Loading...
HomeMy WebLinkAboutKING SOOPERS #146, MIDTOWN GARDENS MARKETPLACE - FDP210001 - SUBMITTAL DOCUMENTS - ROUND 3 - SUPPLEMENTAL INFORMATIONST M EM EM UT EM MGC M.L.O.M.L.O.M.L.O. M.L.O. M.L.O. 200A M.C.B. M.L.O. M.L.O. M.L.O. 200A M.L.O. M.C.B. 200A M.L.O. 125A M.L.OM.L.O 1600A/3P 500 kVA 200A200A200A 100% RATED 200A 200A 480/277V, 3 PHASE, 4-WIRE 100A 100A/3P400A 200A 75 kVA 200A800A/3P200A 2500A/3P SHUNTTRIPSHUNTTRIPSHUNT TRIP 400A 100kW/125kVA 480/277V, 3 PHASE, 4-WIRE LSIGLSIG 400A 200A200A GFCI PROTECTED #8 CU #6 CU #6 CU #2 CU #1/0 CU #1/0 CU #2/0 CU #3/0 CU #3/0 CU #3/0 CU #3/0 CU #3/0 CU 15 30 45 75 112.5 150 200 225 300 400 500 750 GROUND WIRE SIZEKVA TRANSFORMER GROUNDING PER NEC MAIN BREAKER KIRK KEY INTERLOCK KIRK KEY BREAKER FOR FULL-STORE BACK-UP 1600A/3P GFCI PROTECTED TYPICAL FOR ALL OWNER FURNISHED ELECTRICAL EQUIPMENT (DIRECT BUY) TYPICAL FOR ALL OWNER FURNISHED ELECTRICAL EQUIPMENT (DIRECT BUY) NEMA 3R BUSSED ENCLOSURE WITH QUICK CONNECT RECEPTACLES IN AND LUGS / CABLE OUT FURNISHED BY KROGER. EXTERIOR MOUNTED FOR TEMPORARY CONNECTION OF MOBILE GENERATOR. CONCRETE PAD GROUND MAT 1500 KVA PRIMARY VOLTAGE - 13.2 kV SECONDARY VOLTAGE-480/277 V PRIMARY AVAILABLE FAULT - 16,960A 3∅/4-WIRE TLDPA TRANSFORMER 480V TO 208Y/120V LD1FLA2FLA1 8 GROUND PER N.E.C. ELEC. CONTRACTOR SHALL RECEIVE & INSTALL G.E. #TCAL LUG KIT, WHICH SHALL BE FURNISHED BY G.E. HA EHA ATS2 ELA EMERGENCY ESSENTIAL POWERAUTOMATIC TRANSFER SWITCHELB MAIN SWITCHBOARD "MSB" EMERGENCY OPTIONAL STANDBY (NEC 700.5(B)) POWER AUTOMATIC TRANSFER SWITCH ELECTRICAL SINGLE-LINE DIAGRAM 42 10 11 J.B. AT KIOSK 9 12 EXOTHERMIC WELD (TYPICAL) 3/4" DIA x 10FT. GROUND ROD (MINIMUM 3 PER SPECIFICATION) OPTIONAL STANDBY "CLEAN" POWER NOTE: PROVIDE DEDICATED INSULATED ISOLATED GROUND CONDUCTOR FROM THE SERVICE ENTRANCE DERIVED GROUND TO THE INSULATED ISOLATED GROUND BAR IN THE PANEL "ELA", "ELB","ELC", AND "ELP" (WITH NO BREAKS, BONDING, SPLICES, ETC. BETWEEN THE TWO). IN ADDITION PROVIDE GROUNDING ELECTRODE CONDUCTOR AT "TELA" AND EQUIPMENT GROUNDING CONDUCTOR FROM "TELA" TO BONDED EQUIPMENT GROUND BAR IN PANELS "ELA", "ELB", "ELC", AND "ELP". PPA1 M.L.O. LC MAIN DISTRIBUTION PANEL "LDPA" 208/120V, 3 PHASE, 4-WIRE 3Φ/4-WIRE TELA TRANSFORMER 480V TO 208Y/120V GROUND PER N.E.C. EHB 5 ELC OPTIONAL STANDBY "DIRTY" POWER OPTIONAL STANDBY "CLEAN" POWER 1 LF1 3 13 14 21 22 26 LEHA1 TO LIGHTING LOADS6 GROUND PER N.E.C. ELP (PHARMACY) COFFEE KIOSK PANEL