HomeMy WebLinkAboutSYMBIOS LOGIC PUD - FINAL - 5-94F - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS• u August 7, 1996 Steve Olt City Planner City of Fort Collins Planning 281 N. College Ave. Fort Collins, CO. 80522 RE: Symbios Final P.U.D resubmittal Dear Steve, Attached are the required copies for resubmittal of the Symbios Final PUD Plans. Engineering documents are being submitted separately by RBD Engineering. Outlined below I have summarized our response to staff comments. The response numbers correspond with the numbers on your letter dated July 19, 1996. Of course we would be happy to get together with you and engineering to discuss any specific items. City Item Comment Number 1. No response required 2. See RBD's revised plat 3. No response required 4a. Refer to RBD's engineering drawings 4b. Per discussions in the CRT meeting for this project it was stated by Doug Martine that offsets between existing utilities seemed to allow for the inclusion of light and powers additional service line. Tricia Kroetch from RBD will clarify locations of existing utilities along C.R. 9 and coordinate with Doug Martine. design LANDSCAPE ARCHITECTURE URBAN DESIGN PLANNING BHA DESIGN, INC. 2000 VERMONT FT. COLLI INS, CO 80525 TEL 303 223-7577 FAX 303 226-3855 • • design Symbios ODP/PDP Revised drawing submittal Page 2 5. All site lighting and parking lot lighting is shown on the site plan. The building elevations do not indicate any light fixtures at this time. Final fixtures have not yet been determined. We will provide detailed cut sheets when the fixture style is finalized. 6. (1)The additional hydrants have been provided at the entrances on C.R. 9 and Harmony Road. Refer to RBD's revised drawings. (2)The building will be sprinkled to NFC standard 13. (3) The service drive is 30 feet wide providing the unobstructed roadway to the building for aerial operations. 7a. Ten handicap spaces are being provided, and the text has been revised accordingly. 7b. The note on the site plan has been revised to reference the granting of a variance for the 46 foot building height. 8. Refer to RBD's engineering drawings. 9. (1)More landscaping has been added. Have increased the number of Burr Oak. (2) Have increased the landscaping at the southeast corner of the site. The pond will be constructed as part of the first phase, therefore no landscape contingency is being planned. (3) I have included a copy of RBD's site grading plan for your review of the Harmony Road berms. 10. No response required. 11. Refer to RBD's revised drawings. A preliminary design will be included as part of RBD's revised drawings. 12. Refer to RBD's engineering drawings. Power lines will need to be moved. We are currently in the process of negotiation with PSCO. 13. Refer to RBD's design Symbios ODP/PDP Revised drawing submittal Page 3 14. Stormwater comments will be addressed by RBD. 15. The ultimate width of Harmony Road is indicated on the Site Plan and all Engineering Drawings, and all improvements are outside of the 80' setback zone. 16. Refer to sheet 3 of 4 for landscape screening north of the service area. 17. Sheet numbers have been changed. 18. A note has been added to the landscape plan about coordination between consultants. A landscape categories table has been added to the landscape plan as requested. Plant locations have been adjusted to have required separations from utilities. The street trees along CR 9 have not been added. The new street standards do not apply to this project. RBD will be addressing comments from CDOT, Stormwater, Water/Wastewater, Mapping, and Transportation. Please let me know how we can be of further assistance. I look forward to hearing from you soon. Sincerely, bha design inc. by Roger Sherman, ASLA Project Manager