Loading...
HomeMy WebLinkAboutHOUSING AUTHORITY FACILITY PUD - PRELIMINARY & FINAL - 28-89A - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSSTAFF REPORT PROJECT: Housing Authority Facility PUD, Preliminary and Final- #28-89A APPLICANT: Jim Kline Fort Collins Housing Authority 1715 West Mountain Ave. Fort Collins, CO 80521 OWNER: City of Fort Collins PROJECT DESCRIPTION: A request for preliminary and final PUD approval for a 2,688 sq. ft. addition to the existing 3,883 sq. ft. Housing Authority building located at 1715 West Mountain Avenue. The Housing Authority is also platting the property into a one lot subdivision at this time. The lot area is 16,766 sq. ft. and is zoned N-C-L, Neighborhood Conservation Low Density. RECOMMENDATION: Approval EXECUTIVE SUMMARY: The applicant proposes a passive solar designed 2,688 sq. ft addition to the west side of the existing 3,883 sq. ft. building. The Housing Authority uses the existing building as an office, for vehicle storage, and as a shop for minor repairs. The applicants are proposing to expand the existing office area into the existing garage and to use the new addition for a work shop and an enclosed vehicle storage area. Currently, the area to be expanded upon is a fenced, gravel, outdoor storage area. One tree will be relocated and three elm trees on the south side of the addition will be replaced with ash trees. The proposed project earns 52% on the Business Service Uses Point Chart E and meets the applicable All Development Criteria of the Land Development Guidance System. The proposed project supports the guidelines and policies of the West Side Neighborhood Plan. DEVELOPMENT SERVICES 300 LaPorte Ave. P.O. Boa 580 Fort Collins. CO 80522-0580 (303) 221-6750 PLANNING DEPARTMENT Housing Authority Maintenance Facility PUD - Preliminary & Final, #28-89A March 23, 1992 P & Z Meeting Page 2 COMMENTS: 1. Background• The surrounding zoning and land uses are as follows: N: R-M; single family homes and townhomes (Mountain Court PUD) S: N-C-L; City Park ball fields and golf course E: R-M; multi -family (Housing Authority units) W: N-C-L; City Park Nine golf course and Trolley Building This site is part of the original City plat. Prior to construction of the building, the Housing Authority and the City of Fort Collins entered into a lease agreement for the 16,766 square foot tract of land. After a building permit was issued and the Housing Authority Facility was constructed in 1977 a new 40 year lease agreement was approved by City Council (see attached lease agreement). In 1982 the Planning and Zoning Board approved a 1000 square foot addition and in June of 1988 they approved a 300 square foot addition to the existing building. Both additions were approved as expansions to a non -conforming use. These additions were used to expand the office area and to add indoor vehicle and equipment storage. The existing building is a non -conforming use in the N-C-L Zoning District as a result of the October 1, 1991 Westside rezoning (see attached "Chronology" for further background details). 2. Land Use• This request is for preliminary and final PUD approval for a 2,688 sq. ft. addition to the 3,883 sq. ft. existing Housing Authority building, located at 1715 West Mountain Avenue. The addition is for enclosed vehicle storage, storage area for supplies, and a shop. office uses would expand into the existing garage. The number of employees will remain the same. The use of the building will remain the same. Changes in day to day operations, new Federal laws requiring additional record keeping and storage, the need for additional privacy for confidential client interviews, and the need for additional storage area for bulk purchases have created the need for expansion. The final building size (excluding areas for indoor parking) would be in conformance with the building to lot size requirements and the set back requirements of the N-C-L zone. Staff has reviewed the project against the policies of the West Side Plan. The land use plan for the West Side Neighborhood "reinforces and builds on the existing land use pattern that has • • Housing Authority Maintenance Facility PUD - Preliminary & Final, #28-89A March 23, 1992 P & Z Meeting Page 3 evolved over the years and is intended to conserve and enhance the neighborhoods valuable assets". The Housing Authority PUD addresses general policies LU-1, LU-2, and LU-3 (see attached) by: 1. Retaining and enhancing the existing land use, proposing new development or redevelopment in areas where physical deterioration exists. 2. Using the Land Development Guidance System to clearly state and enforce regulations and guidelines relating to development of the entire property. 3. Separating overall neighborhood issues and concerns from those of the adjacent property owners, basing decisions concerning conflicts on the relative importance of the general versus individual welfare. The West Side Neighborhood Plan does not specifically address the Housing Authority site. The area is included on the "Future Land Use Map" as part of City Park along with the Fire Station and City Park Shop on Bryan Street and the Trolley Barn on Mountain. On page 4-13 (see attached), the entire City Park area including Grandview Cemetery, the golf course, and the ball fields are designated as a "potential national register district". The footnote to this designation states that, "although all of City Park is shaded, the preference would be only to designate those portions which are relatively undeveloped and in a natural state". The Housing Authority PUD addresses the "community facilities" policy CF-11 in that: 1. The expansion will not diminish open space, as the area is not currently "open". All existing vegetation will remain or be relocated or replaced. 2. The maintenance portion of the building is an accessory use to the office and vehicle storage uses and Staff feels that the increase is not significant given that the area is already used for outdoor storage of vehicles and temporary storage sheds. 3. The use and activity at the site is not proposed to change and therefore will not adversely impact adjacent residences. Staff believes that the addition has been designed to blend with the existing architecture and retain the residential character of the building. Staff believes that the addition will clean up the site. Housing Authority Maintenance Facility PUD - Preliminary & Final, #28-89A March 23, 1992 P & Z Meeting Page 4 4. Staff believes that the leased area is not functionally a part of City Park and that the potential for historic designation of the City Park district is not precluded by this expansion. As the use and activity at the site is not proposed to change; the addition is residential in character; existing vegetation will remain or be relocated; the area of the proposed addition is currently a graveled, fenced area that is within the original lease agreement area and not functionally a part of City Park; development of the entire site would be subject to the regulations and guidelines of the proposed PUD and the LDGS, and, services provided by the Housing Authority benefit the community as a whole, Staff believes that the project supports the guidelines and policies of the West Side Neighborhood Plan. The proposed project earns 52% on the Business Service Uses Point Chart E and meets the applicable All Development Criteria of the Land Development Guidance System. Points were earned for 1) being located outside of the South College Avenue Corridor, 2) joint parking, 3) contiguity to existing urban development, and 4) for energy conservation. The applicant used method two of the Energy Conservation Worksheet and received points for the following measures: 1. Long axis of the building is east/west with the majority of windows on the south wall. (0.2 points) 2. Automatic night/weekend temperature setbacks are provided (0.4) 3. Automatic spark ignition for boilers, furnaces, heaters. . (0. 