Loading...
HomeMy WebLinkAboutFORT COLLINS HOUSING AUTHORITY PUD EXPANSION - PRELIMINARY - 28-89C - CORRESPONDENCE - STAFF'S PROJECT COMMENTS (2)COMMA Planning and Environmental &vices Planning Department City of Fort Collins August 3, 1994 James K. Kline Fort Collins Housing Authority 1715 West Mountain Fort Collins, CO 80521 Dear Mr. Kline: Staff has reviewed the Fort Collins Housing Authority PUD Expansion - Preliminary and have the following comments: 1. The building expansion results in an increase in runoff that needs to be addressed. If there is no plan to detain the increased runoff, a variance will be required. Please coordinate with Glen Schlueter of the Stormwater Utility at 221-6589. 2.. The expansion will either need to be separated from the existing structure by one hour fire wall construction or include fire sprinklers. 3. Please see the attached comments from Building Inspection. Please note the following deadlines for the September 26, 1994 Planning and Zoning Board meeting: Plan revisions are due September 7, 1994. P,M.T.'s, 10 prints, renderings are due September 19, 1994. Should you have any questions regarding these comments, please contact me. Sincerely, I 14 L Robert E. Blanchard, AICP Chief Planner cc: Glen Schlueter, Stormwater Utility k 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 805222-0580 • (303) 221-6750 i Fort Collins Housing Authority Expansion PUD - Preliminary ---- Building--exceeds-5000--sq' suppression system is requ as amended by the City of .are --feet in --area. An —automatic —fire _red in accordance with Section 3802, UBC Fort Collins. Storage or use of hazardous materials must be in compliance with the Fire Code and Chapter 9 of the 1991 Uniform Building Code as adopted by the City of Fort Collins. A list of such materials with quantities and classifications should be submitted for review at the time of building permit application. Exterior walls, openings in exterior walls and projections from exterior walls (cornices, eave overhangs, etc.) shall be of fire resistive construction as required by Table 5A, Uniform Building Code. The site shall be accessible to persons with disabilities in accordance with Uniform Building Code Section 3103 and UBC Appendix Section 3106. Provide designated and marked accessible routes .between buildings and the public way and accessible parking and the buildings. Provide parking and signs per Appendix Section 3107. Construction drawings submitted with application for building permit require the seal and signature of an architect or engineer registered in the State of Colorado. A general contractor with a valid C-01 level City license must be responsible for the construction of the addition. Sharon Getz Building Inspection/221-6760