August 3, 1994
James K. Kline
Fort Collins Housing Authority
1715 West Mountain
Fort Collins, CO 80521
Dear Mr. Kline:
Staff has reviewed the Fort Collins Housing Authority PUD
Expansion - Preliminary and have the following comments:
1. The building expansion results in an increase in runoff
that needs to be addressed. If there is no plan to
detain the increased runoff, a variance will be
required. Please coordinate with Glen Schlueter of the
Stormwater Utility at 221-6589.
2.. The expansion will either need to be separated from the
existing structure by one hour fire wall construction
or include fire sprinklers.
3. Please see the attached comments from Building
Inspection.
Please note the following deadlines for the September 26, 1994
Planning and Zoning Board meeting:
Plan revisions are due September 7, 1994.
P,M.T.'s, 10 prints, renderings are due September 19, 1994.
Should you have any questions regarding these comments, please
contact me.
Sincerely,
I 14 L
Robert E. Blanchard, AICP
Chief Planner
cc: Glen Schlueter, Stormwater Utility
k
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 805222-0580 • (303) 221-6750
i
Fort Collins Housing Authority Expansion PUD - Preliminary
---- Building--exceeds-5000--sq'
suppression system is requ
as amended by the City of
.are --feet in --area. An —automatic —fire
_red in accordance with Section 3802, UBC
Fort Collins.
Storage or use of hazardous materials must be in compliance with
the Fire Code and Chapter 9 of the 1991 Uniform Building Code as
adopted by the City of Fort Collins. A list of such materials with
quantities and classifications should be submitted for review at
the time of building permit application.
Exterior walls, openings in exterior walls and projections from
exterior walls (cornices, eave overhangs, etc.) shall be of fire
resistive construction as required by Table 5A, Uniform Building
Code.
The site shall be accessible to persons with disabilities in
accordance with Uniform Building Code Section 3103 and UBC Appendix
Section 3106. Provide designated and marked accessible routes
.between buildings and the public way and accessible parking and the
buildings. Provide parking and signs per Appendix Section 3107.
Construction drawings submitted with application for building
permit require the seal and signature of an architect or engineer
registered in the State of Colorado. A general contractor with a
valid C-01 level City license must be responsible for the
construction of the addition.
Sharon Getz
Building Inspection/221-6760