1) 4. Electric resistance heat not used. (0.2) 5. Windows are shaded from summer sun using overhangs, window coverings, deciduous trees.. (0.2) 3. Design: The applicant is proposing to build the solar addition on the west side of the existing building. Currently the area is used for outdoor storage and is fenced with a 6' wood fence. The applicant is proposing to fit the addition within the existing fenced area leaving the existing fence in place. From Mountain Avenue, the sloping roof of the addition seen above the fence, would be the only visible change. Existing hedges and shrubbery would remain. The addition would be one story on the north side and two stories on the south, with clerestory story windows along the south side Housing Authority Maintenance Facility PUD - Preliminary & Final, #28-89A March 23, 1992 P & Z Meeting Page 5 for solar gain and day lighting. The maximum height of the addition would be 19' from the ground to the pitch of the roof. The building is to be frame construction with 12" wood grain textured masonite lap siding in neutral earth tones of tan with white trim. The existing building will be repainted to match the addition. On the west end, an architectural element of imitation stone work will be used to break up the broad elevation. The architectural character of the building will remain residential. The roofing material is proposed to be a 3-tab fiberglass shingle in a neutral earth tone color. The existing garage doors, which face Mountain Avenue, will be removed. Vehicles to be stored in the addition will enter from a new concrete drive way on Mountain Avenue, at the northwest corner of the lot, and exit from the existing driveway. There will be two garage doors, one on the west elevation and one on the east elevation of the addition. Employee and client parking is provided in the Parks and Recreation ballpark parking lot to the east of the building. The Housing Authority and Parks and Recreation have an agreement to share this parking. The Housing Authority is not open during peak hours of parking demand by the ball fields. There is direct pedestrian access from the parking lot to the entrance of the Housing Authority which is on the south side of the building. The existing landscaping would remain the same with the exception of relocating an existing pine from the northwest corner to the rear of the addition and replacing three existing elm trees with ash trees on the south property line. The City Forester visited the site and felt that construction would come too close to these trees for them to survive and suggested that ash trees be planted further to the south to replace them. 4. Neighborhood Compatibility: A neighborhood meeting was held on March 11, 1992 for this project. There were three property owners in attendance. Their main concerns were that the Housing Authority was outgrowing the site and that the expansion would not be compatible with the surrounding neighborhood. There was concern that the entire south side of Mountain Avenue, west of Bryan Street, would turn into an "industrial area", with the Housing Authority and the Trolley Barn. There was also some misunderstanding as to the extent of the shop area. David Herrera, Executive Director of the Housing Authority, explained that no vehicle maintenance or welding was performed in the shop. The shop is used for minor "household" repairs, making Housing Authority Maintenance Facility PUD - Preliminary & Final, #28-89A March 23, 1992 P & Z Meeting Page 6 keys, small carpentry projects, and other similar kinds of shop work. Mr. Herrera gave the group a tour of the building, pointing out the extent of the previous two expansions, and explaining the day to day operations which have necessitated the need for additional office space, file storage space, supply storage for bulk purchases, and indoor vehicle parking. The fact that the West Side Plan did not specifically address the Housing Authority Site, but included it as "park" on the map, was a concern expressed by residents. Another concern was raised about future expansions and what would happen to the building when the Housing Authority finally outgrows the building. The neighbors were concerned that they would be left with a "white elephant" in their neighborhood. Mr. Herrera stated that the Housing Authority has looked at many sites around town to relocate the office operation, shop operation, or both. There are no suitable alternatives at this time. Mr. Herrera also stated that the Housing Authority would not be leaving this site, they planned to take full advantage of the $1.00 per year lease for the full 40 years and continue on a month by month after that term expires. According to Mr. Herrera, the existing site is ideally located and is central to the Housing Authority's projects. The issue of imposing a condition on future expansion was discussed. The Housing Authority was acceptable to stipulations that the building not be expanded beyond the proposed construction. Staff believes that the site does not lend itself to further expansion, given the lot size, set backs, and existing landscaping. 5. Storm Drainage: Storm Drainage concerns have been addressed. The applicant has requested a variance to the requirement to include a detailed basin drainage study in the drainage report on the grounds that most of the basin is pervious and that the only impervious area is the parking lot shared with Parks and Recreation and the office building. The basin drains to the parking lot and via an inlet drains to Larimer County Canal on the east side of the parking lot. The variance request was granted by the Stormwater Utility. Stormwater has requested that the developer be allowed seven days to begin construction of the building and driveway after the sod has been removed. If construction is not underway within this time period, erosion control measures will have to be installed per City criteria and a financial security submitted. Housing Authority Maintenance Facility PUD - Preliminary & Final, #28-89A March 23, 1992 P & Z Meeting Page 7 RECOMMENDATION This request meets the criteria of the Business Service Uses Point Chart and the applicable All Development Criteria of the Land Development Guidance System. The project supports the guidelines and policies set forth in the West Side Plan. Staff recommends approval of the Housing Authority Maintenance Facility PUD, Preliminary and Final- # 28-89A. is m • ls'1 ��e�y +»»rgtla �»y� .tll r taevepr+ to tAl �y r�+a u r tJr a.Nt�Y »rt a..t. • ia. Ib[�al< rM /wgr tlgrrw a+w e»x a+a14a. tN �ele : I'- 20" 0 5 IB 20 40 BB SITE PLAN FORT COLLINS HOUSING AUTHORITY P.U.D_ 1715 VEST MOUNTAIN AVENUE WEST MOUNTAIN AVENUE Ex 19T. T9EE9\ ce m » cn arlsrl • J • W ea! I61 .62' • l F,e shed oeinessANe sArzquu ,e3%�-:` rlaI T � \ townie Arm. ` \ •\ ... ns / I �.. n. ,e 11 P—p... d 56' poll a eddlll or, sa ® n 1 in exist. 1 m l�eme 8 br,ck bldg. uy a+n r a.retee , ' geofflc space l a. se EXISTING ,a^ Ptxe R—ITeq 11 IF + 19 ex ° G9 ""t' �• °°° 1116° C a _ Is! "Pl."",. �Nf d,lVe & lot xEN ,.s• as Tvu .eat 177.63' 1 fal:lt PtlT[CTlea aPMIlICMIpaa - ay to qS ge P, [a q9 1 beeebell field )x[eT [ e ppmttEx. a [E[iTPlgAia. Y e: rert [e„tn. atlnm M e+ tvl was rtc e and r»ertettvne +et`�rtervn ++ie+pl+na� + <ept tea enateve» 1 1 pp vM ey ens Pl--g an4 bonang 9osee et e» city et Fert cellE». leleraae ev tel+ y at .B.IgYJ s»r+tarl el Ne P,am,tnq ve ivva p +re q.»en a q[xi,PIGATa. ie+ yert ge,lin. 9»ang ,.tnn e Pr<pertY 4 ++Plan+N tlty t eeePt tee <ovG,ttov�4 an° restrt<tty» +et+torte vn »r d pl... 1 1 Nei APG :oxq .Ee.,us`spUAxe FE[T exIsilxG ep,[plxc ANEA J, enJ SgpABE F[et PNG" AgpITIIF e. sea apaaxe Fee'[ iMAe BOIIDIxG ApG e,S)l SQUARE —T Toni,. yxpPpaep ngleolxG wvEBAue . .Jva EXIsi IxG mxexerE salve 1, saB aggwe Teer GPo q m cseTE oxlve ; up spuAxe r PAas)xe Is ssAxeq IN eaxas [ x[rnEAieox eAB+IxG Eor olaEcr[Y AUJAcexT ro reE BETE rne[E ANe Ju spacrs I .�alae.a<n Y anca1e�a PLAN:ADIITICN OF MINITACILITY DKR: CITY ff FORT COLLINS MINE AMITY AWSS:1715 VEST SWAIN AVENE BM 221-5404 OATE:.14N14RY 6.1992 1 OF[ • LANDSCAPE PLAN FORT COLL I NS HOUSING AUTHORITY P . U . 0 . aQ aQaf . .EL "I AP¢. . 16,t6fi BQVAae FEET 1715 VEST AOUNTA I N AVENUE Fa]aTt.Q aa,LQla� aaF. - a.w. aw.ae FEET ¢TIaTIBQ BBILQIa� eQPT>�B .fa. PPoPoBFO :—:D. - L.6w SQPN,E FE[T TOTAL Bvltv[rG Aver. . 