Loading...
HomeMy WebLinkAboutH-25 MULTI-FAMILY - FDP210008 - SUBMITTAL DOCUMENTS - ROUND 2 - UTILITY PLANS” “ ” ” ” ” ” ” ” ” ”FINAL DEVELOPMENT PLANFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADCOVER SHEETH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC1.0 CJS19059.02_COVER_PROD.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02H-25 MULTI FAMILY VICINITY MAP NORTH SCALE: NTS All changes, addendums, additions, deletions and modifications to these drawings must be approved, in writing, by the Fort Collins-Loveland Water District and the South Fort Collins Sanitation District. District Engineer Date FORT COLLINS - LOVELAND WATER DISTRICT SOUTH FORT COLLINS SANITATION DISTRICT CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: APPROVED: APPROVED: APPROVED: APPROVED: CITY ENGINEER,APPROVED SHEETS WATER & WASTEWATER UTILITY,APPROVED SHEETS STORMWATER UTILITY,APPROVED SHEETS PARK PLANNING & DEVELOPMENT,APPROVED SHEETS TRAFFIC OPERATIONS,APPROVED SHEETS DATE DATE DATE DATE DATE APPROVED: ENVIRONMENTAL PLANNER,APPROVED SHEETS DATE P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_COVER_PROD.dwg, C1.0 COVER SHEET, 5/26/2021 9:29:37 AM, VGentry, 1:1 FINAL DEVELOPMENT PLANFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGENERAL CONSTRUCTION NOTESH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC1.1 CJS19059.02_NOTES_PROD.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02“” · · · · ·“” · · · “” “”“”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_NOTES_PROD.dwg, C1.1 GENERAL CONSTRUCTION NOTES, 5/26/2021 9:29:46 AM, VGentry, 1:1 PROPOSED LIGHT & POLE UNDERGROUND POWER FINAL DEVELOPMENT PLANELECTRIC JUNCTION BOX EXISTING STORM DRAIN MANHOLE EXISTING CATCH BASIN EXISTING WATER VALVE EXISTING FIRE HYDRANT EXISTING CURB STOP FIRE DEPT. CONNECTION FIBER OPTIC PEDESTAL GUYWIRE IRRIGATION BOX LIGHT POLE ELECTRIC PEDESTAL ROOF DRAIN EXISTING SANITARY SEWER MANHOLE SANITARY SEWER CLEAN OUT TELEPHONE BOX TELEPHONE MANHOLE TELEPHONE PEDESTAL COMMUNICATIONS MANHOLE COMMUNICATIONS PEDESTAL AC = FINISHED GRADE AT ASPHALT EXISTING WATER REDUCER LINETYPES ABBREVIATIONS SYMBOLS PROPOSED CATCH BASIN PROPOSED WATER REDUCER PROPOSED WATER VALVE PROPOSED FIRE HYDRANT PROPOSED CURB STOP PROPOSED SANITARY SEWER MANHOLE PROPOSED STORM DRAIN MANHOLE EXISTING MONUMENT BOX PROPOSED MONUMENT BOX NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. FIBER OPTIC GAS PIPELINE SANITARY SEWER STORM DRAIN TELEPHONE TELEVISION/CABLE WATER CONTOUR OVERHEAD POWER FENCE - VINYL FENCE - BARBWIRE FENCE - WOOD CURB AND GUTTER EDGE OF ASPHALT FENCE - CHAINLINK/ WOVEN WIRE EXISTING PROPOSED FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADLEGEND SHEETH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC1.2 CJS19059.02_COVER_PROD.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02DEMO AREA PROPOSED ASPHALT PROPOSED CONCRETE PROPOSED GRAVEL EW = FINISHED GRADE AT EDGE OF WALK TC = FINISHED GRADE AT TOP BACK OF CURB BC = FINISHED GRADE AT BUILDING CORNER TW = FINISHED GRADE AT TOP OF WALL EA = FINISHED GRADE AT EDGE OF ASPHALT EC = FINISHED GRADE AT EDGE OF CONCRETE SDI = STORM DRAIN INLET SDMH = STORM DRAIN MANHOLE FL = FINISHED GRADE AT FLOWLINE FG = FINISHED GRADE EX = APPROXIMATE EXISTING ELEVATION POC = POINT ON CURVE WTR = WATER PI = POINT OF INTERSECTION PRC = POINT OF REVERSE CURVE RT = RIGHT SS = SANITARY SEWER PT = POINT OF TANGENCY SD = STORM DRAIN GV = GATE VALVE BFV = BUTTERFLY VALVE RED = REDUCER LF = LINEAL FOOT FT = FEET SSMH = SANITARY SEWER MANHOLE BVC = BEGIN VERTICAL CURVE CS = CURB STOP EVC = END VERTICAL CURVE PVI = POINT OF VERTICAL INTERSECTION KEYNOTE CALL OUT (SEE KEYNOTE LEGEND) SRVC = SERVICE (TYP.) = TYPICAL PC = POINT OF CURVATURE GR = EXISTING GRADE AT GROUND BRK = GRADE BREAK HP = HIGH POINT LT = LEFT CO = SANITARY CLEAN OUT WELL GATE VALVE POWER METER POWER MANHOLE TRANSFORMER SIGN POWER POLE GUYWIRE LIGHT POLE SIGNAL POLE FOUND CORNER MONUMENT AS NOTED SET CORNER MONUMENT, REBAR WITH CAP BENCHMARK SECTION QUARTER CORNER SECTION CORNER P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_COVER_PROD.dwg, C1.2 LEGEND SHEET, 5/26/2021 9:29:58 AM, VGentry, 1:1 HARMONY ROAD STRAUSS CABIN ROAD0 50 SCALE: 1" = 50' 1002550 FINAL DEVELOPMENT PLANNORTH NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADEXISTING CONDITIONS AND DEMO PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC2.0 CJS19059.02_EX_SITE_PROD.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_EX_SITE_PROD.dwg, C2.0 EXISTING CONDITIONS AND DEMO PLAN, 5/26/2021 9:30:48 AM, VGentry, 1:1 BLDG 1 BLDG 2 BLDG 4 BLDG 5 CAR CARE BIKE RACKS 1 FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSITE AND HORIZONTAL CONTROL PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC3.1 CJS19059.02_HC_PROD.