Loading...
HomeMy WebLinkAboutKING SOOPERS #146, MIDTOWN GARDENS MARKETPLACE - FDP210001 - DOCUMENT MARKUPS - ROUND 3 - DRAINAGE REPORT PREPARED FOR: Dillon Companies/King Soopers, Inc. 55 Tejon Street Denver, Colorado 80223 Phone: (303) 778-3053 PREPARED BY: Galloway & Company, Inc. 6162 S. Willow Drive, Suite 320 Greenwood Village, CO 80111 DATE: February 3, 2021 REVISED: March 24, 2021 MIDTOWN GARDENS MARKETPLACE KING SOOPERS STORE #146 Fort Collins, Colorado FINAL DRAINAGE REPORT Fort Collins Water Utilities Comments Matt Simpson masimpson@fcgov.com 4/16/2021 Midtown Gardens Marketplace 3/24/2021 Galloway & Company, Inc. Page 12 of 19 Storm Water Detention The proposed underground StormTech system, Pond A, will be designed as an LID basin for the site, including Water Quality treatment and 100-year detention with a controlled 2-year historic release rate of 0.50 cfs/acre. Detention storage has been designed for all of Basin A. The remainder of the site will have only water quality provided in the underground system. Required volumes were determined using the Modified FAA Method. Below is a summary of the total storage proposed. A tabulation of the stage storage volume for Pond A can be found in Appendix C. Table 2 Water Quality / LID Summary New or Modified Impervious Area 10.06 AC Impervious Area Captured 9.42 AC (94% of Total)1 WQCV Required 14,339 CF WQCV Provided 23,251 CF 1. Per discussions with the City, remainder of impervious area is infeasible to be captured Table 3 Detention Summary Table Tributary Area (WQ / Detention) 10.46 AC / 6.98 AC WSEL100 5016.97 Q100 Release Rate 3.49 CFS V100 Required 58,096 CF Total Volume Required (WQCV + V100) 72,435 CF Total Volume PRovided (WQCV + V100) 72,653 CF VII. Variance Requests No variances are being requested with the proposed improvements described herein. VIII. Erosion Control A General Permit for Stormwater Discharge Associated with Construction Activities issued by the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division (WQCD), will be acquired for the site. A Stormwater Management Plan (SWMP) should be prepared to identity the Best Management Practices (BMPs) which, when implemented, will meet the requirements of said General Permit. Below is a summary of SWMP requirements which may be implemented on-site. A separate SWMP Report has been prepared for the site. The following temporary BMPs may be installed and maintained to control on-site erosion and prevent sediment from traveling off-site during construction: · Silt Fence – a woven synthetic fabric that filters runoff. The silt fence is a temporary barrier that is placed at the base of a disturbed area. Add trib area for detention separated into 2 rows, 1 for WQ and 1 for deten- tion Project Number:King Soopers Store #146 Date:3/23/2021 Project Location:CO, Fort Collins Calculations By:E. Mowinckel Checked By:P. Dalrymple Pond Description:Pond A Water Quality User Input Cell:Blue Text 1/2 2-year 2163 0.89 0.05 3.48 0.81 minutes seconds in/hr cubic feet cubic feet cubic feet acre-feet 5 300 1.43 1321 241.8 1079 0.02 10 600 1.11 2048 483.6 1564 0.04 15 900 0.94 2599 725.4 1874 0.04 20 1200 0.81 2984 967.2 2017 0.05 25 1500 0.72 3313 1209 2104 0.05 30 1800 0.65 3614 1450.8 2163 0.05 35 2100 0.59 3795 1692.6 2102 0.05 40 2400 0.54 3966 1934.4 2032 0.05 45 2700 0.50 4128 2176.2 1952 0.04 50 3000 0.46 4263 2418 1845 0.04 55 3300 0.44 4434 2659.8 1774 0.04 60 3600 0.41 4559 2901.6 1658 0.04 65 3900 0.39 4698 3143.4 1555 0.04 70 4200 0.37 4735 3385.2 1350 0.03 75 4500 0.35 4865 3627 1238 0.03 80 4800 0.33 4893 3868.8 1024 0.02 85 5100 0.32 5041 4110.6 931 0.02 90 5400 0.31 5087 4352.4 735 0.02 95 5700 0.29 5106 4594.2 512 0.01 100 6000 0.28 5189 4836 353 0.01 105 6300 0.27 5254 5077.8 176 0.00 110 6600 0.26 5301 5319.6 -19 0.00 115 6900 0.26 5435 5561.4 -126 0.00 120 7200 0.25 5449 5803.2 -354 -0.01 Modified FAA Method - WQ Storage Volume Calculations Inputs | Tributary Area Output | Detention Volume Return Period for Detention Control: Required Storage, cubic feet: Catchment 'C': Required Storage, ac-ft: Average Outflow Storage Volume Storage Volume Catchment Drainage Area, ac: Release Rate, cfs: Storm Duration Time Rainfall Intensity Inflow Volume H:\King Soopers - City Market\CO, Fort Collins - KSS000146 -#18 College Drake\3.04 Grading-Drainage Studies\3.04.2 Proposed Drainage Reports- Info\Hydrology\KSS 146_Rational_Routing.xls