NEMA 1 NEMA 1 NEMA 1 PPA2 M.L.O. BUILDING STEEL & REBARS INCOMING WATER SERVICE A SIGN SHALL BE PLACED AT THE SERVICE ENTRANCE EQUIPMENT THAT INDICATES THE TYPE AND LOCATION OF ON-SITE EMERGENCY POWER SOURCES. A SIGN SHALL BE PLACED AT THE SERVICE ENTRANCE EQUIPMENT THAT INDICATES THE TYPE AND LOCATION OF ON-SITE EMERGENCY POWER SOURCES. (SPECIALTY LTG) SPACES AS AVAILABLE SINGLE-LINE LEGEND PROVIDED (FURNISHED AND INSTALLED) BY ELECTRICAL CONTRACTOR. FLUSH INDICATES EQUIPMENT FURNISHED BY EQUIPMENT MANUFACTURER AND RECEIVED / INSTALLED / WIRED BY ELECTRICAL CONTRACTOR (UNLESS NOTED OTHERWISE). INDICATES EQUIPMENT FURNISHED BY KROGER AS PART OF DIRECT BUY G.E. ELECTRICAL EQUIPMENT PACKAGE AND RECEIVED / INSTALLED / WIRED BY ELECTRICAL CONTRACTOR. INDICATES PANELBOARD THAT WILL BE FURNISHED WITH SUB-FEED LUGS KIT THAT SHALL BE INSTALLED BY ELECTRICAL CONTRACTOR. INDICATES FLUSH MOUNTED PANELBOARD. ALL OTHER PANELBOARDS SHALL BE SURFACE MOUNTED. INDICATES EQUIPMENT FURNISHED BY ELECTRICAL UTILITY, INSTALLATION ASSISTED BY ELECTRICAL CONTRACTOR (UNLESS NOTED OTHERWISE). SURGE PROTECTION AS REQUIRED PER NEC 700.8. EMERGENCY GENERATOR NATURAL GAS, STANDBY RATED WIREWAY IN 1" CONDUIT, CONNECT FROM OUTPUT TERMINALS TO BUILDING SECURITY SYSTEM FOR FAULT CONDITION. SEE DETAIL ESD-3B.2 ON E5-SERIES DRAWINGS FOR EMERGENCY SYSTEM WIRING DIAGRAM. SEE PNET SCHEDULE FOR GENERATOR ORDERING INFORMATION. PROVIDE EPO SWITCH AT LOCATION SHOWN ON POWER DRAWING. FIELD INSTALL SWITCH AND CONNECTION TO GENERATOR AS APPROVED BY MANUFACTURER AND NEC. PROVIDE CONDUIT AND WIRING FROM GENERATOR TO SWITCH LOCATION.PROVIDE CONTROL WIRING FOR AUTOMATIC TRANSFER SWITCHES AS REQUIRED. PROVIDE CONDUIT AND WIRING FOR GENERATOR BATTERY CHARGER AND BLOCK HEATER AS SHOWN ON ELECTRICAL FLOOR PLANS. SIZE PER N.E.C. TABLE 250.66. REFER TO SPEC SECTION 26 05 26 FOR ADDITIONAL INFORMATION SECONDARY TRANSFORMER CONDUCTOR LENGTH NOT TO EXCEED 10'-0" CONC. PAD REFER TO DETAIL 'N' ON E5-SERIES DRAWINGS FOR SERVICE EQUIPMENT DETAIL. UTILITY TRANSFORMER PPA3 M.L.O. TO PROTOCOL UNITS DEF2DEF1 LHA# DB DB DB DB DB DB DB DB DB DB M DB DB DB EC DB G DB DB DB DB DB DB DB SP SP UT DB DB DB EPM 2200 i.LON SMART SERVER PROVIDE A SELECTIVE COORDINATION STUDY FOR ENTIRE LIFE SAFETY SYSTEM FROM POINT OF GENERATION (GENERATOR AND MSB) DOWN TO BRANCH CIRCUIT BREAKERS. SYSTEM TO BE SELECTIVELY COORDINATED TO 0.1 SECONDS. NOTE FOR SWITCHGEAR MFGR: D1600-4A 200-4A 200-4A 