6, 9r1 savtae [feT —Pos¢o co.. - ma sauAaF FEET west mountain avenue — — — - •dp• of earc-4� ��. " 1- - T. an I eN 6'p 6'v 6'c!.\THl`CEIlFTvBtly .Uv)�Pvv i .6z 1 EI.t..Q1 QT I.aa E B.IBBf le raNlvaa ]acATaA A n• PI 1 ahed I ahed a . d r�Fa TQ .A �e ..=y •ttt;tte tA- t-, ` A` ..ca^ Teo• eAewTwcTniAw .. r e•p,n �� B�.eb I \ .m..•cvt r nL.accw. ss IF a-P, ,dd1t, oe.rf.a< e t — eld9. � MDUaTAtx Av¢xue fi 96YM avlfi.B) m 1 SEE aAL 2 '•1•B'.1. 19'•1 fle.v [rd. a14P•^a <rY .a .a• Al. -. Taee raoracxlxr awclrlcArlaaa - to tt as w ar taw �• :' ""' • s• "'$'a C — _.•Iwo` — � alpha 1 {. drive S parking L 177. 63 za'.!• .. N • va. er•e. IBTIIp la• PveLO[:ATED e•w i °•' • ed. ` txLci F 9 C.P a„. Brfva uaA. 6e.e6el1 Field 1 cel" 1'• 20' 1 I 1 , 1 e 5 IB 213 40 fi0 - Prw 1— A I— ceaTIFILATa Tn• et r c c , PMaa9 a canTfe,ctTv. catY ee rote tt,tan• • ,v • n c a e. °naa..9 �L.fay a m.awa .wf ..e br cn. e1•n"an9 ,"e arena"9 an+ta ee c"e c,cra Fn.c e[ .ne t•.e.,•e,e•. .•s ietubtA..... Pa... . ``•Pe IS. .n, me,e eown., mmt.m m eba mT B.I99e RM ADDITIQI ff MINT.FALILITY UM: CITY OF FORT CILLM Ip E% NJD(RITY W E5S:1715 YBT AQNTAIN AVEME PW:221-5484 DAIS:IMM 6,1992 I OF I FORT COLLINS HOUSING AUTHORITY P.U.D- 1715 VEST MOUNTAIN AVENUE ELEVATIONS AND FLOOR PLAN . . W. f I 7EE1 m m Sf' yj. south view proposed addict Inside parking ® 8 Ell m PMBIXQ MEA IY[Y SQeMB PEei north view loft above parking -' f storage ores Il we Mu . Yee aQ.— Pen 4 —1 7 mo1nt.shop aEoe aYE.. YYY eQUME PEEr Floor plan SCALE : l'= 10' Fll--� 0 5 10 20 40 I EXIST.SHOP & GARAGE REMODELED FOR OFFICES W R-WADOMIN OF MINT.FACILITY 7VHR: CITY CF FIRT CCLUNS H SINS W MITY AMRESS:1715 VEST MMA1N AVEME PHJE:221-5484 DATE:.IWW7f 6.1992 2 of 2 i FORT COLLINS HOUSING AUTHORITY P.U.D. clear story windows used for solar gain and day light lighting. PROPOSED ADDITION cxisting brick existing brick Owner : FORT COLLINS HOUSING AUTHORITY 1715 WEST MOUNTAIN AVENUE FORT COLLINS CO. 80521 Phone : 221- 5484 contact person JAMES K KLINE existing facade plywood with 2"x 4" cedar trim boards nvrcmrnir- nnrr nrvn li ALL DEVELOPMENT: NUMBERED CRITERIA CHART ALL CRITERIA APPLICABLE CRITERIA ONLY CRITERION Is the criterion camccble? Will the criterion be satisfisa? If no, please explain `0" ,e:F Fes- Yes No NEIGHBORHOOD COMPATABILITY 1. Social Compatability 2. Neighborhood Character �/ ✓ ✓ 3. Land Use Conflicts ✓ 4. Adverse Tratfic Impact PLANS AND POLICIES 5. Comprehensive Plan V ✓ PUBLIC FACILITIES & SAFETY 6. Street Capacity �/ ✓ 7. Utility Capacity >/ 8. Design Standards �/ ✓ 9. Emergency Access 10. Security Lighting ✓ 11. Water Hazards RESOURCE PROTECTION 12. Soils & Slooe Hazard 13. Significant Vegetation ✓ ✓ ✓ 14. Wildlife Habitat ✓ 15. Historical Landmark ✓ 16. Mineral Deposit 17. Eco-Sensitive Areas ✓ 18. Agricultural Lands ENVIRONMENTAL STANDARDS 19. Air Quality ✓ ✓ 20. Water Quality ✓ ✓ 21. Noise ✓ 22. Glare & Heat ✓ 23. Vibrations 24. Exterior Lighting ✓ ✓ �/ 25. Sewages & Wastes ✓ ✓ ✓ SiTE DESIGN 26. Community Organization ✓ ✓ 27. Site Organization 28. Natural Features ✓ 29. Energy Conservation 30. Shadows ✓ ✓ 31. Solar Access �/ ✓ 32. Privacy 33. Coen Space Arrangement ✓ 34. Building Height 35. Vehicular Movement 36. Vehicular Design ✓ ✓ 37. Parking ✓ ✓ -77 38. Active Recreational Areas ✓ 39. Private Outdoor Areas 40. Peaestrian Convenience ✓ ✓ 41. Pedestrian Conflicts ✓ ✓ 42. Lonascocing/Coen Areas ✓ ✓ 43. LandscapingiBuildings ✓ 44. LonascaoingrScreening I ✓ ✓ 45. Public Access ✓ I ✓ 46. Sians ✓I ✓ �Z• IR�• Il/ sow oy ent. ✓ -12- A A ACTIVITY: Business Service Uses DEFINITION: L E Those activities which are predominantly retail, office, and service uses which would not qualify as or be a part of a neighborhood or commu- nity/regional shopping center. Uses include: retail shops; offices; per- sonal service shops; financial institutions; hotels/motels; medical clin- ics; health clubs; membership clubs; standard and fast-food restaurants; hospitals; mortuaries; indoor theatres; retail laundry and dry cleaning outlets; limited indoor recreation uses; small animal veterinary clinics; printing and newspaper offices; and, other uses which are of the same gen- eral character. CRITERIAEach of the following applicable criteria must be answered "yes" and implemented within the develop- ment plan. Yes No 1. Does the project gain its primary vehicular access from a street other ❑ than South College Avenue? u 2. DOES THE PROJECT EARN AT LEAST 50% OF THE MAXIMUM POINTS AS CALCULATED ❑ ON "POINT CHART E" FOR THE FOLLOWING CRITERIA? a. Is the activity contiguous to an existing transit route (not appli- cable for uses of less than 25,000 square feet GLA or with less than 25 employees) or located in the Central Business District? b. Is the project located outside of the "South College Avenue Corri- dor?" c. Is the project contiguous to and functionally a part of a neighbor- hood or community/regional shopping center, an office or industrial park, located in the Central Business District or in the case of a single user, employ or will employ a total of more than 100 full- time employees during a single 8-hour shift? d. Is the project on at least two acres of land or located in the Cen- tral Business District? continued -22- continued, W� ^� e. Does the project contain two or more significant g t uses (such as retail, office, residential, hotel/motel, and recreation)? f. Is there direct vehicular and pedestrian access between on -site parking areas and adjacent existing or future off -site parking areas which contain more than ten (10) spaces? g • Does the activity reduce non-renewable energy usage through the application of alternative energy systems or through energy conservation measures beyond those normally required by the Model Energy Code as adopted by the City? Refer to Appendix G for Energy Conservation Methods to use for calculating energy conservation points. h. Is the project located with at least 1/6th of its property boundary contiguous to existing urban development? i. If the site contains a building or place in which a historic event occurred, which has special public value because of notable archi- tecture, or is of cultural significance, does the project fulfill the following criteria. i. Prevent creation of influences adverse to its preservation; ii. Assure that new structures and uses will be in keeping with the character of the building or place. Imitation of period styles should be avoided; and iii. Propose adaptive use of the building or place that will lead to its continuance, conservation and improvement in an appropriate manner while respecting the integrity of the neighborhood. 3 j 1' lid • BUSINESS SERVICE USES POINT CHART E For All Criteria Appliccble Criteria Cniy tt,e I II III IV Criterion Crtenori Apckzc;e C1c:e tt+.e Mwrp:!er Points Earned Mcrmum ApC11C G Yes No CcrTBCr Score Ixll Porrs a. Transit Route I �l IX 12 10 2 — b. South Coilege Corridor �I X I(DI 0 4 8 c. Part of Center Q I X 12 10 3 Q 6 d. Two Acres or More OX I X 2 I 0 3 Q 6 e. Mixed -Use X X 2 0 3 Q 6 `. Joint Parking ry I 1 IC2)1 0 3 Co g. Energy Conservation I 02131410 2 8 h. Contiguity QX I X 12 I G 5 10 10 i. Historic Preservation I 1 12 ( 0 2 — — 1�2I0 1I 2I0 I. I 1I2I0 Tctais v vi Percentage Ecmed of Maximum Appiic:.ble Points V/VI = VII 52 /0 vu IF i'Y OF FORT C0flI ENERGY CONSERVATION WORKSHEET This worksheet must be completed and submitted at the time of application for all non-residential Preliminary PUD's requesting energy conservation points on the applicable Land Use Activity Point Chart. Please choose one of the two methods below. Be realistic in determining your commitment for energy conservation mea- sures. Failure to fulfill a commitment made for energy conservation measures may result in disqualification of a project under the applicable criteria of the LDGS. NAME OF PUD: METHOD ONE: uAGMEW V-4-MIMP A- — W/), — - Date: / I propose a percent reduction in the annual energy consumption for the structure(s) in this proposed PUD. This reduction receives point(s) for energy conservation. NOTE FOR THOSE PROJECTS