Loading...
HomeMy WebLinkAboutSYMBIOS LOGIC PUD - PRELIMINARY - 5-94E - SUBMITTAL DOCUMENTS - ROUND 1 - GEOTECHNICAL (SOILS) REPORTAPR 22 '96 03:39PM RBD INC FORT COLLINS . h P.2 PRELIMINARY GEOTECHNICAL ENGINEERING REPORT S y/Y!f> / PROPOSED NCR FACILITY HARMONY ROAD FORT COLLINS, COLORADO ELI PROJECT NO, 20395113 JUNE 9, 1993 INTRODUCTION This report contains the results of our preliminary geotechnical engineering exploration for the proposed project to be located on Harmony Road in southeast Fort Collins, Colorado. The site is located In the Southeast 1 /4 of Section 32, Township 7 North, Range 88 West of the 8th Principal Meridian, Larimer County, Colorado. The purpose of these services is to provide information and preliminary geotechnical engineering recommendations relative to: • subsurface soil and bedrock conditions • groundwater conditions • preliminary foundation design and construction • basement construction • floor slab design and construction • earthwork • drainage The conclusions and recommendations contained in this report are based upon the results of field and laboratory testing, engineering analyses, and experience with similar soil and structural conditions. PROPOSED CONSTRUCTION Based on Information provided by Mr. Don Rott, Facilities Manager, the proposed facility is to consist of a story office building with. a future manufacturing facility. Construction will probably consist of steel frame, masonry structures with possible basement construction. Column loads are expected to be relatively high. Final site grading plans were not available prior to preparation of this report. Ground floor level is anticipated at, or slightly above existing site grade. APR 22 '96 03:39PM RBD INC FORT COLLINS P.3 w NCR Corporation ELI Project No. 20935115 Other major site development will include the construction of paved areas adjacent to the proposed building locations. Two levels of traffic are anticipated for pavements to be constructed on the site. These include automobile parking and driveways and truck access. SITE EXPLORATION The scope of the services performed for this project included site reconnaissance by a engineering geologist, a subsurface exploration program, laboratory testing and engineering analyses. Figid Exol Jatlon: A total of 9 test borings were drilled to depths of 25 to 30 feet at the locations shown on the Site Plan, Figure 1. The borings were drilled on a grid to obtain representative coverage of the property for a preliminary evaluation of the site. All borings were advanced with a truck -mounted drilling rig, utilizing 4-inch diameter solid stem auger. in addition to the borings, nine 3'x3'x3' deep concrete blocks were constructed at the site by ABC Concrete of Fort Collins, Colorado. These blocks are to be used for a site vibration study by Collin Gardon Associates of San Mateo, California. The location of borings were positioned in the field by measurements from property lines and existing site features using conventional chaining methods. The accuracy of boring locations should only be assumed to the level Implied by the methods used to determine each. Continuous lithologic logs of each boring were recorded by the geotechnical engineer during the drilling operations. At selected intervals, samples of the subsurface materials were taken by means of pushing thin -walled Shelby tubes, or by driving split -spoon samplers. Penetration resistance measurements were taken with each sampling with the split -spoon by driving the sampler with a 140 pound hammer failing 30 inches. When property Interpreted, the penetration resistance is a useful index to the consistency, relative density or hardness of the materials encountered. In addition, photoionization detector (PID) readings were obtained in Boring 8 to survey for potential petroleum contamination from the underground storage tank at the site. Groundwater conditions were evaluated in each boring at the time of site exploration, and 4 days after drilling. Laboratory Tooting: All samples retrieved during the field exploration were returned to the laboratory for evaluation by the project geotechnical engineer, and were classified in accordance 2 APR 17 '96 03:16PM RBD INC FORT COLLINS P.2 NCR Corporation ELI Project No. 20935115 with the Unified Soil Classification system described in Appendix C. Samples of bedrock were classified in accordance with the general notes for Bedrock Classification. At that time, the field descriptions were confirmed or modified as necessary, final boring logs prepared, and an applicable laboratory testing program was formulated to determine engineering properties of the subsurface materials. Boring Logs for the project are presented in Appendix A. Selected soil and bedrock samples were tested for the following engineering properties: • Water content • Dry density • Unconfined compression • Expansion • Plasticity The significance and purpose of each laboratory test is described in Appendix C. Laboratory test results are presented in Appendix B, and were used for the geotechnical engineering analyses, and the development of foundation and earthwork recommendations. All laboratory test were performed in general accordance with applicable ASTM, local or other accepted standards. SITE CONDITIONS The site consists of irrigated farm land. A farmhouse with four outbuildings occupy the south- central portion of the property. An underground tank is located at the north end of the existing garage. The tank according to the landowner is 42 inches in diameter and has not been used for 18 years. The property is relatively flat and has minor drainage to the east. A relatively large irrigation lateral cuts the property from north to south near the center of the property. The site is bordered on the east by County Road 9, on the north by open farm fields, on the west by a mobile home park and