200-4A 150-4AI D200-4AI 200-4AI 800-3A 225-4A 400-4A 10 125-3C 400-4A 150-4A 150-4AI 200-4AI 400-4A 100-4A 100-4A 10 200-4A 200-4A 125-4AI 225-4A 13 13 1 5 20-2C 200-4A 1 18 1600-4A 14 150-4A 16 100-4C 150-4A 150-4A U2500-4A 2 22 200-4A 200-4A 17 DB 100 90 NEMA 1EC NEMA 1EC NEMA 1EC NEMA 1EC 3 ST 200 150 DB 100 100 DB DB M.L.O. 200A LD2 TO LIGHTING LOADS 3 30 NEMA 1 DB RCP-1 PANEL LD1600A/3P400A/3P400A/3P150A/3P200A/3P200A/3P90A/3P200A/3P1 200A/3P2 200A/3P3 200A/3P4 200A/3P5 200A/3P6 200A/3P7 200A/3P9 200A/3P10 200A/3P11 200A/3P13 DB DB LHA# TO LIGHTING LOADS 200A/3P8 14 15 200A/3P16 200A3P12 SPARESPACESPACE7 200A/3P23 24 25 200-4A M.L.O. 200A HB DB LHB# DB TO LIGHTING LOADS DB M.L.O. 200A HC DB LHC# DB TO LIGHTING LOADS 200-4A 100 70 100 100-4A 100-4C100A/3P100A/3P60-4C 60 60100A/3P60-4C 60 5060A/3P15 45A/3P16 45A/3P17 200A/3P18 19 20 SPARESPAREDOAS-1 45-3C45-3C DOAS-2 M.L.O. 200A LF2 DB 200-4A LLF1 TO LIGHTING LOADSDB 1 17 1 TYP. 12 6 8 15 SPARESPARESEE PANEL SCHEDULES FOR BRANCH CIRCUIT'S ASSOCIATED CONTACTOR N.T.S COORDINATE TRANSFORMER CLEARANCE REQUIREMENTS WITH FORT COLLINS LIGHT AND POWER PRIOR TO INSTALLATION 1. SEE SHEET E6.2.1 THROUGH E6.2.4 FOR CONTACTOR SCHEDULES. INSTALL "BC" LIGHTING CONTROL INTERFACE ("LCI" - FURNISHED BY EQT. MFR.) NEAR CONTACTOR. PROVIDE (1) 3/4" EMPTY CONDUIT FROM CONTACTOR TO "LCI" AND FROM "LCI" TO "BC" CONTROL PANEL. PROVIDE TWO 20A / 120V DEDICATED CONTROL POWER CIRCUITS, FED FROM NEARBY 120/208 VOLT PANELBOARD, ONE FOR CONTACTOR COIL(S) AND ONE FOR LIGHTING CONTROL INTERFACE(S). MULTIPLE CONTACTOR COILS AND MULTIPLE LIGHTING CONTROL INTERFACES MAY SHARE THE RESPECTIVE CONTROL POWER CIRCUITS. PROVIDE 20A / 1P BRANCH BREAKERS IN SOURCE PANELBOARD (EVEN IF NOT SCHEDULED). THE COIL VOLTAGE AND LINE VOLTAGE SHOULD MATCH FOR ALL CONTACTORS. ALL CONTROLLED CIRCUITS SHALL BE ROUTED THROUGH CONTACTORS. 2. UTILITY METERING POINT; ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING TERMINATIONS WITH UTILITY. LOCATION OF METER WILL BE COORDINATED WITH UTILITY. METERING SHALL BE INSTALLED PER LOCAL ELECTRICAL UTILITY GUIDELINES. 3. PROVIDE 6 INCH HIGH REINFORCED CONCRETE HOUSEKEEPING PAD WITH CHAMFERED CORNERS. 4. LOCAL EQUIPMENT DISCONNECT SWITCH, FOR RTU'S, WILL BE FURNISHED BY ROOFTOP EQUIPMENT MANUFACTURER. NOTE THAT ROOFTOP UNIT IS NOT UL LISTED/LABELED FOR ALUMINUM WIRING CONNECTIONS. EITHER CONVERT TO COPPER CONDUCTORS VIA A UL LISTED AND APPROVED SPLICE IN AN ADJACENT JUNCTION BOX (IN JOIST SPACE IMMEDIATELY BELOW ROOFTOP UNIT) AS INDICATED, OR PROVIDE COPPER CONDUCTORS THE ENTIRE LENGTH OF THE CIRCUIT. 