HomeMy WebLinkAboutLAURIE SUBDIVISION PUD - PRELIMINARY - 44-89D - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSPN JACK JOB -INS COMPANY Nineteen Ten Prospector Avenue Suite Two Hundred Park City, Utah 84060 801 •645.9000 August 5, 1991 Ms. Sherry Albertson -Clark, AICP City of Fort Collins Planning Department 281 North College Avenue Fort Collins, Colorado 80522-0530 Dear Sherry: In response to your letter of 17 June 1991, we are submitting the revised Laurie Subdivision PUD plans. Each of the 33 items requiring revision have been addressed and a brief explanation follows: 1. An 8-foot easement has been shown along Wooded Creek Court (see Preliminary Site Plan/Plat). 2. The actual location or status of the utility easements along the private driveway is pending the action of the utility coordination meeting scheduled for 6 August 1991. 3. The developer will contact the City's light and power utility regarding charges. 4. Rear lot utility easements have been shown as well as easements along the east property line of lots 1 and 9. 5. That tree plantings must be kept away from natural gas utilities has been noted (see General Landscape Plan). 6. Regarding the utility easement from Hepplewhite to the project site, Dr. Bill Musslewhite has purchased that easement. 7. Responsibility for exterior structure features will be placed on the architectural review committee as noted in Note F.4, Preliminary Site Plan/Plat. 8. Setbacks have been identified on lot 1 as typical. Lot line dimensions have been given. See Preliminary Site Plan/Plat. 9. Lots 3-6 will require fire sprinkling as noted on the Preliminary Site Plan/Plat. 10. Water line sizes are shown on the Utility Plan. The developer will contact the water district regarding fire sprinkler system taps. • Land Planning • Architecture • Civil Engineering Ms. Sherry Albertson -Clark RE: Laurie Subdivision August 5, 1991 Page Two 11. The turn -around at the end of the private drive has been revised to encompass a 40-foot outside and 20-foot inside radii. 12. The standard of construction for the private drive has been noted on the Preliminary Site Plan Plat, note 7. 13. An updated list of adjacent property owners was submitted earlier by Don Richmond of Richmond Associates (303) 224- 3140. 14. The irrigation ditch of Applewood Estates will be piped through the project as shown on the Erosion Control and Grading Plan. 15. Revegetation plans are outlined on the General Landscape Plan and the methodology is outlined in the revised Preliminary Drainage Report. 16. Notes E and G have been added to the Preliminary Site Plan/Plat. Additional clarification has been given on the appropriate plans regarding architectural restrictions, plant relocation etc. 17. Specific existing vegetation locations are shown on the General Landscape Plan. Building envelopes have been identified on that plan and adjusted to reduce impacts on the existing vegetation. 18. A revised Preliminary Drainage Report is included with this submittal. 19. A profile of the private driveway is shown on the Erosion Control and Grading Plan. 20. The plant list and the grass seed mix have been revised to show the desired plant material and seed to be used. 21. A count of the existing trees to be removed/relocated is noted on the General Landscape Plan. Among the trees indicated to be removed/relocated, those tress which are suitable to be transplanted will be as recommended by the City Forester. 22. The lot lines on lots 3, 6, 7 and 8 have been adjusted as shown on the plans. r Ms. Sherry Albertson -Clark RE: Laurie Subdivision August 5, 1991 Page Three 23. The building envelopes have been shown, as well as the existing vegetation, on the General Landscape Plan (see also comment 17 of this letter). 24. Areas of lots adjacent to the ravine outside the building envelope will be left in their natural state as noted on the Preliminary Site Plan/Plat. 25. The open space will be dedicated as a conservation easement as indicated on the Preliminary Site Plan/Plat. 26. No response required. 27. The sidewalks and utilities have been identified and labeled on the appropriate plans. 28. At the time of Final Plat application, the Development Manual will be used. 29. Utility companies will be notified to locate existing utilities prior to construction. 30. A revised Preliminary Drainage Report is included with the submittal. 31. The culvert sizing is identified in the Erosion Control and Grading Plan and the erosion control process is outlined in the Revised Drainage Report. 32. Maintenance of the private driveway and embankments will be by the homeowners association as noted on the Preliminary Site Plan/Plat. 33. No response required. This explanation will help in locating how the areas of concern have been addressed. I am including five copies of all the revised plans as requested. If there are further comments, please contact me. Sincerely,; Curtis R. Tanner Planner CRT:mb Enclosures