Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutMAGNOLIA DWELLINGS - FDP210015 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT
FINAL DRAINAGE REPORT
FOR
Magnolia Dwellings
Prepared by:
Highland Development Services
6355 Fairgrounds Ave, Suite 100
Windsor, Colorado 80550
Phone: 970.674.7550
Prepared for:
Forge + Bow Dwellings
120 W. Olive Street, Suite 220
Fort Collins, CO 80524
Office: 970.797.2354
July 6, 2021
Job Number 20-1021-00
Highland Development Services, Inc.
6355 Fairgrounds Avenue, Suite 100 | Windsor, CO 80550 | 970.674.7550
July 6, 2021
Mr. Dan Mogen
Fort Collins Utilities
700 Wood Street
Fort Collins, CO 80522
RE: Final Drainage Report for Magnolia Dwellings
Dear Dan,
We are pleased to submit for your review, the Final Drainage Report for the Magnolia Dwellings
multi-family redevelopment project. This report describes the drainage design intent to be in
accordance with the City of Fort Collins Stormwater Criteria Manual.
We appreciate your time and consideration in reviewing this submittal. Please call if you have
any questions.
Sincerely,
Highland Development Services
Andrew C. Bartel, EI Jason T. Claeys, P.E., LEED AP
Page i
TABLE OF CONTENTS
Table of Contents ............................................................................................................................. i
Engineer Certification ......................................................................................................................ii
General Description and Location .................................................................................................. 1
Site Description and Location ...................................................................................................... 1
Site Soils ....................................................................................................................................... 1
Storm Drainage Criteria .................................................................................................................. 3
Hydrologic Criteria ....................................................................................................................... 3
Hydraulic Criteria ......................................................................................................................... 3
Drainage Basins ............................................................................................................................... 4
Drainage Facility Design .................................................................................................................. 5
Drainage Conveyance Design ...................................................................................................... 5
Low Impact Development ............................................................................................................... 6
Stormwater Pollution Prevention ................................................................................................... 8
Conclusions ..................................................................................................................................... 9
References .................................................................................................................................... 10
Appendix ....................................................................................................................................... 11
Appendix A – Site Descriptions, Characteristics, & References .................................................. A
Appendix B – Rational Calculations ............................................................................................. B
Appendix C – Low Impact Development Calculations ................................................................. C
Appendix D – Capacity Calculations ............................................................................................ D
Page ii
ENGINEER CERTIFICATION
I hereby certify that this report (plan) for the final drainage design of Magnolia Dwellings was
prepared by me (or under my direct supervision) in accordance with the provisions of the City
of Fort Collins Stormwater Criteria Manual and Construction of Public and Private
Improvements for the Responsible Parties thereof. I understand that the City of Fort Collins
does not and shall not assume liability for drainage facilities designed by others.
________________________________________
Jason T. Claeys, PE
Registered Professional Engineer
State of Colorado No. 42122
Page 1
GENERAL DESCRIPTION AND LOCATION
SITE DESCRIPTION AND LOCATION
Magnolia Dwellings, 335 E. Magnolia Street, is located in the Southeast Quarter and Southwest
Quarter of Section 12, Township 7 North, Range 69 West of the Sixth Principal Meridian, City of
Fort Collins, County of Larimer, within the State of Colorado. The property is the west half of Lot
1, Block 144 of the original Fort Collins plat, dated January 16, 1873. The site is bounded by
private residential lots to the west and east, the alleyway to the south, and Magnolia Street to
the north.
The project site totals approximately 0.22 acres and is currently a single-family residential lot.
The existing structures include a single-family residential home and a garden shed. The site is
located within the Old Town Drainage Basin, which provides standard water quality for the site.
The site generally slopes from the southwest to the northeast. A 2 ft tall retaining wall lies
approximately 50 ft north of the alley right-of-way and steps down from south to north. The
site grade south of the wall is approximately 3.5% and is approximately 2.0% north of the wall.
Storm runoff via overland flow is conveyed through the site to Magnolia Street. The existing site
is approximately 24.1% impervious. No wetlands are located within the area of proposed
development.
Offsite drainage is also conveyed through the existing site. Approximately 0.58 acres of offsite
drainage area is conveyed along the western property line. It is assumed that this offsite basin
is 25.3% impervious. It is anticipated that the proposed improvements will adequately convey
the offsite runoff to Magnolia Street as it has historically.
The project site is located within FEMA Zone X, Area of minimal flood hazard, per FEMA Flood
Insurance Rate Panel 08069C0979H, effective 5/2/2012. FEMA Firmette is included in Appendix
A.
The existing single-family building is proposed to be removed and the site redeveloped with a
four-unit, multi-family residential building. The proposed redevelopment also includes alley
improvements, a parking area with access from the alley, and associated pedestrian walkways.
Low impact development techniques are proposed to provide the stormwater quality
enhancement requirements.
SITE SOILS
The Magnolia Dwellings site consists primarily of Fort Collins loam and Satanta loam and are
classified as Type C hydrologic group, respectively. According to USDA/Natural Resource
Page 2
Conservation Group, Type C soils a have slow infiltration rate when thoroughly wet. These soils
consist chiefly of soils having a layer that impedes the downward movement of water or soils of
moderately fine texture or fine texture. These soils also have a slow rate of water transmission.
Per the “Geotechnical Subsurface Exploration, Proposed Multi-Family Residence”, prepared by
Earth Engineering Company, Inc. dated May 19, 2020:
“Brown to reddish brown sandy lean clay soils were encountered at the surface at the boring
locations. The sandy lean clay soils encountered in the borings were medium stiff to very stiff in
consistency and exhibited a low potential for swelling with variation in moisture content at
current moisture/density conditions. The moderately plastic sandy lean clay soils were
underlain by brown sand and gravel materials at a depth of approximately 12 and 16 feet below
present site grades at borings B-1 and B-2, respectively. The essentially granular materials were
very dense in consistency, contained cobbles and extended to the bottom of the borings at a
depth of approximately 20 and 25½ feet below present site grades.”
Groundwater was also observed during the subsurface soil exploration:
“At the time of drilling, free water was observed at a depth of approximately 16 and 19 feet
below present site grades in the borings completed on this property. Approximately 48 hours
after drilling, free water was observed at a depth of approximately 14½ and 18 feet below
present site grades at borings B-1 and B-2, respectively.”
Page 3
STORM DRAINAGE CRITERIA
This final drainage report was prepared to meet or exceed the City of Fort Collins Stormwater
Criteria Manual. The Criteria Manual and amendments to the Urban Drainage Flood Control
District’s (UDFCD) Drainage Criteria Manual (USDCM) Volumes 1, 2 and 3 were referenced as
guidelines for this design.
HYDROLOGIC CRITERIA
The rational method was performed to calculate the peak runoff rates for each basin. Percent
imperviousness and runoff coefficients were calculated for each basin using the surface
characteristics of each basin. The time of concentration was calculated using City of Fort Collins
initial time of concentration and the intensity was calculated using the corresponding storm
rainfall depth and the City of Fort Collins’ Intensity-Duration-Frequency Curve.
HYDRAULIC CRITERIA
The final storm drainage system will be designed to convey the minor and major storm events
through the combination of storm sewer pipes and drain pans/channels. The Autodesk
Hydraflow will be used to analyze the drainage system on the site.
Page 4
DRAINAGE BASINS
The Magnolia Dwellings developed drainage basins are delineated by areas draining through
the site. The site is broken into 3 main drainage systems:
Drainage Basin D1:
Drainage Basin D1 pertains to the improvements on the site, which has an approximate area of
0.18 acres and is approximately 69.9% impervious. The improvements include the entire
condominium building and the sidewalk on the east side of the building, as well as the parking
lot and bike shed.
Drainage Basin D2:
Drainage Basin D2 pertains to the improvements on the site, which has an approximate area of
0.04 acres and is approximately 28.9% impervious. This area consists of the landscaping and
sidewalk on the west side of the proposed building that drains to the proposed channel on the
west property line.
Drainage Basin OS1:
Drainage Basin OS1 pertains to the existing drainage that flows through the site from the lot to
the west and the lots to the south that currently drain across the alleyway and onto the site.
This drainage system has an approximate area of 0.58 acres and is approximately 25.3%
impervious.
Page 5
DRAINAGE FACILITY DESIGN
DRAINAGE CONVEYANCE DESIGN
Storm infrastructure to convey runoff will include drain pans/channels and storm sewer pipes.
Stormwater detention is not required for the site because the increase to impervious area on
the site is less than 5,000 square feet. Water quality treatment for 50% of the site is provided
by the Udall Natural Area water treatment facility. The remaining treatment must be provided
by Low Impact Development (LID) methods.
