Loading...
HomeMy WebLinkAboutMARS LANDING - PDP190013 - DOCUMENT MARKUPS - ROUND 4 - SITE PLANT TTT - - - - - - - - - - - - - - STAMP Date: Drawn By: Project No: Checked By:H:\Goodwin Knight\CO, Fort Collins - GNK000008.10 - Mars Landing ISP\CADD\3 CD\GNK08_C2.0_Horizontal Control.dwg - Donald Cecil - 3/3/2021Init.#Issue / DescriptionDateMARS LANDINGPROJECT DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTION03.03.2021 GNK000008 JEP DBC SCALE: 1"=30' 0 15 30 SITE PLAN C1.0 LEGEND: PROPOSED RIGHT-OF-WAY PROPOSED LOTLINE EASEMENT LINE PROPOSED CURB AND GUTTER PROPERTY BOUNDARY EXISTING CURB AND GUTTER NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK BEFORE COMMENCING NEW CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO LANDSCAPE PLANS FOR STREET TREE INFORMATION, AND SURVEY DOCUMENTS FOR ADDITIONAL RIGHT-OF-WAY, EASEMENT AND ROADWAY CENTERLINE INFORMATION. 3. BUILDING POINTS ARE AT CORNERS OF NOMINAL BUILDING FOOTPRINTS. CONTRACTOR SHALL CONFIRM ALL BUILDING CORNERS AND DIMENSIONS WITH ARCHITECT PRIOR TO CALLING FOR STAKES. 4.ALL DIMENSIONS REFERENCE FLOWLINE, BUILDING OR PROPERTY LINE UNLESS SPECIFIED OTHERWISE. 5.CONTRACTOR TO COORDINATE WITH CIVIL ENGINEER AND ARCHITECT PRIOR TO STAKING BUILDING COORDINATES. 6.FOR ALL CATCH AND SPILL CURB INFORMATION AND TRANSITIONS, SEE GRADING PLANS C2.1-C2.2. 7.ALL STRIPING AND PAVEMENT MARKINGS SHALL COMPLY WITH THE MUTCD AND SECTION 627 OF THE CDOT SPECIFICATIONS. 8.ALL TRAFFIC CONTROL SIGNS SHALL CONFORM TO THE REQUIREMENTS OF THE MUTCD WITH REGARD TO SIGN TYPE, SIZE, LOCATION AND MOUNTING SPECIFICATIONS. 9.ALL ON-SITE CURB AND GUTTER SHALL BE 18" CATCH OR SPILL CURB AND GUTTER UNLESS NOTED 10.ALL H/C RAMPS SHALL HAVE TRUNCATED DOMES PER SITE PLAN DETAILS SHEET. 11.REFER TO DETAIL SHEET -- FOR H/C PARKING STALL DETAILS AND SIGN REQUIREMENTS - ALL SPACES ARE VAN ACCESSIBLE AND SHOULD BE POSTED AS SUCH. PROVIDE 2.5' CLEAR FROM FLOWLINE TO POST. 12.THERE SHALL BE A 3' MINIMUM TRANSITION FROM SPILL TO CATCH CURB AND GUTTER. 13.ALL SIGNS TO BE H.I.P. 14.FOR PAVEMENT DESIGN, PAVEMENT SECTIONS, AND SUBGRADE PREPARATION, REFER TO PRELIMINARY SUBSURFACE EXPLORATION REPORT DATED JULY 17, 2019 BY EARTH ENGINEERING CONSULTANTS. CONTRACTOR TO VERIFY FINAL PAVEMENT AND SUBGRADE DESIGN WITH GEOTECHNICAL ENGINEER PRIOR TO CONSTRUCTION. 