April 26, 1989
Mr. Dick Gruitch
Mr. Norman Hodge
Architects/Engineers West
9605 Maroon Circle; Suite 215
Englewood, CO 80112
Dear Sirs:
For your information, attached is a copy of the Staff's comments concerning
the Dellenbach Chevrolet amended PUD Plan, which was presented before the
Conceptual Review Team on April 24, 1989.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6750.
Sincerely,
6�
Linda Ripley
Senior Planner
Attachment
LR/bh
xc: Tom Peterson, Director of Planning
Mike Herzig, Development Coordinator
Jim Faulhaber, Civil Engineer I
Project Planner
File
300 LaPorte Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
Y
CONCEPTUAL REVIEW STAFF COMMENTS
MEETING DATE: April 24, 1989
ITEM: Dellenbach Chevrolet Amended PUD Plan
APPLICANT: Architects/Engineers West
LAND USE DATA: Request for 3600 square foot showroom addition to an
existing auto dealership.
COMMENTS:
1. Since the proposed addition represents an increase in floor area greater than
2%, the plan must be submitted as an amended PUD and approved by the
Planning and Zoning Board. (Planning)
2. Show building envelopes and dimensions for the addition and the modular
office structure on the site plan. (Zoning)
3. There is a 12 inch water main on the College Avenue side of the project
and an 8 inch water main along Mason/McClelland Street. A sanitary sewer
manhole exists at the northeast corner of the site. Separate taps are
required for additional buildings. (Water and Sewer)
4. The project will be assessed a street oversizing fee paid at the time of
building permit. Check with Mat Baker (221-6605) to see how the fee is
calculated. If new services are proposed utility drawings will be required.
(Engineering)
5. Provide a letter from a registered engineer verifying that the proposed
changes will not effect impervious area or existing flow patterns on the
site. There is an existing detention pond at the southwest corner of the site
which has been partially filled. The detention pond should be re-evaluated
to determine if the fill needs to be removed. Identify the boundary of
floodplain ponding if it effects this site. Contact Glen Schlueter (221-6589)
for further information. (Storm Drainage)
6. The addition will need to meet fire containment requirements per Code.
(Building Inspection)
7. If additional power is required, development charges will apply. The
proposed addition may be located over an existing electrical service line.
(Light and Power)