5. RECEIVE AND INSTALL ALL SWITCHBOARDS AND PANELBOARDS (WITH FEEDERS). MARKED ELECTRICAL EQUIPMENT (TAGGED WITH DB) WILL BE FURNISHED BY OWNER. 6. PROVIDE ELECTRICAL POWER WORK FOR ROOFTOP REFRIGERATION SYSTEM CONDENSERS, SEE ROOF PLAN AND PROTOCOL DETAIL ON E5.6. PROVIDE (1) EMPTY 1 INCH CONDUIT FROM EACH CONDENSER TO ITS RESPECTIVE RACK OR PROTOCOL UNIT, CONDUIT SHALL CONTAIN PULL STRING. 7. KROGER PROVIDED PAD MOUNT SERVICE TRANSFORMER. COORDINATE INSTALLATION AND ANY ADDITIONAL REQUIREMENTS WITH LOCAL UTILITY COMPANY. SEE DETAIL ON E5-SERIES DRAWINGS FOR TRANSFORMER PAD AND RACEWAY INSTALLATION REQUIREMENTS. SEE CIVIL DRAWINGS FOR TRANSFORMER LOCATION AND ANY SITE WORK REQUIRED FOR BRINGING SERVICE INTO TRANSFORMER EQUIPMENT. 8. PROTOCOL UNITS ARE PACKAGE SUPPLEMENTAL REFRIGERATION UNITS. RELATED PANELBOARDS WILL UTILIZE BRANCH CIRCUIT BREAKERS THAT HAVE INTEGRAL CONTACTS TO CONTROL DEFROST LOADS, WHICH WILL BE ELECTRONICALLY OPERATED FROM THE RESPECTIVE PROTOCOL UNIT CONTROL SYSTEM. THESE PANELBOARDS WILL COLLECTIVELY FEED PROTOCOL UNIT COMPRESSORS, PROTOCOL UNIT CONTROL DEVICES, REMOTE CASE ELECTRIC DEFROSTS, ETC. PROVIDE ALL CONDUIT, WIRING AND TERMINATION WORK ASSOCIATED WITH HOME- RUNS FROM REMOTE CASES / EQUIPMENT. FIELD VERIFY BRANCH CIRCUIT SIZES, TERMINATION REQUIREMENTS AND CIRCUIT DESIGNATIONS FOR ALL RELATED LOADS FROM REFRIGERATION EQUIPMENT VENDOR. ROUTE ALL CASE LIGHTING HOME-RUNS THROUGH CONTACTOR. UNIT REMOTE CASE FANS, REMOTE CASE LIGHTS AND REMOTE CASE ANTI-SWEATS ARE FED FROM OTHER ELECTRICAL PANELS AND CONTROLLED THROUGH CASE CONTROLLER. FIELD VERIFY REQUIRED FUSES SIZES FOR THE FUSIBLE DISCONNECT SWITCHES THAT SERVE ALL PROTOCOL EQUIPMENT. FIELD VERIFY ALL CIRCUIT / HOME-RUN DESIGNATIONS FOR ALL LOADS FED FROM PROTOCOL EQUIPMENT. COORDINATE ALL RELATED WORK IN DETAIL WITH PROTOCOL UNIT EQUIPMENT VENDOR PRIOR TO ROUGH-IN. WIRE ALL PANELBOARDS LOCATED WITHIN THE PROTOCOL UNIT, WHICH SHALL BE FURNISHED AND INSTALLED BY REFRIGERATION EQUIPMENT VENDOR. INSTALL AND WIRE ALL REMOTE PANELBOARDS LOCATED NEAR PROTOCOL, WHICH SHALL BE FURNISHED BY REFRIGERATION EQUIPMENT VENDOR. 