Loading...
HomeMy WebLinkAboutLAURIE SUBDIVISION PUD, 2ND FILING - FINAL - 44-89E - CORRESPONDENCE - STAFF'S PROJECT COMMENTS (2)Services Planning Department March 15, 1992 Doyle Pergande Jack Johnson Company 1910 Prospector Ave., Suite 200 Park City, Utah 84060 Dear Doyle: • We're down to the wire on Laurie Subdivision PUD. Here are a couple of final things I noted on the plans we received on Friday: 1. A note should be placed on the utility plans (general notes sections) that a pre -construction meeting will be required. 2. The language of the conservation easement (on the plat) should include "All maintenance of the above described easement, including maintenance of erosion control materials.." 3. A note should be placed on the plat referencing that there are special conditions and restrictions shown on the site plan and landscape plan, that apply to the lots as shown on the plat. 4. Clarification is needed re: where the plant relocation and deadfall placement detail fits within the conservation easement area. 5. The "City Planning" Signature Block on the plat should reflect approval by the Planning and Zoning Board and signed by the Secretary of the Planning and Zoning Board. 6. The irrigation easement shown on the site plan on Lot 10 should be extended to the SE corner of this lot. 7. Note "A" on the site plan should reflect 10 single family lots. ..8. The site plan shows a 30' wide driveway with shoulders. This should be a 20' wide driveway, with 3' shoulders on either side. 9. Density for the 2nd filing on the site plan should show as .81 DU/acre, rather than 1.2 DU/acre. 10. The note on the site plan (Note 2 ) and landscape plan (Note 14 ) regarding individual erosion control plans should reflect this requirement for Lots 2, 3, 4, 5 and 8. These are the final changes I am aware of to date. I do not have 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750 • final comments from Stormwater, Natural Resources or Engineering, based on the plans we received on Friday; however, the items listed above are the ones I feel are most needed for the Planning and Zoning Board to see. If there are additional comments and/or revisions from the other departments, these items may be addressed after the Planning and Zoning Board hearing on March 23. The final documents I need by 3:00 P.M. on Tuesday, March 17 are as follows: a. Twelve sets of the site plan, landscape plan and plat b. 8-1/2 x 11" PMT of the site plan, landscape plan and plat C. colored rendering of landscape plan (unfolded) Please call me immediately if you have any questions on the above comments. Sincereyiy, Sherry Albdr son -Clark, AICP Chief Plane 1