Loading...
HomeMy WebLinkAboutH-25 MULTI-FAMILY - FDP210008 - DOCUMENT MARKUPS - ROUND 2 - UTILITY PLANS100-YR FLOODPLAIN 100-YR FLOODWAY HARMONY ROAD STRAUSS CABIN ROAD20' EXISTING WATERLINE EASEMENT 20.00' EXISTING EASEMENT (PURPOSE UNKNOWN) EXISTING UNPAVED ACCESS EXISTING ROW EXISTING ROW EXISTING DIRT ROAD SHALL BE USED FOR CONSTRUCTION TRAFFIC LIMITS OF CONSTRUCTION LIMITS OF CONSTRUCTION APPROXIMATE AREA FOR STOCKPILED MATERIAL BLDG 1 BLDG 2 BLDG 3 BLDG 6 BLDG 12 BLDG 10 BLDG 7 BLDG 9 BLDG 4 BLDG 11 BLDG 5 BLDG 8 CAR CARE CENTER 0 50 SCALE: 1" = 50' 1002550 NORTH NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONHARMONY & STRAUSS CABIN ROADEROSION CONTROL PLANH-25 MULTI FAMILY DEVELOPMENT FORT COLLINS, COC7.0 CJS19059.02_EROSION_PROD.DWGRS/EB/VJG2/19/20 1ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/21--2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL----19059.02CONTOUR NOTE: ·PROPOSED CONTOURS ARE SHOWN AT 1' MAJOR AND 0.5' MINOR ·EXISTING CONTOURS ARE SHOWN AT 5' MAJOR AND 1' MINOR AREA OF FILL REMOVAL AND GRADING = 637,109 SF (14.63 ACRES) EARTHWORK QUANTITIES CUT 7,910 CY FILL 27,840 CY FLOODPLAIN USE PERMIT NO. 11411 CONSTRUCTION SEQUENCE: 1. OBTAIN ALL REQUIRED PERMITS FOR PROPOSED WORK. 2. INSTALL ROCK SOCKS AND INLET PROTECTION. 3. INSTALL VEHICLE TRACKING CONTROL. 4. INSTALL STABILIZED STAGING AREA. 5. INSTALL ALL PERIMETER BMPs. 6. PERFORM STRIPPING, GRUBBING AND STABILIZE STOCKPILED MATERIALS. 7. PERFORM EARTHWORK. 10. STABILIZE STOCKPILED MATERIALS AND GRADED/DISTURBED AREAS, AS REQUIRED. 9. INSTALL UTILITIES, PAVEMENTS AND REMAINING IMPROVEMENTS. 10. SEED AND MULCH NEWLY GRADED AND DISTURBED AREAS. 11. REMOVE ALL TEMPORARY BMPs ACCEPT FOR PERIMETER CONTROLS. 12. REMOVE PERIMETER CONTROLS UPON ESTABLISHED 70% VEGETATED GROUND COVER. PROJECT CONTROL/DATUM: VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88). VERTICAL CONTROL BASED UPON TRIMBLE VRS NETWORK SOLUTION. HORIZONTAL DATUM: COLORADO STATE PLANE COORDINATES NAD 83(2011) DATUM. HORIZONTAL CONTROL BASED UPON TRIMBLE VRS NETWORK SOLUTION. DATUM NOTE: 1. THIS DRAWING IS AT MODIFIED STATE PLANE. TO REDUCE TO STATE PLANE COORDINATES, SCALE AT 0.99973537 (1.00026470) ABOUT THE ORIGIN 0,0. EROSION CONTROL LEGEND STOCKPILE MANAGEMENT STABILIZED STAGING AREA PERMANENT SEEDING SILT FENCE STREET SWEEPING SURFACE ROUGHNING EROSION CONTROL PLANGENERAL NOTES 1. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL REQUIRED PERMITS PRIOR TO COMMENCEMENT OF ANY WORK ON THE PROJECT. 2. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS AT AND ADJACENT TO THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY, DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND SHALL NOT BE LIMITED TO NORMAL WORKING HOURS. THE DUTY OF THE CITY TO CONDUCT CONSTRUCTION REVIEW OF THE CONTRACTOR'S PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES IN, ON, OR NEAR THE CONSTRUCTION SITE. 3. THE CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS, BARRICADES, FLAG PERSONS, OR OTHER DEVICES NECESSARY TO PROVIDE FOR PUBLIC SAFETY IN ACCORDANCE WITH THE CURRENT MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. 4. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL SURVEY MONUMENTS. ANY MONUMENT THAT MUST BE DESTROYED FOR CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL ENGAGE THE SERVICES OF A LICENSED SURVEYOR PRIOR TO DISTURBING ANY MONUMENTS. 5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE OWNER AND THE ENGINEER OF ANY PROBLEMS IN IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE OWNER AND THE ENGINEER OF ANY PROBLEMS IN CONFORMING TO THESE PLANS FOR ANY ELEMENT OF THE PROPOSED IMPROVEMENTS PRIOR TO ITS CONSTRUCTION. 6. CONTRACTOR SHALL COORDINATE THE IMPROVEMENTS WITH AND PROVIDE NOTIFICATION OF CONSTRUCTION SCHEDULING TO THE OWNER OF ANY BUSINESS WHERE PROPOSED IMPROVEMENTS MAY AFFECT THE DAILY OPERATIONS OF THAT OWNER'S BUSINESS. 7. CONTRACTOR SHALL OBTAIN OWNER APPROVAL FOR ANY IMPROVEMENTS NOT CONTAINED WITHIN THESE PLANS. 