Loading...
HomeMy WebLinkAboutLAURIE SUBDIVISION PUD - PRELIMINARY - 44-89D - CORRESPONDENCE - STAFF'S PROJECT COMMENTS1 Develor*-nt Services • Planning Department City of Fort Collins June 17, 1991 Dr. Bill Musselwhite 3041 N. Taft Avenue Loveland, CO 80537 Dear Bill: Staff has reviewed the Laurie Subdivision PUD, Preliminary submittal and has the following comments to make on this item: 1. An 8' easement is needed along both sides of Wooded Creek Court. (Note: All easements need to be shown on the preliminary site plan/plat and would be dedicated on the final subdivision plat). 2. A 10' easement is needed along both sides of the private drive, to accommodate PSCO and Light and Power. The driveway also needs to be an easement. This additional 6' easement will need to be graded level with the driveway. 3. The developer should contact the City's Light and Power Utility, Distribution Engineering, to receive information regarding the Utility's construction and development charges. Contact Doug Martine, 221-6700. 4. Rear lot utility easements are needed along all lots and along the north property line of Lots 1 and 9 for telephone cable. 5. Trees should not be planted within 4' of natural gas facilities. 6. The status of the utility easement that connects to Hepplewhite needs to be clarified for Public Service Company, since it was not part of the recorded plat of The Ridge. 7. Note F-4 needs to clearly state who will have responsibility to approve exterior structure features. 8. Setbacks and lot line dimensions need to be shown on the preliminary site plan/plat. 9. Lots 3 - 6 exceed the 660' distance from a single point of access. Homes constructed on these lots must be equipped with an approved residential fire sprinkler system. A note specifying which lots must have sprinkler systems should be added to the site 281 North College avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750 • E plan. 10. Water line size must be shown on the utility plans. The developer must contact the water district to install water taps for sprinkler systems for Lots 3 - 6. 11. Turning radii on the private drive must provide a minimum of 20' inside and 40' outside. 12. Construction and surfacing of the private drive must conform to City street standards. The width, as shown, is adequate, given sprinkler protection of homes on Lots 3 - 6. 13. The list of affected property owners (owners within 500 feet of site) needs to be updated, since more than six months have passed since the original list was submitted. 14. Clarification is needed regarding the Applewood Estates irrigation ditch and whether this ditch is proposed to be piped through this property. 15. Reference is made on the proposed plans regarding revegetation of areas disturbed by the proposed private driveway. Further information needs to be provided regarding these plans, including the extent, types of plant material to be used in revegetation, bank stabilization, etc. 16. Notes E and G on the site plan reference the previous Laurie Subdivision submittal. This information should be added to the new site plan. Any other information from the original submittal (ie. architectural requirements, covenants, tree replacement plan, etc.) that is to be included as part of this new submittal needs to be clarified. 17. Building envelopes on Lots 8 and 9 appear to impact a large area of vegetation. More detail is needed for this area, to determine the nature of the area shown as vegetation and impacts on this area. For example, how many trees would be removed from these lots? Is the vegetation in this area primarily understory, trees, or a combination of both? Specific tree locations should be identified on the site or landscape plan. Tree replacement plans also need to be specified. 18. A revised drainage report and plan and grading plan must be submitted for review. For further information, contact Susan Hayes at the Stormwater Utility, 221-6589. 19. As in the previous submittal, staff has concerns about the crossing of the existing ravine on this site. In order for staff to make a thorough evaluation and determine if mitigation is appropriate/adequate, a profile of the proposed private drive, indicating the extent of cut and fill, needs to be provided. 20. The City Natural Resources Department has concerns about the grass mix shown on the plans. I have attached a preferred grass mix list. The smooth sumac, rhus typina, should be changed to rocky mountain smooth sumac, rhus glabia. Russian olive is an introduced, undesirable species for natural areas and should be replaced with wild plum, chokecherry, or another suitable native shrub. 21. A count of the existing trees and shrubs to be removed needs to be made and indicated on the plans. Will any of the trees or shrubs be relocated? 22. Lots 3, 6, 7, and 8 extend into the open space area/gulch in such a way that the natural areas may be impacted. Lot lines should be redesigned to conform with the natural topography and protect the integrity of the area. 23. Building envelopes are not labeled on the site plan or shown on the landscape plan. The building envelopes and "existing trees to remain" bubbles appear to be in conflict on lots 8 and 9. Please show more information on the plans about what the existing vegetation consists of. 24. What are covenants regarding the landscaping treatment of lots outside of the building envelope? Portions of lots associated with the ravine, should be left in native vegetation. This should be noted on the plans. 25. Please indicate whether the open space will be dedicated as a conservation easement and what will the landscaping treatment be for this area. 26. The general street layout is acceptable to the City Engineering staff for a preliminary submittal. 27. The plan is missing some minor information such as the size of water and sewer lines and location of sidewalks, but is generally acceptable for a preliminary. 28. For final, City standards, following the outline in the Development Manual, should be used for what is required to be shown on the final utility plans and plat. 29. Western Gas Supply Company would like to remind the developer to please have all the existing utilities located before beginning construction. 30. The previously submitted preliminary drainage report must be revised to reflect the new layout. The newly adopted Erosion Control Criteria must also be addressed. 31. In general, this layout is much improved. The major drainage issues are still the sizing of the culverts under the private drive and protecting the existing ravine from erosion due to increased and concentrated flows. S • • 32. Since the road across the ravine is going to be a private drive, maintenance of the embankments and culverts will be the responsibility of the homeowners. 33. Further comments concerning storm drainage can not be made until the preliminary drainage report and grading plan are submitted. Revised plans and documents, addressing the comments above, must be submitted on the following schedule: Noon, Wednesday, July 3, 1991 Noon, Monday, July 15, 1991 - 5 copies of all plans - 10 folded site and landscape plans, a colored site plan and an 8-1/2"x 1111 PMT I will be out-of-town from June 17 until July 8. If any questions arise during my absence, Kirsten Whetstone may be able to assist you. Kirsten can be reached at 221-6750. I will be happy to contact you immediately upon my return, if there are any points to be discussed or resolved. Sincerely, Sherry ertson-Clark, AICP Chief Planner cc Curtis Tanner c/o Jack Johnson Co. FAX # 801-649-1620 0 | » | Intra%.,' 3 RANGE SITES: Loamy Plains, Clayey Plains, Loamy Foothill, and Clayey Foothill Species Variety % of mixture Western Wheatgrass Arriba 35 Barton Rosana Sideoats Grama Vaughn 10 Butte Niner El Reno Haskell Trailway Blue Grama Pastura 10 Hachita Green Needlegrass Lodorm 5 Switchgrass Grenville 20 Big Bluestem Kaw 10 Pawnee Yellow Indiangrass Llano 10 ' Holt Cheyenne OW Seeding rate: 10.5 lbs./acre drilled; 21 lbs./acre broadcast