9. PROVIDE 6 INCH CONDUIT, PLUS (1) SPARE 6 INCH CONDUIT FROM METERING CABINET TO INTERRUPTER SWITCH. PROVIDE CONDUIT AND WIRE FROM INTERRUPTER SWITCH TO TRANSFORMER AS SHOWN. PROVIDE CONCRETE ENCASEMENT OF ALL EXTERIOR UNDERGROUND SERVICE CONDUITS. REFER TO SITE CIVIL PLANS FOR LOCATION AND ANY SPECIAL ELECTRICAL SERVICE REQUIREMENTS. COORDINATE INSTALLATION OF ELECTRICAL SERVICE WITH LOCAL UTILITY COMPANY. INTERRUPTER SWITCH AND METERING CABINET PROVIDED BY KROGER. 10. REFER TO TRANSFORMER GROUNDING TABLE FOR GROUND WIRE SIZE. 11. NEMA 3R COMBINATION STARTER WITH FUSIBLE DISCONNECT FOR DELI HOOD. STARTER SHALL BE 208 VOLT, 3 PHASE, NEMA 0 WITH (1) NORMALLY OPEN AND (1) NORMALLY CLOSED AUXILIARY CONTACTS AND OVERLOADS WITH H-O-A SELECTOR SWITCH. CONTROL POWER SHALL BE 120 VOLT. REFER TO E5-SERIES DRAWINGS FOR ADDITIONAL WIRING INSTRUCTIONS AND ROOF PLAN FOR ADDITIONAL INSTALLATION DETAILS. 12. CONDUIT AND WIRE SHALL ORIGINATE IN FUTURE SPACE, PROVIDE WIRE PULLING BOXES AS REQUIRED ALONG RACEWAY PATH BACK TO SWITCHBOARD. 13. SHUNT TRIP BREAKERS TO BE CONTROLLED BY KIRK-KEY AT 1600 AMP GENERATOR BACK-UP SECTION. 14. NEMA 3R BUSSED ENCLOSURE WITH QUICK CONNECT RECEPTACLES IN AND LUG / CABLE OUT. EXTERIOR MOUNTED FOR CONNECTION OF TEMPORARY MOBILE GENERATOR. RACEWAY SYSTEM(S) FROM MSB TO MGC SHALL BE INSTALLED UNDERGROUND. 15. CERTIFIED PROTOCOL SHOP DRAWINGS MUST BE RECEIVED AND APPROVED PRIOR TO ORDERING ELECTRICAL PANELS, CIRCUIT BREAKERS, FUSES, AND WIRING FOR THE PROTOCOL UNITS. ANY DEVIATIONS IN ACTUAL APPROVED PROTOCOL SHOP DRAWINGS VERSUS DESIGN MUST BE VERIFIED AND EQUIPMENT ORDERS ADJUSTED TO MATCH ACTUAL SUBMITTAL DRAWINGS. 16. PROVIDE 6 INCH HIGH CONCRETE HOUSEKEEPING EQUIPMENT PAD FOR EXTERIOR GENERATOR. PAD SHALL EXTEND OUT 6 INCHES PAST THE GENERATOR HOUSING, COORDINATE PAD WITH GENERATOR SUBMITTAL DRAWINGS. 17. ALL EMERGENCY PANELS SHALL HAVE A FACTORY INSTALLED UL LISTED, SPD (SURGE PROTECTION DEVICE) IN COMPLIANCE WITH NEC 700.8. 18. REFER TO ESD-6 ON E5-SERIES DRAWINGS FOR ADDITIONAL WIRING REQUIREMENTS. SINGLE LINE KEYNOTES SPACES AS AVAILABLE SPACESPACESPACESPACESPACESPACESPACEEC PROVIDED BREAKERS 90 RECESSED EC EC EC EC EC M.L.O. 200A LL DB 200-4A M.L.O. 200A LM DB 200-4A M.L.O. 200A LN DB 200-4A M.L.O. 200A DEF3 DB 200-4A 150 kVA 3∅/4-WIRE TLH TRANSFORMER 480V TO 208Y/120V GROUND PER N.E.C. DB 10SPACE M.C.B. M.L.O. 400A 400A LJLH SECONDARY TRANSFORMER CONDUCTOR LENGTH NOT TO EXCEED 10'-0" DB DB 400-4A 400-4A 5 TYP. 200-4A RECESSED SURFACE SURFACE SURFACE SURFACE SURFACE SURFACE SURFACE SURFACE SURFACE SURFACE SURFACESURFACE SURFACE RECESSED SURFACE SURFACE SURFACE SURFACE SURFACE