Loading...
HomeMy WebLinkAboutODELL NORTH BEET TAILINGS GRADING - BDR210005 - SUBMITTAL DOCUMENTS - ROUND 2 - DRAINAGE REPORT NORTHERNENGINEERING.COM | 970.221.4158 PRELIMINARY DRAINAGE MEMO: Odell - North FORT COLLINS | GREELEY 1 | 1 June 23rd, 2021 City of Fort Collins Community Development and Neighborhood Services 281 North College Avenue Fort Collins, CO 80522 RE: DRAINAGE MEMORANDUM FOR ODELL - NORTH PROJECT FORT COLLINS, COLORADO NE PROJECT #: 368-005 Dear Staff: Northern Engineering Services is pleased to submit this Drainage Memorandum for the Odell North Project application for your review. This Drainage Memorandum has been prepared in accordance with the Fort Collins Stormwater Criteria Manual (FCSCM) and Mile High Flood District (MHFD) standards. The site occupies the lot from the North side of Odell Brewing Company to Buckingham Street. The subject site is located in the Northeast quarter of Section 12, Township 7 North, Range 69 of the 6th P.M. Fort Collins, Larimer County, Colorado. The site is bounded to the west by 3rd Street, to the north by Buckingham Street, to the east by Colorado Iron & Metal Inc., and to the south by the Odell Brewing Company. The intent of this project is to remove the large quantities of beet waste currently occupying the lot at depths of up to 15’ below grade (based on geotechnical investigation performed by CTL|Thompson, Inc.), then re-grade the lot in a manner that directs the area’s runoff to existing stormwater infrastructure and limits outfall rates to match downstream capacity of the current system through use of a temporary detention pond. This is expected to be completed with minimal use of imported fill material in preparation for future expansion of the Odell Brewery parking lot and affordable housing projects. The current topography is a flattened mound that tends to drain Southeastward and channels into a temporary infiltration pond with an area inlet for drainage. A re- grading of the lot will prioritize directing runoff to existing stormwater appurtenances in a more efficient and direct manner, while retrofitting those appurtenances to accommodate an enlarged basin after development without an increase in outfall rate downstream. Current site conditions consist entirely of permeable ground surfaces, with a combination of gravel and native vegetation, as well as the existing parking lot which will not be altered. Upon completion of the re-grading, the disturbed areas will be reseeded with native vegetation. Please see the attached materials for further information. If you have any questions, please feel free to contact us at your earliest convenience. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Sterling Hallauer, EI Project Engineer Danny Weber, PE Project Manager Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Wednesday, Jun 16 2021 6-inch pipe full capacity Circular Diameter (ft) = 0.50 Invert Elev (ft) = 4945.19 Slope (%) = 0.50 N-Value = 0.012 Calculations Compute by: Known Depth Known Depth (ft) = 0.50 Highlighted Depth (ft) = 0.50 Q (cfs) = 0.430 Area (sqft) = 0.20 Velocity (ft/s) = 2.19 Wetted Perim (ft) = 1.57 Crit Depth, Yc (ft) = 0.34 Top Width (ft) = 0.00 EGL (ft) = 0.57 0 1 Elev (ft)Section 4944.75 4945.00 4945.25 4945.50 4945.75 4946.00 Reach (ft) Pond No :Temp a-1 100-yr 0.28 14.23 min 39434 ft3 11.45 acres 0.91 ac-ft Max Release Rate =0.42 cfs Time (min) Ft Collins 100-yr Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustment Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 