Loading...
HomeMy WebLinkAboutSOUTH SHIELDS VETERINARY CLINIC PUD - FINAL - 44-89B - CORRESPONDENCE - OTHER WATER AND OR SANITATION DISTRICTStiyINS-40 • C �91,�R DIS�4~G January 23, 1990 Mr. Mike Herzig Development Coordinator Planning Department City of Fort Collins P. O. Box 580 Fort Collins, Colorado 80522 Re: Laurie Subdivision Dear Mike: • The Fort Collins -Loveland Water District and the South Fort Collins Sanitation District have reviewed the above -mentioned project and submit the following comments: 1. The general notes are to include the following: All water and sewer line construction shall be in accordance with the most recent standards and specifications of the Fort Collins -Loveland Water District and the South Fort Collins Sanitation District, respectively. 2. The contractor shall schedule a pre -construction meeting with the Fort Collins -Loveland Water District and South Fort Collins Sanitation District prior to construction. 3. Submittal of a property plat is required. 4. The construction plans are to include all construction drawings concerning streets, overlot grading and storm drainage. 5. Water and sanitary sewer service lines are to be indicated and stationed for all lots. 6. A six-inch water line may be inadequate for non-residential development. 7. The manhole is to be shown at station 4 + 47. (more) 4700 South College Avenue Fort Collins, Colorado 80525 Telephone 226-3104 -- 669-4321 Mr. Mike Herzig January 23, 1990 Page 2 8. The Districts require a minimum 20-foot utility easement on standard District easement forms. In locations where the sanitary sewer line exceeds depths of 12 feet, additional easement will be required. 9. District policy requires the installation of a 12-inch water line along the South Shields frontage of the proposed project, from the existing line south of Clarendon Hills Drive. 10. On sheet 2 of 4, the sanitary sewer line slope and line size downstream of manhole 3 are to be indicated. 11. Match lines should be indicated. 12. The easements between lot 24 and lot 23 of the Ridge Subdivision for the water and sewer line appear to be inadequate. This needs to be addressed to the satisfaction of the District by the developer. 13. On sheet 4 of 4, all specifications notes are to be deleted. 14. The sanitary sewer clean -out is to be deleted. The Fort Collins -Loveland Water District and South Fort Collins Sanitation District will require another review due to the extensive nature of the changes and comments. If you have any questions, feel free to call. Respectively, Michael DiTullio District Manager cc: Terry Farrill