HomeMy WebLinkAboutTHE MARKET PLACE PUD - PRELIMINARY - 21-89 - SUBMITTAL DOCUMENTS - ROUND 1 - APPLICATIONCity of Fort Collins
Project Name: The Market Place
Project Number: 87.061
Project Location or Street Address: northeast corner
South College Avenue & Troutman Parkway
Land Use Information:
PLANNING DEPARTMENT
APPLICATION FORM
8.15 ac / 355.003 SF
Regional Shopping Center
Today's Date: April 5, 1989 Total Number of Dwelling Units: N/A
40 Total Commercial Floor Area: 939929 SF
GENERAL INFORMATION: Collins Partners, A Colorado Corporation
Partners
Owners Names Cascade Management Corp Rosenbaum/Dean, General Steve Boette Applicants Name: � Contact Person: Y
Address: William K. Strickfaden, Presidlk&6ss: 101 N. Cascade Ave, Suite 400 Address: same as applicant
a Colorado Corporation; and
Telephone: Telephone: (719) 630-0066 Colo. Spgs, CO Telephone:
ames P. Peterson 80903
( 30'3) 482-6066
0
Gross Acreage/Sq. Footage:
Existing Zoning: HB
Proposed Use: Communi
TYPE OF REQUEST:
Please indicate type of application submitted by checking the box preceding appropriate request(s). Combined requests, except for Final
PUD and Final Subdivision, require the combined individual fees. No application will be processed until all required information is provided.
Additional handouts are available explaining information requirements for each of the following review processes.
Annexation with Initial Zoning
Fee: $50.00 + $10,00 per sheet of annexation plat + $3.00* per sheet
of annexation petition Requested Zone
Rezoning Requested Zone
Fee: $50.00 i- $3.00* per sheet of rezoning petition
Planned Unit Development - Master Plan
Fee: $60.00
X
Planned Unit Development - Preliminary Plan
Fee: $50.00
Planned Unit Development - Final Plan (including final subdivision)
Fee: $110.00 + $10.00 per sheet of subdivision plat
PUD Administrative Change
Fee: $5.00
Minor Subdivision
Fee: $150.00
Preliminary Subdivision
Fee: $50.00
Final Subdivision - 1 to 4 lots
Fee: $75.00
Final Subdivision - more than 4 lots
Fee: $110.00 + $10.00 per sheet of plat
Multiple -Family Use Requests in the R-M and R-H Zoning District
Fee: $85.00
Non -Residential Use Requests in the R-H Zoning District
Fee: $85.00
Nan -Conforming Use Requests
Fee: $110.00
Group Home Review
Fee: $85.00
IL/1P Site Plan Review
Fee: $110.00
Other Special Site Plan Review
Fee:$100.00
Vacation of ROW or Easement
Fee: $3.00* per sheet of filing document
Street Name Change
Fee: $3.00* per sheet of filing document
5;1987
PUD ADMINISTRATIVE CHANGE
Description of the change and reason(s) for the request:
Planning Department:
Action:
Date:
By:
Building Inspection:
Action:
Date:
By:
Engineering:
Action:
Date:
By:
CERTIFICATION
I certify that the information and exhibits herewith submitted are true and correct to the best of my knowledge and that
in filing the application I am acting with the knowledge and consent of the owners of the property without whose consent the requested
action cannot lawfully be accomplished.
Name:
Address: '-101 N. Cascade Avenue, Suite 400
Colorado Springs, CO 80903
Telephone: (719) 630-0066
/ s ' ICI � � •. ��
Q
-14 B
C ` O �! CS .,� WA, Rp �2�U 3
�,
I I
4
30ARllWALK P 2. 30ARD /AL,< el a5 I�
Zost:� rp
t 17
r _
J'
Nr1 Z.A p
ThOUTM49 PARLW1'f
j Project Location f
RP1
j Area of Notification ,
� I ,
r p
ur) W
HARMONY
3 - $
ITEM THE MARKET PLACE
NUMBER 21-89 , 21-89A, 21-89B
- -
E SEEN,
----
--- -- - -- - - - -- -
I
ElO5rr1G QMB.
If S I
LIMIT 0L51TE PLAN
OE�wAlx�
\
5280 Sf
E I
ni` r.o
111 IIII IIII ''
m IIII IIIIII IIIIIII j l l jl l' IIIIIII III',, IIIIII I' , L
IIIII '' IIIIII ";' III II Illj I
III I I I I
IIIIII 'I jlll I'I IIIII III IIII III I' II II �"
II, IIII IIIIIII I II IIIIII IIIIII I I IIIII 11 ' I �
II III' 'III L I II I I I II
_
A
dill IIll�il III III �
I. III IIII 'I J IIII
--
IIIIII
�..I } ,i
lllp" IIIIII III IIIW 'IINANI,V %
'I ill IIIII rl
IIIII
Y
—
, !