Drainage Basin D1:
Drainage Basin D1 pertains to the improvements on the site, which has an approximate area of
0.18 acres. The proposed improvements will utilize a system of roof drains, area inlets, and
storm drains to convey drainage to the proposed LID facility and then outlet to an existing 12”
clay storm pipe in Magnolia Street.
Drainage Basin D2:
Drainage Basin D2 pertains to the improvements on the site, which has an approximate area of
0.04 acres. This system will intercept drainage from the western portion of the proposed lot.
The area consists of landscaping and a sidewalk and is not able to be conveyed to the
Stormtech chambers. Instead, drainage will sheet flow to the proposed concrete channel that
runs the entire length of the western property line and drains into Magnolia Street.
Drainage Basin OS1:
Drainage Basin OS1 pertains to the existing drainage that flows through the site. This system
will intercept drainage from the lot to the west and the lots to the south that currently drain
across the alleyway and onto the site. The proposed improvements will include a concrete
channel that runs the entire length of the western property line and drains into Magnolia
Street.
Page 6
LOW IMPACT DEVELOPMENT
The City of Fort Collins updated the Low Impact Development ordinance in 2016 (Ordinance No.
007, 2016) to require:
· Treat at least 75% of any newly developed or redeveloped impervious area using one or
a combination of LID techniques, or
· Treat at least 50% of any newly developed or redeveloped impervious area using one or
a combination of LID techniques when 25% of private driveable surfaces are permeable.
To satisfy the required implementation of Low Impact Development (LID) techniques, below
grade filtration chambers (such as ADS StormTech chamber system) are proposed to be utilized.
The chambers will treat approximately 82.5% of the total site area. For the purposes of water
quality, all chambers will be isolator rows with filter fabric placed along the bottom of all the
chambers. Other LID techniques were explored, but due to the limited space available on-site
filtration chambers were the most feasible means for additional water quality enhancement.
Pavers within the parking area did not treat enough contributing area to justify their use. It is
anticipated that the filtration chambers will include an impermeable liner due to the proximity
to the proposed and neighboring structures. Sediment will be captured within the chambers
prior to the runoff being released. The chambers will be accessible to remove sediments.
Standard water quality is provided regionally off site. A Standard Operations Procedure will be
provided at final design to assist in ensuring that these BMPs will adequately perform over
time.
Below is a description of the 4-step process for selecting structural BMPs:
Urban Drainage and Flood Control District (UDFCD) recommends a Four Step Process for
receiving water protection that focuses on reducing runoff volumes, treating the water quality
capture volume (WQCV), stabilizing drainageways and implementing long-term source controls.
The Four Step Process applies to the management of smaller, frequently occurring events.
Step 1: Employ Runoff Reduction Practices
To reduce runoff peaks, volumes, and pollutant loads from urbanizing areas, implement Low
Impact Development (LID) strategies, including Minimizing Directly Connected Impervious
Areas (MDCIA).
Page 7
Captured runoff from strategic areas are routed through below grade filtration chambers.
Filtration chambers will slow and filter runoff prior to being released into the adjacent storm
drain system.
Step 2: Implement BMPs that Provide a Water Quality Capture Volume with Slow Release
The filtration chambers are designed to provide water quality capture volume per Urban
Drainage’s recommendations and calculations. The captured runoff is designed for a 12-hr drain
time.
Step 3: Stabilize Drainageways
Natural Drainageways are subject to bed and bank erosion due to increases in frequency,
duration, rate and volume of runoff during and following development. Because the site will
drain to an existing storm system, bank stabilization is unnecessary with this project.
Step 4: Implement Site Specific and Other Source Control BMPs
Proactively controlling pollutants at their source by preventing pollution rather than removing
contaminants once they have entered the stormwater system or receiving waters is important
when protecting storm systems and receiving waters. This can be accomplished through site
specific needs such as construction site runoff control, post-construction runoff control and
pollution prevention / good housekeeping. It will be the responsibility of the contractor to
develop a procedural best management practice for the site.
All calculations are attached for reference.
Page 8
STORMWATER POLLUTION PREVENTION
Erosion and sedimentation will be controlled on-site by use of sediment control logs, inlet
protection, and a gravel construction entrance. The measures are designed to limit the overall
sediment yield increase due to construction as required by the City of Fort Collins. During
overlot and final grading the soil will be roughened and furrowed perpendicular to the
prevailing winds.
During the performance of the work required by these specifications or any operations
appurtenant thereto, whether on right-of-way provided by the City or elsewhere, the
contractor shall furnish all labor, equipment, materials, and means required. The Contractor
shall carry out proper efficient measures wherever and as necessary to reduce dust nuisance,
and to prevent dust nuisance that has originated from his operations from damaging crops,
orchards, cultivated fields, and dwellings, or causing nuisance to persons. The Contractor will
be held liable for any damage resulting from dust originating from his operations under these
specifications on right-of-way or elsewhere.
It is unlawful to track or cause to be tracked mud or other debris onto public streets or rights-
of-way. Wherever construction vehicles access routes or intersect paved public roads,
previsions must be made to minimize the transport of sediment by runoff or vehicles tracking
onto the paved surface. Stabilized construction entrances are required with base material
consisting of 6” coarse aggregate. The contractor will be responsible for clearing mud tracked
onto public streets on a daily basis.
All temporary and permanent erosion and sediment control practices must be maintained and
repaired as needed to assure continued performance of their intended function. Maintenance
is the responsibility of the contractor.
All disturbed areas must be seeded and mulched within 30 days of project start. Vegetation
shall not be considered established until a ground cover is achieved which is demonstrated to
be mature enough to control soil erosion to the satisfaction of the Town Inspector and to
survive severe weather condition.
Page 9
CONCLUSIONS
This Final Drainage Report for Magnolia Dwellings has been prepared to comply with the
stormwater criteria set by the City of Fort Collins. The proposed drainage system will be
designed to convey the developed peak storm water runoff through the site to the existing
storm system. Drainage conveyance systems will be designed to convey drainage to existing
roadways and collect onsite drainage and treat it in accordance with LID before discharging it
into the existing storm drain system. Additionally, the drainage system will improve existing
offsite conditions and protect the proposed building and neighboring lots by establishing
conveyance to Magnolia Street and Peterson Street. This final drainage report anticipates the
implementation of best management practices for erosion control, temporary and permanent,
and on-site construction facilities.
It can therefore be concluded that development of Magnolia Dwellings will comply with the
storm water jurisdictional criteria and the approved City of Fort Collins Stormwater Criteria
Manual and will not adversely affect the adjacent properties, streets, storm drain system
and/or detention/water quality facilities.
Page 10
REFERENCES
1. Urban Storm Drainage Criteria Manual (Volumes 1, 2, and 3), Urban Drainage and Flood
Control District, June 2001, Revised January 2016.
2. Fort Collins Stormwater Criteria Manual, Fort Collins Utilities, City of Fort Collins,
Colorado, Dated December 2018, Adopted January 2019.
3. “Hydrologic Group Rating for Larimer County Area, Colorado”, USDA-Natural Resources
Conservation Service, National Cooperative Soil Survey. Web Soil Survey URL:
http://websoilsurvey.nrcs.usda.gov. [9/28/2020]
4. “Geotechnical Subsurface Exploration, Proposed Multi-Family Residence 335 East
Magnolia Street”, prepared by Earth Engineering Consultants, LLC, Dated May 19, 2020
5. “Flood Insurance Rate Map, Larimer County, Colorado – Map Number 08069C0979H”,
Federal Emergency Management Agency, Map Revised May 2, 2012.
Page 11
APPENDIX
Appendix A – Site Descriptions, Characteristics, & References
Appendix B – Rational Calculations
Appendix C – Low Impact Development Calculations
Appendix D – Capacity Calculations
Appendix A
APPENDIX A – SITE DESCRIPTIONS, CHARACTERISTICS, & REFERENCES
PROJECT SITE
PETERSON STREETE. MAGNOLIA STREET
E. MULBERRY STREET WHEDBEE STREETMATHEWS STREETREMINGTON STREETOLIVE STREET
Vicinity Map
Scale: 1" = 250'
PROJECT DATUM: NAVD 88
CITY OF FORT COLLINS BENCHMARK NO. 29-97:
NORTHEAST CORNER OF MULBERRY ST. AND WHEDBEE ST., ON A CONCRETE TRAFFIC SIGNAL BASE
ELEV = 4978.01
CITY OF FORT COLLINS BENCHMARK NO. 6-00:
ON A CATCH BASIN AT THE NORTHWEST CORNER OF MULBERRY ST. AND COLLEGE AVE.
ELEV = 4993.85
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED
NGVD29 UNADJUSTED DATUM (PRIOR TO CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS.
