Loading...
HomeMy WebLinkAboutTIMBERLINE CHURCH PROPERTY ODP - ODP210003 - SUBMITTAL DOCUMENTS - ROUND 1 - PROJECT NARRATIVE 244 North College Ave, #130 I Fort Collins, CO 80524 www.norris-design.com June 30, 2021 City of Fort Collins – Planning & Development Services Attn: Mr. Jason Holland – City Planner 281 North College Avenue Fort Collins, CO 80524 Re: Timberline Church: ODP Narrative and Statement of Planning Objectives. Dear Mr. Holland, On behalf of the owners, Timberline Church and the Board of Governors of the Colorado State University System, we are pleased to provide to the City of Fort Collins these ODP application materials for the property located at and near 2908 S Timberline generally located to the east of the intersection of Timberline Road and Sagebrush Drive within the City of Fort Collins. The following information provides additional application details as required by City of Fort Collins. Proposed is an overall framework for the property that now includes two parcels currently owned by the Board of Governors of the Colorado State University System. The proposed ODP plan shows how an overall framework of existing and future development can grow cohesively on these properties.  Name and Address of Each Owner: SP# 8729200907, 8729200915 8729226901, 8729225904, 8729225902. 8729225905, 8729225903, 8729225901 Board of Governors of the Colorado State University System Timberline Church Campus Delivery 6009 2908 S. Timberline Road Fort Collins, CO 80523 Fort Collins, CO 80525  Statement of Planning Objectives i. Statement of appropriate City Plan Principles and Policies achieved by the proposed overall Development Plan. Response: The proposed ODP is consistent with Fort Collins City. The following are examples principles and policies in which is ODP supports and furthers: o Supporting a Sustainable Pattern of Development. o Principle LIV 2: Promote infill and redevelopment o Policy LIV 2.1 - REVITALIZATION OF UNDERUTILIZED PROPERTIES o Principle LIV 4: Enhance neighborhood livability o Principle LIV 5: Create more opportunities for housing choices. o Policy LIV 5.2 - SUPPLY OF ATTAINABLE HOUSING o Policy LIV 5.3 - LAND FOR RESIDENTIAL DEVELOPMENT o Policy LIV 5.5 - INTEGRATE AND DISTRIBUTE AFFORDABLE HOUSING o Principle T 2: Build and maintain high-quality infrastructure that supports all modes of travel. o Principle T 7: Support walking as a safe, easy and convenient travel option for all ages and abilities by building a connected network of sidewalks, paths and trails. ii. Description of existing and proposed, open space, buffering, landscaping, circulation, transition areas, wetlands and natural areas. Response: A majority of the property is already developed and/or disturbed. 244 North College Ave, #130 I Fort Collins, CO 80524 www.norris-design.com o Existing and proposed open space – No additional open space is planned with this new ODP. An existing detention is in place and will continue to be utilized to serve existing and proposed development. o Existing and proposed buffering – No additional buffering is proposed with this ODP. With canal and existing environmentally sensitive areas adjacent on the south and south-east side of the property, future development will be required to address and sufficiently meet the requirements of the Fort Collins Land Use Code. o Existing and proposed landscaping – Landscaping is provided in previously developed areas of the OPD. As the project develops landscaping will be provide per Fort Collins standards, and designed in such a way that it is cohesive with existing landscaping so that a common theme can be established and carried throughout this area, even as it develops out in multiple phases over several years. o Existing and proposed circulation – Circulation is proposed to occur in much the same matter is it currently established, with a few notable enhancements, including the addition of another connection at Timberline Road, as well as the idea to provide more formal circulation patterns for future development, specially at the northern side of the property. o Existing and proposed transition areas – No existing or proposed transition areas are planned o Existing and proposed wetlands and natural areas. iii. Estimate of number of employees for commercial and industrial uses. Response: This information is not known at this time. iv. Description of rationale behind the assumptions and choices made by the applicant. Response: The existing Timberline Church comprises a large area within the overall ODP area and is driving the proposed concept plan and the framework being developed. This OPD is identifying areas where future development of the site may occur based on the existing framework in tandem with the proposed updates as well as a new proposed access off of Timberline Road. v. Written narrative addressing each /issue raised at the neighborhood meetings(s) if a meeting was held. A neighborhood meeting held