PLANNING AND ZONING BOARD MEETING OF May 22, 1989
STAFF REPORT
PROJECT: The Market Place PUD, Preliminary - #21-89
APPLICANT: Rosenbaum -Dean Corp.
c/o Yergenson, Obering & Whittaker
115 S. Weber
Colorado Springs, CO 80903
OWNER: Cascade Management Corp./Bill Strickfaden, President
James Peterson
c/o Miscio and Stroud, Inc.
300 S. Howes
Fort Collins, CO 80524
PROJECT PLANNER: Sherry Albertson -Clark
PROJECT DESCRIPTION: A request for preliminary approval for a 94,121
square foot regional/community shopping center on 8.1 acres. The site is
located on the east side of College Avenue, north of Troutman Parkway. The
site is zoned h-b, Highway Business and r-m-p, Medium Density Planned
Residential.
RECOMMENDATION: Approval with conditions.
EXECUTIVE SUMMARY: The applicant proposes a 94,121 square foot shopping
center. The anchor tenant is Phar-Mor, which is a 55,000 square foot
drugstore. Other uses include four retail spaces and two free-standing pads.
The project scores 57% on Point Chart C "Community/Regional Shopping
Center" and is in conformance with the approved South College Properties
Superblock #3 Master Plan. Conditions regarding the landscape easement,
signage, building elevations, access easements and dedication of Troutman
Parkway have been placed on the preliminary approval.
DEVELOPMENT 300 LaPorte Ave. • P.O. Box 580 • Fort Collins, Colorado 80522 • (303) 221.6750
SEHVICES. PLANNING DEPARTMENT
The Market Place
P & Z Meeting -
Page 2
COMMENTS
1. Background:
PUD, Preliminary, #21-89
May 22, 1989
The surrounding zoning and land uses are as follows:
N: h-b; vacant
S: h-b, r-p; Pavilion Retail Center, National Car Rental
E: r-m-p; vacant
W: h-b; Best, Pic'n Save, Sea Galley
The site is zoned h-b, Highway Business and r-m-p, Medium Density Planned
Residential with a PUD condition. The property currently contains a residence
and several out buildings.
The site is part of the South College Properties Superblock #3 Master Plan,
approved in 1982. The approved master plan consists of two phases. The first
phase was the Fountainhead PUD. Phase two consists of the remainder of the
21-acre master plan. Uses proposed on the master plan included retail shopping,
drive-thru facilities, motels/hotels, offices, clinics, automobile sales, service
stations, restaurants, theaters and residential uses. Integrated pedestrian and
vehicular circulation was intended to be encouraged throughout the master plan
area.
2. Land Use:
The proposed uses consist of a 55,000 square foot drug store (Phar-Mor), four
retail spaces encompassing 30,900 square feet and two free-standing pads.
The land uses proposed on this preliminary site plan were evaluated under the
criteria of the Community/Regional Shopping Center Point Chart. Using Point
Chart C, the project achieves 57%. Points were awarded for being contiguous
to a collector and/or arterial street (College is arterial, Troutman Parkway is
collector); being contiguous to a transit route; providing for future direct
vehicular/parking access with adjacent properties; having primary access from a
non -arterial street (primary access is from Troutman Parkway); and contiguity
to existing urban development.
The proposed land uses are consistent with those uses proposed on the South
College Properties Superblock #3 Master Plan.
3. Design:
The buildings planned for this project consist of the anchor tenant, Phar-Mor,
four attached retail spaces and two free-standing pads, for a total of 94,121
square feet. The anchor tenant and retail spaces are linked through a series of
pedestrian plazas. Parking is centrally located and meets City guidelines for
the proposed uses. The Phar-Mor structure is proposed at 30' in height, with
other structures on the site between 20' and 26' in height.
The Market Place PUD, Preliminary, #21-89
P & Z Meeting - May 22, 1989
Page 3
Building setbacks along the site's College Avenue and Troutman Parkway
frontage have been increased to be consistent with setbacks on the Pavilion
Shopping Center, ranging from 36' - 58' from the right-of-way of these streets.