IF NGVD 29 UNADJUSTED (PRIOR TO CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING
EQUATIONS SHOULD BE USED:
NGVD29 UNADJUSTED (PRIOR TO CITY OF FORT COLLINS DATUM) = 4978.01 (NAVD88 DATUM) - 3.18
NGVD29 UNADJUSTED (PRIOR TO CITY OF FORT COLLINS DATUM) = 4993.85 (NAVD88 DATUM) - 3.17
N
W E
S
Hydrologic Soil Group—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
9/28/2020
Page 1 of 44492380449239044924004492410449242044924304492440449245044923804492390449240044924104492420449243044924404492450493850493860493870493880493890493900
493850 493860 493870 493880 493890 493900
40° 34' 58'' N 105° 4' 21'' W40° 34' 58'' N105° 4' 19'' W40° 34' 55'' N
105° 4' 21'' W40° 34' 55'' N
105° 4' 19'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84
0 15 30 60 90
Feet
0 5 10 20 30
Meters
Map Scale: 1:390 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Larimer County Area, Colorado
Survey Area Data: Version 15, Jun 9, 2020
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Aug 11, 2018—Aug
12, 2018
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Hydrologic Soil Group—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
9/28/2020
Page 2 of 4
Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
35 Fort Collins loam, 0 to 3
percent slopes
C 0.2 74.9%
94 Satanta loam, 0 to 1
percent slopes
C 0.1 25.1%
Totals for Area of Interest 0.2 100.0%
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive
precipitation from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when
thoroughly wet. These consist mainly of deep, well drained to excessively
drained sands or gravelly sands. These soils have a high rate of water
transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well
drained soils that have moderately fine texture to moderately coarse texture.
These soils have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of
water transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay
layer at or near the surface, and soils that are shallow over nearly impervious
material. These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in
their natural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Hydrologic Soil Group—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
9/28/2020
Page 3 of 4
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Hydrologic Soil Group—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
9/28/2020
Page 4 of 4
USGS The National Map: Orthoimagery. Data refreshed April 2020
National Flood Hazard Layer FIRMette
0 500 1,000 1,500 2,000250
Feet
Ü
SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT
SPECIAL FLOOD
HAZARD AREAS
Without Base Flood Elevation (BFE)
Zone A, V, A99
With BFE or DepthZone AE, AO, AH, VE, AR
Regulatory Floodway
0.2% Annual Chance Flood Hazard, Areas
of 1% annual chance flood with average
depth less than one foot or with drainage
areas of less than one square mileZone X
Future Conditions 1% Annual
Chance Flood HazardZone X
Area with Reduced Flood Risk due to
Levee. See Notes.Zone X
Area with Flood Risk due to LeveeZone D
NO SCREEN Area of Minimal Flood Hazard Zone X
Area of Undetermined Flood HazardZone D
Channel, Culvert, or Storm Sewer
Levee, Dike, or Floodwall
Cross Sections with 1% Annual Chance
17.5 Water Surface Elevation
Coastal Transect
Coastal Transect Baseline
Profile Baseline
Hydrographic Feature
Base Flood Elevation Line (BFE)
Effective LOMRs
Limit of Study
Jurisdiction Boundary
Digital Data Available
No Digital Data Available
Unmapped
This map complies with FEMA's standards for the use of
digital flood maps if it is not void as described below.
The basemap shown complies with FEMA's basemap
accuracy standards
The flood hazard information is derived directly from the
authoritative NFHL web services provided by FEMA. This map
was exported on 10/14/2020 at 11:26 AM and does not
reflect changes or amendments subsequent to this date and
time. The NFHL and effective information may change or
become superseded by new data over time.
This map image is void if the one or more of the following map
elements do not appear: basemap imagery, flood zone labels,
legend, scale bar, map creation date, community identifiers,
FIRM panel number, and FIRM effective date. Map images for
unmapped and unmodernized areas cannot be used for
regulatory purposes.
Legend
OTHER AREAS OF
FLOOD HAZARD
OTHER AREAS
GENERAL
STRUCTURES
OTHER
FEATURES
MAP PANELS
8
B 20.2
The pin displayed on the map is an approximate
point selected by the user and does not represent
an authoritative property location.
1:6,000
105°4'39"W 40°35'11"N
105°4'2"W 40°34'44"N
PROJECT SITE
E. MULBERRY ST.
E. MAGNOLIA ST.PETERSON ST.
Appendix B
APPENDIX B – RATIONAL CALCULATIONS
Design Engineer:
Design Firm:
Project Number:
Date:
%
Impervious
Runoff
Coefficient C
Return
Period
Frequency
Adjustment
Factor (Cf)
100% 0.95
2-year to
10-year 1.00
90% 0.95 100-year 1.25
90% 0.95
40% 0.50
0% 0.25
C2 to C10 C100
H1 9,492 0.218 0 1,376 321 1,911 5,884 24.1% 0.43 0.53
OS1 25,058 0.575 0 3,350 0 8,333 13,375 25.3% 0.43 0.53
D1 7,827 0.180 2,035 3,113 703 0 1,976 69.9% 0.77 0.97
D2 1,668 0.038 0 535 0 0 1,133 28.9% 0.47 0.59
D total 9,495 0.218 0 3,648 703 0 5,144 41.2% 0.57 0.71
COMPOSITEApaved
(sq feet)
Aroof
(sq feet)
Awalk
(sq feet)
Agravel/pavers
(sq feet)
Alawn
(sq feet)
Lawns
(Heavy, 2-7% Slope)
Sub-basin
Designation
Atotal
(sq feet)
Atotal
(acres)
Weighted %
Impervious
Paved
Roof
Walks
Runoff Coefficients and Frequency Adjustment Factors for City of Fort Collins - Storm Water Criteria Manual
Gravel/Pavers
% Impervious values from Table 3.2.2 in the Fort Collins Stormwater Criteria Manual
D.Egger
20-1021-00
February 18, 2021
Land Use
335 E. Magnolia Street
DEVELOPED IMPERVIOUS AREA CALCULATION
DESIGN CRITERIA:
Fort Collins Stormwater Criteria Manual
BASINS:
Highland Development Services
20-1021-00 Rational Calcs (2021-02-17).xlsx Page 1 of 4 Highland Development Services
Design Engineer:
Design Firm:
Project Number:
Date:
EQUATIONS:
-Equation 5-3 -Equation 5-4 -Urbanized Check Equation 3.3-5
- CoFC Overland Flow
CONSTRAINTS:
300 ft - Overland flow shall not exceed for developed condition
500 ft - Overland flow shall not exceed for undeveloped condition
Final t c = minimum of t i + t t and urbanized basin check
recommended minimum t c = 5 min for urbanized basins
Time of Concentration (2-yr to 10-yr)
H1 H1 24.1% 0.43 0.218 74 0.0340 7.22 136 0.0200 0.14 0.025 2.27 1.00 8.21 210 11.17 8.21
OS1 OS1 25.3% 0.43 0.575 203 0.0250 13.22 189 0.0320 0.10 0.016 3.59 0.88 14.09 392 12.18 12.18
D1 D1 69.9% 0.77 0.180 58 0.0500 2.72 176 0.0100 0.10 0.016 2.01 1.46 5.00 234 11.30 5.00
D2 D2 28.9% 0.47 0.038 5 0.1000 1.21 121 0.0100 0.10 0.016 2.01 1.01 5.00 126 10.70 5.00
OVERALL LENGTH
(ft/ft)
tc
(min)
SLOPE
(ft/ft)
ti
(min)
LENGTH
(ft)
SLOPE
(ft/ft)
VELOCITY
(ft/s)
ROUGHNESS
COEFFICIENT
HYDRAULIC
RADIUS
(ft)
LENGTH
(ft)
DESIGN CRITERIA:
City of Fort Collins Stormwater Criteria Manual
Overland Flow Equations for City of Fort Collins Stormwater Criteria Manual
SUB-BASIN DATA INITIAL/OVERLAND TIME
(ti)TRAVEL TIME (tt)
tc=ti+tt
(min)
Urban Check Final
tc
(min)DESIGN
POINT Sub-basin %
Impervious C2-10
AREA
(acres)
tt
(min)
February 19, 2021
335 E. Magnolia Street
DEVELOPED TIME OF CONCENTRATION
D.Egger
20-1021-00
Highland Development Services
ticttt+=
V
Ltt60
=1.871.1
10
180
+=LtcV.R2/3 S 1/2
20-1021-00 Rational Calcs (2021-02-17).xlsx Page 2 of 4 Highland Development Services
Design Engineer:
Design Firm:
Project Number:
Date:
EQUATIONS:
-Equation 5-3 -Equation 5-4 -Urbanized Check Equation 3.3-5
- CoFC Overland Flow
CONSTRAINTS:
300 ft - Overland flow shall not exceed for developed condition
500 ft - Overland flow shall not exceed for undeveloped condition
Final t c = minimum of t i + t t and urbanized basin check
recommended minimum t c = 5 min for urbanized basins
Time of Concentration (100-yr)
H1 H1 24.1% 0.53 0.218 74 0.0340 6.08 136 0.0200 0.14 0.025 2.27 1.00 7.08 210 11.17 7.08
OS1 OS1 25.3% 0.53 0.575 203 0.0250 11.12 189 0.0320 0.10 0.016 3.59 0.88 12.00 392 12.18 12.00
D1 D1 69.9% 0.97 0.180 58 0.0500 1.11 176 0.0100 0.10 0.016 2.01 1.46 5.00 234 11.30 5.00
D2 D2 28.9% 0.59 0.038 5 0.1000 0.98 121 0.0100 0.10 0.016 2.01 1.01 5.00 126 10.70 5.00
OVERALL LENGTH
(ft/ft)
tc
(min)
SLOPE
(ft/ft)
ti
(min)
LENGTH
(ft)
SLOPE
(ft/ft)
VELOCITY
(ft/s)
HYDRAULIC
RADIUS
(ft)
ROUGHNESS
COEFFICIENT
LENGTH
(ft)
DESIGN CRITERIA:
City of Fort Collins Stormwater Criteria Manual
Overland Flow Equations for City of Fort Collins Stormwater Criteria Manual
SUB-BASIN DATA INITIAL/OVERLAND TIME
(ti)TRAVEL TIME (tt)
tc=ti+tt
(min)
Urban Check Final
tc
(min)DESIGN
POINT Sub-basin %
Impervious C100
AREA
(acres)
tt
(min)
February 19, 2021
335 E. Magnolia Street
DEVELOPED TIME OF CONCENTRATION
D.Egger
20-1021-00
Highland Development Services
ticttt+=
V
Ltt60
=1.871.1
10
180
+=LtcV.R2/3 S 1/2
20-1021-00 Rational Calcs (2021-02-17).xlsx Page 3 of 4 Highland Development Services
Design Engineer:
Design Firm:
Project Number:
Date:
EQUATIONS:I = rainfall intensity (in/hr)
Q n = n -yr peak discharge (cfs)P 1 = one-hour point rainfall depth (in)
C n = n -yr runoff coefficient t c = time of concentration (min)
I n = n -yr rainfall intensity (in/hr) P 1-2yr =0.82 in
A n = Basin drainage area (ac)P 1-10yr =1.40 in
P 1-100yr =2.86 in
BASIN SUMMARY:
tc (min)Runoff Coeff
(C2-10)C(A) (acres)Intensity
(in/hr)Q (ft3/s)tc (min)Runoff Coeff
(C2-10)C(A) (acres)Intensity
(in/hr)Q (ft3/s)tc (min)Runoff Coeff.