on May 3, 2021, was attended by approximately 15-20 members of the community plus several members of Fort Collins Staff and the Applicant team. At the meeting, Staff and the Applicant team gave presentations about the approval process and the proposed project. A majority of the questions centered around the potential for adverse traffic impacts and user impacts to the surrounding neighborhood. Traffic impacts are being mitigated by providing access directly to Timberline Road, which will mitigate impacts to the existing neighborhood. In addressing the comment about impacts on the surrounding neighborhood, this new community is determined to provide amenities and services to its users, so it is difficult to determine impacts on the surrounding neighborhood. The Applicant and Owner are committed to being good neighbors and will continue to work with the surrounding community to understand their concerns and find practical solutions as the property develops over time. vi. Name of the project as well as any previous name(s) the project may have been known by. Response: Timberline Church ODP vii. A narrative description of how conflicts between land uses are being avoided or mitigated. Response: We do not believe conflicts between land uses currently occur or will occur within the development of this ODP. Current standards within the Fort Collins land use code. This ODP is proposing additional vehicular connectivity to Timberline Road as well as establishing an enhanced neighborhood connection to the greater trail system that is adjacent to this site. Both of which mitigate 244 North College Ave, #130 I Fort Collins, CO 80524 www.norris-design.com any real or perceived conflicts and further strengthen this development with the greater Fort Collins community.  Additional ODP Required ODP Submittal Materials. o A copy of the applicable conceptual review letter and an explanation of how issues have been addressed. Response: A response to the Concept Review letter has been included with these submittal materials. IT should be a noted, a vast majority of the comments received dealt with the accompanying Multi- family comments, with few, ODP specific comments. o A legal description of the site. A PARCEL OF LAND LOCATED IN THE WEST HALF OF SECTION 29, TOWNSHIP 7 NORTH, RANGE 68 WEST OF THE 6TH PRINCIPAL MERIDIAN CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO o A statement of proposed ownership and maintenance responsibility of public and private open space areas. Response: No proposed open space is planned with this ODP. Open space areas will be identified within each future PDP as proposed in the future. Regardless, at this time it is anticipated that all open space will be privately owned and maintained. o A development phasing schedule including the sequence for each phase, approximate size in areas of each phase, and proposed phasing of construction of public improvements, recreation, and common open space areas. Response: Phasing is as shown. o Phase 1 - Includes Planning Area 3 which is comprised of the currently developed Timberline Church, no updates or changes are proposed. o Phase 2 – Includes Planning Area 4 – This area is planned for multi-family development, of which a PDP application is currently under review through the City of Fort Collins. This phase also includes the connection from Planning Area 4 to Timberline Road. (between Planning Areas 5 & 6) o Phase 3 and beyond – At this time, the order, type of, or timing of the remaining Planning Areas is not known. Overall infrastructure improvements required for each phase have been or will be made as needed as each phase of development occurs, in accordance with what requirements of each type of development. Improvements may be referenced by PDP plans included as development occurs. o Master utility and overall Drainage Plan for water, sewer and stormwater. Response: These plans are included within this ODP Submittal. o Overall Drainage report, which complies with the appropriate City Basin Master Plans in the Storm Drainage Design Criteria and Construction Standards. Response: This plan is included within this ODP Submittal. o A Transportation Impact Analysis (TIA) prepared in accordance with the Transportation Impact Analysis Guidelines. Response: This plan is included within this ODP Submittal. o Other information and data as the Director may require for full and complete consideration of the development. 244 North College Ave, #130 I Fort Collins, CO 80524 www.norris-design.com Response: We believe we have included all requested submittal materials. Please reach out if Staff believes other items should be requires. We are excited to bring this project to the City of Fort Collin and look forward to working with you and the City throughout this process. Please feel free to reach out to me at 970.409.3414 or rmcbreen@norris-design.com with any questions or comments Sincerely, Norris Design Ryan F. McBreen Principal