Loading...
HomeMy WebLinkAboutH-25 MULTI-FAMILY - FDP210008 - DOCUMENT MARKUPS - ROUND 2 - UTILITY PLANS (2)BLDG 12 BLDG 10 BLDG 7 BLDG 9 BLDG 11 BLDG 8 BLDG 1 2 BLDG 3 BLDG 6 BLDG 12 BLDG 10 BLDG 7 BLDG 9 BLDG 4 BLDG 11 BLDG 5 BLDG 8 CAR CARE BIKE RACKS FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONHARMONY & STRAUSS CABIN ROADSANITARY SEWER PLAN AND PROFILEH-25 MULTI FAMILY DEVELOPMENT FORT COLLINS, COC5.1 CJS19059.02_SAN_STREET_A.DWGRS/EB/VJG2/19/20 1ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/21--2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL----19059.0230 15 0 30 60 SANITARY LINE A PLAN VIEW SANITARY LINE A PROFILE VIEW HORIZONTAL SCALE:1" = 30' VERTICAL SCALE: 1"=5' UTILITY NOTES: 1. ALL DRIVE AISLES CONTAIN A UTILITY EASEMENT, SEE ALL SEWER MUST BE CONSTRUCTED PER SFCSD CURRENT CONSTRUCTION SPECIFICATIONS. 2. ALL PIPE MEASUREMENTS ARE FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_SAN_STREET_A.dwg, C5.1 SANITARY SEWER PLAN AND PROFILE, 4/6/2021 8:50:28 PM, VGentry, 1:1NEED A 0.1' MIN DROP FROM INVERT IN TO INVERT OUTOUT INVERT? SEWER SERVICES ARE NORMALLY 4" OR 6" NEED A MIN 0.3' DROP FOR 90 DEGREE BEND MIN A 0.1' DROP FROM INVERT IN TO INVERT OUT SEWER SERVICES ARE NORMALLY 4" OR 6" switched all services to 6" switched all services to 6" fixed fixed fixed fixed BLDG1BLDG9BLDG4BLDG 1 2 BLDG 3 BLDG 6 BLDG 12 BLDG 10 BLDG 7 BLDG 9 BLDG 4 BLDG 11 BLDG 5 BLDG 8 CAR CARE BIKE RACKS 30 15 0 30 60 FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONHARMONY & STRAUSS CABIN ROADSANITARY SEWER PLAN AND PROFILEH-25 MULTI FAMILY DEVELOPMENT FORT COLLINS, COC5.2 CJS19059.02_SAN_STREET_A.DWGRS/EB/VJG2/19/20 1ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/21--2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL----19059.02SANITARY LINE B PLAN VIEW SANITARY LINE B PROFILE VIEW HORIZONTAL SCALE:1" = 30' VERTICAL SCALE: 1"=5' CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE UTILITY NOTES: 1. ALL DRIVE AISLES CONTAIN A UTILITY EASEMENT, SEE ALL SEWER MUST BE CONSTRUCTED PER SFCSD CURRENT CONSTRUCTION SPECIFICATIONS. 2. ALL PIPE MEASUREMENTS ARE FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_SAN_STREET_A.dwg, C5.2 SANITARY SEWER PLAN AND PROFILE, 4/6/2021 8:50:55 PM, VGentry, 1:1INVERT OUT? NEED A 0.3' MIN DROP FOR 90 DEGREE BEND LABEL THE 8" SERVICE LATERALS AS PRIVATE NEED A MIN 0.1' DROP FROM INVERT IN TO INVERT OUT updated fixed this one has a greater than 0.3' drop updated BLDG2BLDG6BLDGBLDG5BLDG8BLDG 1 2 BLDG 3 BLDG 6 BLDG 12 BLDG 10 BLDG 7 BLDG 9 BLDG 4 BLDG 11 BLDG 5 BLDG 8 CAR CARE BIKE RACKS 30 15 0 30 60 FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONHARMONY & STRAUSS CABIN ROADSANITARY SEWER PLAN AND PROFILEH-25 MULTI FAMILY DEVELOPMENT FORT COLLINS, COC5.3 CJS19059.02_SAN_STREET_A.DWGRS/EB/VJG2/19/20 1ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/21--2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL----19059.02SANITARY LINE C PLAN VIEW SANITARY LINE C PROFILE VIEW HORIZONTAL SCALE:1" = 30' VERTICAL SCALE: 1"=5' CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE UTILITY NOTES: 1. ALL DRIVE AISLES CONTAIN A UTILITY EASEMENT, SEE ALL SEWER MUST BE CONSTRUCTED PER SFCSD CURRENT CONSTRUCTION SPECIFICATIONS. 