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02NORTH 0 100 SCALE: 1" = 100' 20050100 NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. PLAN NOTES 1 NEW ASPHALT PAVING NEW CONCRETE WALK NEW ACCESSIBILITY RAMP NEW 4" PAINTED WHITE STRIPE AT 3' O.C. (TYP.) NEW PAINTED INTERNATIONAL DISABLED SYMBOL (TYP.) NEW 4" PAINTED WHITE PARKING STRIPE (TYP.) NEW CONCRETE DRIVE APPROACH PER LCUASS STANDARDS 12" WHITE STOP BAR STOP SIGN (R1-1) NEW TRASH PAD AND ENCLOSURE (SEE ARCH. FOR DETAILS) 2 3 4 5 6 7 8 9 10 NEW BIKE RACKS11 POOL AND AMENITY AREA12 TRANSFORMER PAD PARK SPACE/PLAYGROUND PEDESTRIAN TRAIL CONCRETE DEAD-END BARRICADE 13 14 15 16 SECONDARY EMERGENCY ACCESS WITH FENCING AND ROLL-OVER CURB17 LANDSCAPE WALL FOR TREE PROTECTION18 NEW CURB AND GUTTER (TYP.)19 DOG PARK WITH BREAKAWAY FENCING20 LANDSCAPE BERMS (TYP.)21 DOGHOUSES WITH FIRE RISER (TYP.)22 LIGHT POLES23 PICNIC TABLES AND CORNHOLE24 PEDESTRIAN HANDICAP RAMPS AND CROSSWALK (TYP.)25 SIDEWALK CHASE AND FLUME (INFLOW DETACHED FOR 2 CHASES ALONG HARMONY PER DETAIL D-10C AND OUTFLOW ATTACHED FOR INTERNAL CHASES PER DETAIL D-10) 26 STANDARD 90 DEGREE PARKING SPACE WITH 2' OVERHANG (TYP.)27 SIDEWALK ANGLED PARKING SPACE WITH 2' OVERHANG (TYP.)28 STANDARD COMPACT PARKING SPACES (TYP.)29 PARALLEL PARKING SPACES (TYP.)30 CRITICAL ROOT ZONE OF TREES TO REMAIN AND BE PROTECTED31 2 FT CONCRETE PAN32 18 IN OUTFLOW CURB AND GUTTER33 18 IN INFLOW CURB AND GUTTER34 5' TRANSITION BETWEEN INFLOW AND OUTFLOW CURB AND GUTTER. KEYNOTE SYMBOL IS CENTERED ON THE TRANSITION 35 NORTH 0 20 SCALE: 1" = 20' 401020 P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_HC_PROD.dwg, C3.1 SITE AND HORIZONTAL CONTROL PLAN, 5/26/2021 9:31:51 AM, VGentry, 1:1 BLDG 3 BLDG 6 CAR CARE CENTER CAR CARE BIKE RACKS 2 FINAL DEVELOPMENT PLANNORTH NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSITE AND HORIZONTAL CONTROL PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC3.2 CJS19059.02_HC_PROD.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 20 SCALE: 1" = 20' 401020 NORTH 0 100 SCALE: 1" = 100' 20050100 PLAN NOTES 1 NEW ASPHALT PAVING NEW CONCRETE WALK NEW ACCESSIBILITY RAMP NEW 4" PAINTED WHITE STRIPE AT 3' O.C. (TYP.) NEW PAINTED INTERNATIONAL DISABLED SYMBOL (TYP.) NEW 4" PAINTED WHITE PARKING STRIPE (TYP.) NEW CONCRETE DRIVE APPROACH PER LCUASS STANDARDS 12" WHITE STOP BAR STOP SIGN (R1-1) NEW TRASH PAD AND ENCLOSURE (SEE ARCH. FOR DETAILS) 2 3 4 5 6 7 8 9 10 NEW BIKE RACKS11 POOL AND AMENITY AREA12 TRANSFORMER PAD PARK SPACE/PLAYGROUND PEDESTRIAN TRAIL CONCRETE DEAD-END BARRICADE 13 14 15 16 SECONDARY EMERGENCY ACCESS WITH FENCING AND ROLL-OVER CURB17 LANDSCAPE WALL FOR TREE PROTECTION18 NEW CURB AND GUTTER (TYP.)19 DOG PARK WITH BREAKAWAY FENCING20 LANDSCAPE BERMS (TYP.)21 DOGHOUSES WITH FIRE RISER (TYP.)22 LIGHT POLES23 PICNIC TABLES AND CORNHOLE24 PEDESTRIAN HANDICAP RAMPS AND CROSSWALK (TYP.)25 SIDEWALK CHASE AND FLUME (TO MATCH EXISTING WIDTH)26 STANDARD 90 DEGREE PARKING SPACE WITH 2' OVERHANG (TYP.)27 SIDEWALK ANGLED PARKING SPACE WITH 2' OVERHANG (TYP.)28 STANDARD COMPACT PARKING SPACES (TYP.)29 PARALLEL PARKING SPACES (TYP.)30 CRITICAL ROOT ZONE OF TREES TO REMAIN AND BE PROTECTED31 2 FT CONCRETE PAN32 18 IN OUTFLOW CURB AND GUTTER33 18 IN INFLOW CURB AND GUTTER34 TRANSITION FOR CURB AND GUTTER TYPES35 P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_HC_PROD.dwg, C3.2 SITE AND HORIZONTAL CONTROL PLAN, 5/26/2021 9:32:00 AM, VGentry, 1:1 BLDG 10 BLDG 9 BLDG 11 CAR CARE BIKE RACKS 3 FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSITE AND HORIZONTAL CONTROL PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC3.3 CJS19059.02_HC_PROD.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 20 SCALE: 1" = 20' 401020 NORTH 0 100 SCALE: 1" = 100' 20050100 NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. PLAN NOTES 1 NEW ASPHALT PAVING NEW CONCRETE WALK NEW ACCESSIBILITY RAMP NEW 4" PAINTED WHITE STRIPE AT 3' O.C. (TYP.) NEW PAINTED INTERNATIONAL DISABLED SYMBOL (TYP.) NEW 4" PAINTED WHITE PARKING STRIPE (TYP.) NEW CONCRETE DRIVE APPROACH PER LCUASS STANDARDS 12" WHITE STOP BAR STOP SIGN (R1-1) NEW TRASH PAD AND ENCLOSURE (SEE ARCH. FOR DETAILS) 2 3 4 5 6 7 8 9 10 NEW BIKE RACKS11 POOL AND AMENITY AREA12 TRANSFORMER PAD PARK SPACE/PLAYGROUND PEDESTRIAN TRAIL CONCRETE DEAD-END BARRICADE 13 14 15 16 SECONDARY EMERGENCY ACCESS WITH FENCING AND ROLL-OVER CURB17 LANDSCAPE WALL FOR TREE PROTECTION18 NEW CURB AND GUTTER (TYP.)19 DOG PARK WITH BREAKAWAY FENCING20 LANDSCAPE BERMS (TYP.)21 DOGHOUSES WITH FIRE RISER (TYP.)22 LIGHT POLES23 PICNIC TABLES AND CORNHOLE24 PEDESTRIAN HANDICAP RAMPS AND CROSSWALK (TYP.)25 SIDEWALK CHASE AND FLUME (TO MATCH EXISTING WIDTH)26 STANDARD 90 DEGREE PARKING SPACE WITH 2' OVERHANG (TYP.)27 SIDEWALK ANGLED PARKING SPACE WITH 2' OVERHANG (TYP.)28 STANDARD COMPACT PARKING SPACES (TYP.)29 PARALLEL PARKING SPACES (TYP.)30 CRITICAL ROOT ZONE OF TREES TO REMAIN AND BE PROTECTED31 2 FT CONCRETE PAN32 18 IN OUTFLOW CURB AND GUTTER33 18 IN INFLOW CURB AND GUTTER34 TRANSITION FOR CURB AND GUTTER TYPES35 NEW PAINTED RIGHT TURN ARROW PER CITY OF FORT COLLINS STANDARDS34 REMOVE EXISTING PAVEMENT STRIPING35 NATURAL HABITAT BUFFER ZONE P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_HC_PROD.dwg, C3.3 SITE AND HORIZONTAL CONTROL PLAN, 5/26/2021 9:32:10 AM, VGentry, 1:1 BLDG 12 BLDG 7 BLDG 8 CAR CARE BIKE RACKS 4 FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSITE AND HORIZONTAL CONTROL PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC3.4 CJS19059.02_HC_PROD.