(C100)C(A) (acres)Intensity
(in/hr)Q (ft3/s)
H1 H1 0.218 8.21 0.43 0.09 2.38 0.22 8.21 0.43 0.09 4.07 0.38 7.08 0.53 0.12 8.75 1.01
OS1 OS1 0.575 12.18 0.43 0.25 2.04 0.50 12.18 0.43 0.25 3.49 0.86 12.00 0.53 0.31 7.16 2.20
D1 D1 0.180 5.00 0.77 0.14 2.85 0.40 5.00 0.77 0.14 4.87 0.68 5.00 0.97 0.17 9.95 1.73
D2 D2 0.038 5.00 0.47 0.02 2.85 0.05 5.00 0.47 0.02 4.87 0.09 5.00 0.59 0.02 9.95 0.23
10-yr Peak Runoff 100-yr Peak Runoff
335 E. Magnolia Street
DEVELOPED PEAK RUNOFF
DESIGN CRITERIA:
Design
Point Sub-basin Area (acres)
D.Egger
Highland Development Services
20-1021-00
February 19, 2021
2-yr Peak Runoff
City of Fort Collins Stormwater Criteria Manual
nnnnAICQ=(0.786651)
1
)10(
5.28
ct
PI
+
=
20-1021-00 Rational Calcs (2021-02-17).xlsx Page 4 of 4 Highland Development Services
Appendix C
APPENDIX C – LOW IMPACT DEVELOPMENT CALCULATIONS
Design Engineer:
Design Firm:
Project Number:
Date:
DESIGN CRITERIA
Low Impact Development Summary
Sq-Ft Acres
Impervious Area
(sq-ft)
% of Impervious
Area Requiring
Treatment
Impervious Area
Requiring
Treatment
9,492 0.22 6,385 75% 4,789
LID
Facility
Contributing
Basins
Area Drainage
to LID
(sq-ft)
% Impervious
Impervious
Area Treated
(sq-ft)
WQCV12-hr
(watershed inches)
WQCV12-hr
(cu-ft)
Treatment
Method
D1 D1 7,827 69.9% 5,851 0.22 143 Storm Chamber
4,789
5,851
122.2%
Area (sq-ft) Area (acres) Treatment Ratio
7,827 0.18 82.5%
1,665 0.04 17.5%
9,492 0.22Total Improvement Area
Water Quality Area Treatment Summary
Description
Total Area Treated by LID
Total Area unable to be Treated
335 E. Magnolia Street
Low Impact Development
Total % Required Treatment
Development Area Breakdown
City of Fort Collins - Ordinance No. 007, 2016
- Treat at least 75% of any newly developed or redeveloped impervious area using one or a combination of LID techniques, or
- Treat at least 50% of any newly developed or redeveloped impervious area using one or a combination of LID techniques when 25% of private driveable surfaces are
permeable.
Impervious Area Treated (sq-ft)
Impervious Area Required for LID Treatment (sq-ft)
LID Treatment Summary
LID Treatment Areas
D.Egger
Highland Development Services
20-1021-00
February 18, 2021
Urban Storm Drainage Criteria Manual by Urban Drainage and Flood Control District, June 2001 (Revised January 2016)
Description
Total Redeveloped Area
Allowed FilterFabric Flow Ratea(cfs)0.35 gpm/sq-ftSC-106LP 14 10 6 6 85.4 25 12 14.8 0.012 6.9 15.0SC-310 18 8 6 6 85.4 34 16 20.2 0.016 14.7 31.0SC-740 18 8 6 6 85.4 51 30 30.2 0.024 45.9 74.9DC-780 18 12 6 9 85.4 51 30 30.2 0.024 46.2 78.4MC-3500 24 8 12 9 90 77 45 48.1 0.038 109.9 178.9 14.9 46MC-4500 24 7 12 9 52 100 60 36.1 0.028 106.5 162.6 35.7 108.7LIDFacilityChamberTypeTotalRelease Ratef(cfs) WQ Flowg(cfs)Req'd StorageVolumeh(cu-ft)Minimum No. of ChambersiChamberStoragej(cu-ft)No. ofEndcapskEndcapStoragel(cu-ft)Total ChamberVolumem(cu-ft)Total InstalledSystem Volumen(cu-ft)WQCV12-hr(cu-ft)D1 SC-310 0.06 0.2156 4 56 12 0 56 205 143Max Cover(ft)Min Cover(in)ChamberModelD.EggerHighland Development Services20-1021-00February 18, 2021Min InstalledChamber/AggregateVolumec(cu-ft)335 E. Magnolia StreetLow Impact DevelopmentStormTech Chamber Configuration SummaryStormTech Chamber DataDesign Engineer:Design Firm:Project Number:Date:Length(in)Width(in)Height(in)Floor Area(sq-ft)ChamberVolumeb(cu-ft)MinAggregate Base(in)Min Aggregate Cover(in)NegligibleEndcapVolumed(cu-ft)Min InstalledEndcap/AggregateVolumee(cu-ft)NegligibleNegligibleNegligibleNote:a. Release rate per chamber, limited by flow through geotextile with accumulated sediment. City acceptable flow rates determined to be approximately 1/2 of the Nov-07 Qmaxfrom Figure 17 of the "Final Report on Field Verification Testing of the StormTech Isoloator Row Treatement Unit", prepard by the University of New Hamphire Stormwater Center, dated Setpember 2010.b. Volume within chamber only, not accounting for void spaces in surrounding aggregate.c. Volume includes chamber and void spaces (40%) in surrounding aggregate, per chamber unit.d. Volume within endcap only, not accounting for void spaces in surrounding aggregate.e. Volume includes endcap and void spaces (40%) in surrounding aggregate, per chamber unit.f. Release rate per chamber times number of chambers. This is used as the allowed release rate for the FAA calculations.g. WQ flow, equal to 1/2 of the 2-yr peak runoff rate, referenced to size flow control structure.h. Required detention volume determined using the FAA Method based on the acceptable release rate of sediment accumulated filter fabric of the chambers and the 1/2 of the 2yr in flow rate.i. Number of chambers required to provide required FAA storage volume stored within the chamber and endcaps only (no aggregate storage).j. Total volume provided in chambers only (no aggregate storage).k. Number of endcaps based on desired chamber layout.