8. IT IS THE RESPONSIBILITY OF THE CONTRACTOR DURING CONSTRUCTION ACTIVITIES TO RESOLVE CONSTRUCTION PROBLEMS DUE TO CHANGED CONDITIONS ENCOUNTERED DURING THE PROGRESS OF ANY PORTION OF THE PROJECT. 9. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING OVERHEAD AND UNDERGROUND UTILITIES. IF A UTILITY IS DAMAGED DURING CONSTRUCTION, THEN IT SHALL BE REPAIRED BY THE CONTRACTOR AT NO EXPENSE TO THE OWNER. CONTRACTOR SHALL COORDINATE WITH UTILITY OWNER/PROVIDER REGARDING ANY RE- ROUTING, REMOVAL, AND/OR MODIFICATION TO ANY EXISTING UTILITY LINE AND/OR APPURTENANCE. CONTRACTOR TO COORDINATE WITH A LICENSED ELECTRICIAN, AS REQUIRED, REGARDING ON - SITE ELECTRICAL ABANDONMENT,RE- ROUTING AND/OR PRESERVATION. 10. ALL EXISTING UTILITIES SHOWN IN THESE PLANS ARE APPROXIMATE AND SOME UTILITIES MAY NOT BE SHOWN AT ALL. SITE CONTRACTOR SHALL VERIFY THE HORIZONTAL AND VERTICAL LOCATION OF ALL EXISTING UTILITIES SHOWN OR NOT SHOWN IN THESE PLANS PRIOR TO CONSTRUCTION. CALL UTILITY NOTIFICATION CENTER OF COLORADO 811 ROCK SOCK CONCRETE WASHOUT AREA HARMONY 25, PARCEL 86030000281/29/20ISSUED FOR CONSTRUCTIONOVERLAND FLOW ARROW EROSION CONTROL CALCULATION TABLE AREA DESCRIPTION AREA (ac) TOTAL PROJECT AREA ±16.0 ACRES TOTAL AREA OF DISTURBANCE ±16.0 ACRES TOTAL AREA OF STAGING/STORAGE ±0.4 ACRES TOTAL AREAS FOR HAULING N/A TOTAL VOLUME OF MATERIAL TO BE RELOCATED 7,910 CY VEHICLE TRACKING CONTROL INLET PROTECTION STAKED SEDIMENT CONTROL LOG LIMITS OF CONSTRUCTION CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_EROSION_PROD.dwg, C7.0 EROSION CONTROL PLAN, 4/6/2021 7:55:50 PM, VGentry, 1:1Inlet protection and rock socks have been added along Harmony Rd and proposed chases The requested note regarding debris in streets has been added The EC security estimate is provided at end of this report FINAL DEVELOPMENT PLANFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONHARMONY & STRAUSS CABIN ROADEROSION CONTROL NOTESH-25 MULTI FAMILY DEVELOPMENT FORT COLLINS, COC7.1 CJS19059.02_DETAIL_PROD.DWGRS/EB/VJG2/19/20 1ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/21--2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL----19059.02“” “” CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_DETAIL_PROD.dwg, C7.1 EROSION CONTROL NOTES, 4/6/2021 7:57:03 PM, VGentry, 1:1 FINAL DEVELOPMENT PLANFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONHARMONY & STRAUSS CABIN ROADEROSION CONTROL DETAILSH-25 MULTI FAMILY DEVELOPMENT FORT COLLINS, COC7.2 CJS19059.02_DETAIL_PROD.DWGRS/EB/VJG2/19/20 1ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/21--2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL----19059.02CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_DETAIL_PROD.dwg, C7.2 EROSION CONTROL DETAILS, 4/6/2021 7:57:07 PM, VGentry, 1:1 FINAL DEVELOPMENT PLANFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONHARMONY & STRAUSS CABIN ROADEROSION CONTROL DETAILSH-25 MULTI FAMILY DEVELOPMENT FORT COLLINS, COC7.3 CJS19059.02_DETAIL_PROD.DWGRS/EB/VJG2/19/20 1ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/21--2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL----19059.02CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_DETAIL_PROD.dwg, C7.3 EROSION CONTROL DETAILS, 4/6/2021 7:57:17 PM, VGentry, 1:1 FINAL DEVELOPMENT PLANFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONHARMONY & STRAUSS CABIN ROADEROSION CONTROL DETAILSH-25 MULTI FAMILY DEVELOPMENT FORT COLLINS, COC7.4 CJS19059.02_DETAIL_PROD.DWGRS/EB/VJG2/19/20 1ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/21--2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL----19059.02CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CITY ENGINEER DATE STORMWATER UTILITY DATE PARKS & RECREATION DATE TRAFFIC ENGINEER DATE ENVIRONMENTAL PLANNER DATE P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_DETAIL_PROD.dwg, C7.4 EROSION CONTROL DETAILS, 4/6/2021 7:57:22 PM, VGentry, 1:1