9.950 9567 1.00 0.42 126 9441 10 7.720 14845 1.00 0.42 252 14593 15 6.520 18806 1.00 0.42 378 18428 20 5.600 21537 1.00 0.42 504 21033 25 4.980 23940 1.00 0.42 630 23310 30 4.520 26075 1.00 0.42 756 25319 35 4.080 27459 1.00 0.42 882 26577 40 3.740 28767 1.00 0.42 1008 27759 45 3.460 29940 1.00 0.42 1134 28806 50 3.230 31055 1.00 0.42 1260 29795 55 3.030 32046 1.00 0.42 1386 30660 60 2.860 32997 1.00 0.42 1512 31485 65 2.720 33997 1.00 0.42 1638 32359 70 2.590 34863 1.00 0.42 1764 33099 75 2.480 35766 1.00 0.42 1890 33876 80 2.380 36613 1.00 0.42 2016 34597 85 2.290 37430 1.00 0.42 2142 35288 90 2.210 38247 1.00 0.42 2268 35979 95 2.130 38910 1.00 0.42 2394 36516 100 2.060 39612 1.00 0.42 2520 37092 105 2.000 40381 1.00 0.42 2646 37735 110 1.940 41035 1.00 0.42 2772 38263 115 1.890 41795 1.00 0.42 2898 38897 120 1.840 42458 1.00 0.42 3024 39434 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. A = Tc = Project Location : Design Point C = Design Storm DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Input Variables Results Required Detention Volume Fort Collins, CO 368-005 Odell - North Project Number : Project Name : Runoff Coefficient1 Percent Impervious1 0.95 100% 0.95 90% 0.50 40% 0.50 40% 0.20 2% 0.20 2% Basin ID Basin Area (sq.ft.) Basin Area (acres) Asphalt, Concrete (acres)Rooftop (acres) Gravel (acres) Pavers (acres) Undeveloped: Greenbelts, Agriculture (acres) Lawns, Clayey Soil, Flat Slope < 2% (acres) Percent Impervious C2*Cf Cf = 1.00 C5*Cf Cf = 1.00 C10*Cf Cf = 1.00 C100*Cf Cf = 1.25 A-1 498,576 11.446 0.394 0.000 0.000 0.000 11.052 0.000 5%0.23 0.23 0.23 0.28 Total Onsite 498,576 11.446 0.394 0.000 0.000 0.000 11.052 0.000 5% 0.23 0.23 0.23 0.28 DEVELOPED RUNOFF COEFFICIENT CALCULATIONS Asphalt, Concrete Rooftop Gravel Pavers Odell - North S. Hallauer June 19, 2021 Project: Calculations By: Date: Character of Surface Streets, Parking Lots, Roofs, Alleys, and Drives: Lawns and Landscaping: Combined Basins 2) Composite Runoff Coefficient adjusted per Table 3.2-3 of the Fort Collins Stormwater Manual (FCSM). Lawns, Clayey Soil, Flat Slope < 2% USDA SOIL TYPE: C Undeveloped: Greenbelts, Agriculture Composite Runoff Coefficient2 1) Runoff coefficients per Tables 3.2-1 & 3.2 of the FCSM. Percent impervious per Tables 4.1-2 & 4.1-3 of the FCSM. Page 1 of 1 Tc2 Tc10 Tc100 C2 C10 C100 I2 (in/hr) I10 (in/hr) I100 (in/hr) Q2 (cfs) Q10 (cfs) Q100 (cfs) a-1 A-1 11.446 14.23 14.23 14.23 0.23 0.23 0.28 1.92 3.29 6.71 5.0 8.5 21.7 Total Onsite Total Onsite 11.446 14.23 14.23 14.23 0.23 0.23 0.28 1.92 3.29 6.71 5.0 8.5 21.7 Combined Basins Intensity, I from Fig. 3.4.1 Fort Collins Stormwater Manual Tc (Min) DEVELOPED DIRECT RUNOFF COMPUTATIONS Intensity Flow Odell - North S. Hallauer June 19, 2021 Project: Calculations By: Date: Rational Equation: Q = CiA (Equation 6-1 per MHFD) Design Point Basin Area (acres) Runoff C Page 1 of 1 Project: Date: Where: Length (ft) Elev Up Elev Down Slope (%) Ti 2-Yr (min) Ti 10-Yr (min) Ti 100-Yr (min) Length (ft) Elev Up Elev Down Slope (%)Surface Roughness (n) Flow Area3 (sq.ft.) WP 3 (ft) Hydraulic Radius (ft) Velocity (ft/s) Tt (min) Max. Tc (min) Comp. Tc 2-Yr (min) Tc 2-Yr (min) Comp. Tc 10-Yr (min) Tc 10-Yr (min) Comp. Tc 100-Yr (min) Tc 100-Yr (min) a-1 A-1 500 52.05 47.54 0.90%37.8 37.8 35.4 261 47.54 45.58 0.75%Swale (8:1)0.025 8.00 16.12 0.50 3.24 1.34 14.23 39.15 14.23 39.15 14.23 36.71 14.23 Total Onsite Total Onsite 500 52.05 47.54 0.90% 37.8 37.8 35.4 261 47.54 45.58 0.75% Swale (8:1) 