Meeting at Ft. Collins Planning Dept.
Date: March 29, 1989
Place: City of Fort Collins Planning Dept.
Present: Tom Peterson - Planning Director
Sherry Albertson -Clark - Project Planner
Don Parsons - Parsons & Associates
Jim Depatie - YOW Architects
Summary of Items Discussed:
1) Preliminary/Final Plan as joint submittal
is not recommended by City. Submittal must be
totally complete or consideration of it could be
delayed. Preliminary Plan stage is used to work
out details. Final plans usually approved by
consent when processed separately.
2) Planning and Zoning Board will delay
action on Final Plan if any questions at all arise
on Preliminary Plan. Planning and Zoning Board
has been, in the past, very unfavorable towards
joint submittals.
3) City recommends a staggered submittal:
Submit Preliminary Plan - April 5
Receive Comments - April 21
Submit Revised Plan - May 3
Submit Final Plan - May 5
Planning & Zoning Hearing - June 26
4) Sign sizes and locations determined by
P.U.D. plans, with consideration of individual
site. Pad user may have a separate pole sign,
depending upon site conditions. Final sign
details must be submitted as part of Final Plan.
5) Motorcycle and bicycle parking must be
provided, no specific minimums required.
6) Backs of buildings (facing JFK Parkway)
must be screened effectively.
7) Building elevations of pad sites are not
required with submittal. However, applicant is
encouraged to provide as much graphic information
as possible regarding pad buildings. Pad
buildings must be compatible with main center
buildings.
N so
8) Signature blocks are not required on each
sheet. Standard format for signature blocks was
provided. Attorney's statement may not be
required if owner's statement is amended to say
the same thing.
9) Owners of record at time of consideration
must sign site plans and plat.
10) Applicant fills out point chart - City
verifies it with maps in Planning Dept.
ll) Copies of City Land Use Policy booklets
provided to YOW.