DESIGN CRITERIA
0.73
1.00
0.73 ft3 acre-ft
0.18 acres 56 0.00
0.06 cfs
Time
(min)
1/2 2-yr
Intensity
(I , in/hr)
Q100
(cfs)
Accumulative
Runoff Volume
(ft3)
Accumulative
Release Volume
(ft3)
Detained
Volume
(ft3)
Detained
Volume
(acre-ft)
0 0.000 0.00 0 0 0 0.00
5 1.425 0.19 56 18 38 0.00
10 1.105 0.14 87 36 51 0.00
15 0.935 0.12 110 54 56 0.00
20 0.805 0.11 127 72 55 0.00
25 0.715 0.09 141 90 50 0.00
30 0.650 0.09 153 108 45 0.00
35 0.585 0.08 161 126 35 0.00
40 0.535 0.07 168 144 24 0.00
45 0.495 0.06 175 162 13 0.00
50 0.460 0.06 181 180 1 0.00
55 0.435 0.06 188 199 -10 0.00
60 0.410 0.05 194 217 -23 0.00
Adjusted Runoff Coefficient (CC f )
Area (A )
Allowed Release Rate
- City of Fort Collins - Storm Water Criteria Manual
- City of Fort Collins accepts 1/2 of the 2-yr runoff as the WQ inflow rate
WQ Treatment Volume Calculation - D1 Filtration Chamber
Runoff Coefficient (C )
Frequency Factor (C f )Required Detention
335 E. Magnolia Street
WQ Treatment Volume - FAA Method
D.Egger
Highland Development Services
20-1021-00
February 18, 2021
Design Engineer:
Design Firm:
Project Number:
Date:
VANDNDNDNDNDNDNDNDNDNDNDNFIRE RISERHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comOFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJ #
SCALE (V)335 EAST MAGNOLIA STREETLID EXHIBIT02/19/21
1" = 20'
N/A
DTE
JTC
20-1021-00
LID
1 1
N
W E
S
DRAINAGE BASIN BOUNDARY
AREA CONTRIBUTING TO LID
TREATMENT
0
SCALE: 1" = 20'
2010
LEGEND
BASIN COEFFICIENT (100-YR)
BASIN DESIGNATION
BASIN AREA
DESIGN POINT
DRAINAGE FLOW ARROW
User Inputs
Chamber Model: SC-310
Outlet Control Structure: Yes
Project Name: 335 E. Magnolia St
Engineer: N/A
Project Location:
Measurement Type: Imperial
Required Storage Volume: 144 cubic ft.
Stone Porosity: 40%
Stone Foundation Depth: 6 in.
Stone Above Chambers: 6 in.
Average Cover Over Chambers: 18 in.
Design Constraint Dimensions:(15 ft. x 30 ft.)
Results
System Volume and Bed Size
Installed Storage Volume: 205.05 cubic ft.
Storage Volume Per Chamber: 14.70 cubic ft.
Number Of Chambers Required: 4
Number Of End Caps Required: 4
Chamber Rows: 2
Maximum Length:20.75 ft.
Maximum Width: 8.77 ft.
Approx. Bed Size Required: 181.90 square ft.
System Components
Amount Of Stone Required: 13.54 cubic yards
Volume Of Excavation (Not Including
Fill):
15.72 cubic yards
Advanced Drainage Systems, Inc.FOR STORMTECHINSTRUCTIONS,DOWNLOAD THEINSTALLATION APPSiteASSISTIMPORTANT - NOTES FOR THE BIDDING AND INSTALLATION OF THE SC-310 SYSTEM1.STORMTECH SC-310 CHAMBERS SHALL NOT BE INSTALLED UNTIL THE MANUFACTURER'S REPRESENTATIVE HAS COMPLETED APRE-CONSTRUCTION MEETING WITH THE INSTALLERS.2.STORMTECH SC-310 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE".3.CHAMBERS ARE NOT TO BE BACKFILLED WITH A DOZER OR AN EXCAVATOR SITUATED OVER THE CHAMBERS.STORMTECH RECOMMENDS 3 BACKFILL METHODS:·STONESHOOTER LOCATED OFF THE CHAMBER BED.·BACKFILL AS ROWS ARE BUILT USING AN EXCAVATOR ON THE FOUNDATION STONE OR SUBGRADE.·BACKFILL FROM OUTSIDE THE EXCAVATION USING A LONG BOOM HOE OR EXCAVATOR.4.THE FOUNDATION STONE SHALL BE LEVELED AND COMPACTED PRIOR TO PLACING CHAMBERS.5.JOINTS BETWEEN CHAMBERS SHALL BE PROPERLY SEATED PRIOR TO PLACING STONE.6.MAINTAIN MINIMUM - 6" (150 mm) SPACING BETWEEN THE CHAMBER ROWS.7.EMBEDMENT STONE SURROUNDING CHAMBERS MUST BE A CLEAN, CRUSHED, ANGULAR STONE 3/4-2" (20-50 mm).8.THE CONTRACTOR MUST REPORT ANY DISCREPANCIES WITH CHAMBER FOUNDATION MATERIALS BEARING CAPACITIES TO THE SITE DESIGNENGINEER.9.ADS RECOMMENDS THE USE OF "FLEXSTORM CATCH IT" INSERTS DURING CONSTRUCTION FOR ALL INLETS TO PROTECT THE SUBSURFACESTORMWATER MANAGEMENT SYSTEM FROM CONSTRUCTION SITE RUNOFF.NOTES FOR CONSTRUCTION EQUIPMENT1.STORMTECH SC-310 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE".2.THE USE OF CONSTRUCTION EQUIPMENT OVER SC-310 & SC-740 CHAMBERS IS LIMITED:·NO EQUIPMENT IS ALLOWED ON BARE CHAMBERS.·NO RUBBER TIRED LOADERS, DUMP TRUCKS, OR EXCAVATORS ARE ALLOWED UNTIL PROPER FILL DEPTHS ARE REACHED IN ACCORDANCEWITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE".·WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT CAN BE FOUND IN THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE".3.FULL 36" (900 mm) OF STABILIZED COVER MATERIALS OVER THE CHAMBERS IS REQUIRED FOR DUMP TRUCK TRAVEL OR DUMPING.USE OF A DOZER TO PUSH EMBEDMENT STONE BETWEEN THE ROWS OF CHAMBERS MAY CAUSE DAMAGE TO THE CHAMBERS AND IS NOT ANACCEPTABLE BACKFILL METHOD. ANY CHAMBERS DAMAGED BY THE "DUMP AND PUSH" METHOD ARE NOT COVERED UNDER THE STORMTECHSTANDARD WARRANTY.CONTACT STORMTECH AT 1-888-892-2694 WITH ANY QUESTIONS ON INSTALLATION REQUIREMENTS OR WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT.SC-310 STORMTECH CHAMBER SPECIFICATIONS1.CHAMBERS SHALL BE STORMTECH SC-310.2.CHAMBERS SHALL BE ARCH-SHAPED AND SHALL BE MANUFACTURED FROM VIRGIN, IMPACT-MODIFIED POLYPROPYLENE ORPOLYETHYLENE COPOLYMERS.3.CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2922 (POLETHYLENE) OR ASTM F2418-16a (POLYPROPYLENE), "STANDARDSPECIFICATION FOR CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".4.CHAMBER ROWS SHALL PROVIDE CONTINUOUS, UNOBSTRUCTED INTERNAL SPACE WITH NO INTERNAL SUPPORTS THAT WOULDIMPEDE FLOW OR LIMIT ACCESS FOR INSPECTION.5.THE STRUCTURAL DESIGN OF THE CHAMBERS, THE STRUCTURAL BACKFILL, AND THE INSTALLATION REQUIREMENTS SHALL ENSURETHAT THE LOAD FACTORS SPECIFIED IN THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, SECTION 12.12, ARE MET FOR: 1)LONG-DURATION DEAD LOADS AND 2) SHORT-DURATION LIVE LOADS, BASED ON THE AASHTO DESIGN TRUCK WITH CONSIDERATIONFOR IMPACT AND MULTIPLE VEHICLE PRESENCES.6.CHAMBERS SHALL BE DESIGNED, TESTED AND ALLOWABLE LOAD CONFIGURATIONS DETERMINED IN ACCORDANCE WITH ASTM F2787,"STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".LOAD CONFIGURATIONS SHALL INCLUDE: 1) INSTANTANEOUS (<1 MIN) AASHTO DESIGN TRUCK LIVE LOAD ON MINIMUM COVER 2)MAXIMUM PERMANENT (75-YR) COVER LOAD AND 3) ALLOWABLE COVER WITH PARKED (1-WEEK) AASHTO DESIGN TRUCK.7.REQUIREMENTS FOR HANDLING AND INSTALLATION:·TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKINGSTACKING LUGS.·TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESSTHAN 2”.·TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED INSECTION 6.2.8 OF ASTM F2922 SHALL BE GREATER THAN OR EQUAL TO 400 LBS/IN/IN. AND b) TO RESIST CHAMBER DEFORMATIONDURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROMREFLECTIVE GOLD OR YELLOW COLORS.8.ONLY CHAMBERS THAT ARE APPROVED BY THE SITE DESIGN ENGINEER WILL BE ALLOWED. UPON REQUEST BY THE SITE DESIGNENGINEER OR OWNER, THE CHAMBER MANUFACTURER SHALL SUBMIT A STRUCTURAL EVALUATION FOR APPROVAL BEFOREDELIVERING CHAMBERS TO THE PROJECT SITE AS FOLLOWS:·THE STRUCTURAL EVALUATION SHALL BE SEALED BY A REGISTERED PROFESSIONAL ENGINEER.·THE STRUCTURAL EVALUATION SHALL DEMONSTRATE THAT THE SAFETY FACTORS ARE GREATER THAN OR EQUAL TO 1.95 FORDEAD LOAD AND 1.75 FOR LIVE LOAD, THE MINIMUM REQUIRED BY ASTM F2787 AND BY SECTIONS 3 AND 12.12 OF THE AASHTOLRFD BRIDGE DESIGN SPECIFICATIONS FOR THERMOPLASTIC PIPE.·THE TEST DERIVED CREEP MODULUS AS SPECIFIED IN ASTM F2922 SHALL BE USED FOR PERMANENT DEAD LOAD DESIGNEXCEPT THAT IT SHALL BE THE 75-YEAR MODULUS USED FOR DESIGN.9.CHAMBERS AND END CAPS SHALL BE PRODUCED AT AN ISO 9001 CERTIFIED MANUFACTURING FACILITY.©2013 ADS, INC.PROJECT INFORMATIONADS SALES REPPROJECT NO.ENGINEERED PRODUCTMANAGERMAGNOLIA DWELINGSFORT COLLINS, CO
StormTech888-892-2694 | WWW.STORMTECH.COM®Chamber System4640 TRUEMAN BLVDHILLIARD, OH 430261-800-733-7473DATE: DRAWN: UUPROJECT #: CHECKED: N/ATHIS DRAWING HAS BEEN PREPARED BASED ON INFORMATION PROVIDED TO ADS UNDER THE DIRECTION OF THE SITE DESIGN ENGINEER OR OTHER PROJECT REPRESENTATIVE. THE SITE DESIGN ENGINEER SHALL REVIEW THIS DRAWING PRIOR TO CONSTRUCTION. IT IS THE ULTIMATERESPONSIBILITY OF THE SITE DESIGN ENGINEER TO ENSURE THAT THE PRODUCT(S) DEPICTED AND ALL ASSOCIATED DETAILS MEET ALL APPLICABLE LAWS, REGULATIONS, AND PROJECT REQUIREMENTS.REVDRWCHKDESCRIPTIONMAGNOLIA DWELINGSFORT COLLINS, COSHEETOF26NOTES•MANIFOLD SIZE TO BE DETERMINED BY SITE DESIGN ENGINEER. SEE TECH NOTE #6.32 FOR MANIFOLD SIZING GUIDANCE.•DUE TO THE ADAPTATION OF THIS CHAMBER SYSTEM TO SPECIFIC SITE AND DESIGN CONSTRAINTS, IT MAY BE NECESSARY TO CUT AND COUPLE ADDITIONAL PIPE TO STANDARD MANIFOLDCOMPONENTS IN THE FIELD.•THE SITE DESIGN ENGINEER MUST REVIEW ELEVATIONS AND IF NECESSARY ADJUST GRADING TO ENSURE THE CHAMBER COVER REQUIREMENTS ARE MET.•THIS CHAMBER SYSTEM WAS DESIGNED WITHOUT SITE-SPECIFIC INFORMATION ON SOIL CONDITIONS OR BEARING CAPACITY. THE SITE DESIGN ENGINEER IS RESPONSIBLE FORDETERMININGTHE SUITABILITY OF THE SOIL AND PROVIDING THE BEARING CAPACITY OF THE INSITU SOILS. THE BASE STONE DEPTH MAY BE INCREASED OR DECREASED ONCE THIS INFORMATION ISPROVIDED.•NOT FOR CONSTRUCTION: THIS LAYOUT IS FOR DIMENSIONAL PURPOSES ONLY TO PROVE CONCEPT & THE REQUIRED STORAGE VOLUME CAN BE ACHIEVED ON SITE.PROPOSED ELEVATIONSMAXIMUM ALLOWABLE GRADE (TOP OF PAVEMENT/UNPAVED):4988.20MINIMUM ALLOWABLE GRADE (UNPAVED WITH TRAFFIC):4982.20MINIMUM ALLOWABLE GRADE (UNPAVED NO TRAFFIC):4981.70MINIMUM ALLOWABLE GRADE (TOP OF RIGID CONCRETE PAVEMENT):4981.70MINIMUM ALLOWABLE GRADE (BASE OF FLEXIBLE PAVEMENT):4981.70TOP OF STONE:4980.70TOP OF SC-310 CHAMBER:4980.208" x 8" TOP MANIFOLD INVERT:4979.1612" ISOLATOR ROW PLUS INVERT:4978.9512" ISOLATOR ROW PLUS INVERT:4978.95BOTTOM OF SC-310 CHAMBER:4978.87BOTTOM OF STONE:4978.37PROPOSED LAYOUT4STORMTECH SC-310 CHAMBERS4STORMTECH SC-310 END CAPS6STONE ABOVE (in)6STONE BELOW (in)40STONE VOID194INSTALLED SYSTEM VOLUME (CF)(PERIMETER STONE INCLUDED)(COVER STONE INCLUDED)(BASE STONE INCLUDED)169SYSTEM AREA (SF)57.8SYSTEM PERIMETER (ft)*INVERT ABOVE BASE OF CHAMBERMAX FLOWINVERT*DESCRIPTIONITEM ONLAYOUTPART TYPE0.90"12" BOTTOM PREFABRICATED END CAP, PART#: SC310EPE12BR / TYP OF ALL 12" ISOLATOR ROWPLUS CONNECTIONSAPREFABRICATED END CAP3.50"8" x 8" TOP MANIFOLD, MOLDED FITTINGSBMANIFOLD0.9 CFS IN30" DIAMETER (24.00" SUMP MIN)CNYLOPLAST (INLET W/ ISOPLUS ROW)30" DIAMETER (24.00" SUMP MIN)DNYLOPLAST (INLET W/ ISOPLUS ROW)ISOLATOR ROW PLUS(SEE DETAIL/TYP 2 PLACES)PLACE MINIMUM 12.50' OF ADSPLUS125 WOVEN GEOTEXTILE OVER BEDDINGSTONE AND UNDERNEATH CHAMBER FEET FOR SCOUR PROTECTION AT ALLCHAMBER INLET ROWSBED LIMITS20.75'8.17'15.44'6.17'10'5'0ABDC8.77'6.17'ACB4" ADS N-12 DUAL WALL PERFORATED HDPE UNDERDRAINDUNDERDRAINEE
StormTech888-892-2694 | WWW.STORMTECH.COM®Chamber SystemACCEPTABLE FILL MATERIALS: STORMTECH SC-310 CHAMBER SYSTEMSPLEASE NOTE:1.THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE".2.STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 6" (150 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR.3.WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FORCOMPACTION REQUIREMENTS.4.ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION.NOTES:1.CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2922 (POLETHYLENE) OR ASTM F2418-16a (POLYPROPYLENE), "STANDARD SPECIFICATION FOR CORRUGATED WALL STORMWATER COLLECTIONCHAMBERS".2.SC-310 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTIONCHAMBERS".3.THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITHCONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS.4.PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS.5.REQUIREMENTS FOR HANDLING AND INSTALLATION:·TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS.·TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 2”.·TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED IN SECTION 6.2.8 OF ASTM F2922 SHALL BE GREATER THAN OR EQUAL TO 400LBS/IN/IN. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD ORYELLOW COLORS.MATERIAL LOCATIONDESCRIPTIONAASHTO MATERIALCLASSIFICATIONSCOMPACTION / DENSITY REQUIREMENTDFINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS FROM THE TOP OF THE 'C'LAYER TO THE BOTTOM OF FLEXIBLE PAVEMENT OR UNPAVED FINISHEDGRADE ABOVE. NOTE THAT PAVEMENT SUBBASE MAY BE PART OF THE 'D'LAYER.ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S PLANS.CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS.N/APREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVEDINSTALLATIONS MAY HAVE STRINGENT MATERIAL ANDPREPARATION REQUIREMENTS.CINITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THE TOP OF THEEMBEDMENT STONE ('B' LAYER) TO 18" (450 mm) ABOVE THE TOP OF THECHAMBER. NOTE THAT PAVEMENT SUBBASE MAY BE A PART OF THE 'C'LAYER.GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35% FINES ORPROCESSED AGGREGATE. MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF THISLAYER.AASHTO M145¹A-1, A-2-4, A-3ORAASHTO M43¹3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10BEGIN COMPACTIONS AFTER 12" (300 mm) OF MATERIAL OVERTHE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS IN6" (150 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY FORWELL GRADED MATERIAL AND 95% RELATIVE DENSITY FORPROCESSED AGGREGATE MATERIALS. ROLLER GROSSVEHICLE WEIGHT NOT TO EXCEED 12,000 lbs (53 kN). DYNAMICFORCE NOT TO EXCEED 20,000 lbs (89 kN).BEMBEDMENT STONE: FILL SURROUNDING THE CHAMBERS FROM THEFOUNDATION STONE ('A' LAYER) TO THE 'C' LAYER ABOVE.CLEAN, CRUSHED, ANGULAR STONEAASHTO M43¹3, 357, 4, 467, 5, 56, 57NO COMPACTION REQUIRED.AFOUNDATION STONE: FILL BELOW CHAMBERS FROM THE SUBGRADE UP TOTHE FOOT (BOTTOM) OF THE CHAMBER.CLEAN, CRUSHED, ANGULAR STONEAASHTO M43¹3, 357, 4, 467, 5, 56, 57PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE.2,3DCBA*TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVEDINSTALLATIONS WHERE RUTTING FROM VEHICLES MAYOCCUR, INCREASE COVER TO 24" (600 mm).SUBGRADE SOILS(SEE NOTE 4)PERIMETER STONE(SEE NOTE 5)EXCAVATION WALL(CAN BE SLOPED OR VERTICAL)SC-310END CAPPAVEMENT LAYER (DESIGNEDBY SITE DESIGN ENGINEER)16"(405 mm)18"(450 mm) MIN*8'(2.4 m)MAX6" (150 mm)MINDEPTH OF STONE TO BE DETERMINEDBY SITE DESIGN ENGINEER 6" (150 mm) MIN12" (300 mm) MIN12" (300 mm) TYP34" (865 mm)6"(150 mm) MINADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALLAROUND CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS4640 TRUEMAN BLVDHILLIARD, OH 430261-800-733-7473DATE: DRAWN: UUPROJECT #: CHECKED: N/ATHIS DRAWING HAS BEEN PREPARED BASED ON INFORMATION PROVIDED TO ADS UNDER THE DIRECTION OF THE SITE DESIGN ENGINEER OR OTHER PROJECT REPRESENTATIVE. THE SITE DESIGN ENGINEER SHALL REVIEW THIS DRAWING PRIOR TO CONSTRUCTION. IT IS THE ULTIMATERESPONSIBILITY OF THE SITE DESIGN ENGINEER TO ENSURE THAT THE PRODUCT(S) DEPICTED AND ALL ASSOCIATED DETAILS MEET ALL APPLICABLE LAWS, REGULATIONS, AND PROJECT REQUIREMENTS.REVDRWCHKDESCRIPTIONMAGNOLIA DWELINGSFORT COLLINS, COSHEETOF3612" (300 mm) MINTHERMOPLASTIC LINER DETAILNON-WOVENGEOTEXTILEANGULARSTONEOVERLAP ON TOP SEVERALINCHES TO ANCHORTHERMOPLASITCLINEREARTHNON-WOVENGEOTEXTILEMBERS".
StormTech888-892-2694 | WWW.STORMTECH.COM®Chamber SystemINSPECTION & MAINTENANCESTEP 1)INSPECT ISOLATOR ROW PLUS FOR SEDIMENTA.INSPECTION PORTS (IF PRESENT)A.1.REMOVE/OPEN LID ON NYLOPLAST INLINE DRAINA.2.REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLEDA.3.USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOGA.4.LOWER A CAMERA INTO ISOLATOR ROW PLUS FOR VISUAL INSPECTION OF SEDIMENT LEVELS (OPTIONAL)A.5.IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3.B.ALL ISOLATOR PLUS ROWSB.1.REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW PLUSB.2.USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW PLUS THROUGH OUTLET PIPEi)MIRRORS ON POLES OR CAMERAS MAY BE USED TO AVOID A CONFINED SPACE ENTRYii)FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLEB.3.IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3.STEP 2)CLEAN OUT ISOLATOR ROW PLUS USING THE JETVAC PROCESSA.A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45" (1.1 m) OR MORE IS PREFERREDB.APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEANC.VACUUM STRUCTURE SUMP AS REQUIREDSTEP 3)REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS.STEP 4)INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM.NOTES1.INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUSOBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS.2.CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY.CATCH BASINORMANHOLESC-310 ISOLATOR ROW PLUS DETAILNTSSTORMTECH HIGHLY RECOMMENDSFLEXSTORM INSERTS IN ANY UPSTREAMSTRUCTURES WITH OPEN GRATESSC-310 CHAMBER12" (300 mm) HDPE ACCESS PIPE REQUIREDUSE FACTORY PRE-FABRICATED END CAPPART #: SC310EPE12BRSC-310 END CAPOPTIONAL INSPECTION PORTCOVER ENTIRE ISOLATOR ROW PLUS WITH ADSGEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE5' (1.5 m) MIN WIDEONE LAYER OF ADSPLUS125 WOVEN GEOTEXTILE BETWEENFOUNDATION STONE AND CHAMBERS4' (1.2 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMSSUMP DEPTH TBD BYSITE DESIGN ENGINEER(24" [600 mm] MIN RECOMMENDED)4640 TRUEMAN BLVDHILLIARD, OH 430261-800-733-7473DATE: DRAWN: UUPROJECT #: CHECKED: N/ATHIS DRAWING HAS BEEN PREPARED BASED ON INFORMATION PROVIDED TO ADS UNDER THE DIRECTION OF THE SITE DESIGN ENGINEER OR OTHER PROJECT REPRESENTATIVE. THE SITE DESIGN ENGINEER SHALL REVIEW THIS DRAWING PRIOR TO CONSTRUCTION. IT IS THE ULTIMATERESPONSIBILITY OF THE SITE DESIGN ENGINEER TO ENSURE THAT THE PRODUCT(S) DEPICTED AND ALL ASSOCIATED DETAILS MEET ALL APPLICABLE LAWS, REGULATIONS, AND PROJECT REQUIREMENTS.REVDRWCHKDESCRIPTIONMAGNOLIA DWELINGSFORT COLLINS, COSHEETOF46