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 20 SCALE: 1" = 20' 401020 NORTH 0 100 SCALE: 1" = 100' 20050100 NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. PLAN NOTES 1 NEW ASPHALT PAVING NEW CONCRETE WALK NEW ACCESSIBILITY RAMP NEW 4" PAINTED WHITE STRIPE AT 3' O.C. (TYP.) NEW PAINTED INTERNATIONAL DISABLED SYMBOL (TYP.) NEW 4" PAINTED WHITE PARKING STRIPE (TYP.) NEW CONCRETE DRIVE APPROACH PER LCUASS STANDARDS 12" WHITE STOP BAR STOP SIGN (R1-1) NEW TRASH PAD AND ENCLOSURE (SEE ARCH. FOR DETAILS) 2 3 4 5 6 7 8 9 10 NEW BIKE RACKS11 POOL AND AMENITY AREA12 TRANSFORMER PAD PARK SPACE/PLAYGROUND PEDESTRIAN TRAIL CONCRETE DEAD-END BARRICADE 13 14 15 16 SECONDARY EMERGENCY ACCESS WITH FENCING AND ROLL-OVER CURB17 LANDSCAPE WALL FOR TREE PROTECTION18 NEW CURB AND GUTTER (TYP.)19 DOG PARK WITH BREAKAWAY FENCING20 LANDSCAPE BERMS (TYP.)21 DOGHOUSES WITH FIRE RISER (TYP.)22 LIGHT POLES23 PICNIC TABLES AND CORNHOLE24 PEDESTRIAN HANDICAP RAMPS AND CROSSWALK (TYP.)25 SIDEWALK CHASE AND FLUME (TO MATCH EXISTING WIDTH)26 STANDARD 90 DEGREE PARKING SPACE WITH 2' OVERHANG (TYP.)27 SIDEWALK ANGLED PARKING SPACE WITH 2' OVERHANG (TYP.)28 STANDARD COMPACT PARKING SPACES (TYP.)29 PARALLEL PARKING SPACES (TYP.)30 CRITICAL ROOT ZONE OF TREES TO REMAIN AND BE PROTECTED31 2 FT CONCRETE PAN32 18 IN OUTFLOW CURB AND GUTTER33 18 IN INFLOW CURB AND GUTTER34 TRANSITION FOR CURB AND GUTTER TYPES35 NATURAL HABITAT BUFFER ZONE P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_HC_PROD.dwg, C3.4 SITE AND HORIZONTAL CONTROL PLAN, 5/26/2021 9:32:20 AM, VGentry, 1:1 BLDG 1 BLDG 2 BLDG 3 BLDG 6 BLDG 12 BLDG 10 BLDG 7 BLDG 9 BLDG 4 BLDG 11 BLDG 5 BLDG 8 CAR CARE CENTER 0 50 SCALE: 1" = 50' 1002550 FINAL DEVELOPMENT PLANNORTH NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADOVERALL GRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.0 CJS19059.02_GRAD_PROD.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02AREA TO BE GRADED: ±537,156 SF OR ±12.331 ACRES FLOODWAY REGULATIONS NOTES: 1.NO FILL IN THE FLOODWAY UNLESS A HYDRAULIC ANALYSIS SHOWS “NO-RISE”. 2.NO MANUFACTURED HOMES, EXCEPT IN AN EXISTING PARK, CAN BE PLACED IN THE FLOODWAY. 3.NO CHANGING A NONCONFORMING NON-RESIDENTIAL OR MIXED USE STRUCTURE TO A RESIDENTIAL STRUCTURE. 4.LANDSCAPING MEETS REQUIREMENTS FOR NO ENCROACHMENT IN THE FLOODWAY WITHOUTA HYDRAULIC ANALYSISTOSHOW“NO-RISE”. 5.NO STORAGE OF MATERIALS OR EQUIPMENT. NATURAL HABITAT BUFFER ZONE FOUNDATION ELEVATION NOTE: THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM TEH 100-YEAR STORM.P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD.dwg, C4.0 OVERALL GRADING PLAN, 5/26/2021 9:34:09 AM, VGentry, 1:1 BLDG 1 CAR CARE BIKE RACKS 1 FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.1 CJS19059.02_GRAD_PROD-2.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10 SCALE: 1" = 10' 20510 NORTH 0 100 SCALE: 1" = 100' 20050100 NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. “” “”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-2.dwg, C4.1 GRADING PLAN, 5/26/2021 9:37:06 AM, VGentry, 1:1 BLDG 2 CAR CARE BIKE RACKS 2 FINAL DEVELOPMENT PLANNORTH NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.2 CJS19059.02_GRAD_PROD-2.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10 SCALE: 1" = 10' 20510 NORTH 0 100 SCALE: 1" = 100' 20050100 “” “”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-2.dwg, C4.2 GRADING PLAN, 5/26/2021 9:37:32 AM, VGentry, 1:1 BLDG 3 CAR CARE BIKE RACKS 3 FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.3 CJS19059.02_GRAD_PROD-2.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10 SCALE: 1" = 10' 20510 NORTH 0 100 SCALE: 1" = 100' 20050100 NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.MATCHLINE-SEE SHEET C4.17“” “”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-2.dwg, C4.3 GRADING PLAN, 5/26/2021 9:38:15 AM, VGentry, 1:1 BLDG 4 CAR CARE BIKE RACKS 4 FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.4 CJS19059.02_GRAD_PROD-2.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10 SCALE: 1" = 10' 20510 NORTH 0 100 SCALE: 1" = 100' 20050100 NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE “” “”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-2.dwg, C4.4 GRADING PLAN, 5/26/2021 9:39:01 AM, VGentry, 1:1 BLDG 5 CAR CARE BIKE RACKS 5 FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.5 CJS19059.02_GRAD_PROD-2.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10 SCALE: 1" = 10' 20510 NORTH 0 100 SCALE: 1" = 100' 20050100 NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. “” “”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-2.dwg, C4.5 GRADING PLAN, 5/26/2021 9:39:41 AM, VGentry, 1:1 BLDG 6 CAR CARE CENTER CAR CARE BIKE RACKS 6 FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.6 CJS19059.02_GRAD_PROD-3.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10 SCALE: 1" = 10' 20510 NORTH 0 100 SCALE: 1" = 100' 20050100 NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. “” “”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-3.dwg, C4.6 GRADING PLAN, 5/26/2021 10:30:47 AM, VGentry, 1:1 CAR CARE BIKE RACKS 7 FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.7 CJS19059.02_GRAD_PROD-3.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10 SCALE: 1" = 10' 20510 NORTH 0 100 SCALE: 1" = 100' 20050100 NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. “” “”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-3.dwg, C4.7 GRADING PLAN, 5/26/2021 10:31:04 AM, VGentry, 1:1 CAR CARE BIKE RACKS 8 FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.8 CJS19059.02_GRAD_PROD-3.