Setbacks along JFK Parkway have also been increased to provide buffering for
the service and loading areas along the backs of buildings.
Extensive plant material has been provided around the site's perimeter and
berming has been incorporated along the three street frontages. Several
existing trees on the site are being retained. Six foot high screen walls,
berming and landscaping are also planned to provide screening of service areas
at the backs of the buildings. A combination of landscaping and screen
fencing has been provided for buffering between the service area and the
outparcel to the southeast. Foundation plantings have been provided for all
but the free-standing pads, which would be addressed at final review, when
specific tenants are known. Planters are proposed along the building fronts, to
provide visual interest and shade for pedestrians and landscape islands
throughout the parking area define traffic aisles and break-up asphalt areas.
A 15 foot off -site landscape easement will be obtained as an interim solution
for providing landscape screening along the north property line of the
Phar-Mor facility. It is anticipated that the property to the north will develop
in a similar fashion; however, until this occurs, the north elevation of
Phar-Mor would be visible from College Avenue, with no space available on -site
for plant material to provide screening for this elevation. Staff is
recommending a condition that a 15 foot landscape easement be provided on
the adjacent property to the north with the final plans.
Signage has been indicated on the building elevations and would consist of
interior lit channel letters. Monument signs are also proposed for the site and
are designed using materials that match those used in the center. Staff is
recommending a condition that a unified signage design for all signage on -site
be provided with the final plans.
The proposed building materials consist of painted and ribbed concrete block
and synthetic stucco. Ribbed metal canopies are planned for the store entries
and on the north and east elevations of Phar-Mor. The materials and colors
proposed are intended to match those used at Fountainhead to the north;
however, the colors represented on the rendered elevations are not compatible
with those used on Fountainhead. While staff does not believe this center needs
to match Fountainhead, the colors used should be compatible. Of concern, is
the blue banding color, which appears to provide too extreme of a contrast.
Staff would also encourage greater usage of the stucco material, as an
alternative to standard block. Staff is recommending a condition that further
information be provided on the proposed building elevations, addressing the
color scheme and materials, with final plans.
The Market Place PUD, Preliminary, #21-89
P & Z Meeting - May 22, 1989
Page 4
4. Neighborhood Compatibility:
No neighborhood meeting was held on this proposal. The proposed land uses
are deemed compatible with existing uses in the area.
5. Transportation:
Access to the site is from Troutman Parkway (a collector street) and a shared
right-in/right-out on College Avenue. The College access requires a joint access
easement with the property owner to the north and would also function as
access to this adjacent property when it is developed. A conceptual plan has
indicated how the two properties may be linked, in terms of access and site
orientation. The applicant would be required to provide an access easement
dedication at the time of final plan review for The Market Place PUD for this
joint access. A decel lane is required along the site's College Avenue frontage.
Additional access is provided from JFK Parkway (an arterial street) which
functions as a re -circulation road, providing alternatives to College Avenue.
This access serves the loading/service areas of the shopping center.
Staff has encouraged the applicant to include the outparcel in this development
plan so that access and development potential could be evaluated concurrently;
however, this outparcel is under separate ownership and as of this time, is not
included in the preliminary plan. Access to this outparcel has been provided,
through two future access points along the service drive. A potential shared
access on Troutman Parkway has also been shown on the preliminary plan;
however, the location of this access does not line-up with the existing drive to
the south and therefore, is not desirable from a traffic standpoint.
The north half of Troutman Parkway (34') along this site has never been
dedicated as public right-of-way. The current property owner has agreed to
providing this dedication. Staff is recommending a condition that prior to
final approval, a signed deed of dedication for the north half of Troutman
Parkway be provided.
RECOMMENDATION
Staff finds that The Market Place PUD Preliminary meets the criteria of the
Community/Regional Shopping Center Point Chart and the All Development
Chart of the Land Development Guidance System. There are several concerns
that must be addressed prior to final PUD review. Therefore, staff is
recommending approval with the following conditions:
1. A 15' landscape easement be provided on the adjacent property to the north
with final plans.
