Loading...
HomeMy WebLinkAboutMAVERIK - FDP210003 - SUBMITTAL DOCUMENTS - ROUND 3 - SUPPORTING DOCUMENTATIONPROJECT NAME: DATE: LF 0 $7.97 $0.00 $2.25 $0.00 LF 0 $5.14 $0.00 $2.25 $0.00 EACH 0 $6,500.00 $0.00 $170.00 $0.00 Sewer Cleanout EACH 0 $132.07 $0.00 $170.00 $0.00 EACH 1 $5,000.00 $5,000.00 $230.00 $230.00 Sanitary Sewer Inspection Fees $230.00 LF 168 $36.67 $6,160.56 $2.45 $411.60 LF 168 $16.40 $2,755.20 $2.45 $411.60 EACH 2 $539.58 $1,079.16 $255.00 $510.00 EACH 0 $0.00 $0.00 $150.00 $0.00 EACH 0 $0.00 $0.00 $105.00 $0.00 EACH 0 $0.00 $0.00 $105.00 $0.00 EACH 2 $0.00 $0.00 $85.00 $170.00 EACH 0 $0.00 $0.00 $130.00 $0.00 EACH 1 $2,340.79 $2,340.79 $130.00 $130.00 EACH 0 $0.00 $0.00 $130.00 $0.00 EACH 1 $2,340.79 $2,340.79 $400.00 $400.00 EACH 0 $0.00 $0.00 $400.00 $0.00 EACH 1 $4,616.68 $4,616.68 $255.00 $255.00 LF 434 $7.19 $3,120.46 $2.45 $1,063.30 EACH 3 $69.11 $207.33 $85.00 $255.00 Water Inspection Fees $3,606.50 LF 113 $34.57 $3,906.41 $1.50 $169.50 LF 0 $0.00 $0.00 $2.95 $0.00 LF 45 $207.82 $9,351.90 $2.95 $132.75 EACH 0 $0.00 $0.00 $230.00 $0.00 EACH 2 $1,606.10 $3,212.20 $230.00 $460.00 EACH 1 $6,500.00 $6,500.00 $170.00 $170.00 Public Storm Inspection Fees $932.25 LS 1 $15,000.00 $15,000.00 SY 1,500 $19.23 $28,845.00 $2.55 $3,825.00 SY 0 $0.00 $0.00 $2.55 $0.00 LF 670 $17.66 $11,832.20 $2.55 $1,708.50 LF 1,040 $36.99 $38,469.60 $2.55 $2,652.00 EACH 1 $0.00 $0.00 $100.00 $100.00 SY 0 $0.00 $0.00 $0.65 $0.00 SY 180 $50.00 $9,000.00 $1.40 $252.00 SY 0 $0.00 $0.00 $2.55 $0.00 SY 0 $0.00 $0.00 $1.40 $0.00 LF 625 $258.01 $0.00 $2.95 $1,843.75 LF 113 $48.30 $5,457.90 $2.30 $259.90 LF 0 $0.00 $0.00 $2.30 $0.00 LF 168 $48.30 $8,114.40 $2.30 $386.40 Street System Inspection Fees $11,027.55 LS 1 $45.00 $45.00 EACH 3 $600.00 $1,800.00 $30.00 $90.00 LF 0 $0.00 $0.00 $0.40 $0.00 SF 4,190 $20,740.50 Pavement Age 5 Excavation Permit Fees $20,875.50 TOTAL INSPECTION FEES $36,671.80 $165,782.79 Water Meter Pit (1 1/2") Water Meter Pit (3" ) INFRASTRUCTURE CONSTRUCTION COST PER UNIT (COST ESTMATE APPROVED BY THE CITY) TOTAL ESTIMATED INFRASTRUCTURE COST 4" PVC Sewer Main 1" Copper Irrigation Main 1" Water Valves INSPECTION FEE PER UNIT (SET BY THE CITY) TOTAL INSPECTION FEE Monday, April 26, 2021 Maverik Convenience Store and Fuel Station UNIT OF MEASURE ESTIMATED QUANTITY (PROVIDED BY PROJECT ENGINEER) TOTAL PUBLIC INFRASTRUCTURE COST Boring Concrete Pavement Application Potholing Pavement Impact Fees Curb & Gutter Drive Approach Trench - Storm Trench - Sewer Trench - Water Excavation Permit Retaining Wall (Concrete, Masonry, Stone) Asphalt Pavement Sidewalk** Pedestrian Ramps Apron Gutter Cross Pan Fire Access Grass Crete Water Connection/Disconnect Grading 4" Fire Line Fitting (Bend/Tee/Cross)* Public Storm Sewer System 12" Storm Reinforced Concrete Pipe Storm Concrete Headwall/Wing Walls Box Culvert Storm Chase Storm Inlet All Types Storm Manhole Street System & Trenching Water Fire Hydrant 2" Water Valves Water Meter Pit (3/4" ) * PRIVATE IMPROVEMENTS REQUIRING CITY INSPECTIONS WILL NEED TO BE INCLUDED. HOWEVER PRIVATE IMPROVEMENTS WILL NOT BE INCLUDED IN THE TOTAL INFRASTRUCTURE COST FOR BONDING ** INCREASE SIDEWALK LENGTH FOR ANY SIDEWALKS WIDER THAN 4.5' IN WIDTH. STANDARD SIDEWALK INSPECTION FEE WIDTH IS 4.5' DESCRIPTION (ALL PUBLIC & APPLICABLE PRIVATE* IMPROVEMENTS) Sanitary Sewer System 6" PVC Sewer Main Sewer Manhole 4" PVC Water Main (Fire Line)* Water Meter Pit (2" ) Water Meter Pit (1") Water Fitting (Bend/Tee/Cross) Sewer Main Connection/Disconnect Water System 2" Copper Water Main Water Service Line Stub For Review 04/26/2021 5:22:17 PM