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10 SCALE: 1" = 10' 20510 NORTH 0 100 SCALE: 1" = 100' 20050100 NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. “” “”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-3.dwg, C4.8 GRADING PLAN, 5/26/2021 10:31:18 AM, VGentry, 1:1 BLDG 9 CAR CARE BIKE RACKS 9 FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.9 CJS19059.02_GRAD_PROD-3.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10 SCALE: 1" = 10' 20510 NORTH 0 100 SCALE: 1" = 100' 20050100 NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. “” “”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-3.dwg, C4.9 GRADING PLAN, 5/26/2021 10:51:00 AM, VGentry, 1:1 BLDG 7 BLDG 8 CAR CARE BIKE RACKS 10 FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.10 CJS19059.02_GRAD_PROD-3.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10 SCALE: 1" = 10' 20510 NORTH 0 100 SCALE: 1" = 100' 20050100 NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. “” “”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-3.dwg, C4.10 GRADING PLAN, 5/26/2021 10:51:52 AM, VGentry, 1:1 BLDG 7 CAR CARE BIKE RACKS 11 16 16 17 17 FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.11 CJS19059.02_GRAD_PROD-4.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10 SCALE: 1" = 10' 20510 NORTH 0 100 SCALE: 1" = 100' 20050100 NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. “” “”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-4.dwg, C4.11 GRADING PLAN, 5/26/2021 10:40:04 AM, VGentry, 1:1 BLDG 10 CAR CARE BIKE RACKS 12 16 16 17 17 FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.12 CJS19059.02_GRAD_PROD-4.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10 SCALE: 1" = 10' 20510 NORTH 0 100 SCALE: 1" = 100' 20050100 NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. “” “”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-4.dwg, C4.12 GRADING PLAN, 5/26/2021 10:40:37 AM, VGentry, 1:1 BLDG 11 CAR CARE BIKE RACKS 13 16 16 17 17 FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.13 CJS19059.02_GRAD_PROD-4.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10 SCALE: 1" = 10' 20510 NORTH 0 100 SCALE: 1" = 100' 20050100 NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. “” “”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-4.dwg, C4.13 GRADING PLAN, 5/26/2021 10:41:30 AM, VGentry, 1:1 BLDG 12 CAR CARE BIKE RACKS 14 16 16 17 17 FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.14 CJS19059.02_GRAD_PROD-4.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10 SCALE: 1" = 10' 20510 NORTH 0 100 SCALE: 1" = 100' 20050100 NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. “” “”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-4.dwg, C4.14 GRADING PLAN, 5/26/2021 10:42:21 AM, VGentry, 1:1 CAR CARE BIKE RACKS 15 16 16 17 17 FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.15 CJS19059.02_GRAD_PROD-4.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10 SCALE: 1" = 10' 20510 NORTH 0 100 SCALE: 1" = 100' 20050100 NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. “” “”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-4.dwg, C4.15 GRADING PLAN, 5/26/2021 10:43:02 AM, VGentry, 1:1 CAR CARE BIKE RACKS 16 16 17 FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.16 CJS19059.02_GRAD_PROD-4.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10 SCALE: 1" = 10' 20510 NORTH 0 100 SCALE: 1" = 100' 20050100 NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.MATCHLINE-SEE THIS SHEETMATCHLINE-SEE SHEET C4.17MATCHLINE-SEE THIS SHEET“” “”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-4.dwg, C4.16 GRADING PLAN, 5/26/2021 10:43:50 AM, VGentry, 1:1 CAR CARE BIKE RACKS 17 17 FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.17 CJS19059.02_GRAD_PROD-4.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10 SCALE: 1" = 10' 20510 NORTH 0 100 SCALE: 1" = 100' 20050100 NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.MATCHLINE-SEE SHEET C4.16MATCHLINE-SEE SHEET C4.3“” “”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-4.dwg, C4.17 GRADING PLAN, 5/26/2021 10:45:06 AM, VGentry, 1:1 BLDG 1 BLDG 2 BLDG 3 BLDG 6 BLDG 12 BLDG 10 BLDG 7 BLDG 9 BLDG 4 BLDG 11 BLDG 5 BLDG 8 CAR CARE CENTER EX FIBER OPTIC VAULT EX 24" RCP INV=4845.5EX ELECTRICAL CABINET FIBER OPTIC VAULT 0 50 SCALE: 1:50_XREF 1002550 FINAL DEVELOPMENT PLANNORTH NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADOVERALL UTILITY PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.0 CJS19059.02_UTIL_PROD.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02UTILITY NOTES: 1.ALL WATER MUST BE CONSTRUCTED PER CURRENT FORT COLLINS-LOVELAND WATER DISTRICT (FCLWD) SPECIFICATIONS. 2.ALL SEWER MUST BE CONSTRUCTED PER CURRENT SOUTH FORT COLLINS SANITATION DISTRICT SPECIFICATIONS. 3.BUILDINGS 1-12 REQUIRE 1 1/2 INCH METER. PIPE ON BUILDING SIDE OF METER WILL BE UP-SIZED TO 2-INCH DIAMETER 5 FEET BUILDING SIDE OF THE METER VAULT. 4.SANITARY SEWER SERVICES TO BUILDINGS ARE 6-INCH DIAMETER AT 1% MINIMUM WITH A CLEAN-OUT LOCATED 5-FEET OUTSIDE THE BUILDING FOOTPRINT. 5.SEE PLUMBING PLANS FOR EXACT LOCATIONS OF WHERE SERVICES LEAVE THE BUILDING FOOTPRINTS. EASEMENT NOTE: 1.EASEMENTS ARE LABELED AS ACCESS (A), UTILITY (U), DRAINAGE EASEMENT (DE) AND EMERGENCY ACCESS EASEMENT (EAE) AS REFLECTED ON THE PLAT.P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_UTIL_PROD.dwg, C5.0 OVERALL UTILITY PLAN, 5/26/2021 9:54:25 AM, VGentry, 1:1 BLDG 12 BLDG 10 BLDG 7 BLDG 9 BLDG 11 BLDG 8 C.O. C.O. C.O. C.O. C.O. UTILITY EASEMENT (TYP) UTILITY EASEMENT (TYP) UTILITY EASEMENT (TYP) F.D.C. F.D.C. F.D.C. F.D.C. BLDG 1 2 BLDG 3 BLDG 6 BLDG 12 BLDG 10 BLDG 7 BLDG 9 BLDG 4 BLDG 11 BLDG 5 BLDG 8 CAR CARE BIKE RACKS FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSANITARY SEWER PLAN AND PROFILEH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.1 CJS19059.02_SAN_STREET_A.