RECESSEDRECESSEDRECESSED RECESSED RECESSED RECESSED EC I.G.I.G. I.G. I.G. COORDINATE CT METERING REQUIREMENTS WITH FORT COLLINS LIGHT AND POWER PRIOR TO INSTALLATION 30-3C RTU 1 RTU 2 RTU 3 RTU 4 RTU 5 RTU 6 RTU 7 RTU 8 RTU 9 RTU 10 RTU 11 RTU 12 RTU 13 RTU 14 RTU 17 RTU 18 RTU 19 EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 30-3C 20-3C 30-3C PANEL PPA1 PANEL PPA1 PANEL PPA1 PANEL PPA1 PANEL PPA1 PANEL PPA1 PANEL PPA1 PANEL PPA1 PANEL PPA1 PANEL PPA1 PANEL PPA1 PANEL PPA1 PANEL PPA2 PANEL PPA2 PANEL PPA2 PANEL PPA2 PANEL PPA2 EF-CC DB PANEL 20-2C EF-E1 DB PANEL EF-E2 DB PANEL EF-G1 DB PANEL EF-G2 DB PANEL EF-K1 DB PANEL EF-K2 DB PANEL EF-R1 DB PANEL EF-R2 DB PANEL EF-R3 DB PANEL EF-S DB PANEL 20-2C 20-2C 20-2C 20-2C 20-3C 20-2C 20-2C 20-2C 20-2C 20-2C 11 11 LD2 LF2 LD2 LL LJ LJ LJ LJ LD2 LF2 LL NEMA 3R NEMA 3R NEMA 3R NEMA 3R NEMA 3R NEMA 3R NEMA 3R NEMA 3R NEMA 3R NEMA 3R NEMA 3R EM RTU 15 RTU 16 EM4 4 PANEL PPA2 PANEL PPA2 RTU 20 EM4 20-3C PANEL PPA2 RTU 21 EM4 30-3C PANEL PPA2 NEMA 3RNEMA 3RNEMA 3RNEMA 3RNEMA 3R NEMA 3R NEMA 3R NEMA 3R NEMA 3R NEMA 3R NEMA 3R NEMA 3R NEMA 3R NEMA 3R NEMA 3R NEMA 3R NEMA 3R NEMA 3R NEMA 3R NEMA 3R NEMA 3R 15-3C30-3C 30-3C 30-3C 30-3C 30-3C 30-3C 30-3C 30-3C 30-3C 30-3C 20-3C 20-3C 20-3C 20-3C EM 100A ATS1 100-4C TO LIGHTING LOADSDB1 LEHB1 LEHB2 TO ATS2 TO GENERATOR TAP TO ATS1 TO GENERATOR TAP 100-4A 20-2C 30 NEMA 3R DB E19BE REDBOX PANEL LF1 20-3C 30 NEMA 1 DB BALER PANEL PPA3 20-3C 30 NEMA 1 DB BALER PANEL PPA3 20-4C 30 NEMA 3R DB PANEL PPA3 70-3C 70 NEMA 1 DB UTENSIL WASHER PANEL LH 20-3C 30 NEMA 3R DB COMPACTOR PANEL PPA3 SEWAGE EJECTOR PUMP M 20-4C 30-2C 30 NEMA 1 DB CU-1 PANEL ELC 30 30-2C FCU-1 200-4A SCA: 27,067 A SCCR: 42,000 SCA: 29,184 A SCCR: 42,000 SCA: 29,965 A SCA: 21,038 A SCA: 32,265 A SCCR: 65,000 SCA: 33,920 A SCA: 15,529 A SCCR: 22,000 SCA: 20,763 A SCCR: 22,000 SCA: 12,633 A SCCR: 22,000 SCA: 17,748 A SCCR: 22,000 SCA: 4,483 A SCA: 3,069 A SCA: 2,909 A SCCR: 22,000 SCA: 2,909 A SCCR: 22,000 SCA: 2,771 A SCCR: 22,000 SCA: 24,502 A SCCR: 42,000 SCA: 7,040 A SCCR: 42,000 SCA: 24,863 A SCCR: 42,000 SCA: 5,751 A SCCR: 22,000 SCA: 5,751 A SCCR: 22,000 SCA: 20,279 A SCCR: 42,000 SCA: 15,552 A SCCR: 22,000 SCA: 15,199 A SCCR: 22,000 SCA: 14,887 A SCCR: 22,000 SCA: 14,887 A SCCR: 22,000 SCA: 13,761 A SCCR: 22,000 SCA: 13,506 A SCCR: 22,000 SCA: 13,260 A SCCR: 22,000 SCA: 2,683 A SCCR: 22,000 SCA: 3,419 A SCCR: 22,000 SCA: 3,419 A SCCR: 22,000 SCA: 3,034 