_. _ 4
m IIIII ul'; IIII IIIIIII lull
l y
,4 a
IIIII I' I I'll�i ti l l ,`�
AliII
I
I
III I
'II' 'h II141 II I, I I
I
� 1
II I I IIIII I I
w
1 d
J ,
x
I II'. I II I I
I jl I I 'IIII II 'III III ' I
IIII
5LI
—
'I s.
N IIII Ii,i IIII IIIIIII IIIII III
--
22'3fi" W
IIII I �'
6
!
III q
1 1-
uwscAFE Isuws, : 'III E��;n Y M Y of i'�G
It(,mcALl
_n 5 6ti
11,
V' _
o
I
III IIIIIII I ,i 6' NIP1 GONG BLOOt
� i i i ' I"�II I
T7•rPICW w EN,10
5
33' 2' s8" W
86.27'
uc wouL I ", ALONG SERNGE OMI£
i
_
dl I I I I
I
_
�n
l I I fO4w
II II
':. �� " SGAEEN EFWCNG -SEE
IyTy'. I OEtuISGPNIG V N FM
I
_
I
IIIII'Il' I I I '�I u1 II ,.
s
_
m A � �-
e
,`
- � �s � i I
RETAIL C P RETAIL. D
s Stu a
1 1 i PAD B 0
o I 2"5D 5i E
'
LIMIT OF STE PLAN
F P
5,7 0 51 "~
+s.mrr s
1 BlE1
Hb. 1Y III T N ,`
1
`--,Y-
_r_1 _ _ _ _ _ _ _ _ _, 1
d
----------------
q
5TT EpSn,IG�E'W„EJI•
d�
�----'--------
R
-�
z
-- a
----1
_- _-
-
<a me
A 90'
89' S7' 5V IN 307.80'
R 20.00'
L 3.—
II..EEppWW1, ■q/,�GS
YB•INDIIIC iF
m
S
YANQ
i
F N C
E�I.0 � G11TR1L
TROUTMAN PARKWAY��pN"„jpm��Np�1��
N 0 R T H
p
SP- 2
PRELIMINARY PLAN
21
�s
roe
I
M� "I II!
II
l.......... ... •...._ -.._ 1 ..... ...... mii 111 R I IIII R„��IIa��IpM
IIfII(ilhIIIIIIIIIhllllilllLIIIII(Ifilllllll{I(II{I{Illlililllilll(IIIIIIIIIIIIIillliilll(IIIN�Iua I ..
1.... i � � ii�li! I'i!'"! i I � I ( £ili!£ ilti -1 ii.gjii£iiii
�.iflffl.l.l.l i lliiiiiLillifl.11(I I II Iffll ..._i....li �
" '
� f��
`
w
.
�.+""•aa`���
Wa��jilii ■I�ai
i! a��:i
I�■n 1� IB'
:- ��'•■�I�.��il�■i�,
a! '. _n.... Wit"
:E:,�m.s
�:. =.n '-. `s-. •. �l.y'..
J ■■���..■■�.■�■■�IA�L'11I■J■■■�
!'
LIIJ■�.:1'•■�../
—,.■.4�l�:a���-= _a
■r, -: <•.s�IF
�w,w..r��/�
I 1 i "
I;w'rn p'Ihjnlj; Ci a l'., :ailr' l�il(Ihi",13liiiiilf. lillh.IlIIII�i�1.3. 1. 'l.i£. MO
.... .:3!!tR£Itll ,�ii, lil@' i f,.
Y rJ .I,ilI �) l IIII IIII ! �fi.
nni inl midii,, n!ili 1 II I 11 PHA �O�
llllll) � 1 I i I (l l I I
1"a�, !�1 GII;
zi , III Gt l .. -_,. � _. •.,.� r'•_�i. rC.�����i�. r _.
ll IEII II a a C 's ®� f a
k ..........
II I 1 •r'
it III I IIII 'Cxl 'll !fii!
ll I II . III I ! 1111111 0! 'I1
ifl�li lllil ,.I II IIII IIII llllll IIIilll 'II uG„III ljl ll _I. ,
I
J'IIII l l l ME11:
!HNn° it lir'illlll
1
Jam' .' _: _'• r. 6... ^_ic_ .. >_4'_ �� _. . €c: .. E _ _ �a� ....