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.0230 15 0 30 60 SANITARY LINE A PLAN VIEW SANITARY LINE A PROFILE VIEW HORIZONTAL SCALE:1" = 30' VERTICAL SCALE: 1"=5' UTILITY NOTES: 1.ALL DRIVE AISLES CONTAIN A UTILITY EASEMENT, SEE ALL SEWER MUST BE CONSTRUCTED PER SFCSD CURRENT CONSTRUCTION SPECIFICATIONS. 2.ALL PIPE MEASUREMENTS ARE FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_SAN_STREET_A.dwg, C5.1 SANITARY SEWER PLAN AND PROFILE, 5/26/2021 10:57:51 AM, Rstraus, 1:1 BLDG1BLDG9BLDG4BLDG 1 2 BLDG 3 BLDG 6 BLDG 12 BLDG 10 BLDG 7 BLDG 9 BLDG 4 BLDG 11 BLDG 5 BLDG 8 CAR CARE BIKE RACKS 30 15 0 30 60 FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSANITARY SEWER PLAN AND PROFILEH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.2 CJS19059.02_SAN_STREET_A.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02SANITARY LINE B PLAN VIEW SANITARY LINE B PROFILE VIEW HORIZONTAL SCALE:1" = 30' VERTICAL SCALE: 1"=5' UTILITY NOTES: 1.ALL DRIVE AISLES CONTAIN A UTILITY EASEMENT, SEE ALL SEWER MUST BE CONSTRUCTED PER SFCSD CURRENT CONSTRUCTION SPECIFICATIONS. 2.ALL PIPE MEASUREMENTS ARE FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_SAN_STREET_A.dwg, C5.2 SANITARY SEWER PLAN AND PROFILE, 5/26/2021 10:58:05 AM, Rstraus, 1:1 BLDG2BLDG6BLDGBLDG5BLDG8BLDG 1 2 BLDG 3 BLDG 6 BLDG 12 BLDG 10 BLDG 7 BLDG 9 BLDG 4 BLDG 11 BLDG 5 BLDG 8 CAR CARE BIKE RACKS 30 15 0 30 60 FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSANITARY SEWER PLAN AND PROFILEH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.3 CJS19059.02_SAN_STREET_A.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02SANITARY LINE C PLAN VIEW SANITARY LINE C PROFILE VIEW HORIZONTAL SCALE:1" = 30' VERTICAL SCALE: 1"=5' CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE UTILITY NOTES: 1.ALL DRIVE AISLES CONTAIN A UTILITY EASEMENT, SEE ALL SEWER MUST BE CONSTRUCTED PER SFCSD CURRENT CONSTRUCTION SPECIFICATIONS. 2.ALL PIPE MEASUREMENTS ARE FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_SAN_STREET_A.dwg, C5.3 SANITARY SEWER PLAN AND PROFILE, 5/26/2021 10:58:17 AM, Rstraus, 1:1 BLDG 2 BLDG 3 CAR CARE CENTER BLDG 1 2 BLDG 3 BLDG 6 BLDG 12 BLDG 10 BLDG 7 BLDG 9 BLDG 4 BLDG 11 BLDG 5 BLDG 8 CAR CARE BIKE RACKS 30 15 0 30 60 FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSANITARY SEWER PLAN AND PROFILEH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.4 CJS19059.02_SAN_STREET_A.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02SANITARY LINE D PLAN VIEW SANITARY LINE D PROFILE VIEW HORIZONTAL SCALE:1" = 30' VERTICAL SCALE: 1"=5' CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE UTILITY NOTES: 1.ALL DRIVE AISLES CONTAIN A UTILITY EASEMENT, SEE ALL SEWER MUST BE CONSTRUCTED PER SFCSD CURRENT CONSTRUCTION SPECIFICATIONS. 2.ALL PIPE MEASUREMENTS ARE FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_SAN_STREET_A.dwg, C5.4 SANITARY SEWER PLAN AND PROFILE, 5/26/2021 10:58:30 AM, Rstraus, 1:1 BLDG 1 BLDG 2 BLDG 3 BLDG 6 BLDG 12 BLDG 10 BLDG 7 BLDG 9 BLDG 4 BLDG 11 BLDG 5 BLDG 8 CAR CARE BIKE RACKS BLDG 12 BLDG 10 BLDG 11 30 15 0 HORIZONTAL SCALE:1" = 30' 30 60 VERTICAL SCALE: 1"=5' STORM DRAIN A PLAN VIEW STORM DRAIN A PROFILE VIEW FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSTORM DRAIN PLAN AND PROFILEH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.5 CJS19059.02_STORM_STREET_A.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_STORM_STREET_A.dwg, C5.5 STORM DRAIN A, 5/26/2021 9:59:55 AM, VGentry, 1:1 BLDG 1 BLDG 2 BLDG 3 BLDG 6 BLDG 12 BLDG 10 BLDG 7 BLDG 9 BLDG 4 BLDG 11 BLDG 5 BLDG 8 CAR CARE BIKE RACKS BLDG430 15 0 HORIZONTAL SCALE:1" = 30' 30 60 VERTICAL SCALE: 1"=5' STORM DRAIN B PLAN VIEW STORM DRAIN B PROFILE VIEW FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSTORM DRAIN PLAN AND PROFILEH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.6 CJS19059.02_STORM_STREET_A.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_STORM_STREET_A.dwg, C5.6 STORM DRAIN, 5/26/2021 10:00:10 AM, VGentry, 1:1 BLDG11BLDG5BLDG 1 BLDG 2 BLDG 3 BLDG 6 BLDG 12 BLDG 10 BLDG 7 BLDG 9 BLDG 4 BLDG 11 BLDG 5 BLDG 8 CAR CARE BIKE RACKS FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSTORM DRAIN PLAN AND PROFILEH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.7 CJS19059.02_STORM_STREET_A.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.0230 15 0 30 60 STORM DRAIN C PLAN VIEW HORIZONTAL SCALE:1" = 30' VERTICAL SCALE: 1"=5' STORM DRAIN C PROFILE VIEW HORIZONTAL SCALE:1" = 30' VERTICAL SCALE: 1"=5' STORM DRAIN C PROFILE VIEW STORM DRAIN C PLAN VIEW P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_STORM_STREET_A.dwg, 5.7 STORM DRAIN C, 5/26/2021 10:00:27 AM, VGentry, 1:1 BLDG 1 BLDG 2 BLDG 3 BLDG 6 BLDG 12 BLDG 10 BLDG 7 BLDG 9 BLDG 4 BLDG 11 BLDG 5 BLDG 8 CAR CARE BIKE RACKS BLDG7CAR CARE CENTER 30 15 0 HORIZONTAL SCALE:1" = 30' 30 60 VERTICAL SCALE: 1"=5' STORM DRAIN G PLAN VIEW STORM DRAIN E PROFILE VIEW FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSTORM DRAIN PLAN AND PROFILEH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.8 CJS19059.02_STORM_STREET_A.