2. A unified signage design for all signage on -site be provided with final
plans.
The Market Place PUD, Preliminary, #21-89
P & Z Meeting - May 22, 1989
Page 5
3. Additional information be provided on the proposed building elevations,
addressing the color scheme and materials, with final plans.
4. Easements for the outparcel access be provided with final plans.
5. A signed deed of dedication for the north half of Troutman Parkway be
provided prior to final approval.
ITEM THE MARKET PLACE
NUMBER 21-89
Nv318 C3 r+3soe
' 9 dO13n3Q
04
I
.vw+wna r+rrunolu a 3nHNr no�nm s
Y � �
� In
and 3ovid 13>(&VM 3Ha
'
F�eiS=
e
�< �FK l
qqpp y
Waa
1
yypp
i
i 1
Ed ~
A:R
1�
��
��y;$ W� W z
�
��•
I -
_ -_ toga 32 qT
94
uj- i
af
�
olI I
log.# ;
�R' I
y�N
'{y�Rpi��ia;.
4
q=
pp
li 'x <N I
I. a� y '
O -- LaN I iiiiil I
I I
jf
•�` � � it � i e
,}.+I, � r � t- � � I ..�-. i
S
-
-- -- -- - -
-- --
gY
n
�
311N31r 303i1oo woos
ru avw-ao-iww rwuaw
xnanc miorur .c
� � �
V 3037700 Hinos °pJ
a
■46%'
r j& `?
,I I` VI I ll1,\1 DNI21110 N INN 1')�I
-- ----------
fin
NMI
H
- ------
ire
I aw 101
PW 0
Mira
NMI
I win]
mmm
son
RON
ME
RU A
0
AMR-=
M Q
MU.
---- --
VHHH
---
7
ME
"OSA
Ems
msss
ME
rA
:II
-
r:
� =
- r
�
All
-
.�
-F
-s
_4
`+SI)r.-�.r.Yl .�n„dQ fl:5:-4!G - U{)i'i�10�'titiin,rls np4•iOln`J i.q"%1 S Sll
ADIVL1IHM N DNIMIOO MSNIDMI 1 ,
HUM
_-_
■ }'�k� -4-
FEWM
HAI
f �
N -
EMS I
II MUUMUU
' +{
--------------
-
i =-:__ a ,-
— III 11-------------
« , N , 1 ■ sue-
;�ME
WE
J _ E I)
HIRE mmii
rd{
Ed !
lop om
«. • r
MIN
Him
HEM
OF
ME
IFL
�a
E N O B E R I N G WHITTAKER P C
A R C H I T E C T S
115 SOUTH WEBER SUITE 200 • COLORADO SPRINGS • CO 80903 •719/475-8133 • DENVER • 303/892-9056
STATEMENT OF PLANNING OBJECTIVES
PRELIMINARY PLAN SUBMITTAL
Proposed Shopping Center
S. College Avenue & Troutman Parkway
Ft. Collins, Colorado
CONFORMANCE TO CITY LAND USE POLICIES
This project is in conformance with the applicable
policies, goals, and objectives as defined by the
City of Fort Collins, and the approved Super Block
#3 Master Plan of South College Properties. The
project site is located at the northeast corner of
South College Avenue and Troutman Parkway. The
ground is presently vacant. The property is
surrounded by the Fountainhead development to the
north, the Best/Pic 'n Save Center to the west,
the Pavilion development to the south, and vacant
land to the east. The site is totally within the
existing Ft. Collins city limits, and would be
serviced from existing utility mains. The major
points of access to the site will be from existing
curb cuts on Troutman Parkway, and from South
College Avenue and JFK Parkway as specified by the
approved Super Block #3 Master Plan of South
College properties, providing convenient, direct
access from surrounding commercial and residential
areas. The site is adjacent to existing public
transportations routes as well. Planning for the
center has taken into account the surrounding
projects, and provisions have been incorporated to
allow for easy cross -access with each. Building
materials and colors will be chosen to compliment
the Fountainhead development, adjacent to the
north. Side and rear elevations of the buildings
fronting on major roads will be screened with a
combination of walls and landscape materials. It
is the desire of the applicant that this center be
a viable asset for the citizens of Ft. Collins.