PAINTED LICNT BRONN TO
LEFT SIDE —SLOG. D IIATCM FWNTAINNEAD CENTER REAR— BUILDING E REAR— BUILDING F ADJACENT BLDG. C—
RIBBED CDNOREIE BLOCK
PAINTED DART TO
4ATCM FWNTAI.—
NNEAD CENTER
Ilnlrt9 mm&
�IIIu�B� a�l�6;,�n����1�h�91 �I�IIiiN liir. II IbUN�lli�;u,"!Ia:nliiiii�$u41'i4iiil!nll!:Im nlu u:,iinl!..I ,,,W1.11 rM r; „i,
;..a..ai hinil�l I 4 _
!IIi���IlUllilil� JIIP�INPi��alll!ial l!l iiln�n'il�lll�llllll!Ih41il illlliilili 1i' I! i�iiIIII�IIIiInIW ill nyul i ili ! .411i1 ul h il! olil!!i ;;i! xiiiuii��l'I
i6 19a n ",.II n ni4 w!�'y lu mil �m1rn�r wa1p...Iii',
u,iil@�III��Pah�ninNhN�E!!7P°rmN'y6NI�hI i�IL��bll.. II nl��II�!�!��ileq'11:" n...,. Ii,u�Ltiafnii�� n BBBBw 1 I �.I 1 . .I . 11. ■ ,��
c
E N O B E R I N G WHITTAKER P C
A R C H I T E C T S
115 SOUTH WEBER SUITE 200 • COLORADO SPRINGS • CO 80903 • 719/475-8133 • DENVER • 303/892-9056
STATEMENT OF PLANNING OBJECTIVES
PRELIMINARY PLAN SUBMITTAL
Proposed Shopping Center
S. College Avenue & Troutman Parkway
Ft. Collins, Colorado
CONFORMANCE TO CITY LAND USE POLICIES
This project is in conformance with the applicable
policies, goals, and objectives as defined by the
City of Fort Collins, and the approved Super Block
#3 Master Plan of South College Properties. The
project site is located at the northeast corner of
South College Avenue and Troutman Parkway. The
ground is presently vacant. The property is
surrounded by the Fountainhead development to the
north, the Best/Pic In Save Center to the west,
the Pavilion development to the south, and vacant
land to the east. The site is totally within the
existing Ft. Collins city limits, and would be
serviced from existing utility mains. The major
points of access to the site will be from existing
curb cuts on Troutman Parkway, and from South
College Avenue and JFK Parkway as specified by the
approved Super Block #3 Master Plan of South
College properties, providing convenient, direct
access from surrounding commercial and residential
areas. The site is adjacent to existing public
transportations routes as well. Planning for the
center has taken into account the surrounding
projects, and provisions have been incorporated to
allow for easy cross -access with each. Building
materials and colors will be chosen to compliment
the Fountainhead development, adjacent to the
north. Side and rear elevations of the buildings
fronting on major roads will be screened with a
combination of walls and landscape materials. It
is the desire of the applicant that this center be
a viable asset for the citizens of Ft. Collins.
PROPOSED OWNERSHIP
The property owner will maintain ownership of all
parking, landscaping, and circulation areas on the
site. The property owner(s) will maintain such
areas at all times. It is possible that one or
more of the pad sites will be sold to individual
tenants. In such cases, the tenant would be
responsible for maintenance of all improvements
through a common area association.
T
ESTIMATED EMPLOYMENT
It is estimated that approximately 150 persons
wouid be employed by the tenants of this project.
ASSUMPTIONS AND CHOICES
Access - Vehicular access points to the site are
located so as to minimize any possible disruption
on surrounding streets. One right-in/right-out
access point on South College Avenue is located so
that it may serve as a convenient point of access
for future development (see Mater Plan SP-1). The
Master Plan also provides a shared access on JFK
Parkway that allows for a tie-in for users of the
Fountainhead project to the north. Two access
points on Troutman Parkway are directly opposite
existing driveways to the Pavilion project. All
access points conform to the Super Block #3 Master
Plan of South College properties.
Building Orientation - Given the size and shape
of the site, retail buildings were logically
oriented so that the major focus of the center is
from College Avenue. When combined with future
development and surrounding projects, a total
unified theme is established with provisions for
easy and efficient transitions, both between and
within each individual project.
Parking - Parking areas have been oriented to
provide for efficient vehicular ingress and
egress, and for pedestrian access to the project
tenant spaces. Parking rows have a landscaped
island at each end to help define major
circulation corridors, and to break up large
expanses of asphalt. In addition, several full
length landscape islands have been designed in
order to further divide the parking area into
"sub -lots", which relate to various elements of
the project.
Design - Many elements of the general design
themes from the Fountainhead project, such as
building colors and landscape elements, have been
incorporated into this project to help unify the
commercial area of which this project is a part.
Ir "
•
CONFORMANCE TO CRITERIA
1. The project is contiguous to an arterial
street - S. College Avenue.
2. The project is contiguous to an existing
transit route.
3. The project is adjacent to two existing
community/regional scale projects, with planned
access between each, and becomes a part of a
larger unified community/regional center.