15.ALL PROPOSED EASEMENTS ARE TO BE RECORDED BY SEPARATE DOCUMENT. PROPOSED CURB AND GUTTER - SPILL PROPOSED CONCRETE CROSSPAN TRANSITION PROPOSED FENCE PROPOSED SIDEWALK 1 TRUNCATED DOME 2 IN-FALL CURB 3 4 OUT-FALL CURB5 HANDICAP RAMP 6 HANDICAP PARKING SIGN 7 STOP SIGN 8 HAND RAILS PER ARCHITECTURAL DETAIL 9 PROPOSED 1' CURB CHASE (SEE SHEET -- FOR DETAIL) PROPOSED BIKE RACKS (SEE LANDSCAPE DETAILS) 10 11 3' REINFORCED CONCRETE DRAINAGE PAN 3' WIDE NON- REINFORCED CONCRETE DRAINAGE PAN (LANDSCAPE AREA) 12 6' STREET INTERSECTION CROSS PAN 13 FIRE ACCESS ROAD SIGN "NO PARKING" (ARROW POINTED LEFT) 14 FIRE ACCESS ROAD SIGN "NO PARKING" (ARROW POINTED RIGHT) 15 FIRE ACCESS ROAD SIGN "NO PARKING" (ARROW BOTH WAYS) SITE LIGHT 16 CROSSWALK STRIPING - 7' LONG x 18" WIDE, 5' O.C. CAUTION - NOTICE TO CONTRACTOR 1.ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE FIELD LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEERED PRIOR TO CONSTRUCTION. 2.WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY, IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATION OF SUCH EXISTING UTILITY, EITHER THROUGH POTHOLING OR ALTERNATIVE METHOD. REPORT INFORMATION TO THE ENGINEER PRIOR TO CONSTRUCTION. 3.CONTRACTOR RESPONSIBLE FOR AS-BUILT DRAWINGS, TESTS, REPORTS AND/OR ANY OTHER CERTIFICATES OR INFORMATION AS REQUIRED FOR ACCEPTANCE OF WORK FROM CITY, UTILITY DISTRICTS OR ANY OTHER GOVERNING AGENCY. 4.CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY MONUMENTATION. CONTRACTOR SHALL HAVE LICENSED SURVEYOR REPLACE ANY DAMAGED OR DISTURBED MONUMENTATION AT THEIR COST. Know what's before you dig. HEAVY DUTY TRAFFIC DRIVE LANES PAVEMENT: PAVEMENT SECTION PER GEOTECH REPORT LIGHT DUTY TRAFFIC PARKING STALLS: PAVEMENT SECTION PER GEOTECH REPORT PROPOSED NATURAL HABITAT BUFFER ZONE (NHBZ) PROPOSED WETLAND MITIGATION AREA EXISTING UPLANDS AREA (AC) 1.50 NATURAL AREAS CALCULATIONS: EXISTING PRAIRIE DOG COLONY TO REMAIN 0.00 EXISTING WETLANDS 0.014 EXISTING PRAIRIE DOG COLONY 3.50 EXISTING UPLANDS TO BE VACATED EXISTING WETLANDS TO BE VACATED EXISTING PRAIRIE DOG COLONY TO BE VACATED EXISTING UPLANDS TO REMAIN 0.00 EXISTING WETLANDS TO BE VACATED 0.00 1.50 0.014 3.50 PRAIRIE DOG COLONY MITIGATION ** PROPOSED UPLANDS MITIGATON 1.505 PROPOSED WETLANDS MITIGATION 0.018 **SEE NOTE BELOW BLACK TAILED PRAIRIE DOG COLONY MITIGATION NOTE BLACK-TAILED PRAIRIE DOGS LOCATED WITHIN THE PARCEL WILL BE TRAPPED AND DONATED TO EITHER A RAPTOR REHABILITATION PROGRAM OR A BLACK-FOOTED FERRET RECOVERY PROGRAM. ALL CONTROL ETC. WILL BE DONE PER CITY OF FORT COLLINS, CPW AND COLORADO DEPARTMENT OF AGRICULTURE REQUIREMENTS. CONTROL WILL BE CONDUCTED VIA THE INTRODUCTION OF CARBON MONOXIDE INTO THE BURROWS. POST-CONTROL OF THE PRAIRIE DOGS A REPORT WILL BE PREPARED WHICH WILL IDENTIFY THE CONTROL METHOD USED AND THE NUMBER OF PRAIRIE DOGS TRAPPED/DONATED