2. ALL PIPE MEASUREMENTS ARE FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_SAN_STREET_A.dwg, C5.3 SANITARY SEWER PLAN AND PROFILE, 4/6/2021 8:51:20 PM, VGentry, 1:1NEED MIN 0.1' DROP FROM INVERT IN TO INVERT OUT NEED MIN 0.3' DROP FOR 90 DEGREE BEND NEED MIN 0.1' DROP FROM INVERT IN TO INVERT OUT FOR THE STRAIGHT THROUGH FLOWS. IF FLOWS ARE HIGH ENOUGH FOR 8" SEWER LATERALS, THE DISTRICT WILL REQUIRE MANHOLES WHERE THE 8" PRIVATE SERVICES CONNECT TO THE 8" PUBLIC MAIN. (TYP) all laterals are 6" now fixed fixed fixed BLDG 2 BLDG 3 CAR CARE CENTER BLDG 1 2 BLDG 3 BLDG 6 BLDG 12 BLDG 10 BLDG 7 BLDG 9 BLDG 4 BLDG 11 BLDG 5 BLDG 8 CAR CARE BIKE RACKS 30 15 0 30 60 FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONHARMONY & STRAUSS CABIN ROADSANITARY SEWER PLAN AND PROFILEH-25 MULTI FAMILY DEVELOPMENT FORT COLLINS, COC5.4 CJS19059.02_SAN_STREET_A.DWGRS/EB/VJG2/19/20 1ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/21--2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL----19059.02SANITARY LINE D PLAN VIEW SANITARY LINE D PROFILE VIEW HORIZONTAL SCALE:1" = 30' VERTICAL SCALE: 1"=5' CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE UTILITY NOTES: 1. ALL DRIVE AISLES CONTAIN A UTILITY EASEMENT, SEE ALL SEWER MUST BE CONSTRUCTED PER SFCSD CURRENT CONSTRUCTION SPECIFICATIONS. 2. ALL PIPE MEASUREMENTS ARE FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_SAN_STREET_A.dwg, C5.4 SANITARY SEWER PLAN AND PROFILE, 4/6/2021 8:51:45 PM, VGentry, 1:1CASING IS NOT NEEDED ON GRAVITY PIPE NEED A MIN 0.3' DROP FOR A 90 DEGREE BEND IS A SAND OIL INTERCEPTOR REQUIRED? SUBMIT AN INDUSTRIAL BUSINESS PRETREATMENT QUESTIONAIRE. fixed removed The Wyatt apartments just to the west required a S/O Separator. We will coordinate with you on this and we will submit a questionnaire, as required BLDG 1 BLDG 2 BLDG 3 BLDG 6 BLDG 12 BLDG 10 BLDG 7 BLDG 9 BLDG 4 BLDG 11 BLDG 5 BLDG 8 CAR CARE CENTER EX FIBER OPTIC VAULT EX 24" RCP INV=4845.5 EX ELECTRICAL CABINET EX DRAIN CHASE EX DRAIN CHASE FIBER OPTIC VAULT CAR CARE BIKE RACKS FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONHARMONY & STRAUSS CABIN ROADWATERLINE PLANH-25 MULTI FAMILY DEVELOPMENT FORT COLLINS, COC5.11 CJS19059.02_WATER_PROD.DWGRS/EB/VJG2/19/20 1ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/21--2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL----19059.02CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE 0 40 SCALE: 1:40_XREF 802040 FINAL DEVELOPMENT PLANNORTH NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. UTILITY NOTES: 1. ALL DRIVE AISLES CONTAIN A UTILITY EASEMENT, SEE PLAT FOR DETAILS. 2. ALL WATER MUST BE CONSTRUCTED PER CURRENT FORT COLLINS-LOVELAND WATER DISTRICT (FCLWD) SPECIFICATIONS. 