USING METHOD ONE: Certification by a professional engineer, licensed in Colorado, and a summation of the engineer's calculation methods and results will be required to document energy conservation measures at the time of building permit application. METHOD TWO: I propose the following energy conservation measures for the structure(s) in this proposed PUD: Measure Points 'c ni4jif V v n'SiS 7L�iYt kic 7 4ed lj►1�r OcJS Sledy4m sJ1wP-Lt sjA - Total Points received fro ethod 2: Preparer's Name: kcf a_ :2 • • CITY OF FORT COLLINS 1715 West Mountain, Ft. Collins, Colorado 80521 Telephone (303) 221-5484 HMINGP'UK1' C FAX 221-0821 LINs HOUSING AUTHORITY P.U.D. Energy Conservation This addition was designed with several natural energy conservation measures in mind. One of course is that the north side of the building is without windows allowing for maximum insulation and very little air infiltration. It also has the major portion of the roofing facing it, which will allow the cold wind to move over it with minimum resistance. The South side of the building has very good solar exposure. We are utilizing this fact by placing the majority of the windows there. On this side of the building will be a shop area with an exposed concrete floor which will allow for some solar mass to absorb any natural heat received from the windows. On the upper portion of the building there are also windows. These are intended for natural light and solar gain to the indoor parking area. The light provided from these will prevent the majority of electrical lighting to be used during business hours, and they will also provide additional solar heating. In summer use they will provide a natural air circulation for cooling. The addition will have different degrees of heating needs. The shop area will be the only place where it will need to remain at a room temperature. The parking and storage areas will be kept no warmer than approximately 50 degrees. The overhead door will be on a automated operator that will insure the door to be kept closed when not in use. All walls will be insulated along with the roof system. The heating system will be a gas fired space heater with temperature set back controls which will allow for lower temperatures during evening hours. The existing building was remodeled about three years ago, at that time we replaced the heating system. The system now is of the 80% efficiency rating and is equipped with automatic temperature set back controls. The office is lighted throughout with fluorescent lights. The building has very good southern exposures also. It is maximized with many large windows utilizing the natural light and heat that is gained. The portions of the building that were added on were insulated to code standards and in addition we used interior vapor barriers and exterior ones as well. New wood windows with double panes were installed. The existing garage will be converted into additional office space which will receive the same treatment. Devel Services 0 Planning Department Lim 6 0-0 �— 0 City of Fort Collins arc , 1992 Ron Steinbach, President City Park Neighborhood Association 1345 West Mountain Avenue Fort Collins, CO 80522-0580 Dear Mr. Steinbach, Thank you for your letter of February 24. I have conducted some research into the history of the Housing Authority building using files found at the City Clerk's office, the Building Department, and the Planning Department. I have been unable to turn up anything referencing conditions of expansion, as mentioned at the February 24th Planning and Zoning Board Meeting. If you have any information about these conditions, please send me a copy. I have attached all applicable minutes, meeting notes, agreements, and a chronology of the Housing Authority Building for your information. City Planning staff will facilitate a neighborhood meeting at the Housing Authority Building (1715 West Mountain) on Wednesday March 11, 1992 at 7pm. A letter was sent out to the affected property owners and the City Park Neighborhood Association on February 28th. I hope that you received notice of that meeting and that you plan to attend. Staff has again reviewed the project against the policies of the West Side Plan. Because the use and activity at the site is not proposed to change, the addition is residential in character, existing vegetation will remain or be relocated, and the area of the proposed expansion is currently a graveled, fenced off area that is within the original lease area, and is not functionally a part of City Park, Staff believes that the project does not contradict the guidelines and policies set forth in the West Side Plan and will make that recommendation to the Planning and Zoning Board. If you have other specific concerns about the Housing Authority Planned Unit Development or if you would like to meet with Ken Waido and me to discuss the guidelines and policies of the West Side Plan please do not hesitate to give me a call. Sincerely, Kirsten Whetstone Project Planner cc Mr. David Herrera, Executive Director Fort Collins Housing Authority 1715 W. Mountain Avenue Fort Collins, CO 80521 281 North College Avenue • P.O. Bo\ 580 • Fort Collins, CO 80522-0580 • (303) 221-67:;,i • February 24, 1992 Mr. Tom Peterson Planning Director City of Fort Collins P.O. Box 580 Fort Collins, CO 80522-0580 As you are aware, at tonight's Planning and Zoning Board (P&Z Board) meeting, there was extensive discussion of the history behind the current Fort Collins Housing Authority site at 1715 W. Mountain Avenue. It was apparent from the discussion that there was a general lack of understanding of the historical details of development on that site. neighbors were the only ones to recollect any prior commitments. To aid us in our further evaluation of the proposed conversion, please provide us with a summary of the history of development and expansions at the site in question, from the date of the first construction. Also please provide us the minutes of all P&Z Board and City Council discussions related to all phases of development at this site. I would encourage you and your staff to reevaluate the proposal in light of the guidelines and policies set forth in the Westside Neighborhood Plan. It is our contention that the proposal is not compatible. Please provide us with the data requested at least 2 weeks prior to the next hearing before the P&Z Board. We need that amount of time to convene a board meeting and discuss the issue before presenting our position to the P&Z Board. Thank you for your assistance. We look forward to maintaining an open dialog n all issues related to the neighborhood, and to continuing to work wl h you and the Fort Collins Housing Authority. Sincerely, Ro"�einesident City Park Neighborhood Association 1345 W. Mountain Avenue Fort Collins, CO 80521 cc: Mr Bernie Strom Planning and Zoning Board P.O. Box 580 Fort Collins, CO 80522-0580 Mr. David Herrera, Executive Director Fort Collins Housing Authority 1715 W. Mountain Avenue Fort Collins, CO 80521 CHRONOLOGY FOR THE HOUSING AUTHORITY BUILDING JUNE 4, 1974 Zoning Board of Appeals (ZBA) approved a request by the Housing Authority to reduce the front yard set back from 30' to 15' for the to be constructed Housing Authority Building. The property at 1705 (now addressed 1715) West Mountain was in the RL, Low Density Residential, zoning district. Uses for the building, mentioned in the minutes of the ZBA Hearing included: Human Resources and Housing Authority offices, recreation, day care, arts and crafts classes, and a kitchen. APRIL 16, 1975 The Housing Authority applied for a building permit for the Housing Authority Building to be located at 1715 W. Mountain Avenue. Uses mentioned on the permit included office and recreation uses. These uses were determined to be permissible in the RL zone and a permit was issued. JANUARY 23, 1976 A certificate of occupancy (CO) was issued for the Housing Authority Building at 1715 West Mountain Avenue. The uses listed on the certificate were for Housing Authority offices and recreation. Parking was provided at the Parks and Recreation ball fields lot on the east