HomeMy WebLinkAboutMAVERIK - FDP210003 - SUBMITTAL DOCUMENTS - ROUND 3 - STAFF'S PROJECT COMMENTS  Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6689
970.224.6134 ‑ fax
fcgov.com/developmentreview
July 09, 2021
Cassie Younger
Maverik
185 State Street
Salt Lake City, UT 8411
RE: Maverik, FDP210003, Round Number 3
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of Maverik. If you have questions about any comments, you may
contact the individual commenter or direct your questions through your Development
Review Coordinator, Brandy Bethurem Harras via phone at 970‑416‑2744 or via email at
bbethuremharras@fcgov.com.
Comment Summary:
Department: Development Review Coordinator
Contact: Brandy Bethurem Harras, 970‑416‑2744, bbethuremharras@fcgov.com
Topic: General
Comment Number: 4
04/06/2021: FOR FINAL APPROVAL:
All "For Final Approval / For Approval" comments need to be addressed and
resolved prior to moving forward with the final documents and recording of this
project. I will provide a recording checklist and process information.
Comment Number: 1
04/06/2021: INFORMATION:
I will be your primary point of contact throughout the development review and
permitting process. If you have any questions, need additional meetings with the
project reviewers, or need assistance throughout the process, please let me
know and I can assist you and your team. Please include me in all email
correspondence with other reviewers and keep me informed of any phone
conversations. Thank you!
Comment Number: 5
05/17/2021: INFORMATION:
LUC 2.211 Lapse, Term of Vested Right: Within a maximum of three (3) years
following the approval of a final plan or other site specific development plan, the
applicant must undertake, install and complete all engineering improvements
(water, sewer, streets, curb, gutter, street lights, fire hydrants and storm
drainage) in accordance with city codes, rules and regulations. The period of
time shall constitute the "term of the vested property right." Failure to undertake
and complete such engineering improvements within the term of the vested
property right shall cause a forfeiture of the vested property right and shall
require resubmission of all materials and reapproval of the same to be
processed as required by this Code. All dedications as contained on the final
plat shall remain valid unless vacated in accordance with law.
Department: Engineering Development Review
Contact: Spencer Smith, 970‑221‑6603, smsmith@fcgov.com
Topic: General
Comment Number: 1
07/06/2021: FOR DCP/BUILDING PERMIT
The City has had some coordination on being able to collect this fee. I should
be able to give you a final number prior to your DCP issuance. If you are ready
to move forward with construction prior to this being provided, we will have
some flexibility to allow you to begin construction prior to paying it, if absolutely
necessary, so this should not hold up your construction schedule.
04/06/2021: FOR FINAL APPROVAL:
This comment is just a reminder that there is a repayment due to the City of Fort
Collins for previously constructed I‑25/Hwy 392 interchange improvements. I
believe I provided an estimated cost of the repay in a previous comment or
email. Please contact me if you would like to have the exact amount provided.
Comment Number: 2
07/06/2021: DEVELOPMENT AGREEMENT
I am continuing to work with City staff on finalizing the DA draft. Once our City
Attorney has reviewed the draft, it will be sent to the development team for review.
Comment Number: 3
07/06/2021: DEVELOPMENT CONSTRUCTION PERMIT
I understand that construction may be planned to begin later this year. Please
continue to keep me in the loop regarding your construction schedule and when
you will be looking to have the DCP meeting, which is required prior to DCP
issuance. I have sent the cost estimate and utility plans to our Chief Engineering Inspector
for review. I will follow up once I have received either approval or comments from him.
Comment Number: 5
05/24/2021: FOR FINAL APPROVAL
Thank you for submitting the easement documents for review. Please continue
to work with me to get the easements approved and then recorded. Please
note that the developer will need to pay the appropriate recording fees to
Larimer County in order to record all documents. Once the easement
documents are finalized, the City will provide you with the final amount of the recording fees.
Department: Traffic Operation
Contact: Steve Gilchrist, 970‑224‑6175, sgilchrist@fcgov.com
Topic: General
Comment Number: 2
05/24/2021: FOR FINAL APPROVAL:
Signing and Striping redlines have been provided for the changes requested in the previous comment.
Department: Stormwater Engineering
Contact: Dan Mogen, 970‑305‑5989, dmogen@fcgov.com
Topic: General
Comment Number: 2
07/07/2021: FOR FINAL APPROVAL ‑ UPDATED:
I appreciate the continued coordination and discussion around updates.
Please see updated redlines and contact me for discussion.
05/24/2021: Thank you for reaching out, meeting, and coordinating on these
latest updates and addressing many of my concerns. While many have been
addressed, there are still some questions remaining regarding the outlet
structure, spillway, hydraulic sizing, and other details. Please see updated
redlines for reference, and I encourage another meeting to review redlines and potential revisions.
04/05/2021: There are numerous redlines from preliminary review that have not
been addressed including details on the spill containment system, the sand
filters and forebays. Please review current redlines, and provide written responses on the PDFs.
I encourage you to reach out with any questions or to review potential revisions,
and I’d be happy to set up a meeting or conference call to do so in place of written responses.
