Loading...
HomeMy WebLinkAboutLAURIE SUBDIVISION PUD - PRELIMINARY - 44-89D - CORRESPONDENCE - RESPONSE TO APPLICANTDevelo Ot Services • Planning Department City of Fort Collins August 28, 1991 Dr. William M. Musslewhite 3041 North Taft Loveland, Co 80537 RE: Laurie Subdivision PUD, Preliminary - #44-89,D Dear Dr. Musslewhite: On August 26, 1991 the Planning and Zoning Board of the City of Fort Collins approved the above referenced project with the following conditions: 1. The language of the proposed conservation easement, including maintenance be reviewed by City staff during final review. 2. Tree and shrub removal plans be submitted for approval for Lots 8 and 9 prior to the issuance of a building permit. 3. Individual erosion control and revegetation plans be required for Lots 3, 6, 8 and 9 prior to the issuance of a building permit, to ensure adequate treatment during construction and revegetation with compatible plant materials. On -site inspection, by City staff, throughout the construction process will be required, to ensure these plans are adhered to. 4. Rip rap areas be designed to allow revegetation and that detailed plans for these sites be submitted for approval at the time of final review. 5. Detailed plans and specifications regarding rip -rap materials, placement, size, etc. and other erosion control methods be submitted for final review. 6. A detailed analysis, along with plans and specifications for rip -rap materials, placement, size etc. and other erosion control methods proposed to stabilize the ravine be submitted for final review. 7. The applicant redesign the east side of the ravine to no more than 4 lots. If you have any questions, please call our office at 221-6750. Sincerely, Sherry Alb�tson-Clark Chief Planner SAC/gjt 281 ' College AvenUe - P.O. Bo\ 580 - Fort Collin, CO S0:;2'-0:;50 - (303) 221-h7/50