side of the building. The use required a maximum of 17 off-street parking spaces. JANUARY 4, 1977 A Lease Agreement was signed (this replaced an older lease agreement from 1974 before the building was built) between the City of Fort Collins and the Housing Authority, leasing the 16,766 square foot piece of property, including the building, to the Housing Authority for $1.00 per year for a 40 year period. (The property described in the legal description attached to the lease is the same 16,766 sq. ft. piece of property that is shown on the plat drawn up in 1992.) JUNE 20, 1978 City Council considered the Hearing and First Reading of Ordinance #64-1978 rezoning certain properties along Mountain Avenue, west of Shields and east of the Canal, from the RM, Medium Density Residential, to the RL, Low Density Residential, District. The rezoning, called the Wells- West Mountain Property Rezoning, was approved. The Housing Authority Building and leased area was not a part of this rezoning, as it was already zoned RL. MARCH 22, 1982 The Planning and Zoning Board approved an expansion of a non- conforming use request to add 1000 sq. ft. to the west side of the Housing Authority building to provide an indoor equipment and vehicle storage area. The expansion was viewed as a non- conforming use because, although the building was built as a permissible use, it was determined that the use was more accurately a legal non -conforming use. It was determined that the area of expansion was included in the lease agreement between the City of Fort Collins and the Housing Authority and was therefore not official parkland. MAY 12, 1988 The ZBA approved a variance to reduce the front set back from 20' to 15' for a proposed 110 sq. ft. addition to ,the north side of the building. The addition was to be built in -line with the existing building which was set back 151from the property line. The addition was part of a request for expansion heard by the Planning and Zoning Board on June 27. JUNE 27, 1988 The Planning and Zoning Board conforming use request to add of the building (131 sq. ft., a total of 302 square feet. JULY 1989 approved an expansion of a non - three additions to various parts 115 sq. ft., and 56 sq. ft) for The West Side Neighborhood Plan was adopted by City Council. OCTOBER 1, 1991 City Council adopted the West -side rezoning ordinance. This rezoned the Housing Authority site to N-C-L, Neighborhood Conservation Low Density Residential. The existing Housing Authority continues to be a legal, non -conforming use. Any changes to the building would require either a Planned Unit Development or an expansion of a non -conforming use review. Both processes require a hearing by the Planning and Zoning Board. OCTOBER 28, 1991 The Housing Authority applied to the City Planning Department for a non -conforming use review request for a 2,688 sq. ft. addition to the west side of the building. The addition is for an enclosed vehicle and equipment storage area. Part of the existing garage would be converted to office uses and for storage of files and office equipment. The number of employees would remain the same and the number of vehicles would remain the same. The Zoning Department indicated that the expanded building would have to meet the building area to lot size requirements of the N-C-L zone. (Minimum lot size is at least 3 times the floor area of the building, excluding any indoor vehicle storage areas or garages.) Prior to seeing the plat or floor plans, it was thought that the expanded building might not meet the area requirements and the Housing Authority was advised to submit the request as a PUD. Later, after the plat was received, it was determined that the expanded building minus the indoor garage area would require a minimum of a 13,700 sq. ft. lot. The lot that is described in the Lease Agreement and plat is 16,766 sq. ft. and therefore the expanded building would conform to the N-C-L zone and the request could be processed as a non -conforming use expansion. The Housing Authority decided to pursue the Planned Unit Development because they had completed most of the required PUD submittal requirements (storm drainage report, landscape plan, architectural elevations, etc.). NOVEMBER 20, 1991 A "Planning Review" notice sign was posted on the property facing Mountain Avenue. The sign was checked three times and has not been taken down by City Staff. JANUARY 16, 1992 A legal notice was placed in the Triangle Review, listing items on the January 27th Planning and Zoning Board meeting agenda. One of the items on the January 27th agenda was the Housing Authority PUD. The project was pulled off of the agenda prior to the meeting because stormwater plans were incomplete. FEBRUARY 13, 1992 A legal notice was placed in the Triangle Review listing items on the February 24th Planning and Zoning Board meeting agenda. One of the items on the February 24th meeting was the Housing Authority PUD. FEBRUARY 12, 1992 A letter was sent to property owners within 500 feet of the Housing Authority PUD providing notice of the Planning and Zoning Board meeting for February 24, 1992. FEBRUARY 24, 1992 The Planning and Zoning Board tabled the Housing Authority PUD request to the March 23, 1992. ZONING BOARD OF APPEALS Special Meeting June 4, 1974 - 9:15 A.M. Present: Henry Hauser Myron Braden James Beatty William Osborn William Chilton Staff members present: Clyde and Turner. Absent: Arthur March, Jr., City Attorney. Chairman Henry Hauser being absent at beginning of meeting, motion was made by Board member Beatty, seconded by William Chilton, to approve the Chairman- ship of Myron Braden. The motion was unanimous. Appeal No. 530. Section 118-41 (D), reduce front yard set back from 30' to 15' in an RL zone, by John D. McGraw, for the City of Fort Collins Housing Authority, 1705 West Mountain No letters returned, no objections filed. Mr. John McGraw, Executive Director of the Housing Authority, explained the building and its uses, stating he hopes to use it for Human Resources and the Housing Authority offices; that the location is immediately adjacent to the ball diamond and when the parking is vacant, H. R. Phillips, Director of Parks and Recreation, had told they they were welcome to use it for parking. He stated the building would be an Administrative Center for the Housing Authority Management; one portion to be designed for recreation, day care or arts and crafts, kitchen and office complex. Chief Building Inspector, Gordon Clyde, stated there was a problem as to the required off-street parking. The RL zone requirements for off-street parking are weak; they were written for churches and schools and failed to comtemplate uses as are being currently considered. Mr. Clyde asked that the petition be amended to clarify the requirements of this building for off-street parking. Board member Myron Braden stated they had not requested a waiver for parking area requirements; he also asked what they were going to do when it came time to expand? Mr. McGraw responded that the building can be expanded. It was stated by the Board that according to the ordinance, one parking space was required for every 5 seats in places of assembly. Mr. Clyde stated that the 1250 square feet of assembly area would be 83 occupants needing 17 off-street parking spaces; that the Board should deter- mine that there is plenty of off-street parking in the immediate City Park area, and assure that it will continue to be available for use by the Housing Authority. Page 2 Board member Henry Hauser stated there should be a waiver of off-street parking. Board member Beatty made a motion to grant the variance reducing the front 11 yard set back from 30' to 15;, and that the Board waive requirements for off- street parking, contingent upon an agreement with the City Parks and Recreation'; Department for use of off-street parking in that area and that adequate parking. is to be maintained accessible for use by the Housing Authority as long as the building is used for office and meeting purposes, seconded by Myron Braden. The Chairman put the motion rich was unanimously adopted. 