Loading...
HomeMy WebLinkAboutMAVERIK - FDP210003 - DOCUMENT MARKUPS - ROUND 3 - UTILITY PLANS (9)VANSTOP STOP COVER SHEET 1 FINAL UTILITY PLANS FOR MAVERIK INC. STORE LOT 2, INTERSTATE LAND HOLDINGS MINOR LAND SUBDIVISION FILE NO. 12-S3124 A PORTION OF THE SW 1 4 OF SECTION 15, T6N, R68W, OF THE 6TH P.M. CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF C OLORADO MARCH, 2021 VICINITY MAP All changes, addendums, additions, deletions and modifications to these drawings must be approved, in writing, by the Fort Collins-Loveland Water District and the South Fort Collins Sanitation District. District Engineer Date FORT COLLINS - LOVELAND WATER DISTRICT SOUTH FORT COLLINS SANITATION DISTRICT PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-05-02Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 05/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. MARCH 10, 2021 19-122-0006 37 Does not match the required format. See written comments. 5/25/2021 These do not match the titles on these sheets. 7/06/2021 These redli n e s a r e from the 5 / 2 5 r e v i e w . GENERAL NOTES 2 ’ “” – – ’ ’ ’ ’ “” – – “” “”“” PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-05-02Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 05/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. MARCH 10, 2021 19-122-0006 37 5/25/2021 **All Benchmark Statements must match on all sheets.** 7/06/2021 SDVANS TOP STOP SDSITE PLAN 4 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-05-02Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 05/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. MARCH 10, 2021 19-122-0006 37 5/25/2021 See the 4/06/21 Planning Set Site Plan redlines. 7/06/2021 SDSSSSSSWWWWWWW W W WWW W W W W W W SSSSSSSS SS SS SS SS SS SS W W W SDSSSSSSWWWWWWW W W WWW W W W W W W SSSSSSSS SS SS SS SS SS SS W W W EXISTING SITE SURVEY 5 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-05-02Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 05/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. MARCH 10, 2021 19-122-0006 37 5/25/2021 **All circled are line over text.** See Sheet 1. 7/06/2021 SDSSSSSSSSWWWWWWW W W WWW W W W W W W SSSSSSSS SS SS SS SS SS SS SS W W W W W SDSSSSSSSSWWWWWWW W W WWW W W W W W W SSSSSSSS SS SS SS SS SS SS SS W W W W W DEMOLITION PLAN 6 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-05-02Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 05/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. MARCH 10, 2021 19-122-0006 37 5/25/2021 See Sheet 1. 7/06/2021 SDWWWWWWW W W WWW W W W W W W W W W W VANS TOP STOP SDWWWWWWW W W WWW W W W W W W W W W W HORIZONTAL CONTROL PLAN 7 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-05-02Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 05/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. MARCH 10, 2021 19-122-0006 37 5/25/2021 **All circled are line over text.** 7/06/2021 SDVANS TOP STOP SDSITE EASEMENT PLAN 8 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-05-02Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 05/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. MARCH 10, 2021 19-122-0006 37 5/25/2021 **All circled are line over text.** 7/06/2021 SD SSSSSSWWWWWWW W W WWW W W W W W W SSSSSSSS SS SS SS SS SS W VANS TOP STOP SD SSSSSSWWWWWWW W W WWW W W W W W W SSSSSSSS SS SS SS SS SS W B B BBOVERALL GRADING PLAN 9 N.T.S. PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-05-02Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 05/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. MARCH 10, 2021 19-122-0006 37 5/25/2021 *Mask all elevations.*Cut Off Text Text Over Text Text Over Text Line Over Text Line Over Text Line Over Text **All circled are typical line over text issues, except as noted. Correct all similar.** 7/06/2021 SDVANSDB B DETAILED GRADING PLAN 10 N.T.S. PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-05-02Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 05/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. MARCH 10, 2021 19-122-0006 37 5/25/2021 Line Over Text Line Over Text Line Over Text **All circled are typical line over text issues. Correct all similar.** 7/06/2021 SDSSSSSSSSSSSSSSWWWWWWWWWW W W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W WWVANSTOP STOP SDSSSSSSSSSSSSSSWWWWWWWWWW W W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W WWBBDETAILED GRADING PLAN 11 N.T.S. PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-05-02Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 05/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. MARCH 10, 2021 19-122-0006 37 5/25/2021 **All circled are typical line over text issues. Correct all similar.