PROPOSED OWNERSHIP
The property owner will maintain ownership of all
parking, landscaping, and circulation areas on the
site. The property owner(s) will maintain such
areas at all times. It is possible that one or
more of the pad sites will be sold to individual
tenants. In such cases, the tenant would be
responsible for maintenance of all improvements
through a common area association.
0
•
ESTIMATED EMPLOYMENT
It is estimated that approximately 150 persons
would be employed by the tenants of this project.
ASSUMPTIONS AND CHOICES
Access - Vehicular access points to the site are
located so as to minimize any possible disruption
on surrounding streets. One right-in/right-out
access point on South College Avenue is located so
that it may serve as a convenient point of access
for future development (see Mater Plan SP-1). The
Master Plan also provides a shared access on JFK
Parkway that allows for a tie-in for users of the
Fountainhead project to the north. Two access
points on Troutman Parkway are directly opposite
existing driveways to the Pavilion project. All
access points conform to the Super Block #3 Master
Plan of South College properties.
Building Orientation - Given the size and shape
of the site, retail buildings were logically
oriented so that the major focus of the center is
from College Avenue. When combined with future
development and surrounding projects, a total
unified theme is established with provisions for
easy and efficient transitions, both between and
within each individual project.
Parking - Parking areas have been oriented to
provide for efficient vehicular ingress and
egress, and for pedestrian access to the project
tenant spaces. Parking rows have a landscaped
island at each end to help define major
circulation corridors, and to break up large
expanses of asphalt. In addition, several full
length landscape islands have been designed in
order to further divide the parking area into
"sub -lots", which relate to various elements of
the project.
Design - Many elements of the general design
themes from the Fountainhead project, such as
building colors and landscape elements, have been
incorporated into this project to help unify the
commercial area of which this project is a part.
0
CONFORMANCE TO CRITERIA
1. The project is contiguous to an arterial
street - S. College Avenue.
2. The project is contiguous to an existing
transit route.
3. The project is adjacent to two existing
community/regional scale projects, with planned
access between each, and becomes a part of a
larger unified community/regional center.
4. The project gains its primary vehicular access
from Troutman Parkway.
5. The project is planned to allow for easy
pedestrian and vehicular access to existing and
future development of this and adjacent projects.
6. The project has more than 1/6 contiguity with
existing urban development.
7. The project conforms to the approved Super
Block #3 Master Plan of South College properties.
LAND USE CONFLICTS
The project has no areas of land use conflicts, as
the site is bounded on three sides by arterial or
collector streets (S. College Avenue, Troutman
Parkway, and JFK Parkway), and on the fourth side
by an existing commercial center (The
Fountainhead). To further aid in overall area
planning, this project provides for logical
circulation patterns between existing projects
both to the north and the south, and limited
access points on S. College Avenue and JFK Parkway
- intended for common usage by all properties. In
addition, side and rear elevations which face
either JFK or Troutman Parkways will be screened
with a combination of walls and/or landscaping.
•
•
ENERGY CONSERVATION
Major areas of storefront glass are oriented
towards the north and west with 5'-4" wide
overhangs, thereby minimizing as much as possible
daytime soiar heating loads on the buildings. In
addition, all storefront glass will be insulated.
Walls will be constructed of concrete block, and
will be insulated. Roofs will have R-20
insulation. High efficiency lighting and heating,
ventilating, and air conditioning units will be
utilized.
DEVELOPMENT SCHEDULE
Construction is expected
City approval, and take
complete. Construction
improvements will be
with the construction
project schedule.
to begin immediately upon
approximately 6 months to
of any required public
accomplished concurrently
process. See attached