1 Mr. Loren Smith, 1217 West Mountain, an adjacent property owner, voiced an objection to this variance after the meeting, by telephone. The Board adjourned the meeting to the next regular meeting date of June 11, 1974. I� I Chairman ii ,I �I i a Acting Secretary C I T Y O F F 0 R T C 0 L L I N S MFMnPAMr)rIM 1ATF : January 4, 1977 TO: The Honorable Mayor and City Council FROM: Robert L. Brunton, City'Manager RE: Consider Certain Agreements with the Fort Collins Housing Authority (Tabled 12/21/76) This item was on the December 21, 1976, Council meeting agenda. Unfortunately, two of the agreements were omitted from the agenda and were received by Council members too late for any substantive review; therefore, this entire matter was tabled until this meeting. The enclosed package includes three separate agreements: (1) the updated Management Contract for the Low -Rent Housing Project; (2) the Management Contract for the Section VIII Housing Program, and (3) a new 'lease agreement for the use of land where the present Housing Authority Administration and Recreation Building is located. Also enclosed are memos from John McGraw on the need for continuing management and adminis- trative services and a memo from Lucia Liley, Assistant City Attorney, summarizing the major points in the three aforementioned contracts. Council should recall that the City is reimbursed for all expenses in connection with this project. Although the staff of the Housing Authority is listed on our City payroll for fringe benefit purposes, costs are reimbursed by the Housing Authority. Recommendation: The Administration recommends that the City Council approve the three aforementioned agreements and authorize the City Manager and City Clerk to sign the agreements on behalf of the City. 21 &I_ty(��,.,C- / 41,'n- tts January 4, 1977 4- Citizen Participation Certificates of Appreciation Mayor Wilkinson read the following names of recipients for certificates of appreciation for retiring members of Boards and Commissions: 1. Cinny Aragon, Coordinating Commission for Senior Citizens 2. Ann Manvel, Library Board 3. Edward Ted Johnson, Parks and Recreation Board. Ordinance Adopted on First Reading Rezoning Foothills Apartments on Shields Street Following is the City Manager's memorandum on this item: "At its December 21, 1976, meeting the Fort Collins City Council tabled Ordinance No. 99. This tabling was at the request of the petitioner. The Foothills Apartments -Shields Street rezoning consists of 2.3 acres located on the west side of South Shields Street between Stuart Street and Spring Creek. The requested rezoning is from R-M, Medium Density Residential District, to B-P, Planned Business District. At its December 6, 1976 meeting the Planning and Zoning Board recommended for approval of this rezoning." Petitioner, Gene Fischer, spoke to the petition for rezoning. The Director of Planning spoke to the Staff and the Planning and Zoning Board's recommendation for approval. Councilman Suinn expressed concern regarding this petition, and the similarity to a previously denied request for rezoning for similar uses. Councilman Bloom made a motion, seconded by Councilman Bowling to adopt Ordinance No. 99, 1976 on first reading. Yeas: Council - members Bloom, Bowling, Russell and Wilkinson. Nays: Council - members Gray, Reeves and Suinn. Consider Certain Agreements with the Fort Collins Housing Authority Following is the City Manager's memorandum and recommendation on this item: 175 "This item was on the December 21, 1.976, Council meeting agenda. Unfortunately, two of the agreements were omitted from the agenda and were received by Council members too late for any substantive review; therefore, this entire matter was tabled until this meeting. The enclosed package includes three separate. agreements: (1) the updated Management Contract for the Low -Rent Housing Project; (2) the,M-anagement Contract for the Section VIII Housing Program, and (3) a new lease agree- ment for the use of land where the present Housing Authority Administration and Recreation Building -is located. Also enclosed are memos from John McCraw on the need for continuing management and administrative services and a memo from Lucia Liley, Assistant City Attorney, summarizing the major points in the three aforementioned contracts. Council should recall that the City is reimbursed for all expenses in connection with this project. Although the staff of the Housing Authority is listed on our City payroll for fringe benefit purposes, costs are reimbursed by the Housing Authority. Recommendation: The Administration recommends that the City Council approve the three aforementioned agreements and authorize the City Manager and City Clerk to sign the agreements on behalf of the City." Also included and made a part hereof is the summary of the contracts set forth by Assistant City Attorney Lucia Liley: "I have reviewed the proposed management contracts and the lease agreement between the Housing Authority and the City and have made some revisions to these. In their final forms, the major provisions of each can be summarized as follows: 1. Management Contract - Low -rent Housing Project The Housing Authority has constructed and owns fifty dwelling units for rent to eligible persons and a facility for the management and recreational aspects of the project. This contract would be effective January, 1977, and provides that: a) City manage the project under the auspices of the Director of Human Resources; b) All management shall be according to policies of the Housing Authority and the Authority shall have access to all records of the City dealing with the project; c) City must annually submit a budget and operational plan for Authority approval; 176 • • d) City may use any office or other non -dwelling facilities for municipal purposes with Authority approval; e) City would collect all rents and other income and supervise the maintenance required by the project; f) City must initiate, sponsor and coordinate speci- fied social service activities needed by the tenants; g) City shall be responsible for it's employees, shall observe principles of non-discrimination and affirmative action and shall pay specified minimum wage; h) Authority shall pay the City the sum of $1368.31 per month for its management services in addition to any other payments specified in the contract; i) The term of the contract is one year with automatic annual renewal and with the ability to terminate the contract on 60 days notice or upon sale of the project by the Authority or upon non-performance by the City. 2. Lease Agreement The lease agreement between the Authority and the City has these major provisions: a) The City will lease to the Authority the piece of property upon which the management and recreational facility of the Housing Authority is located. b) Rent is $1.00 Per year. c) Term is forty years with a ninety day cancellation provision. d) Housing Authority will Provide hazard insurance, pav any taxes on property and be responsible for maintenance and repair. e) If the Housing Authority desires to charge the public for the use of its facilities, it must get Council approval to do so. . f) On expiration of lease, all Housing Authority facili- ties will become sole property of the.City. 177 3. Management Contract - Section 8 Housin This contract is very similar to the first management contract for the low -rent hc}using project. The major differences are as follows: a) The City must enter i of the Section 8 housing an will then be paid to select these contracts. to contracts with the owners housing assistance payments 3 eligible tenants as per b) The City will receive from the Housing Authority the sum of $1,536.22 per month for administrative services rendered in accordance with this contract." Councilmembers inquired into spe ific areas of the contracts and expressed the following conc rns: 1. Complaints regarding the poor maintenance of the 50 units owned by the Housing Authority. 2. The automatic renewal clause in the contract. 3. The need to keep administrative costs down as low as possible. 