HomeMy WebLinkAboutSOUTH SHIELDS VETERINARY CLINIC PUD - MASTER PLAN - 44-89 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYM
P1EPIQP.APJDUM
0
00
O
To: Dr. William Muss 1evihite
r
Don Rir_hmond, Richmond Associates
O
,
Rick Ensclorff, , Fort Col 1 i ns. Traffic Engineer
O
M
Sherry Albertson -Clark, Senior City Planner
o
From: Platt De 1 i ch
z
g
>
Date: November 1, 1989
O
J
'
Subject: South Shields Veterinary Clinic PUD Traffic
w
Z
Study
w
a
z
This memorandum addresses the traffic impacts of
z
the proposed South Shields Veterinary Clinic PUD on
m
Shields. Street in Fort Collin=_., Colorado. The site is
located approximately 2500 feet south of Harmony Road on
the vies.t side of Shields Street. Along with the
Veterinary Clinic, it was assumed that 9 dwelling units
would be located to the west of the veterinary clinic.
Access to both the vet clinic and the 9 dvielling units
was assumed to be via a private road intersecting with
Shields Street at a T intersection.
The traffic counts used as a base for the following
analyses. 4-iere taken from a. memorandum on Clarendon
Hills, Parcels H and I, dated September 2, 1987. The
short range traffic projection utilized this data
factored by 3 percent per year-. The long range (2010)
traffic projections utilized the 2006 peak hour traffic,
CD
factored by 3 percent per year, taken from "The Ward
z
cc
Smith Farm Site Access Study," April 1986.
w
w
CD
The trip generation from the proposed uses is shown
Ui
w
in Table 1. The reference for the residential use trip
generation is Trip Generation, 4th Edition, ITE. The
CL:
�,
vet clinic trip generation was estimated by Dr. William
•
P1usslet-ahito, based upon his experience at other vet
v
o
clinics.. The trip distribution used for the following
J
a
traffic assignments viere 90 percent to the north and 10
W
cr
percent to the south in the short range future and 75
o
N
percent to the north and 25 percent to the south in the
z
long range future.
.
3
Q
cc
•
Figure 1 shows the resu 1 is of the trip assignment
3
at the access intersection in the short range future
=
a
(1 =90) . The operation of this intersection is shoo-in In
I—
cc
Table 2. Calculation sheets. are provided in Appendix A.
~
Q
This intersection will operate acceptably (level of
service D or better) during the peak hours.
At the location of the Vet Clinic Road, Shields
Street is approximately 36 feet wide. The street is
widened on the east side t,,i i th curb and gutter. This
improvement vias made by the Clarendon Hills development.
The t,:les.t side of Shields h.a.s a rural (shoulders) cross.
section. Approximately 400 feet south of the Vet Clinic
Road, Shield_. Street returns to a tt,,lo lane rural cross.
section. According to the planning consultant for
Clarendon Hills. (Cityscape Urban Design), Shields Street
v,i 1 1 be tali dened to the same 36 foot cross section to at
least the next intersecting street to the south during
the summer of 15190. This t,a i 1 1 provide a 36 foot t-a i de
street at least 1500 feet south of the site. Since this
36 foot wide street is a. temporary condition unt i 1 the
full arterial tii dth r5 lanes) can be completed on the
viest side of Shields., the 36 foot cross section should
be striped a.s one northbound lane, one southbound lane,
and a. center lane t,ih i ch can be used as a. tt,,lo-way left -
turn lane. This. should remove left -turning vehicles to
this site (and other residences on the west side of
Shields) from the through traffic lanes. The need for a
southbound r• i ght-turn deceleration lane is judgmental.
According to nomographs in the 'State Highway Access.
Code, a right -turn deceleration lane is. needed.
According to the "Intersection Channelization Design
Guide," NCHF..F Report 279, TRB, t1ovember 1985, the right -
turn lane is not required. Due to the anticipated low
volumes, a. right -turn lane is not recommended. The City
of Fort Col 1 i ns taxi 1 1 have the final determination on
this matter.
Figure 2 shovis the results of the trip assignment
at the access intersection in the long range future
(2010). The operation of this intersection is shown in
Table 3. Calculation sheets are provided in Appendix B.