Comment Number: 3
07/07/2021: FOR RECORDING ‑ UPDATED:
Drainage easement is required to be recorded along with project approval.
05/24/2021: Thank you for clarifying easement boundaries and providing
easement dedication documents. Comment to remain active to ensure
easement is dedicated prior to final project approval.
04/05/2021: Please clarify proposed drainage easements areas to include all
sand filters, detention pond, and outfall. Please provide easement dedication or plat for review.
Comment Number: 5
07/07/2021: DEVELOPMENT AGREEMENT ‑ UPDATED:
Please see redlines regarding final details needed for SOPs.
05/24/2021: Thank you for providing initial SOPs; clarification is needed on
some of the details prior to final approval and inclusion in the DA. Please see
redlines for additional information.
04/05/2021: Please provide spill containment details in Standard Operating
Procedures (SOPs) for inclusion in the DA. Please see redlines for additional
details needed on the spill containment systems.
Department: Environmental Planning
Contact: Scott Benton, (970)416‑4290, sbenton@fcgov.com
Topic: General
Comment Number: 2
03/30/2021: FOR DCP AND DEVELOPMENT AGREEMENT
Since a humane form of fumigation is to be used (PERC) the lower
payment‑in‑lieu fee of $3,797.08 is available. The payment‑in‑lieu is due prior
to issuance of the DCP, and the fee and payment mechanism is required to be
recorded in the Development Agreement.
Comment Number: 4
06/30/2021: No further comments for FDP phase. Looking forward to
addressing prairie dogs as per the plan for DCP issuance.
Department: Building Services
Contact: Russell Hovland, 970‑416‑2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1
04/02/2021: BUILDING PERMIT:
Construction shall comply with adopted codes as amended. Current adopted codes are:
2018 International Building Code (IBC) with local amendments
2018 International Existing Building Code (IEBC) with local amendments
2018 International Energy Conservation Code (IECC) with local amendments
2018 International Mechanical Code (IMC) with local amendments
2018 International Fuel Gas Code (IFGC) with local amendments
2018 International Swimming Pool and Spa Code (ISPSC) with local amendments
2018 International Plumbing Code (IPC) as amended by the State of Colorado
2020 National Electrical Code (NEC) as amended by the State of Colorado
Copies of current City of Fort Collins code amendments can be found at fcgov.com/building.
Accessibility: State Law CRS 9‑5 & ICC/ANSI A117.1‑2017.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Loads: Risk Category II (most structures):
· 140mph (Ultimate) exposure B or · Front Range Gust Map published by
The Structural Engineer's Association of Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code: 2018 IECC commercial chapter.
INFORMATIONAL ITEMS:
· Commercial occupancies must provide 10ft setback from property line and 20
feet between other buildings or provide fire rated walls and openings per chapter 6 and 7 of the IBC.
· City of Fort Collins amendments to the 2018 IBC require a full NFPA‑13
sprinkler system per IBC chapter 9 or when building exceeds 5000 sq.ft. (or
meet fire containment requirements).
· Prescriptive energy compliance with increased insulation values is required for
buildings using electric heat.
· A City licensed commercial general contractor is required to construct any new commercial structure.
Comment Number: 2
04/02/2021: BUILDING PERMIT:
A passing building air tightness test (blower door) is required before CO can be issued.
Department: Technical Services
Contact: Jeff County, 970‑221‑6588, jcounty@fcgov.com
Topic: Construction Drawings
Comment Number: 4
07/06/2021: FOR FINAL APPROVAL‑UNRESOLVED:
Please provide the following information for the Benchmark Statement in the
EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS
DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION
SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF
FORT COLLINS DATUM) = NAVD88 DATUM ‑ X.XX’.
Comment Number: 6
07/06/2021: FOR FINAL APPROVAL‑UNRESOLVED:
Some of the sheet titles in the sheet index do not match the sheet titles on the
noted sheets. See redlines.
Comment Number: 7
07/06/2021: FOR FINAL APPROVAL‑UNRESOLVED:
All Benchmark Statements must match on all sheets.
Comment Number: 8
07/06/2021: FOR FINAL APPROVAL‑UNRESOLVED:
There are line over text issues. See redlines.
Comment Number: 9
07/06/2021: FOR FINAL APPROVAL‑UNRESOLVED:
There are text over text issues. See redlines.
Topic: Site Plan
Comment Number: 2
07/06/2021: FOR FINAL APPROVAL‑UNRESOLVED:
There are line over text issues. The 4/06/21 redlines have been included.
Comment Number: 5
07/06/2021: FOR FINAL APPROVAL‑UNRESOLVED:
Please provide the following information for the Benchmark Statement in the
EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS
DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION
SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF
FORT COLLINS DATUM) = NAVD88 DATUM ‑ X.XX’.
Department: Water Conservation
Contact: Eric Olson, 970‑221‑6704, eolson@fcgov.com
Topic: General
Comment Number: 1
03/26/2021: BUILDING PERMIT:
Irrigation plans are required no later than at the time of building permit. The
irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of
the Land Use Code. Direct questions concerning irrigation requirements to Eric
Olson, at 221‑6704 or eolson@fcgov.com