3. ALL SEWER MUST BE CONSTRUCTED PER CURRENT SOUTH FORT COLLINS SANITATION DISTRICT SPECIFICATIONS. 4. BUILDINGS 1-12 REQUIRE 1 1/2 INCH METER. PIPE ON BUILDING SIDE OF METER WILL BE UP-SIZED TO 2-INCH DIAMETER 5 FEET BUILDING SIDE OF THE METER VAULT. 5. SANITARY SEWER SERVICES TO BUILDINGS ARE 6-INCH DIAMETER AT 1% MINIMUM WITH A CLEAN-OUT LOCATED 5-FEET OUTSIDE THE BUILDING FOOTPRINT. 6. SEE PLUMBING PLANS FOR EXACT LOCATIONS OF WHERE SERVICES LEAVE THE BUILDING FOOTPRINTS. NORTH 0 100 SCALE: 1" = 100'_XREF 20050100 P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_WATER_PROD.dwg, C5.11 WATERLINE PLAN, 4/6/2021 7:49:52 PM, VGentry, 1:1WHY IS THIS TEMPORARY? WOULD THERE BE A FUTURE CONNECTION TO THE WEST? VALVE UPSTREAM OF HYDRANT BUT WEST OF FIRE SPRINKLER LINE REQUIRED. MOVE THE METER PIT SYMBOL TO THE 1.5" LINE. REMOVE CURB STOP SYMBOL. METER PIT MUST BE WITHIN AN EASEMENT (TYP) CALL OUT WET TAP ON 24" PVC MAIN. REMOVE CURB STOP UPSTREAM OF METER PIT. METER PIT MUST BE IN EASEMENT. WILL THIS DRIVE EXTEND TO THE EAST IN THE FUTURE? IF SO, PROPOSE A TEMP HYDRANT. CALL OUT TAP AND METER PIT FOR ALL BUILDINGS. This has been made a standard fire hydrant and the other one just to the east omitted removed added labels swapped tee and valve with service connection instead added dead end with hydrant updated FH omitted BLDG 1 BLDG 2 BLDG 3 BLDG 6 BLDG 12 BLDG 10 BLDG 7 BLDG 9 BLDG 4 BLDG 11 BLDG 5 BLDG 8 CAR CARE CENTER EX FIBER OPTIC VAULT EX 24" RCP INV=4845.5 EX ELECTRICAL CABINET EX DRAIN CHASE EX DRAIN CHASE FIBER OPTIC VAULT CAR CARE BIKE RACKS FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONHARMONY & STRAUSS CABIN ROADWATERLINE PLANH-25 MULTI FAMILY DEVELOPMENT FORT COLLINS, COC5.12 CJS19059.02_WATER_PROD.DWGRS/EB/VJG2/19/20 1ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/21--2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL----19059.02CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE 0 40 SCALE: 1:40_XREF 802040 FINAL DEVELOPMENT PLANNORTH NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. NORTH 0 100 SCALE: 1" = 100'_XREF 20050100 UTILITY NOTES: 1. ALL DRIVE AISLES CONTAIN A UTILITY EASEMENT, SEE PLAT FOR DETAILS. 2. ALL WATER MUST BE CONSTRUCTED PER CURRENT FORT COLLINS-LOVELAND WATER DISTRICT (FCLWD) SPECIFICATIONS. 3. ALL SEWER MUST BE CONSTRUCTED PER CURRENT SOUTH FORT COLLINS SANITATION DISTRICT SPECIFICATIONS. 4. BUILDINGS 1-12 REQUIRE 1 1/2 INCH METER. PIPE ON BUILDING SIDE OF METER WILL BE UP-SIZED TO 2-INCH DIAMETER 5 FEET BUILDING SIDE OF THE METER VAULT. 5. SANITARY SEWER SERVICES TO BUILDINGS ARE 6-INCH DIAMETER AT 1% MINIMUM WITH A CLEAN-OUT LOCATED 5-FEET OUTSIDE THE BUILDING FOOTPRINT. 6. SEE PLUMBING PLANS FOR EXACT LOCATIONS OF WHERE SERVICES LEAVE THE BUILDING FOOTPRINTS.P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_WATER_PROD.dwg, C5.12 WATERLINE PLAN, 4/6/2021 7:50:14 PM, VGentry, 1:1VALVES ALL 3 SIDES OF TEE. THIS BEND IS NOT PERMITTED. SPLIT UP BEND WITH 2 MH'S fixed fixed pipe alignment to acute angle