(,,Ii th a combined r• i ght-turn/l e+t-turn lane, the exits
from this property will operate unacceptably. The
unacceptable operation is due to the volumes on Shields,
rather than the egressing traffic from the Vet Clinic
Road. Separating the right and loft turns will confine
the delays to only the l of t-turning vehicles and al 1 ov)
the right turns to operate acceptably. However, due to
the anticipated 1 oL%i volumes, separate right- and left -
turn lanes are not recommended. Unacceptable operation
during the peak hours at stop sign controlled intersec-
tions t,,ti th arterial streets is not uncommon. Si gnal i -
zat i on is neither t,,larran ted or recommended at this.
location.
Hepp l et,,th i to Court, an extremely long cul-de-sac to
the viest of the subject property, could potentially be
connected to this access. However, the need for the
connection t,,loul d appear to be voi th the residents of
Heppl et,,lh i to Court. A second means of access to
Hepplet&ihite Court would make emergency access easier and
give the residents an alternative means of access to the
arterial system.
A sight distance analysis to the south of the Jet
C1 i n i c Road was conducted since Shields Street drops off
to the south approximately 200 feet south of the site.
Figure 3 shows the results of that analysis. It was
concluded that there will be adequate sight distance of
500 feet (Fort Collins arterial standard at 50 mph) to
the south when Shield_. Street is built as shoi.,.)n on the
profile prepared by James H. Stewart & Associates,
Consulting Engineers. Based upon the profile data
available, there is also adequate sight distance with
the existing profile of Shields Street with a design
speed of 50 mph.
0
0
Land Use
Vet Cl inic
9 D.U.
Total
Table 1
Trip Generation
Daily
A.M.
Peak
Trips
Trips
Trips
in
out
90
6
2
90
2
C
J
180
8
7
P.M
Peak:
Trips
Trips
in
out
8
8
6
3
14
11
Table 2
Short Range Future Peak Hour Operation
Intersection AM PM
Shields../Vet Clinic Road
EB P..T/LT C C
NB LT A A
Table 3
Long Range Future Peak Hour Operation
Intersection AM PM
8hields.'Vet Clinic Road
EB RT/LT E E
t-,J B LT A A
i.,Ii th separate F.T and LT 1 anes
EB RT A A
EB LT E E
1,18 LT A A
9 D.0
SHORT RANGE (1990)
PEAK HOUR TRAFFIC
0
W_
2
N
9 D.0
m iP
N .�9
9
LONG RANGE (2010)
PEAK HOUR TRAFFIC
4
N
AM / PM
Figure 1
Q
N
AM / PM
Figure 2
O O
Z
O
0
LO
U_
C
U �
a) ca
> 3
a m
00
Q.
0
L-
a.
SIGHT DISTANCE ANALYSIS Figure 3
AF,F,Eh-1D I :< A
1985 HCM: UNSIGNALIZEU INIEI:SEC'IIUNS Page-1
#X#X X#XXXXXX##X#XX#X###X##############XX##X## #######X#XX#X#####XXXXXX
IDENTIFYING INFOkMAIlUN
AVERAGE RUNNING SPEED. MAJUk S1kEET..............
45
PEAK HOUR FACTOR .................................
1
AREA POPULATION ..................................
80000
NAME OF THE EAST/WEST STREET .....................
Vet Clinic
NAME OF THE NORTH/SUUIH STREET ...................
Shieids
NAME OF THE ANALYST ..............................
mid
DATE OF THE ANALYSIS (mm/dd/yy)..................
1u/Z4/89
TIME PERIOD ANALYZED .............................
am ear 199C
OTHER INFORMATION:
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NURTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB WB NB SB
---- ---- ---- ----
LEFT 6 -- 1 0
THRU 0 -- 432 282
kIGHT 1 -- 0 7
NUMBER OF LANES
---------------------------------------------------------------------
EB W6 N6
S6
---------------------
LANES 1 -- 2
-------
i
CAPACITY AND LEVEL-OF-SEkVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c= c - v S
------- p M k SH - -----
MINOR STREET
EB LEFT 7 274 273 > 273 > 267 > C
> 300 > 292 >C
RIGHT 1 722 722 > 722 > 721 > A
MAJOR STREET
NB LEFT 1 801 801 801 800 A
0
1985 HCM: UNSIGNALIZEU INiERSECIIUNS Page-1
IDENTIFYING 1NFORMA11UN
AVERAGE RUNNING SPEED. MAJUR S1kEET..............