** 7/06/2021 POND GRADING DETAIL 12 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-05-02Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 05/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. MARCH 10, 2021 19-122-0006 37 5/25/2021 Line Over Text Line Over Text 7/06/2021 SDSSSSSS SS SS SS VANSTOP STOP SDSSSSSS SS SS SS HARDSCAPE PLAN 13 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-05-02Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 05/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. MARCH 10, 2021 19-122-0006 37 5/25/2021 Line Over Text Line Over Text 7/06/2021 SDSSSSSSSSWWWWWWW W W WWW W W W W W W SSSSSSSS SS SS SS SS SS SS SS W W W W VANS TOP STOP SDSSSSSSSSWWWWWWW W W WWW W W W W W W SSSSSSSS SS SS SS SS SS SS SS W W W W OVERALL UTILITY PLAN 14 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-05-02Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 05/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. MARCH 10, 2021 19-122-0006 37 5/25/2021 **All circled are typical line over text issues. Correct all similar.** 7/06/2021 VANSTORM DRAIN PROFILE H-SCALE: 1"=20' V-SCALE: 1"=4' 16 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-05-02Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 05/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. MARCH 10, 2021 19-122-0006 37 H-SCALE: 1"=20' V-SCALE: 1"=4' 5/25/2021 **All circled are line over text.** *Mask all text in all profiles.* 7/06/2021 4870 4875 4880 4885 4890 4895 4900 4905 4910 4870 4875 4880 4885 4890 4895 4900 4905 4910 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 SD SSSSSSSSSSWW WWWWW W W W W W WWW W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W VANST O P ST O P SD SSSSSSSSSSWW WWWWW W W W W W WWW W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W BBB B FRONTAGE ROAD PLAN AND PROFILEATTACHED WALK PLAN VIEW 4'X6' TREE GRATE DETAIL (TYP.) SCALE: 1"-10' 18 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-05-02Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006RD ATTACHED WLK EXH.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 05/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. MARCH 10, 2021 19-122-0006 37 5/25/2021 Line Over Text (Typical) 7/06/2021 SD INITIAL EROSION CONTROL PLAN 21 13 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-05-02Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 05/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. MARCH 10, 2021 19-122-0006 37 5/25/2021 **All circled are line over text.** 7/06/2021 SDSD INTERIM EROSION CONTROL PLAN 22 13 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-05-02Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 05/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. MARCH 10, 2021 19-122-0006 37 5/25/2021 Mask Text Mask Text **All circled are typical line over text issues. Correct all similar.** *Mask all text in hatching. Correct all similar.* 7/06/2021 SDSD FINAL EROSION CONTROL PLAN 23 13 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-05-02Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 05/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. MARCH 10, 2021 19-122-0006 37 5/25/2021 **All circled are typical line over text issues. Correct all similar.** *Mask all text in hatching. Correct all similar.* 7/06/2021 SDSSSSWWWWWWW W W WWW W W W W W W SSSSSSSS SS SS SS SS VANS TOP STOP SDSSSSWWWWWWW W W WWW W W W W W W SSSSSSSS SS SS SS SS FIRE ACCESS PLAN 26 13 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-05-02Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 05/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. MARCH 10, 2021 19-122-0006 37 5/25/2021 **All circled are line over text.** 7/06/2021 TRASH ENCLOSURE DETAILS 27 13 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-05-02Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 05/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. MARCH 10, 2021 19-122-0006 37 FI R E L A N E - N O P A R KIN G FIRE NO PARKING LANE 5/25/2021 Mask Text 7/06/2021 C SAND FILTER "A" FOREBAY PLAN SECTION C SECTION B BBA SECTION A AASAND FILTER "B" FOREBAY PLAN SAND FILTER "C" FOREBAY PLAN SAND FILTER FOREBAY DETAILS 34 PROJECT NUMBER ISSUE DATE: REVISIONS:MAVERIK INC. STOREI-25 & E. COUNTY RD. 32 / HIGHWAY 392FORT COLLINS, CONo. Date Description NOTE: Conflicting information or errors found inthe construction documents should bebrought to the attention of the architectimmediatly. In the event of a conflict in thedrawings, bidder should not assume theleast expensive option will meet theproject requirements. Bid documents should not be separatedor issued as partial sets tosubcontractors. Bidders are responsiblefor all portions of the documents thatpertain to work covered by sub-bids.Bidder assumes full responsibility forerror or misinterpretations resultingfrom partial sets of Bidding Documentsby itself or any sub-bidder.2021-05-02Plot Date: File Location:O:\1200-Denver\DCI-Civil\Projects\2019\19-122-0006-MAVERIK-FORT COLLINS-CO\19-122-0006FDP.dwg OF 1331 17TH STREET SUITE 605DENVER, COLORADO 80202PHONE: (720) 439-4700 WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL 05/2021© This document, and the ideas and designs may not be reused, in whole orin part, without written permission from D'Amato Conversano Inc.D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use. MARCH 10, 2021 19-122-0006 37 Mask Text Mask Text Mask Text Mask Text 5/25/20217/06/2021