on the south by Harmony Road. SUBSURFACE CONDITIONS Geology: The proposed area is located within the Colorado Piedmont section of the Great Plains physiographic province. The Colorado Piedmont, formed during Late Tertiary and Early quaternary time (approximately sixty-five million (65,000,000) years ago), is a broad, erosional trench which separates the Southern Rock Mountains from the High Plains. Structurally, the site lies along the western flank of the Denver Basin. During the Late Mesozoic and Early Cenozoic Periods (approximately seventy million (70,000,000) years ago), intense tectonic activity occurred, causing the uplifting of the Front Range and the associated downwarping of the Denver Basin to K] APR 17 '96 03:17PM RBD INC FORT COLLINS P.3 . _ - .4 NCR Corporation ELI Project No, 20935115 the east. Relatively flat uplands and broad valleys characterize the present-day topography of the Colorado Piedmont in this region. The site is underlain by the Cretaceous Pierre Formation. The Pierre Shale underlies the site at depths of 17 to 24%2 feet below the surface. The regional dip of the bedrock in this area is slight and in an easterly direction. Seismic activity in the area is anticipated to be low; and from a structural standpoint, the property should be relatively stable. Bedrock is overlain by alluvial and residual clays and sands and gravels of Pleistocene and/or Recent Age. Due to the flat nature of the site, geologic hazards due to mass movement, such as landslides, mudflows, etc., are not anticipated. The property lies within the drainage basin of the Cache La Poudre River and is elevated well above the flood plain of the stream and should not be subjected to flooding. Mapping completed by the Colorado Geological Survey ('Hart, 1872), indicates the site in an area of "Moderate Swell Potential". Potentially expansive materials mapped in this area Include bedrock, weathered bedrock and surficial deposits. Soil and Bedrock Conditions: As presented on Logs of Borings, the subsurface soils are as follows: 1. Sllty Topsoil and Fill Material: The majority of the area tested is overlain by a 8-inch layer of cultivated topsoil. The topsoil has been penetrated by root growth and organic matter. A 1 %-foot layer of fill material was encountered at the surface of Boring 8. The fill is located in the existing farmyard and consists of lean clay with sand and minor amounts of gravel. It is not known whether the fill has been uniformly or properly compacted; therefore, it should not be used as a foundation soil. 2. Lean Clay with Sand! A layer of lean clay and/or lean clay with sand underlies the topsoil and/or fill in all borings and extends to depths of 3 to 734 feet below the surface. The lean clay contains varying amounts of sand, is moist and exhibits generally low to moderate bearing characteristics. When wetted, the lean clay exhibits low swell potential. 3. Sandy Lean Clay, A layer of tan to red sandy lean clay underlies the upper clays and extends to the silty gravel with sand and/or bedrock below. The sandy lean clay is moderately plastic, moist to wet and exhibits low to moderate bearing characteristics. When wetted, the lower clay stratum exhibits low swell potential. 'Hart, Stephen S., 1972, PotentW Swei6ng Sor7 and Rock in the ftnt Range Urban Cenfdor, Colorado, Colorado Qeologleal Survey, Environmental Geology No. 7. 4 APR 17 '96 03:17PM RBD INC FORT COLLINS P.4 NCR Corporation ELI Project No. 2093S 113 4. Silty Grayial yynh Sand: This stratum underlies the clays in Borings 1, 2, 4 through 7 and 9 at depths of 12 to 17%s feet below the surface and extends to the bedrock below. The silty gravel contains varying amounts of sand, minor amounts of cobbles, is well graded, medium dense and exhibits generally moderate bearing characteristics in its wet in situ condition. 5. Sandstone-Siltstone-Clayst,one Bedrock: The bedrock was encountered in all borings at depths of 17 to 24A feet below the surface and extends to greater depths. The upper 2 to 4%s feet of the bedrock is highly weathered; however, the underlying interbedded sandstone-siltstone-claystone is very hard and exhibits very high bearing characteristics. Laboratory Test Resutta; Laboratory test results indicate that the upper clay subsoils have low expansive potential. The slitstone-claystone bedrock exhibits moderate to high expansive potential. _(3roundwater_Conditions: Groundwater was encountered at depths of 10%: to 14A feet in the test borings at the time of field exploration. When checked 4 days after drilling, groundwater was measured at depths of 10 A to 1336 feet, These observations represent only current groundwater conditions, and may not be indicative of other times, or at other locations. Groundwater levels can be expected to fluctuate with varying seasonal and weather conditions and irrigation demands on and/or adjacent to the site. Based upon review of U.S. Geological Survey maps (=Hillier, et al, 1979), regional groundwater is expected to be encountered in unconsolidated alluvial deposits on the site, at depths ranging from 10 to 20 feet below the existing ground surface at the project site. Fluctuations in groundwater levels can best be determined by implementation of a groundwater monitoring plan. Such a plan would include installation of groundwater monitoring wells, and periodic measurement of groundwater levels over a sufficient period of time. CONCLUSIONS AND RECOMMENDATIONS Ge Qral Conaderat90BA: Present site configuration and grades indicate that fill will likely be required to achieve final construction elevation. Final grading plans had not been completed prior 'Hillier, Donald E.,, Schneider. Paul A„ Jr.; and Hutchinson, F. Carter, I SS3, Depth to Water Table H9791 in the you/der-Fort Collins -Greeley Area, Front Range Urban COrridQ& Cularsdo,United States Geological Survcy, Map 1-855-1 5