Page 1 of 2 3/23/2021 Pond BC? check corrected as noted 0.89 per Composite C calculation 1 User Defined Stage-Area Booleans for Message 1 Equal Stage-Area Inputs Watershed L:W 1 CountA Watershed Lc:L Watershed Slope 0 Calc_S_TC Booleans for CUHP 1 CUHP Inputs Complete H_FLOOR 1 CUHP Results Calculated L_FLOOR_OTHER 0.00 ISV 0.00 ISV 0.00 Floor 0.00 Floor 6.60 Zone 1 (User) 6.60 Zone 1 (User) 0.00 Zone 2 0.00 Zone 2 0.00 Zone 3 0.00 Zone 3 DETENTION BASIN STAGE-STORAGE TABLE BUILDER MHFD-Detention, Version 4.03 (May 2020) 0.000 0.425 0.850 1.275 1.700 0.000 0.085 0.170 0.255 0.340 0.00 2.00 4.00 6.00 8.00 Volume (ac-ft)Area (acres)Stage (ft.) Area (acres)Volume (ac-ft) 0 3700 7400 11100 14800 0 5 10 15 20 0.00 2.00 4.00 6.00 8.00 Area (sq.ft.)Length, Width (ft.)Stage (ft) Length (ft)Width (ft)Area (sq.ft.) MHFD-Detention_v4 03.xlsm, Basin 3/23/2021, 7:43 PM Why is the area curve/ data erratic like this? this is a result of the stage - area data ADS provides and the inverted nature of the cham- bers (i.e. the most area/volume is at the bottom), and the stone void spaces. We have updated the stage - area summary based on revised data from ADS to produce a smoother curve COCOEEVTECBGMEEEETLTLETLGMIRTLWMCOEKM PJD 3/24/2021 PROPOSED DRAINAGE MAP 2 SCALE: 1"=40' 0 20 40 - - - - - - - - - - - - - - STAMP H:\King Soopers - City Market\CO, Fort Collins - KSS000146 -#18 College & Drake\CADD\Exhibits\KSS146_Drainage_Proposed.dwg - Erland Mowinckel - 3/24/2021Init.#Issue / DescriptionDate THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT 6162 S. Willow Drive, Suite 320 Greenwood Village, CO 80111 303.770.8884 Planning. Architecture. Engineering. O www.gallowayUS.com C 2016. Galloway & Company, Inc. All Rights Reserved PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate: Drawn By: Project No: Checked By: KSS000146 OF 2PROPOSED DRAINAGE MAPMIDTOWN GARDENS MARKETPLACEKING SOOPERS MARKETPLACE #146S. COLLEGE AVE. & DRAKE RD.FORT COLLINS, COLORADOBASIN SUMMARY TABLE - PROPOSED Tributary Area C2 C100 tc | 2-Year tc | 100-Year Q2 Q100 Sub-basin (acres)(min)(min)(cfs)(cfs) A-1 0.91 0.82 1.00 5.7 5.0 2.1 9.1 A-2 0.23 0.87 1.00 5.0 5.0 0.6 2.3 A-3 1.65 0.87 1.00 5.1 5.0 4.1 16.5 A-4 0.64 0.85 1.00 5.0 5.0 1.6 6.4 A-5 0.15 0.95 1.00 5.0 5.0 0.4 1.5 A-6 0.15 0.88 1.00 5.0 5.0 0.4 1.5 A-7 0.25 0.81 1.00 5.0 5.0 0.6 2.5 A-8 0.13 0.67 0.84 5.5 5.0 0.2 1.1 A-9 0.11 0.95 1.00 5.0 5.0 0.3 1.1 A-10 1.21 0.95 1.00 5.0 5.0 3.3 12.1 A-11 0.67 0.95 1.00 5.0 5.0 1.8 6.7 A-12 0.88 0.95 1.00 5.0 5.0 2.4 8.8 B-1 1.33 0.89 1.00 5.0 5.0 3.4 13.3 B-2 0.79 0.90 1.00 5.3 5.0 2.0 7.9 B-3 0.09 0.72 0.91 5.0 5.0 0.2 0.8 C-1 0.11 0.95 1.00 5.0 5.0 0.3 1.1 C-2 0.12 0.95 1.00 5.0 5.0 0.3 1.2 C-3 1.01 0.87 1.00 6.4 5.0 2.3 10.1 C-4 0.01 0.95 1.00 5.0 5.0 0.0 0.1 C-5 0.02 0.95 1.00 5.0 5.0 0.1 0.2 OS-1 0.51 0.54 0.68 13.6 13.6 0.5 2.4 OS-2 0.32 0.73 0.91 7.7 6.0 0.6 2.8 OS-3 0.10 0.91 1.00 5.0 5.0 0.3 1.0 OS-4 0.36 0.91 1.00 5.0 5.0 0.9 3.6 OS-5 0.71 0.87 1.00 5.0 5.0 1.8 7.1 OS-6 0.15 0.95 1.00 5.0 5.0 0.4 1.5 Please add a column to this table indicating "Detention & WQ" or "WQ Only" for each subbasin. On the drainage map, I suggest turning off all utilities except for storm. Please make sure the roof drains are turned on. Check if the roof drain pipes from basin A-12 connect to the detention portion of the stormtech system. (Note, an easy fix could be removing the orifice plate between the BC pond and the detention chambers. my $0.02 =) Basins B-1, B-2, and C-3 each have a lot of area (~1 acre each) draining to 1 storm inlet each inlet. Will the nuisance flows be managed to your satisfaction in this parking lot? Basin C-3 has allot of area (1 acre) draining to 1 on-grade inlet. I know this is for WQ only, however, will the nuisance flows be managed to your satisfaction? updated EX and PR maps to omit other utilities as requested Basin A-12 drains to the back side of the building and the roof drains at this corner of the building cor- respond to the C basins corrected as noted for Basins B-1 and B-2, the lip in the curb flow line at the chase drains will be sufficient to capture the nuisance flows. For Basin C-3 & B-3, we have adjusted the curb such that there is a small depression between the curb return and the inlet to create a slight sump to capture nuisance flows based on the nuisance flow depth and allow higher flows to pass over and down into the street as intended see note above