4. The project gains its primary vehicular access
from Troutman Parkway.
5. The project is planned to allow for easy
pedestrian and vehicular access to existing and
future development of this and adjacent projects.
6. The project has more than 1/6 contiguity with
existing urban development.
7. The project conforms to the approved Super
Block #3 Master Plan of South College properties.
LAND USE CONFLICTS
The project has no areas of land use conflicts, as
the site is bounded on three sides by arterial or
collector streets (S. College Avenue, Troutman
Parkway, and JFK Parkway), and on the fourth side
by an existing commercial center (The
Fountainhead). To further aid in overall area
planning, this project provides for logical
circulation patterns between existing projects
both to the north and the south, and limited
access points on S. College Avenue and JFK Parkway
- intended for common usage by all properties. In
addition, side and rear elevations which face
either JFK or Troutman Parkways will be screened
with a combination of walls and/or landscaping.
ENERGY CONSERVATION
Major areas of storefront glass are oriented
towards the north and west with 5'-4" wide
overhangs, thereby minimizing as much as possible
daytime solar heating loads on the buildings. In
addition, all storefront glass will be insulated.
Walls will be constructed of concrete block, and
will be insulated. Roofs will have R-20
insulation. High efficiency lighting and heating,
ventilating, and air conditioning units will be
utilized.
DEVELOPMENT SCHEDULE
Construction is expected
City approval, and take
complete. Construction
improvements will be
with the construction
project schedule.
to begin immediately upon
approximately 6 months to
of any required public
accomplished concurrently
process. See attached
ACTIVITY Community/Regiona
Shopping Center
DEFINITON:
Cluster of retail and service establishments designed to serve consumer
demands from the community as a whole or a larger area. The primary func-
tional offering is at least one full -line department store. The center also
includes associated support shops which provide a variety of shopping goods
including general merchandise, apparel, home furnishings, as well as a
variety of services, and perhaps entertainment and recreational facilities.
C RTERIAEach of the following applicable criteria must be
answered "yes" and implemented within the develop-
ment plan.
Yes No NA
1. Does the project gain its primary
vehicular access from a street other
El
than South College Avenue?
2. Are all repair, painting and body work
activities, including the storage of
refuse and vehicle parts, planned to take
X
place within an enclosed structure?
3. DOES THE PROJECT EARN AT LEAST 50% OF THE
MAXIMUM POINTS AS CALCULATED ON "POINT CHART
El
D
C" FOR THE FOLLOWING CRITERIA:
a. Is the project located within "north" Fort Collins?
b. Is the project contiguous to a collector and/or arterial
street?
c. Is the project contiguous to an existing transit route?
d. Is the project adjacent to and functionally a part
of an
existing
community/regional shopping center?
continued
—16—
�- continued
e. Does the project gain its primary vehicular access from a non -
arterial street?
f. Is there direct vehicular and pedestrian access between on -site
parking areas and adjacent existing or future off -site parking
areas which contain more than ten (10) spaces?
g. Does the activity reduce non-renewable energy usage, through the
application of alternative energy systems, use of existing build-
ings, and through committed energy conservation measures beyond
that normally required by City Code?
h. Is the project located with at least 1/6th of its property boundary
contiguous to existing urban development?
i. If the site contains a building or place in which a historic event
occurred, which has special public value because of notable archi-
tecture, or is of cultural significance, does the project fulfill
the following criteria:
i. Prevent creation of influences adverse to its preservation,
ii. Assure that new structures and uses will be in keeping with
the character of the building or place. Imitation of
period styles should be avoided; and
iii.Propose adaptive use of the building or place that will
lead to its continuance, conservation, and improvement in
an appropriate manner while respecting the integrity of the
neighborhood.
1. -17-
•
•
COMMUNITY/REGIONAL
SHOPPING CENTER
POINT CHART C
For All Critera
Applicable Criteria Only
Criterion
IsThe
Criterion
Applicable
Yes No
I u III Iv
Circle
The
Correct
Score
Yes M* No
Multiplier
Points
Earned
1x11
Maximum
Applicable
Points
a. "North" Fort Collins
X
X
2
0
1
0
2
b. Arterial street
X
X
0
2
4-
4
c. Transit route
X
L22I
0
2
4-
4-
d. Part of regional center
X
X
2
0
3
b
e. Non -arterial access
X
X
0
2
4-
4
f. Joint parking
X
1
2
0
2
4
"--
g. Energy conservation
X
1
2
0
4
0
8
h. Contiguity
X
X
2
0
5
10
10
i. Historic preservation
1
2
0
2
j.
120
k
120
I
120
VW —Very Well Done Totals 32. 4-2.
V VI
Percentage Earned of Maximum Applicable Points VNI =vil ,' %
vll
SIM