4. The need to provide for eval*ation of the outcome of the program, specifically the admini trative counseling. 5. The need to meet with the Hosing Authority to discuss the issues raised this evening. Councilwoman Gray made a motion, seconded by Councilman Suinn to adopt the recommendation of the Administration. Yeas: Councilmembers Bloom, Bowling, Gray, Reeves, Russell, Suinn and Wilkinson. Nays: None. Other Business City Attorney March requested Council go back to the agreement with United Bank regarding Stagecoach Subdivision. He inquired if Council would consider accept nce of the agreement and the signing of it if the figure is clanged from $5,000 to $10,000. Councilman Russell made a motion, seconded by Councilman Bowling to approve the agreement with the United Bank and authorize the Mayor and City Clerk to execute the agreement on behalf of the City contingent upon the changing of the $5,000 figure to $10,000. Yeas: Councilmembers Bloom, Bowling, Gray, Reeves, Russell, Suinn and Wilkinson. N ys: None. The Mayor then declared the Cou 178 1 meeting adjourned. N & L J/ LL/ d/ Pages 7 � • 10. #27-82 Schrock Group Home Special Review Request to convert a single-family r idence located at 2425 Merion Court in the Brown Farm Subdivision, to a group home. The property is presently zoned R- Low Density Residential, and group home use requires speci review by the Planning and Zoning Board. Applicant: William SChrock, o Linda Kinyon, Hansen Realty, Inc., First National Tower Bu- ding, Fort Collins, CO. Waido: Gave a staff report reco7/1� nding approval. Ross: Questioned if there wer a desire to change the type of group home to perhaps chiln, or even increasing the number what would happen. Waido: Stated that the r� quest for three elderly persons was the only use this propert�i could be used for. Any change in status for another type of/ group home would have to come back through the Board for publ% hearing. Irene Neary: Area resid�hIt. Stated that she did not object to having adults live in a group home. Questioned if this home was vacated could it/ -be used for juvenile delinquents or drug addicts? Ross: State/that any change in status of the home would have to come to public hearing again and that people within 500' would be notJ'fied. Georg: ved to approve the Schrock Group Home Special Review subject o the condition that additional residents be limited to three adults. Gilfillan: Second. Vote: Motion carried 7-0. 12.�#11-82"� 1715 W. Mountain Avenue Expansion of a Non -Conforming Use Request for approval of an expansion of a non -conforming use for a 1,000 sf addition for equipment and vehicle storage and shop area, located at the Housing Authority Office, 1715 W. Mountain Avenue, zoned R-L, Low Density Residential. Applicant: Fort Collins Housing Authorlity, 1715 W. Mountain Avenue, Fort Collins, CO 80521 Albertson -Clark: Gave a staff report recommending approval. Note: Applicant not present. P ago 8 John Messineo: Area resident. Submitted a petition of people in the area opposed to the project. (Exibit A) Expressed concern about taking more parkland to build a facility for storage. Felt that another site for the facility should be sought. Also expressed concern about future expansion on the present site and the added traffic to the area. Bill Clothier: Area resident. Stated that some residents did not receive notice. Expressed his objection to more parkland being used for development and expressed concerns about higher traffic, increased parking problems, and vandalism. Encouraged develop- ing a storage facility at the Wood Street location. Georg: Pointed out that the area for the proposed expansion was al- ready leased to the Housing Authority so it would be exclued in some forms legally from use as parkland. Dow: Questioned what would happen to the storage facility if the Housing Authority moved or ceased to exist. Waido: Responded that the property was zoned R-L and any use would have to be in conformance with R-L, or would have to come in under the Guidance System. Note: General discussion ensued between Board members and staff concerning the use, possible expansion, traffic and related problems. Georg: Questioned why the City was in the business of leasing parkland, however, stated that the issue was land use and whether or not this non -conforming use should be expanded. Felt that this 3500 sf useage of this land was not high intensity and that the Board does have control over future expansion of non -conforming uses. Crews: Moved to approve the 1715 W. Mountain Avenue Expansion of a Non -Conforming Use. Second. Stoner: Felt that the storage facility would be an asset rather than negative to the whole area. Vote: Motion carried 6-1. (Dow voting no) Dow: Stated the reason for the no vote was that he didn't believe that we should be expanding non -conforming uses in t-is area. Felt that if the facility required more space, they should find a better spot to locate it. r 0 If Is ZBA Minutes May 12, 1988 Page 3 Appeal #1865. Section 29-133 (3), by Fort Collins Housing Authority, 1715 W. Mountain Avenue - Aooroved. ---The variance would reduce the required front yard setback from 20 feet to 15feet for an addition to the Fort Collins Housing Authority building in the RL zone. The addition will line up with the existing wall. ---Petitioner's statement of hardship: The Housing Authority has leased the building as their office since 1977. Since that time staffing levels have increased to the point where additional space is needed. The addition in question is about 110 square feet and will line up with the existing north wall of the building, which already received a variance in 1974. Therefore, the addition will have the same setback as the existing building has. ---Staff comments: If the ZBA approves this variance request, the applicant will then have to proceed to the P&Z Board for review of an enlargement to a building containing a nonconforming use." No notices were returned; no letters were received. Zoning Administrator, Peter Barnes spoke briefly regarding the variance. This building is located directly north of the City Park baseball fields and is currently used as administration offices for the Fort Collins Housing Authority. This building was built as a community recreation building in association with the park and considered an accessory use, it then became the office for the Housing Authority. It is zoned as low density residential which doesn't allow business offices; therefore, it is a nonconforming use. If this variance to reduce the required front yard setback is approved by the ZBA it will then proceed to the P&Z Board for further review. This building was granted a variance in 1974 to reduce the required 30' setback to 15' when the building was originally built. This variance request proposes to add -on to the front and the back of this building and to do some interior remodeling. David Herrera, director of the Housing Authority, appeared to speak in favor of the variance. The proposed addition is needed because of the expansion in staff and because of record keeping requirements and storage. It is proposed to enclose the area under the existing roof line in the front of the building for additional office space. The architecture will match that of which currently exists. The entry is currently on the south side of the building; it was changed to the south side last year for handicap accessibility, so the existing entry sidewalk on the north side of the building will be removed. Boardmember Lancaster questioned the hardship. He questions if out -growing space is a hardship, and wonders if the Board is setting a precedence if the variance is approved. Zoning Administrator, Peter Barnes addressed the Board to clarify the hardship. This addition will have the same setback as the existing building has. This situation comes up in the old part of town usually in residential areas where the houses were built before the 1965 code was adopted. Prior to 1965 different setbacks where required, so if someone wants ZBA Minutes May 12, 1986 Page 4 to add -on to their home and have the addition line up with the existing building, and since the new construction can't comply with the current code requirements because of the existing building setback, it is considered a hardship. All of the Boardmembers agree that enlarging the building will not have a negative impact on the surrounding neighborhood and a motion was made by Boardmember Lancaster to approve the variance for the hardship that this existing building is a nonconforming building. Yeas: Lancaster, Lawton, Thede and Nelson. Nays: !Pone. Appeal #1866. Section 29-493, Collins Housing with conditions. 