A SCCR: 22,000 SCA: 3,034 A SCCR: 22,000 SCA: 3,419 A SCCR: 22,000 SCA: 2,909 A SCCR: 22,000 SCA: 5,943 A SCA: 5,951 A 7 9 SCA: 29,184 A SCCR: 42,000 (3)#8 CU AWG & (1)#10 CU AWG GND IN 3/4" CONDUIT50-3C FEEDER SCHEDULE GENERAL NOTES ●FEEDERS DENOTED BY A "*" HAVE BEEN OVERSIZED TO COMPENSATE FOR VOLTAGE DROP. ●"CU" = COPPER CONDUCTOR ●"AL" = ALUMINUM CONDUCTOR ●IF ALUMINUM CONDUCTORS ARE USED FOR ANY FEEDER AND LUGS/TRANSFORMER COMPARTMENT DO NOT ALLOW THE INCREASED SIZE, COPPER CONDUCTORS SHALL BE INSTALLED. 150-4A 600-4A D200-4AI 400-4A 225-4A 175-4A 200-4AI 150-4AI 125-4A 200-4A (4)#1 AL AWG & (2)#4 AL AWG GND IN 2" CONDUIT100-4AI (3)#4 CU AWG & (1)#8 CU AWG GND IN 1" CONDUIT80-3C (4)#6 CU AWG & (1)#10 CU AWG GND IN 1" CONDUIT60-4C (4)#8 CU AWG & (1)#10 CU AWG GND IN 1" CONDUIT50-4C (3)#10 CU AWG & (1)#10 CU AWG GND IN 3/4" CONDUIT30-3C (2)#10 CU AWG & (1)#10 CU AWG GND IN 3/4" CONDUIT30-2C (4)#12 CU AWG & (1)#12 CU AWG GND IN 3/4" CONDUIT20-4C (3)#12 CU AWG & (1)#12 CU AWG GND IN 3/4" CONDUIT20-3C 150-4C 110-4A 110-3AI 100-4A 800-3A U2500-4A D1200-4A (4)#300 kcmil AL AWG & (1)#2 AL AWG GND IN 2-1/2" CONDUIT (4)#1/0 CU AWG & (1)#6 CU AWG GND IN 2" CONDUIT (3)#1/0 AL AWG & (2)#4 AL AWG GND IN 2" CONDUIT (4)#1 AL AWG & (1)#6 AL AWG GND IN 1-1/2" CONDUIT (3) SETS OF (3)#400 kcmil AL AWG & (1)#3/0 AL AWG GND IN 3" CONDUIT EACH (9) SETS OF (4)#500 kcmil AL AWG IN 4" CONDUIT EACH (4) SETS OF (4)#500 kcmil AL AWG & (1)#250 kcmil AL AWG GND IN 3" CONDUIT EACH (4)#1/0 AL AWG & (1)#4 AL AWG GND IN 2" CONDUIT (4)#250 kcmil AL AWG & (1)#4 AL AWG GND IN 2-1/2" CONDUIT (4)#2/0 AL AWG & (1)#4 AL AWG GND IN 2" CONDUIT (4)#3/0 AL AWG & (1)#4 AL AWG GND IN 2" CONDUIT (4)#3/0 AL AWG & (2)#4 AL AWG GND IN 2" CONDUIT (4)#250 kcmil AL AWG & (2)#4 AL AWG GND IN 2-1/2" CONDUIT (4)#4/0 AL AWG & (1)#4 AL AWG GND IN 2-1/2" CONDUIT (2) SETS OF (4)#250 kcmil AL AWG & (1)#1 AL AWG GND IN 2-1/2" CONDUIT EACH (4)#250 kcmil AL AWG & (2)#1/0 AL AWG GND'S IN 3" CONDUIT (2) SETS OF (4)#500 kcmil AL AWG & (1)#2/0 AL AWG GND IN 3" CONDUIT EACH (4)#1 CU AWG & (2)#6 CU AWG GND IN 2" CONDUIT125-4C * ALL ISOLATED GROUND CONDUCTORS SHALL BE * CONTINUED TO SERVICE ENTRANCE GROUND BAR. CONDUCTOR MATERIAL COPPER (C) VS. ALUMINUM (A) NUMBER OF CONDUCTORS CONDUCTOR AMPACITY GROUND SIZED FOR DERIVED SERVICE (D) OR REMOVED FOR SERVICE ENTRANCE FROM UTILITY (U). SPECIAL - ISOLATED GROUND (I) CONDUCTOR NOMENCLATURE FEEDER SIZED TO COMPENSATE FOR VOLTAGE DROP