HomeMy WebLinkAboutLAURIE SUBDIVISION PUD, 2ND FILING - FINAL - 44-89E - CORRESPONDENCE - OTHER WATER AND OR SANITATION DISTRICTS (2)oyyINS-40t- i •
7
SOUTH FORT COLLINS
w d
Sanitation District
DI S`S4�G
M E M O
� �V%D
TO: Mike Herzig, Development Engineering Manage -17 1 1V 11s92
City of Fort Collins p
Dent
FROM: Terry Farrill, Systems Engineer`
THRU: Mike DiTullio, District Manager
DATE: January 6, 1992
SUBJECT: Laurie Subdivision, 2nd Filing
*****************************************************************
The Fort Collins -Loveland Water District and the South Fort Collins
Sanitation District have reviewed the above mentionedproject and
submit the following comments:
All valuing and fittings for the water line are to be
shown and stationed.
Trees and shrubs are not to be planted over the water and
sanitary sewer lines.
The existing four inch water line located in Shields
Street is to be tied into the proposed eight inch water
line for Wooded Creek Court.
As indicated in prior comments, the specifications
indicated on sheet SD1 are to be deleted. District
details are to be used whenever possible.
The profile sheets are to indicate the 18 inch RCP
Applewood Estates irrigation ditch culvert.
It was discussed in previous meetings that the private access road
would be straightened out as much as possible and that a drawing
would be provided to indicate the location of all utilities within
the private access road, these were not included in the review set.
4700 South College Avenue
Fort Collins, Colorado 80525��
Telephone 226-3104 -- 669-4321
•
•
The Fort Collins -Loveland Water District will require that the
private fire lines be detailed. The fire service is to be
installed with a meter in accordance with the District's detail for
meter pit installations. The fire service and the water service
are to be separated by minimum five foot clearance horizontally.
Given the magnitude and number of concerns on this project, the
Districts will require another review. It is strongly recommended
that the Engineer meet with the District to resolve these issues
and avoid potential' delays.
If you have any questions, please feel free to contact me.
cc: Don Richmond