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02HORIZONTAL SCALE:1" = 30' VERTICAL SCALE: 1"=5' STORM DRAIN G PROFILE VIEW STORM DRAIN E PLAN VIEW NORTH P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_STORM_STREET_A.dwg, C5.8 STORM DRAIN E & G, 5/26/2021 10:00:46 AM, VGentry, 1:1 BLDG 1 BLDG 2 BLDG 3 BLDG 6 BLDG 12 BLDG 10 BLDG 7 BLDG 9 BLDG 4 BLDG 11 BLDG 5 BLDG 8 CAR CARE BIKE RACKS BLDG 5 30 15 0 HORIZONTAL SCALE:1" = 30' 30 60 VERTICAL SCALE: 1"=5' STORM DRAIN F PLAN VIEW STORM DRAIN F PROFILE VIEW FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSTORM DRAIN PLAN AND PROFILEH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.9 CJS19059.02_STORM_STREET_A.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_STORM_STREET_A.dwg, C5.9 STORM DRAIN F, 5/26/2021 10:01:05 AM, VGentry, 1:1 BLDG 1 BLDG 2 BLDG 3 BLDG 6 BLDG 12 BLDG 10 BLDG 7 BLDG 9 BLDG 4 BLDG 11 BLDG 5 BLDG 8 CAR CARE BIKE RACKS 30 15 0 HORIZONTAL SCALE:1" = 30' 30 60 VERTICAL SCALE: 1"=5' STORM DRAIN H PLAN VIEW STORM DRAIN H PROFILE VIEW FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSTORM DRAIN PLAN AND PROFILEH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.10 CJS19059.02_STORM_STREET_A.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_STORM_STREET_A.dwg, C5.10 STORM DRAIN H, 5/26/2021 10:01:18 AM, VGentry, 1:1 BLDG 1 BLDG 2 BLDG 3 BLDG 6 BLDG 12 BLDG 10 BLDG 7 BLDG 9 BLDG 4 BLDG 11 BLDG 5 BLDG 8 CAR CARE BIKE RACKS BLDG 30 15 0 HORIZONTAL SCALE:1" = 30' 30 60 VERTICAL SCALE: 1"=5' STORM DRAIN I PLAN VIEW STORM DRAIN I PROFILE VIEW FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSTORM DRAIN PLAN AND PROFILEH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.11 CJS19059.02_STORM_STREET_A.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_STORM_STREET_A.dwg, C5.11 STORM DRAIN I, 5/26/2021 10:50:09 AM, Rstraus, 1:1 3 BLDG 6 BLDG 12 BLDG 10 BLDG 7 BLDG 9 BLDG 11 BLDG 5 BLDG 8 CAR CARE BIKE RACKS 30 15 0 HORIZONTAL SCALE:1" = 30' 30 60 VERTICAL SCALE: 1"=5' STORM DRAIN OUTFALL PLAN VIEW STORM DRAIN OUTFALL PROFILE VIEW FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSTORM DRAIN PLAN AND PROFILEH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.12 CJS19059.02_STORM_STREET_A.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02FINAL DEVELOPMENT PLANNORTH P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_STORM_STREET_A.dwg, C5.12 STORM DRAIN OUTFALL, 5/26/2021 10:01:45 AM, VGentry, 1:1 3 BLDG 6 BLDG 12 BLDG 10 BLDG 7 BLDG 9 BLDG 11 BLDG 5 BLDG 8 CAR CARE BIKE RACKS BLDG730 15 0 HORIZONTAL SCALE:1" = 30' 30 60 VERTICAL SCALE: 1"=5' STORM DRAIN POOL PLAN VIEW STORM DRAIN POOL PROFILE VIEW FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSTORM DRAIN PLAN AND PROFILEH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.13 CJS19059.02_STORM_STREET_A.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02FINAL DEVELOPMENT PLANNORTH P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_STORM_STREET_A.dwg, C5.13 STORM DRAIN POOL, 5/26/2021 10:01:55 AM, VGentry, 1:1 BLDG 1 BLDG 2 BLDG 3 BLDG 6 BLDG 12 BLDG 10 BLDG 7 BLDG 9 BLDG 4 BLDG 11 BLDG 5 BLDG 8 CAR CARE CENTER EX FIBER OPTIC VAULT EX 24" RCP INV=4845.5 EX ELECTRICAL CABINET FIBER OPTIC VAULT CAR CARE BIKE RACKS FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADWATERLINE PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.14 CJS19059.02_WATER_PROD.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 40 SCALE: 1" = 40'_XREF 802040 FINAL DEVELOPMENT PLANNORTH NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. UTILITY NOTES: 1.ALL DRIVE AISLES CONTAIN A UTILITY EASEMENT, SEE PLAT FOR DETAILS. 2.ALL WATER MUST BE CONSTRUCTED PER CURRENT FORT COLLINS-LOVELAND WATER DISTRICT (FCLWD) SPECIFICATIONS. 3.ALL SEWER MUST BE CONSTRUCTED PER CURRENT SOUTH FORT COLLINS SANITATION DISTRICT SPECIFICATIONS. 4.BUILDINGS 1-12 REQUIRE 1 1/2 INCH METER. PIPE ON BUILDING SIDE OF METER WILL BE UP-SIZED TO 2-INCH DIAMETER 5 FEET BUILDING SIDE OF THE METER VAULT. 5.SANITARY SEWER SERVICES TO BUILDINGS ARE 6-INCH DIAMETER AT 1% MINIMUM WITH A CLEAN-OUT LOCATED 5-FEET OUTSIDE THE BUILDING FOOTPRINT. 6.SEE PLUMBING PLANS FOR EXACT LOCATIONS OF WHERE SERVICES LEAVE THE BUILDING FOOTPRINTS. NORTH 0 100 SCALE: 1" = 100'_XREF 20050100 P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_WATER_PROD.dwg, C5.11 WATERLINE PLAN, 5/26/2021 10:03:38 AM, VGentry, 1:1 BLDG 1 BLDG 2 BLDG 3 BLDG 6 BLDG 12 BLDG 10 BLDG 7 BLDG 9 BLDG 4 BLDG 11 BLDG 5 BLDG 8 CAR CARE CENTER EX FIBER OPTIC VAULT EX 24" RCP INV=4845.5 EX ELECTRICAL CABINET FIBER OPTIC VAULT CAR CARE BIKE RACKS FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADWATERLINE PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.15 CJS19059.02_WATER_PROD.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 40 SCALE: 1" = 40'_XREF 802040 FINAL DEVELOPMENT PLANNORTH NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. NORTH 0 100 SCALE: 1" = 100'_XREF 20050100 UTILITY NOTES: 1.ALL DRIVE AISLES CONTAIN A UTILITY EASEMENT, SEE PLAT FOR DETAILS. 2.ALL WATER MUST BE CONSTRUCTED PER CURRENT FORT COLLINS-LOVELAND WATER DISTRICT (FCLWD) SPECIFICATIONS. 3.ALL SEWER MUST BE CONSTRUCTED PER CURRENT SOUTH FORT COLLINS SANITATION DISTRICT SPECIFICATIONS. 4.BUILDINGS 1-12 REQUIRE 1 1/2 INCH METER. PIPE ON BUILDING SIDE OF METER WILL BE UP-SIZED TO 2-INCH DIAMETER 5 FEET BUILDING SIDE OF THE METER VAULT. 