29-494 (2), 29-293 (2) (f), by The Fort Authority, 114 S. Bryan - Approved ---The variance would reduce the required parking lot landscape setback al g Mountain Avenue from 10 feet to 7 feet behind the walk, redu the required number of parking spaces from 41 to 28, and reduce t amount of required interior parking lot landscaping from 436 sq. ft. to 210 sq. ft. for a multi -family development containing 27, e-bedroom, elderly apartments in the RL zone. ---Petitioner's state nt of hardship: The property has been a trailer park for m years. The petitioner wants to upgrade.the site with 27 elderly artments. The 10 foot landscape strip along Mountain could b obtained by moving the sidewalk north, but there are large existin trees which prevent this without their removal. There will be arge landscape strip on the street side of the walk, so the intent f this ordinance is met. Since the units are one -bedroom, a intended for elderly residents, an allowance of only one car pe nit will be allowed, therefore 41 spaces are not necessary." ---Staff comments: If the ZBA app ves this appeal; the petitioner will then proceed to the P&Z Board r consideration of changing the previous nonconforming trailer ark use to this multi -family project, another nonconforming use in a RL zone. The P&Z Board will make a finding as to whether or no the change in use is more compatible with the uses of surrounding perty than the previous nonconforming use. They will consider th following criteria: 1) the nature and purpose of the existing nonc orming use; 2) the difference in quality and character of the roposed use; 3) the difference in the degree of use of the pro ed use; 4) the reasons for the proposed change; and 5) the ove 11 impact of the proposed use on the surrounding property. There was one notice returned. No letters were recei Zoning Administrator, Peter Barnes spoke regarding th variance stating that this variance deals with a nonconforming use s uation. This is the site of the former Sunset Mobile Home Park. The\1of is for the 4-plex that exists on the site to remain and be c into a 3-plex and to convert the remaining dwelling unit recreation room, and then build four 6-plexes. The site has mature trees in the interior and all but one of them will be • • PLANNING AND ZONING BOARD MINUTES June 27, 1988 The regular meeting of the Planning and Zoning Board was called to order at 6:32 p.m. in Council Chambers of New City Hall, 300 LaPorte Avenue, Fort Collins, Colorado. Board members who had attended the workscssion on June 24, 1988, included Dave Edwards, Sandy Kern, Laurie O'Dell, Don Crews, Jim Klataske, and Alternate Bernie Strom. Board members present at the meeting included Dave Edwards, Sandy Kern, Don Crews, Jim Klataskc and Alternate Bernie Strom. Staff members present included Joe Frank, Ken Waido, Sherry Albertson -Clark, Mike Herzig, Rick Ensdorff, Gail Ault, and Paul Eckman. Acting Chairman Dave Edwards noted that The Westside Neighborhood Plan would be heard on July 11 at 6:30 p.m. in the Council Chambers. Member Crews gave a farewell speech. He indicated that many good projects had been approved in .his seven years on ' the Board. He also noted the many changes that have come to Fort Collins during the 35 years he has lived here, amenities which were due to change - growth. He added that an individual has responsibility to do something for the community and asked people to get involved because it was satisfying. (See Attachment 1). Chairman Edwards asked for a legal determination of a quorum. Paul Eckman responded that four members present at the meeting constituted a quorum, and the number voting determined the item's disposition; i.e., there were five members present constituting a quorum. If 2 members abstained from an item it would take only 2 of the 3 remaining members to approve or deny the item. Assistant Planning Director Joe Frank reviewed the Consent and Discussion Agenda. The Consent Agenda included: Item 1, April 25, 1988 and slay 23, 1988, minutes; Item 2, 20-82D HARBOR WALK ESTATES, PHASE III. PUD -Preliminary and Final; Item 3, 53-85R CENTRE FOR ADVANCED TECHNOL- OGY PUD, 9th FILING (Centre Village, Phase One) - Final; Item 4, 78-81F, CIMARRON PLAZA PUD (Ne�v Giant Video) - Preliminary and Final; Item 5, 13-82AF, OAK RIDGE PUD - Amended_ Master Plan; Item 6, 13-82AG, OAK RIDGE VILLAGE, 6th Filing, PUD - Preliminary R Final; Item 7, 96-81L, RESIDENCES AT HORSETOOTH COiNINIONS PUD - Final; Item 8, 19-85C, CACHE LA POUDRE INDUSTRIAL PARK PUD - Preliminary S Final; Item? 9, 11-82A, HOUSING AUTHORITY Non -Conforming Use Expansion; Item 10, Planning and Zoning .ioard Meeting - June 27, 1988 Page 2 50-88, RIGDEN FARM ANNEXATION. The Discussion Agenda included ITEM 11, 69-84F, FORT RAM VILLAGE PUD, 2nd Filing - Final; ITEM 14, 20-87A, 1990 JUNIOR HIGH SCHOOL; Item 45, 58-86B, RICHARD'S LAKE PUD, PAR- CEL A - Preliminary & Final; and Item 16, 4( 88, STERLING SPECIAL REVIEW - County Referral. Item 56-88, WESTSIDE NEIGHBORHOOD PLAN -Amendment to the Comprehensive Plan was to be continued to a special July 11, 1988, meeting. Item 12, 46-88, PARK SOUTH PUD - Master Plan, and Item 13, 46-88A, PARK SOUTH PUD, Parcel A -Preliminary, as well as Item 17, 7-88A, MIDLAND GREENS PUD - Master Plan Country Referral, were conti- nued to the July 25, 1988, meeting. The Board removed Items 1, 2, 3, 10 and Ken Parker asked that Item 6 be heard. Members Kern and Crews stated they would abstain from item 10, Chairman Edwards from item 2, because of perceived conflicts of interest. Member Kern moved to approve Items 4, 5, 7, 8 and 9 of the Consent Agenda, Member Crews seconded and motion carried 5-0. Member Crews moved to approve .Item 2, Member Strom seconded. Motion carried 4-0. Member Strom moved to approve item 10, Member Klataske seconded, motion carried 3-0. Member Klataske indicated the May 23, 1988, meeting minutes contained an error on Page _ 1, three lines from the bottom and should be changed to read the easterly 10 feet, not 100 feet. Member Crews moved to approve Item 1, Member Strom seconded, motion carried 5-0. Ken Parker, 5213 Honeylocust, asked what the word "unit" in the description referred to. Sherry Albertson -Clark, City Planner, responded that a lot or unit referred to one single .family dwelling. She explained the site layout, stating the lots varied in size from approximately 9000 square feet and larger and McMurray was the eastern boundary. Member Kern interjected the lots ranged in size from 7,800 to 15,600 square feet. Member Strom moved to approve Item 6, Member Crews seconded, motion carried 4-0. CENTRE FOR ADVANCED TECHNOLOGY, 9th Filing - 53-85R Member Crews stated he would be abstaining from the vote on this item as would Member Kern because of a perceived conflicts. Sherry Albertson -Clark gave staff description recommending approval with the condition the sidewalk north of the site be constructed as part of this development. Frank Vaught, representing Colorado State Research Foundation, the applicant, indicated he was informed this afternoon of the sidewalk problem. He was surprised that the extension was a requirement of this proposal since it was a part of the Sundering Townhomes project. He didn't feel the applicant should be responsible to build this four foot sidewalk. ,. S4erry Albertson -Clark stated the sidewalk was on the submitted site plan but a site check revealed it had not been installed. y LW- kl. PROJECT: ,yS/A& 7W6,elTy OD TYPE OF MEETING: NAME ADDRESS WRITT E`1 NOTIFICATION YES/NO OER REV- /! h 6YCf� �-� � yes 6 5 3,2 I i I I