4b
PEAK HOUR FACTOR .................................
1
AREA POPULATION ..................................
80000
NAME OF THE EAST/WEST STREET .....................
Yet Clinic
NAME OF THE NORTH/SUU1H STREET ...................
Shields
NAME OF THE ANALYST ..............................
mid
DATE OF THE ANALYSIS (mm/dd/yy)..................
10/29/89
TIME PERIOD ANALYZED .............................1w
1990 ao".el_
OTHER INFORMATION:
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NURTH/SUUTH
CONTROL TYPE EASTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB WB NB 5B
---- ---- ---- ----
LEFT lU -- 1 0
THRU 0 -- 454 416
RIGHT 1 -- 0 13
NUMBER OF LANES
---------------------------------------------------------------------
EB WE', NL
LANES 1 --
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c - c -
-p------ M ---SH R SH
MINOR STREET
EB LEFT 11 206 ZU6 > 206 > 195 > 0
> 219 > 207 >C
RIGHT 1 604 604 > 604 > 603 > A
MAJOR STREET
NB LEFT 1 679 679 679 678 A
APF1'Et-JU I X L
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
xxxxxxxxxxxx*xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx*xxx:x*x
IDENTIFYING INFORMATION
AVERAGE RUNNING SPEED, MAJOR STREET ..............
45
PEAK HOUR FACTOR .................................
1
AREA POPULATION ..................................
80U00
NAME OF THE EAST/WEST STREET .....................
Vet Clinic
NAME OF THE NORTH/SOUTH STREET ...................
Shields
NAME OF THE ANALYST ..............................
mjd
DATE OF THE ANALYSIS (mm/dd/yy)..................
10/29/09
TIME PERIOD ANALYZED .............................
2010
OTHER INFORMATION:
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NOR1H/SUUTH
CONTROL TYPE EASTBOUND:
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB WB NB SB
---- ---- ---- ----
LEFT 6 -- 1 0
THRU 0 -- 655 53U
RIGHT 1 -- 0 7
NUMBER OF LANES
---------------------------------------------------------------------
EB WN Nb SB
LANES 1
CAPACITY AND LEVEL-UF-SEkVICE Page-3
---------------------------------------------------------------------
POIEN- ACTUAL
FLOW- T1AL MOVEMENT SHARED RESERVE
KATE LAPACIlY CAPACITY CAPACIIT CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c- c - v
------- p M----------- k SH I
MINOR STREET
EB LEFT 7 92 92
RIGHT 1 737 737
MAJOR STREET
NB LEFT 1 524 524
> 92 > 86 > E
> 105 > 98 >E
> 737 > 736 > A
524 523 A
,7
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
IDENTIFYING INFORMATION
AVERAGE RUNNING SPEED. MAJOR STREET ..............
45
PEAK HOUR FACTOR .................................
1
AREA POPULATION ..................................
d0000
NAME OF THE EAST/WEST STREET .....................
Vet Clinic
NAME OF THE NORTH/SOUTH STREET ...................
Shields
NAME OF THE ANALYST ..............................
mid
DATE OF THE ANALYSIS (mm/dd/yy)..................
10/29/89
TIME PERIOD ANALYZED .............................
— pm 1w"u 2010
OTHER INFORMATION:
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND:
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB WB N8 SB
---- ---- ---- ----
LEFT 10 -- 1 0
THRU 0 -- 655 685
RIGHT 1 -- 0 13
NUMBER OF LANES
---------------------------------------------------------------------
EB WB NC 58
-------
---------------------
LANES 1 --
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
PUTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c- c - v
------- -p M ---SH------- --R SH
------ --------- ---------
MINOR STREET
EB LEFT 11 72 71 > 71 > 60 > E
> 78 > 66 >E
RIGHT 1 666 666 > 666 > 665 > A
MAJOR STREET
NB LEFT 1 424 4Z4 424 423 A
•