D250-4AI* WIRE FEEDER SCHEDULE 225-4C (4)#4/0 CU AWG & (1)#4 CU AWG GND IN 2-1/2" CONDUIT D400-4A (2) SETS OF (4)#350 kcmil AL AWG & (1)#4/0 kcmil AL AWG GND IN 3" CONDUIT EACH (2)#12 CU AWG & (1)#12 CU AWG GND IN 3/4" CONDUIT20-2C 110-3C (3)#2 CU AWG & (1)#6 CU AWG GND IN 1-1/2" CONDUIT D200-4A (4)#250 kcmil AL AWG & (1)#1/0 AL AWG GND'S IN 3" CONDUIT 175-3A (3)#4/0 AL AWG & (1)#4 AL AWG GND IN 2-1/2" CONDUIT (4)#3 CU AWG & (1)#6 CU AWG GND IN 1-1/2" CONDUIT90-4C (4)#4 CU AWG & (1)#10 CU AWG GND IN 1" CONDUIT80-4C 1600-4A (6) SETS OF (4)#500 kcmil AL AWG & (1)#350 kcmil AL AWG GND IN 3-1/2" CONDUIT EACH (4)#2 AL AWG & (1)#6 AL AWG GND IN 1" CONDUIT80-4A 110-4C (4)#2 CU AWG & (1)#6 CU AWG GND IN 2" CONDUIT 100-4C (4)#3 CU AWG & (1)#8 CU AWG GND IN 2" CONDUIT 125-3C (3)#2/0 CU AWG & (1)#4 CU AWG GND IN 2" CONDUIT 250-4A (4)#350 kcmil AL AWG & (1)#4/0 kcmil AL AWG GND IN 3" CONDUIT EACH (4)#4 CU AWG & (1)#10 CU AWG GND IN 1" CONDUIT70-4C (3)#4 CU AWG & (1)#10 CU AWG GND IN 1" CONDUIT70-3C # OWNER © 2021 Cole+Russell Architects, Inc.THIS DOCUMENT IS THE PRODUCT AND EXCLUSIVE PROPERTY OF COLE+RUSSELL ARCHITECTS, INC. NEITHER THE DOCUMENT NOR THE INFORMATION IT CONTAINS MAY BE COPIED OR USED FOR OTHER THAN THE SPECIFIC PROJECT FOR WHICH IT WAS PREPARED WITHOUT THE EXPLICIT CONSENT OF COLE+RUSSELL ARCHITECTS, INC.SHEET TITLE PROJECT TITLE DATE CONSULTANTS COMMISSION NO. ISSUE DATE SHEET NO. DATE REVISION ISSUE 04/22/2021 ISSUED FOR PERMIT 5/11/2021 9:29:14 AMSINGLE LINE DIAGRAM KING SOOPERS KS146 E6.2 04/22/2021 520329 2535 S. College Ave. Fort Collins, CO 80525 EXECUTED BY: MBJ REVIEWED BY: EMA CINCINNATI DENVER architecture+designwww.cr-architects.com 800.469.4949 P 513.721.8080P 303.863.8100creating extraordinary placesDALLAS P 972.253.4675SEATTLETF 800.469.4949®PNET SCHEDULE MARK ePRO # P-NET ITEM NO.ITEM DESCRIPTION CN1 K-0001421 060-00009 538 GENERATOR 100 kW, NAT. GAS, W/ENCL. P/N:1K00-NG-OD-277/480, 100kW OUTDOOR, NATURAL GAS GENSET, W/ENCL. P/N:K100-NG-OD-277/480, 277/480V, W/175 AMP CIRCUIT BREAKER: 2 AMP BATTERY CHARGER, ELECTRONIC GOVERNOR, STEEL WEATHER ENCLOSURE, FACTORY TECH START-UP. NOTE: INSTALLATION IS NOT INCLUDED WITH EQUIPMENT COST. CONTACT JARED PIERSON 262-544-4811 EXT. 2126 TO SCHEDULE STARTUP. ATS1 K-0001428 060-00009 545 TRANSFER SWITCH 100 AMP, 277/480V, P/N HTSN100K1. SEE ATS1 ON POWER PLAN ATS2 K-0001430 060-00009 547 TRANSFER SWITCH 200 AMP, 277/480V, P/N HTSN200K1. SEE ATS2 ON POWER PLAN