date of the title work.
The effective date of the title work was updated on the plat that is attached.
05/17/2021: FOR FINAL APPROVAL:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on redlined sheets and/or in response letter.
Department: Outside Agencies
Contact: Megan Harrity, Larimer County Office of the Assessor, 970‑498‑7065, mharrity@larimer.org,
Topic: General
Comment Number: 1
06/29/2021: FOR FINAL APPROVAL:
Regarding the sub title of the plat: Since the plat has been updated to become
two separate lots, the subtitle does not need to include, "A Lot Merger" of...
The subtitle is correct, the outline of the two lots being merged into one was included on the plat in error.
The attached revised plat shows one lot which is being merged from two.
Department: Historic Preservation
Contact: Maren Bzdek, 970‑221‑6206, mbzdek@fcgov.com
Topic: General
Comment Number: 1
05/18/2021: FOR INFORMATION ONLY:
Your project narrative indicates the replat is proposed in order to build an
addition on 831 W Olive and demolition of the residence at 308 S Washington.
The City has a required demolition noticing process that applies to all proposed
single‑family residence demolitions for buildings more than 50 years old. That
process is outlined at
https://www.fcgov.com/historicpreservation/demolition‑review and begins upon
submittal of preliminary plans for the addition. Demolition notification provides
an opportunity to ensure important historic, architectural, and cultural resources
are not lost without consideration, pursuant to Section 14‑6 of the Municipal
Code. This process provides for consideration of a property over fifty years of
age proposed for demolition, and an opportunity for community members to
receive notice about that demolition and take action to protect the property
through designation, as provided by City Code.
Department: Engineering Development Review
Contact: Spencer Smith, 970‑221‑6603, smsmith@fcgov.com
Topic: General
Comment Number: 2
07/06/2021: UPDATED - FOR BUILDING PERMIT:
If the only public improvement will be the removal of the access to Washington
Ave., we will not need to review utility plans. The work will require a permit from
the Engineering Inspections department, however. Please work with them to
obtain the necessary permitting prior to commencing this work.
05/17/2021: FOR APPROVAL:
The City will require that one of the existing drive access points will need to be
removed. The City would prefer that the S. Washington St. access be removed.
The existing access point that remains will need to be reconstructed to meet
LCUASS if it does not already. Same for any existing sidewalk that does not
meet current LCUASS or ADA standards.
Department: Building Services
Contact: Russell Hovland, 970‑416‑2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1
05/17/2021: BUILDING PERMIT:
Any new dwelling or addition must be located 5ft from the property line and
can't be built over a property line.
Comment Number: 2
05/17/2021: BUILDING PERMIT:
A permit is required for this project and construction shall comply with adopted
codes as amended. Current adopted codes are:
2018 International Residential Code (IRC) with local amendments
2018 International Plumbing Code (IPC) as amended by the State of Colorado
2020 National Electrical Code (NEC) as amended by the State of Colorado
Copies of current City of Fort Collins code amendments can be found at fcgov.com/building.
Please read the residential permit application submittal checklist for complete requirements.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Loads: Risk Category II (most structures):
· 140mph (Ultimate) exposure B or
· Front Range Gust Map published by The Structural Engineer's Association of
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code: 2018 IRC chapter 11.
INFORMATIONAL ITEMS:
· 5ft setback required from property line or provide fire rated walls & openings
for non‑fire sprinkled houses per chap 3 of the IRC. 3ft setback is required for fire sprinkled houses.
· Bedroom egress windows (emergency escape openings) required in all bedrooms.
· Prescriptive energy compliance with increased insulation values is required for
buildings using electric heat.
· A passing building air tightness (blower door) test is required for certificate of occupancy.