5.SANITARY SEWER SERVICES TO BUILDINGS ARE 6-INCH DIAMETER AT 1% MINIMUM WITH A CLEAN-OUT LOCATED 5-FEET OUTSIDE THE BUILDING FOOTPRINT. 6.SEE PLUMBING PLANS FOR EXACT LOCATIONS OF WHERE SERVICES LEAVE THE BUILDING FOOTPRINTS.P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_WATER_PROD.dwg, C5.12 WATERLINE PLAN, 5/26/2021 10:04:00 AM, VGentry, 1:1 100-YR FLOODPLAIN 100-YR FLOODWAY HARMONY ROAD STRAUSS CABIN ROAD20' EXISTING WATERLINE EASEMENT 20.00' EXISTING EASEMENT (PURPOSE UNKNOWN) EXISTING UNPAVED ACCESS EXISTING ROW EXISTING ROW EXISTING DIRT ROAD SHALL BE USED FOR CONSTRUCTION TRAFFIC LIMITS OF CONSTRUCTION LIMITS OF CONSTRUCTION APPROXIMATE AREA FOR STOCKPILED MATERIAL BLDG 1 BLDG 2 BLDG 3 BLDG 6 BLDG 12 BLDG 10 BLDG 7 BLDG 9 BLDG 4 BLDG 11 BLDG 5 BLDG 8 CAR CARE CENTER NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADEROSION CONTROL PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC7.0 CJS19059.02_EROSION_PROD.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02CONTOUR NOTE: ·PROPOSED CONTOURS ARE SHOWN AT 1' MAJOR AND 0.5' MINOR ·EXISTING CONTOURS ARE SHOWN AT 5' MAJOR AND 1' MINOR AREA OF FILL REMOVAL AND GRADING = 637,109 SF (14.63 ACRES) EARTHWORK QUANTITIES CUT 7,910 CY FILL 27,840 CY FLOODPLAIN USE PERMIT NO. 11411 CONSTRUCTION SEQUENCE: 1.OBTAIN ALL REQUIRED PERMITS FOR PROPOSED WORK. 2.INSTALL ROCK SOCKS AND INLET PROTECTION. 3.INSTALL VEHICLE TRACKING CONTROL. 4.INSTALL STABILIZED STAGING AREA. 5.INSTALL ALL PERIMETER BMPs. 6.PERFORM STRIPPING, GRUBBING AND STABILIZE STOCKPILED MATERIALS. 7.PERFORM EARTHWORK. 10.STABILIZE STOCKPILED MATERIALS AND GRADED/DISTURBED AREAS, AS REQUIRED. 9.INSTALL UTILITIES, PAVEMENTS AND REMAINING IMPROVEMENTS. 10.SEED AND MULCH NEWLY GRADED AND DISTURBED AREAS. 11.REMOVE ALL TEMPORARY BMPs ACCEPT FOR PERIMETER CONTROLS. 12.REMOVE PERIMETER CONTROLS UPON ESTABLISHED 70% VEGETATED GROUND COVER. PROJECT CONTROL/DATUM: VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88). VERTICAL CONTROL BASED UPON TRIMBLE VRS NETWORK SOLUTION. HORIZONTAL DATUM: COLORADO STATE PLANE COORDINATES NAD 83(2011) DATUM. HORIZONTAL CONTROL BASED UPON TRIMBLE VRS NETWORK SOLUTION. DATUM NOTE: 1.THIS DRAWING IS AT MODIFIED STATE PLANE. TO REDUCE TO STATE PLANE COORDINATES, SCALE AT 0.99973537 (1.00026470) ABOUT THE ORIGIN 0,0. EROSION CONTROL LEGEND STOCKPILE MANAGEMENT STABILIZED STAGING AREA PERMANENT SEEDING SILT FENCE STREET SWEEPING SURFACE ROUGHNING EROSION CONTROL PLANGENERAL NOTES 1.THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL REQUIRED PERMITS PRIOR TO COMMENCEMENT OF ANY WORK ON THE PROJECT. 2.THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS AT AND ADJACENT TO THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY, DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND SHALL NOT BE LIMITED TO NORMAL WORKING HOURS. THE DUTY OF THE CITY TO CONDUCT CONSTRUCTION REVIEW OF THE CONTRACTOR'S PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES IN, ON, OR NEAR THE CONSTRUCTION SITE. 3.NO CONSTRUCTION DEBRIS OR MUD SHALL BE TRACKED ONTO ADJACENT STREETS. IF ANY TRACKING DOES OCCUR, IT SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR. 4.THE CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS, BARRICADES, FLAG PERSONS, OR OTHER DEVICES NECESSARY TO PROVIDE FOR PUBLIC SAFETY IN ACCORDANCE WITH THE CURRENT MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. 5.THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL SURVEY MONUMENTS. ANY MONUMENT THAT MUST BE DESTROYED FOR CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL ENGAGE THE SERVICES OF A LICENSED SURVEYOR PRIOR TO DISTURBING ANY MONUMENTS. 6.IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE OWNER AND THE ENGINEER OF ANY PROBLEMS IN IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE OWNER AND THE ENGINEER OF ANY PROBLEMS IN CONFORMING TO THESE PLANS FOR ANY ELEMENT OF THE PROPOSED IMPROVEMENTS PRIOR TO ITS CONSTRUCTION. 7.CONTRACTOR SHALL COORDINATE THE IMPROVEMENTS WITH AND PROVIDE NOTIFICATION OF CONSTRUCTION SCHEDULING TO THE OWNER OF ANY BUSINESS WHERE PROPOSED IMPROVEMENTS MAY AFFECT THE DAILY OPERATIONS OF THAT OWNER'S BUSINESS. 8.CONTRACTOR SHALL OBTAIN OWNER APPROVAL FOR ANY IMPROVEMENTS NOT CONTAINED WITHIN THESE PLANS. 9.IT IS THE RESPONSIBILITY OF THE CONTRACTOR DURING CONSTRUCTION ACTIVITIES TO RESOLVE CONSTRUCTION PROBLEMS DUE TO CHANGED CONDITIONS ENCOUNTERED DURING THE PROGRESS OF ANY PORTION OF THE PROJECT. 10.CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING OVERHEAD AND UNDERGROUND UTILITIES. IF A UTILITY IS DAMAGED DURING CONSTRUCTION, THEN IT SHALL BE REPAIRED BY THE CONTRACTOR AT NO EXPENSE TO THE OWNER. CONTRACTOR SHALL COORDINATE WITH UTILITY OWNER/PROVIDER REGARDING ANY RE- ROUTING, REMOVAL, AND/OR MODIFICATION TO ANY EXISTING UTILITY LINE AND/OR APPURTENANCE. CONTRACTOR TO COORDINATE WITH A LICENSED ELECTRICIAN, AS REQUIRED, REGARDING ON - SITE ELECTRICAL ABANDONMENT,RE- ROUTING AND/OR PRESERVATION. 