StormTech888-892-2694 | WWW.STORMTECH.COM®Chamber SystemNOMINAL CHAMBER SPECIFICATIONSSIZE (W X H X INSTALLED LENGTH)34.0" X 16.0" X 85.4" (864 mm X 406 mm X 2169 mm)CHAMBER STORAGE14.7 CUBIC FEET (0.42 m³)MINIMUM INSTALLED STORAGE*31.0 CUBIC FEET (0.88 m³)WEIGHT35.0 lbs.(16.8 kg)*ASSUMES 6" (152 mm) ABOVE, BELOW, AND BETWEEN CHAMBERSBUILD ROW IN THIS DIRECTIONSC-310 TECHNICAL SPECIFICATIONNTSOVERLAP NEXT CHAMBER HERE(OVER SMALL CORRUGATION)START END34.0"(864 mm)16.0"(406 mm)90.7" (2304 mm) ACTUAL LENGTH85.4" (2169 mm) INSTALLED LENGTHAABC9.9"(251 mm)15.6"(396 mm)PART #STUBABCSC310EPE06T / SC310EPE06TPC6" (150 mm)9.6" (244 mm)5.8" (147 mm)---SC310EPE06B / SC310EPE06BPC---0.5" (13 mm)SC310EPE08T / SC310EPE08TPC8" (200 mm)11.9" (302 mm)3.5" (89 mm)---SC310EPE08B / SC310EPE08BPC---0.6" (15 mm)SC310EPE10T / SC310EPE10TPC10" (250 mm)12.7" (323 mm)1.4" (36 mm)---SC310EPE10B / SC310EPE10BPC---0.7" (18 mm)SC310EPE12B12" (300 mm)13.5" (343 mm)---0.9" (23 mm)SC310EPE12BR12" (300 mm)13.5" (343 mm)---0.9" (23 mm)ALL STUBS, EXCEPT FOR THE SC310EPE12B ARE PLACED AT BOTTOM OF END CAP SUCH THAT THE OUTSIDE DIAMETER OFTHE STUB IS FLUSH WITH THE BOTTOM OF THE END CAP. FOR ADDITIONAL INFORMATION CONTACT STORMTECH AT1-888-892-2694.* FOR THE SC310EPE12B THE 12" (300 mm) STUB LIES BELOW THE BOTTOM OF THE END CAP APPROXIMATELY 0.25" (6 mm).BACKFILL MATERIAL SHOULD BE REMOVED FROM BELOW THE N-12 STUB SO THAT THE FITTING SITS LEVEL.NOTE: ALL DIMENSIONS ARE NOMINALPRE-FAB STUB AT BOTTOM OF END CAP WITH FLAMP END WITH "BR"PRE-FAB STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B"PRE-FAB STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T"PRE CORED END CAPS END WITH "PC"4640 TRUEMAN BLVDHILLIARD, OH 430261-800-733-7473DATE: DRAWN: UUPROJECT #: CHECKED: N/ATHIS DRAWING HAS BEEN PREPARED BASED ON INFORMATION PROVIDED TO ADS UNDER THE DIRECTION OF THE SITE DESIGN ENGINEER OR OTHER PROJECT REPRESENTATIVE. THE SITE DESIGN ENGINEER SHALL REVIEW THIS DRAWING PRIOR TO CONSTRUCTION. IT IS THE ULTIMATERESPONSIBILITY OF THE SITE DESIGN ENGINEER TO ENSURE THAT THE PRODUCT(S) DEPICTED AND ALL ASSOCIATED DETAILS MEET ALL APPLICABLE LAWS, REGULATIONS, AND PROJECT REQUIREMENTS.REVDRWCHKDESCRIPTIONMAGNOLIA DWELINGSFORT COLLINS, COSHEETOF56
NYLOPLAST DRAIN BASINNTSNOTES1.8-30" (200-750 mm) GRATES/SOLID COVERS SHALL BE DUCTILE IRON PER ASTM A536GRADE 70-50-052.12-30" (300-750 mm) FRAMES SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-053.DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN DETAILS4.DRAINAGE CONNECTION STUB JOINT TIGHTNESS SHALL CONFORM TO ASTM D3212FOR CORRUGATED HDPE (ADS & HANCOR DUAL WALL) & SDR 35 PVC5.FOR COMPLETE DESIGN AND PRODUCT INFORMATION: WWW.NYLOPLAST-US.COM6.TO ORDER CALL: 800-821-6710APART #GRATE/SOLID COVER OPTIONS8"(200 mm)2808AGPEDESTRIAN LIGHTDUTYSTANDARD LIGHTDUTYSOLID LIGHT DUTY10"(250 mm)2810AGPEDESTRIAN LIGHTDUTYSTANDARD LIGHTDUTYSOLID LIGHT DUTY12"(300 mm)2812AGPEDESTRIANAASHTO H-10STANDARD AASHTOH-20SOLIDAASHTO H-2015"(375 mm)2815AGPEDESTRIANAASHTO H-10STANDARD AASHTOH-20SOLIDAASHTO H-2018"(450 mm)2818AGPEDESTRIANAASHTO H-10STANDARD AASHTOH-20SOLIDAASHTO H-2024"(600 mm)2824AGPEDESTRIANAASHTO H-10STANDARD AASHTOH-20SOLIDAASHTO H-2030"(750 mm)2830AGPEDESTRIANAASHTO H-20STANDARD AASHTOH-20SOLIDAASHTO H-20INTEGRATED DUCTILE IRONFRAME & GRATE/SOLID TOMATCH BASIN O.D.VARIOUS TYPES OF INLET ANDOUTLET ADAPTERS AVAILABLE:4-30" (100-750 mm) FORCORRUGATED HDPEWATERTIGHT JOINT(CORRUGATED HDPE SHOWN)BACKFILL MATERIAL BELOW AND TO SIDESOF STRUCTURE SHALL BE ASTM D2321CLASS I OR II CRUSHED STONE OR GRAVELAND BE PLACED UNIFORMLY IN 12" (305 mm)LIFTS AND COMPACTED TO MIN OF 90%TRAFFIC LOADS: CONCRETE DIMENSIONSARE FOR GUIDELINE PUPOSES ONLY.ACTUAL CONCRETE SLAB MUST BEDESIGNED GIVING CONSIDERATION FORLOCAL SOIL CONDITIONS, TRAFFIC LOADING& OTHER APPLICABLE DESIGN FACTORSADAPTER ANGLES VARIABLE 0°- 360°ACCORDING TO PLANS18" (457 mm)MIN WIDTHAAASHTO H-20 CONCRETE SLAB8" (203 mm) MIN THICKNESSVARIABLE SUMP DEPTHACCORDING TO PLANS[6" (152 mm) MIN ON 8-24" (200-600 mm),10" (254 mm) MIN ON 30" (750 mm)]4" (102 mm) MIN ON 8-24" (200-600 mm)6" (152 mm) MIN ON 30" (750 mm)12" (610 mm) MIN(FOR AASHTO H-20)INVERT ACCORDING TOPLANS/TAKE OFFNyloplast770-932-2443 | WWW.NYLOPLAST-US.COM®4640 TRUEMAN BLVDHILLIARD, OH 430261-800-733-7473DATE: DRAWN: UUPROJECT #: CHECKED: N/ATHIS DRAWING HAS BEEN PREPARED BASED ON INFORMATION PROVIDED TO ADS UNDER THE DIRECTION OF THE SITE DESIGN ENGINEER OR OTHER PROJECT REPRESENTATIVE. THE SITE DESIGN ENGINEER SHALL REVIEW THIS DRAWING PRIOR TO CONSTRUCTION. IT IS THE ULTIMATERESPONSIBILITY OF THE SITE DESIGN ENGINEER TO ENSURE THAT THE PRODUCT(S) DEPICTED AND ALL ASSOCIATED DETAILS MEET ALL APPLICABLE LAWS, REGULATIONS, AND PROJECT REQUIREMENTS.REVDRWCHKDESCRIPTIONMAGNOLIA DWELINGSFORT COLLINS, COSHEETOF66
Appendix D
APPENDIX D – CAPACITY CALCULATIONS
Channel Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Thursday, Jul 1 2021
Magnolia Dwellings - West Drain Channel
Rectangular
Bottom Width (ft) = 2.00
Total Depth (ft) = 0.50
Invert Elev (ft) = 100.00
Slope (%) = 2.61
N-Value = 0.016
Calculations
Compute by: Known Q
Known Q (cfs) = 2.43
Highlighted
Depth (ft) = 0.25
Q (cfs) = 2.430
Area (sqft) = 0.50
Velocity (ft/s) = 4.86
Wetted Perim (ft) = 2.50
Crit Depth, Yc (ft) = 0.36
Top Width (ft) = 2.00
EGL (ft) = 0.62
0 .5 1 1.5 2 2.5 3
Elev (ft)Depth (ft)Section
99.75 -0.25
100.00 0.00
100.25 0.25
100.50 0.50
100.75 0.75
101.00 1.00
Reach (ft)
Channel Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Tuesday, Jul 6 2021
12 in PVC Pipe Capacity
Circular
Diameter (ft) = 1.00
Invert Elev (ft) = 100.00
Slope (%) = 2.00
N-Value = 0.016
Calculations
Compute by: Q vs Depth
No. Increments = 10
Highlighted
Depth (ft) = 0.10
Q (cfs) = 0.086
Area (sqft) = 0.04
Velocity (ft/s) = 2.10
Wetted Perim (ft) = 0.64
Crit Depth, Yc (ft) = 0.12
Top Width (ft) = 0.60
EGL (ft) = 0.17
0 1 2 3
Elev (ft)Depth (ft)Section
99.50 -0.50
100.00 0.00
100.50 0.50
101.00 1.00
101.50 1.50
102.00 2.00
Reach (ft)
Hydraflow Express - 12 in PVC Pipe Capacity - 07/6/21 1
Depth Q Area Veloc Wp
(ft)(cfs)(sqft)(ft/s)(ft)
0.10 0.086 0.041 2.10 0.64
0.20 0.362 0.113 3.21 0.93
0.30 0.803 0.198 4.05 1.16
0.40 1.381 0.294 4.70 1.37
0.50 2.061 0.395 5.22 1.57
0.60 2.759 0.493 5.59 1.77
0.70 3.434 0.588 5.84 1.98
0.80 4.001 0.674 5.94 2.22
0.90 4.363 0.745 5.86 2.50
1.00 4.092 0.785 5.21 3.14
Hydraflow Express - 12 in PVC Pipe Capacity - 07/6/21 2
Yc TopWidth Energy
(ft)(ft)(ft)
0.12 0.60 0.17
0.25 0.80 0.36
0.38 0.92 0.55
0.50 0.98 0.74
0.62 1.00 0.92
0.72 0.98 1.09
0.80 0.92 1.23
0.85 0.80 1.35
0.88 0.60 1.43
0.86 0.00 1.42