0.025 8.00 16.12 0.50 3.24 1.34 14.23 39.15 14.23 39.15 14.23 36.71 14.23 DEVELOPED TIME OF CONCENTRATION COMPUTATIONS Overland Flow, Time of Concentration: Calculations By: Odell - North S. Hallauer R = Hydraulic Radius (feet) S = Longitudinal Slope, feet/feet Maximum Tc: Combined Basins Design Point Basin Overland Flow Channelized Flow Time of Concentration Channelized Flow, Velocity:Channelized Flow, Time of Concentration: V = Velocity (ft/sec) n = Roughness Coefficient June 19, 2021 (Equation 3.3-2 per Fort Collins Stormwater Manual)1.87 1.1 ∗ 1.49 ∗ /∗(Equation 5-4 per Fort Collins Stormwater Manual) 180 10 (Equation 3.3-5 per Fort Collins Stormwater Manual) ∗ 60 (Equation 5-5 per Fort Collins Stormwater Manual) Notes: 1) Add 4900 to all elevations. 2) Per Fort Collins Stormwater Manual, minimum Tc = 5 min. 3) Assume a water depth of 6" and a typical curb and gutter per Larimer County Urban Street Standard Detail 701 for curb and gutter channelized flow. Assume a water depth of 1', fixed side slopes, and a triangular swale section for grass channelized flow. Assume a water depth of 1', 4:1 side slopes, and a 2' wide valley pan for channelized flow in a valley pan. 4) Basins H-E1 and H-E2 includes that portion of the property that is within the Spring Creek and Importation Canal floodplain. There are no proposed improvements within Basins H-E1 and H-E2. Page 1 of 1 XX V.P. CONTROL IRR LID C.O. AC XXXXXSTSTSTSTSTD EEE EESTSTSTD EEEEAC ACACAC ACAC ELEC BRKR ELEC BRKR ELEC BRKRELEC BRKR D D ELEC BRKR ELEC BRKR ELEC BRKR ELEC BRKR ELEC BRKR HY DD DEEEGGGGGGGGGGGGGG W AC ACACAC ACAC ELEC BRKR ELEC BRKR ELEC BRKRELEC BRKR D D ELEC BRKR ELEC BRKR ELEC BRKR ELEC BRKR ELEC BRKR HY DD DEEEGGGGGGGGGGGGGG W EXISTING 10' UTILITY EASEMENT BUCKINGHAM STREET 3RD STREETLOGAN STREET ODELL BREWING COMPANY OWNER: LOZANO, ALFREDO C. & CRISTINA YOLANDA 832 E LINCOLN AVE. FORT COLLINS, CO 80524 OWNER: CHARLES MESERLIAN 1222 TRAPPERS PT FORT COLLINS, CO 80524 EXISTING 38' UTILITY EASEMENT OWNER: G AND A INVESTMENTS LLC 903 BUCKINGHAM ST, FORT COLLINS, CO, 80524 EXISTING STORM MANHOLE EXISTING STORM DRAIN EXISTING 6" PVC OWNER: ODELL INVESTMENTS, LLC. 800 E LINCOLN AVE. FORT COLLINS, CO 80524 OWNER: ODELL BREWING CO. & ODELL INVESTMENTS, LLC. 832 E LINCOLN AVE. FORT COLLINS, CO 80524 OWNER: ODELL BREWING CO. & ODELL INVESTMENTS, LLC. 832 E LINCOLN AVE. FORT COLLINS, CO 8052449.0048.0050.0046.8347.1347.7451.4851.0047.0046.0052.0047.660.8%0.9%0 . 9% 0 . 9%0.9%5.4%25.0%10.6%1 . 0%1.0%0.6%0.6% 0.6% 10.0% 10.0% 10.1%10.1% 0 . 9% EXISTING CONCRETE PAN EXISTING INLET EXISTING STORM DRAIN DISCHARGES TO LINCOLN AVENUE EXISTING STORM DRAIN INLET RIM ELEV.: 4945.85 INV. 6" PVC (S): 4945.19 REMOVE INLET AND EXPOSE END OF 6" PVC 47.20TEMPORARY DETENTION POND MAX RELEASE RATE: 0.42 CFS PROVIDED VOLUME: 1.09 AC-FT WSEL: 4947.20 EXISTING EDGE OF ASPHALT CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 1 inch = ft. Feet05050 50 100 150 SheetODELL - NORTHThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETENGINEERNGIEHTRONRNFORT COLLINS: 301 North Howes Street, Suite 100, 80521GREELEY: 820 8th Street, 80631970.221.4158northernengineering.comof 7 G1 GRADING PLAN 4 PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.ALL PROJECT DATA IS ON VERTICAL DATUM;NAVD88. SEE COVER SHEET FOR BENCHMARK REFERENCES. 3.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. NOTES: 2.0% (47.45 ) EXISTING SPOT ELEVATION EXISTING LOT LINE 33.43 EXISTING RIGHT OF WAY LEGEND: PROPOSED GRADE BREAK