11.ALL EXISTING UTILITIES SHOWN IN THESE PLANS ARE APPROXIMATE AND SOME UTILITIES MAY NOT BE SHOWN AT ALL. SITE CONTRACTOR SHALL VERIFY THE HORIZONTAL AND VERTICAL LOCATION OF ALL EXISTING UTILITIES SHOWN OR NOT SHOWN IN THESE PLANS PRIOR TO CONSTRUCTION. CALL UTILITY NOTIFICATION CENTER OF COLORADO 811 ROCK SOCK CONCRETE WASHOUT AREA HARMONY 25, PARCEL 86030000281/29/20ISSUED FOR CONSTRUCTIONOVERLAND FLOW ARROW EROSION CONTROL CALCULATION TABLE AREA DESCRIPTION AREA (ac) TOTAL PROJECT AREA ±16.0 ACRES TOTAL AREA OF DISTURBANCE ±16.0 ACRES TOTAL AREA OF STAGING/STORAGE ±0.4 ACRES TOTAL AREAS FOR HAULING N/A TOTAL VOLUME OF MATERIAL TO BE RELOCATED 7,910 CY VEHICLE TRACKING CONTROL INLET PROTECTION STAKED SEDIMENT CONTROL LOG LIMITS OF CONSTRUCTION 0 ## SCALE: ######## ####### NORTH P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_EROSION_PROD.dwg, C7.0 EROSION CONTROL PLAN, 5/26/2021 10:08:32 AM, VGentry, 1:1 FINAL DEVELOPMENT PLANFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADEROSION CONTROL NOTESH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC7.1 CJS19059.02_DETAIL_PROD.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02“” “”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_DETAIL_PROD.dwg, C7.1 EROSION CONTROL NOTES, 5/26/2021 10:09:39 AM, VGentry, 1:1 FINAL DEVELOPMENT PLANFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADEROSION CONTROL DETAILSH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC7.2 CJS19059.02_DETAIL_PROD.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_DETAIL_PROD.dwg, C7.2 EROSION CONTROL DETAILS, 5/26/2021 10:09:43 AM, VGentry, 1:1 FINAL DEVELOPMENT PLANFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADEROSION CONTROL DETAILSH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC7.3 CJS19059.02_DETAIL_PROD.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_DETAIL_PROD.dwg, C7.3 EROSION CONTROL DETAILS, 5/26/2021 10:09:53 AM, VGentry, 1:1 FINAL DEVELOPMENT PLANFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADEROSION CONTROL DETAILSH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC7.4 CJS19059.02_DETAIL_PROD.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_DETAIL_PROD.dwg, C7.4 EROSION CONTROL DETAILS, 5/26/2021 10:10:03 AM, VGentry, 1:1 TRAFFIC RATED CLEANOUT WW-15 FINAL DEVELOPMENT PLANFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADCONSTRUCTION DETAILSH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC8.0 CJS19059.02_DETAIL_PROD.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_DETAIL_PROD.dwg, C8.0 CONSTRUCTION DETAILS, 5/26/2021 10:10:08 AM, VGentry, 1:1 FINAL DEVELOPMENT PLANFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADCONSTRUCTION DETAILSH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC8.1 CJS19059.02_DETAIL_PROD.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_DETAIL_PROD.dwg, C8.1 CONSTRUCTION DETAILS, 5/26/2021 10:10:13 AM, VGentry, 1:1 FINAL DEVELOPMENT PLAN FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION E. HARMONY ROAD & STRAUSS CABIN ROAD CONSTRUCTION DETAILS H-25 MULTI FAMILY HARMONY I-25 SUBDIVISION FORT COLLINS, COC8.3CJS 19059.02_DETAIL_PROD.DWG RS/EB/VJG 2/19/20 1ST PDP SUBMITTAL 7/01/20 9/30/20 10/26/20 4/07/21 5/26/21 - 2ND PDP SUBMITTAL 3RD PDP SUBMITTAL 4TH PDP SUBMITTAL 1ST FDP SUBMITTAL 2ND FDP SUBMITTAL - -- 19059.02 P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_DETAIL_PROD.dwg, C8.3 CONSTRUCTION DETAILS, 5/26/2021 10:10:22 AM, VGentry, 1:1 STANDARD CONCRETE NOTESFINAL DEVELOPMENT PLAN FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION E. HARMONY ROAD & STRAUSS CABIN ROAD CONSTRUCTION DETAILS H-25 MULTI FAMILY HARMONY I-25 SUBDIVISION FORT COLLINS, COC8.2CJS 19059.02_DETAIL_PROD.DWG RS/EB/VJG 2/19/20 1ST PDP SUBMITTAL 7/01/20 9/30/20 10/26/20 4/07/21 5/26/21 - 2ND PDP SUBMITTAL 3RD PDP SUBMITTAL 4TH PDP SUBMITTAL 1ST FDP SUBMITTAL 2ND FDP SUBMITTAL - -- 19059.02 P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_DETAIL_PROD.dwg, C8.2 CONSTRUCTION DETAILS, 5/26/2021 10:10:28 AM, VGentry, 1:1 FINAL DEVELOPMENT PLANFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADCONSTRUCTION DETAILSH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC8.4 CJS19059.02_DETAIL_PROD.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_DETAIL_PROD.dwg, C8.4 CONSTRUCTION DETAILS, 5/26/2021 10:10:33 AM, VGentry, 1:1 FINAL DEVELOPMENT PLANFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSTREET CROSS SECTION DETAILSH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC9.0 CJS19059.02_STREET_DETAIL_PROD.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02STRAUSS CABIN ROAD SOUTH OF HARMONY ROAD LOOKING NORTH ADJACENT TO H-25 FRONTAGE (PROPOSED - ULTIMATE) STRAUSS CABIN ROAD SOUTH OF HARMONY ROAD LOOKING NORTH ADJACENT TO H-25 FRONTAGE (PROPOSED - INTERM) HARMONY ROAD LOOKING EAST ADJACENT TO H-25 FRONTAGE P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_STREET_DETAIL_PROD.dwg, 24x36-DETAILS, 5/26/2021 10:10:53 AM, VGentry, 1:1 2021-05-26 - This sheet has been included in the H25 Project Design plans at the request of the City of Fort Collins. New Site Access by H-25 ProjectGlue down delineators to be removed by H-25 project Changes to this sheet for the H25 project are clouded revisions and were made by Sanderson Stewart 78'-0" Striping to be removed 20'-0" 175'-0" New Right Turn Arrows per City of Fort Collins Standards 2021-04-05 - This sheet has been included in the H25 Project Design plans at the request of the City of Fort Collins. Changes to this sheet for the H25 project are clouded revisions and were made by Sanderson Stewart 20'-0"175'-0" 78'-0" New 4-inch white stripe - 45-ft radius New right turn arrows per City of Fort Collins Standards